Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Building a More Diverse, Equitable, and Inclusive Energy Efficiency Workforce

The U.S. Department of Energy (DOE) Building Technologies Office (BTO) envisions a future where the U.S. building industry leads globally in delivering quality efficiency products and services to American consumers and businesses. One barrier to achieving this vision is the difficulty reported by energy efficiency employers in finding qualified candidates (NASEO and EFI 2020). However, this barrier also presents an opportunity for the industry to expand in a way that invites and supports a more diverse, equitable, and inclusive workforce. The scope of energy, climate, and technology challenges the country faces will require the talents of all Americans. The purpose of this study therefore is to identify key factors to creating successful workforce development and inclusion programs that will support the future of the building industry. These factors can be applied to individual companies, training programs, or broader industry efforts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy I-Corps Annual Report 2024

The U.S. Department of Energy Office of Technology Transitions is pleased to provide an update on the Energy I-Corps program. Now in its ninth year, Energy I-Corps delivers workforce development training and funding support to accelerate clean energy technology commercialization. As of November 2024, 243 teams from 13 National Labs have participated in Energy I-Corps over the course of 19 cohorts and the pilot. Post Energy I-Corps, technologies have attracted more than $197 million in post-program funding and executed 85 licenses.

commercialization↗

Double-Shell Tank Primary Bottom Visual Inspection Results - 20025

A pressing need for the Double-Shell Tank Integrity Program at Hanford is of the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, inspections of the tank bottoms have been able to be conducted due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and portions of the annulus space for all of the DSTs has been inspected twice with UT. This region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to this lack of technology, the degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory, to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. Throughout the FY16-FY18 years, vendors from nondestructive examination community were solicited for ideas to meet the tank bottom inspection challenge. Two tank bottom visual inspection solutions were then pursued to meet that challenge. Both tools were successfully deployed at Tank AP-107, and provided valuable visuals, never before obtained from the under tank environment of a double-shell tank. While there are minor opportunities for improvement identified with each system, general outcomes were overwhelmingly positive. Both systems were successfully able to navigate the refractory air slot pattern from the outer edge to the tank center and record video footage. The micro-crawler provided high quality and very stable footage through the air slot pattern, but took longer to deploy into the slots and traverse through them than the alternative system. The push-pull tethered camera was able to navigate all seven of its target air slots in a matter of a few hours, which included deployment, movement between slot entrances, and complete removal of the system from the annulus environment. Through these air slots, new information was gained about the tank bottom and refractory pad condition of tank AP-107, AP-106, AP-108, and AN-102. While some debris was noted in the air slots, including sand, chipped refractory, and construction materials, the refractory was found to be structurally stable and adequately supporting the primary tank bottom through the full diameter of the tank. Primary tank bottom steel exterior was found to be in good condition, free of ongoing or aggressive corrosion conditions. Looking toward the future, robotic access to and visual inspection of refractory air slots and the primary tank bottom steel has now proven viable. Incorporating periodic air slot inspections as a regular practice within the Double-Shell Tank Integrity Program is the next step, allowing trending of any changes in condition. As ultrasonic testing infrastructure was leveraged to complete the initial system deployments described in this report, it makes sense to adopt that same strategy for ongoing periodic examinations and deploy these primary tank bottom inspection tools alongside ultrasonic testing operations. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, seeking to continuously expand understanding of asset integrity and remaining useful life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intersections of Disadvantaged Communities and Renewable Energy Potential: Analyses to Inform Equitable Investment Prioritization

Renewable energy development can bolster local economies through job creation, local tax revenues, and reduced energy costs; however, communities most in need of economic development and employment opportunities often see lower levels of renewable energy deployment. Megan Day and Liz Ross, along with their co-authors and supported by NREL's Sustainable Communities Catalyzer, identified areas where disadvantaged community indicators intersect with high potential for renewable energy deployment. Through a geospatial intersection of energy burden, environmental hazard, and sociodemographic data with the technical generation potential and levelized cost of energy for multiple renewable energy technologies, we identified trends across disadvantaged community indicators and renewable energy deployment potential. Combining metrics across several tools, including the State and Local Planning for Energy (SLOPE) platform, the Low-Income Energy Affordability (LEAD) tool, and the Environmental Justice Screening and Mapping (EJSCREEN) tool, we compiled a dataset that can be used to inform national- and state-level energy-related assistance programs, economic development efforts, and infrastructure programs seeking to prioritize investments in disadvantage communities.

catalyzer↗

Magnets for a Muon Collider—Needs and Plans

We describe the magnet challenges for a Muon Collider, an exciting option considered for the future of particle physics at the energy frontier. Starting from the comprehensive work performed by the US Muon Accelerator Program, we have reviewed the performance specifications dictated by beam physics and the operating conditions to satisfy the accelerator needs. Among the many magnets that make up a muon collider, we have identified four systems that represent well the envelope of challenges: the target and capture solenoid, the final cooling solenoid, the accelerator dipoles and the collider dipoles. These systems provide focus for the development of novel concepts, largely based on HTS for reasons of performance, cost and sustainability. After giving a consolidated overview of the needs for the magnet systems, we describe here the basic technology options considered, and the plan for design and development activities.

43 PARTICLE ACCELERATORS↗

Flexible Stellarator Physics Facility

We propose to build a Flexible Stellarator Physics Facility to explore promising regions of the vast parameter space of disruption-free stellarator solutions for Fusion Pilot Plants (FPPs). The FESAC Long Range Plan recognized the quasi-symmetric stellarator as “the leading US approach to developing disruption-free, low-recirculating-power fusion configurations”. To deliver the ambitious Decadal Vision for Commercial Fusion Energy, we must establish a persuasive stellarator program in parallel to the tokamak one: the stellarator will prove to be a better path to a reactor if theoretical predictions are confirmed and novel optimization techniques and strategies work as desired. Since the release of the Long Range Plan in 2020, stellarators have arguably made the most significant advances of all fusion concepts. Groundbreaking results from W7-X demonstrated low neoclassical transport and the successful operation of the island divertor. Advances in theory and modeling now allow us to minimize turbulent transport, to achieve equilibria with precise quasisymmetry, to reduce neoclassical transport and fast ion loss to levels far below what has been previously achieved, and to minimize the effect of coil manufacturing errors. If realized, these advances will lead to cost-effective stellarator designs with confinement comparable to tokamaks but without the fundamental challenges of disruptions and current drive.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Analysis Program Annual Progress Report (FY2020)

During fiscal year 2020 (FY 2020), the U.S. Department of Energy Vehicle Technologies Office (VTO) funded analysis projects supportive of VTO’s goals to pursue early stage research in vehicle and mobility system technologies to reduce petroleum dependence, increase energy reliability and security, improve transportation affordability, and promote economic growth. VTO analysis projects result in a foundation of data, analytical models, and applied analyses that provide insights into critical transportation energy problems and assist in research investment prioritization and portfolio planning. This document presents a brief overview of VTO analysis efforts and progress for projects funded in FY 2020. Each of the progress reports includes project objectives, approach, and highlights of the technical results that were accomplished during the fiscal year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Community-scale interaction of energy efficiency and demand flexibility in residential buildings

Demand-side management (DSM) strategies, including energy efficiency (EE) and demand flexibility (DF), contribute to cost-effective operation of the electricity grid. From a system-level perspective, such programs reduce costs, enhance reliability, and reduce network issues. Similarly, DSM programs help participating customers reduce utility bills while maintaining occupant comfort. Understanding the relationship between EE and DF is key to realizing the full potential of DSM programs. In this study, we modeled an all-electric residential community based on a 498-home community that is planned for construction in Fort Collins, Colorado in the United States. We used this community model to study the relationship between different EE measures, including building envelope upgrades and smart appliances, and DF enabled by a home energy management system (HEMS) responding to a time-varying tariff. Various EE levels in the homes – code-minimum, zero energy ready, and even higher levels of envelope efficiency – were simulated. DF is enabled by the HEMS, which coordinates behind-the-meter resources, including flexible building loads, PV, and home battery systems, to minimize utility bills while maintaining occupant comfort. When comparing to the code-minimum homes, EE upgrades alone reduce HVAC energy use during peak hours by up to 50% and the HVAC utility bill by up to $312/year. With the addition of HEMS, the average daily peak demand can be reduced by up to 0.58 MW or 1.2 kW/home in the higher envelope efficiency homes. The combination of EE upgrades, HEMS, and home battery systems is expected to save homeowners up to $590/year while increasing community load flexibility. However, HEMS and home battery systems are less effective in increasing the DF in the more efficient homes due to the lower load.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of the beam-induced depolarization of the HJET target at the EIC

The Polarized Atomic Hydrogen Gas Jet Target (HJET) has played a central role in the absolute calibration of proton beam polarization at RHIC and is foreseen as a key component of the hadron polarimetry program at the future Electron–Ion Collider (EIC). The substantially higher beam current, reduced bunch spacing, and shorter bunch length planned for EIC operation motivate a careful reassessment of possible beam-induced depolarization of the jet target. In this paper, the depolarization of ground-state hydrogen atoms caused by the time-dependent magnetic field of the circulating polarized proton beam is quantitatively evaluated. The hydrogen atom is treated as a four-level hyperfine system in a holding magnetic field, and transitions driven by harmonic components of the bunch-induced magnetic field are analyzed using time-dependent quantum-mechanical evolution along atomic trajectories. Numerical tracking of hydrogen atoms through the beam region is performed using nominal EIC beam parameters. It is shown that, for a holding field of 120 mT (as used at RHIC), the resulting depolarization of the jet target at the EIC is negligibly small, ≲ 0.01 %, and well below the level relevant for EIC polarization accuracy requirements. The stability of this result with respect to plausible variations of the EIC proton beam parameters is also evaluated. In addition, possible effects under alternative experimental conditions are also examined.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

2020 LDRD Annual Report

The largest component of Argonne’s program is LDRD Prime, which emphasizes R&D explicitly aligned with Laboratory major initiatives in support of Argonne’s strategic plan. The choice of Focus Areas under the LDRD Prime component reflects the major initiatives; the state of development of relevant technical fields; the potential value of advancing those fields to DOE/NNSA and the nation; and the compatibility of the fields with existing facilities, capabilities, and staff expertise at Argonne.

25 ENERGY STORAGE↗

2022 Site Environmental Report: Idaho National Laboratory

The INL Site’s operations, as well as the ongoing cleanup mission involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for U.S. Department of Energy, Idaho Operations Office (DOE-ID) in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” The purpose of the report is to provide the following: (1) Present the INL Site, mission, and programs, (2) Report compliance status with applicable federal, state, and local regulations, (3) Describe the INL Site environmental programs and activities, (4) Summarize results of environmental monitoring, (5) Discuss potential radiation doses to the public residing in the vicinity of the INL Site, (6) Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park, (7) Describe quality assurance methods used to ensure confidence in monitoring data, and (8) Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

54 ENVIRONMENTAL SCIENCES↗

Disruption avoidance via island suppression: the crucial roles of DIII-D and foundational research

The FESAC long range plan calls out disruption avoidance and mitigation as key remaining technical gaps. In discussing the roles of DIII-D and NSTX-U, the FESAC long range plan says “Additional research on these facilities, in combination with private and international collaborations, continuing support of existing university tokamak programs, and utilization of US expertise in theory and simulation, is needed to find solutions to remaining technical gaps. These gaps include disruption prediction, avoidance, and mitigation …”. Disruptions pose an existential threat to ITER and to FPPs. For a fusion reactor, unplanned shutdowns caused by disruptions will be a significant barrier to connecting such a reactor to the electric grid, even if disruption mitigation is successful. Disruption studies for ITER in recent years have largely focused on disruption mitigation (e.g., pellet injection), motivated by near-term deadlines for finalizing the design of the mitigation hardware. It is recognized, however, that mitigation alone will not suffice. The 2022 U.S. ITER Research Needs Workshop Report states that ”[d]isruptions are considered the largest threat to the ITER Research Program”, and that “[m]itigation should be a last resort”. As we discuss below, there are unresolved foundational issues that play a critical role in avoidance, and DIII-D is an ideal device for generating the data needed to address these issues.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An Analysis of the Effects of Renewable Energy Intermittency on the 2030 Korean Electricity Market

Republic of Korea has unique geographical characteristics similar to those of an island, resulting in an isolated power system. For this reason, securing sufficient operating reserves for the system’s stability and reliability in the face of the intermittency of increasing variable renewable energy (VRE) is paramount, and this will pave the way to achieving the nation’s decarbonization target and carbon neutrality. However, the current reserve-operation method in Republic of Korea does not take into account energy-system conditions, such as the intermittency of the VRE. Therefore, this paper presents an analysis of the impact of changes in reserve-operation methods on the electricity market in the future Republic of Korean power system, with the increased levels of VRE that are currently envisioned. Specifically, three reserve-operation methods, including Korea’s current reserve-power-operation standards, were applied to the two power-system plans announced by the Korean government to analyze the annual generator operation and costs. The analysis results show that securing reserves proportional to the VRE would exert negative effects, such as increased power-generation costs and the curtailment of nuclear and VRE generation. These results can contribute to the estimation of operational reserves needed for high levels of VRE and to the design of new the Korean reserve market, to be introduced in 2025.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems

The restoration of a power system after a blackout starts around units with enhanced technical capabilities, referred to as black start units (BSUs). We examine the planning problem of optimally allocating these units on the grid subject to a budget constraint. We present a mixed integer programming model based on current literature in power systems. Binary variables are associated with the allocation of BSUs and with the energization state of buses, branches, and generators of the power system over a time horizon. We extract a substructure of the feasible region which imposes the requirement that each island that appears during the restoration process must have at least one operational generator. We discuss three equivalent reformulations for this requirement. We introduce a family of exponentially many, polynomially separable, valid inequalities to strengthen the formulation. Under simplifying assumptions, we show that the convex hull of the feasible region is a full-dimensional polyhedron, and prove that some of the constraints we introduced are facet-defining. We perform experiments to examine the difference in strength between the formulations as well as the computational times to solve the problem to near optimality for synthetic instances of the IEEE-39, IEEE-118, Illinois-200, WECC-225, IEEE-300, South Carolina-500, and Texas-2000 power systems. We illustrate a use case of the model. We conclude by suggesting extensions of the current work for future research.

Black Start Allocation↗

2D Dam-Break Analysis of L Lake and PAR Pond Dams Using HEC-RAS

In 1991 a dam-break study was conducted for the high hazard dams located at L Lake and PAR Pond on the Savannah River Site. Two scenarios were considered, over topping from a Probable Maximum Flood (PMF), and a fair weather dam-break for either or both dams. Unfortunately, no inundation map was developed from the study. The purpose of this project was to redo the original dam-break study with improved data and methodology to generate Inundation maps to assist with emergency response and evacuation plans. The Hydrologic Engineering Center's River Analysis System (HEC-RAS) is a free to download river analysis modeling program developed by the US Army Corps of Engineers capable of 1D and 2D hydraulic calculations. Version 5.0.7 (released March 2019) was used for this project. Digital elevation models for the area were retrieved from the US Geological Survey database and converted to a .hdf file within the program. Then the 2D flood area was identified from the contours. Both L Lake and PAR Pond were inputted as 1D storage areas because DEM data does not contain elevation values under water bodies. An elevation vs volume curve was available for both storage areas. Initial elevations were set for both scenarios. Both dams are earthen dams. The Steel Creek dam at L Lake has 6 ft diameter conduit with an upper and lower sluice gate. PAR pond dam consist of a weir and sluice gate connected to an 8 x 8 ft channel. Both outlets were modeled with a pool elevation vs discharge curve. The steel creek dam sluice gates were assumed to be fully open in all cases. As in the previous study, the dams were set to breach when they were overtopped by 1.5 ft during PMF conditions (Figure 1). A fair weather breach was set to be due to a piping failure (Figure 1). In the dual dam break during fair weather conditions the PAR pond dam fails 3 hours after Steel Creek to achieve maximum flooding in the down stream reaches. Simulation was run 3 days for each case and with a 1 minute computational interval. Maximum flooding occurs under PMF conditions with the failure of both dams. PAR pond dam fails first 16 hours and 32 minutes after the start of the simulation with the Steel creek dam failing 6 minutes later. In all cases, the bridges and roads spanning Steel Creek and Lower Three Runs will be inundated and potentially washed away. The Burtons Ferry Highway south of the storage areas will be partially flooded during PMF failure, dual fair weather failure, and PAR pond failure under fair weather conditions.

54 ENVIRONMENTAL SCIENCES↗

The Fast Modular Reactor (FMR) Pre-Application Regulatory Engagement Plan

The Fast Modular Reactor (FMR) is a 50 MWe Gascooled Fast Reactor (GFR) being developed by General Atomics Electromagnetic Systems (GA-EMS) under U.S. Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), specifically Advanced Reactor Concepts 2020 (ARC-20). The 3-year conceptual design of the FMR is being conducted with verifications of key metrics in fuel, safety, and operational performance. GAEMS is pursuing design, licensing, and commercialization of the proposed reactor, with demonstration by 2030 and deployment by the mid-2030s. The U.S. Nuclear Regulatory Commission (NRC) recommends the pre-application regulatory engagement to provide for early identification of regulatory requirements for advanced reactors and to provide all interested parties with a timely, independent assessment of the safety and security characteristics of advanced reactor designs. As such, GAEMS is developing a pre-application regulatory engagement plan (REP) of the FMR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Technical Resilience Navigator: Risk-Informed Decision Making to Support Resilience Planning

The Technical Resilience Navigator (TRN) helps organizations manage the risk to critical functions at a site from disruptions in energy and water services. Developed in partnership by the Pacific Northwest National Laboratory and the National Renewable Energy Laboratory, under direction and funding from the Department of Energy’s Federal Energy Management Program, the TRN helps organizations enhance their resilience to a variety of disruptive events, both natural and human-caused, that could interrupt normal operations for an unknown period of time. This report provides an overview of the TRN’s risk-informed approach to resilience planning and formally describes how it uses a streamlined risk model to identify effective strategies for improving resilience.

99 GENERAL AND MISCELLANEOUS↗

Federal Workplace Charging Program Guide

This report serves as a program guide to support federal agencies in developing their own policy documents for workplace charging. It provides suggested language that agencies can incorporate into their own policies to define requirements for charging privately owned vehicles (POVs) on government-owned or leased property. The Fixing America's Surface Transportation Act authorizes the U.S. General Services Administration (GSA) and other federal agencies to install, operate, and maintain electric vehicle supply equipment (EVSE) for POVs in parking areas used by federal employees and authorized users, and it requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment. This guide offers details for agency facility managers, transportation personnel, employees, and vendors regarding the charging of electric vehicles (EVs) for use by employees and personnel at government-owned and leased buildings. This guide describes the requirements associated with federal agencies providing EV charging in publicly accessible sites. The policy also describes when and how fees may be imposed to cover costs of electricity, as well as EVSE units and installations in various scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗