Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

JSC Safety and Mission Assurance Data Analysis Overview

These slides describe the data analysis methods that are used to determine inputs for probabilistic risk models supporting the Space Shuttle Program. Other applications can follow a similar path probably using different data sources. Statistical approaches are different and not addressed here. Topics included here: 1) Prior Distribution; 2) Likelihood Data; 3) Bayesian Updating; and 4) Uncertainty and Error. Note: This is a high-level discussion and is not intended to be a tutorial.

Roelant, Henk↗

A High Performance Computing Approach to Tree Cover Delineation in 1-m NAIP Imagery Using a Probabilistic Learning Framework

Tree cover delineation is a useful instrument in deriving Above Ground Biomass (AGB) density estimates from Very High Resolution (VHR) airborne imagery data. Numerous algorithms have been designed to address this problem, but most of them do not scale to these datasets, which are of the order of terabytes. In this paper, we present a semi-automated probabilistic framework for the segmentation and classification of 1-m National Agriculture Imagery Program (NAIP) for tree-cover delineation for the whole of Continental United States, using a High Performance Computing Architecture. Classification is performed using a multi-layer Feedforward Backpropagation Neural Network and segmentation is performed using a Statistical Region Merging algorithm. The results from the classification and segmentation algorithms are then consolidated into a structured prediction framework using a discriminative undirected probabilistic graphical model based on Conditional Random Field, which helps in capturing the higher order contextual dependencies between neighboring pixels. Once the final probability maps are generated, the framework is updated and re-trained by relabeling misclassified image patches. This leads to a significant improvement in the true positive rates and reduction in false positive rates. The tree cover maps were generated for the whole state of California, spanning a total of 11,095 NAIP tiles covering a total geographical area of 163,696 sq. miles. The framework produced true positive rates of around 88% for fragmented forests and 74% for urban tree cover areas, with false positive rates lower than 2% for both landscapes. Comparative studies with the National Land Cover Data (NLCD) algorithm and the LiDAR canopy height model (CHM) showed the effectiveness of our framework for generating accurate high-resolution tree-cover maps.

Segments↗

TPSAS-NF1676L-17243-DND

This presentation captures ERA Project's effort in using integrated cost-schedule-risk analysis tool, identifying and capturing explicit relationships between program funds, schedule, and discrete risks. The project team merged a myriad of cost and schedule data for timely, objective, uncertainty analysis of the ITD's budget and schedule. The project team conducted detailed schedule uncertainty analysis showing schedule activities and how their interrelationships were impacted, representing an impressive advance beyond routine Gantt charts. Furthermore, the ERA Project collected discrete risk events including their impacts to costs and/or schedule and interwove these risks into cost and schedule logic networks, providing the foundation to conduct cost and schedule analyses. The team integrated this data into the analysis model, providing probabilistic results that were then used by the ERA Project's senior management for decision-making purposes. The ERA Project management team, through technical and pathfinder expertise in integrating cost, schedule, risk, and technical content, consistently provided risk-informed recommendations to Implementing Centers and ISRP senior management which ultimately ensured the successful ARMD Key Decision Point (KDP) review of the ERA Phase 2 ITD Portfolio and increased the likelihood of achieving technical objectives within cost and schedule constraints.

Gaudy M Bezos-O'Connor↗

Bayesian Assessment of Chlorofluorocarbon (CFC), Hydrochlorofluorocarbon (HCFC) and Halon Banks Suggest Large Reservoirs Still Present in Old Equipment

Halocarbons contained in equipment such as air conditioners, fire extinguishers, and foams continue to be emitted after production has ceased. These ‘banks’ within equipment and applications are thus potential sources of future emissions, and must be carefully accounted for in order to evaluate nascent production versus banked emissions. Here, we build on a probabilistic Bayesian model, previously developed to quantify CFC-11, 12 and 113 banks and their emissions. We extend this model to a suite of the major banked chemicals regulated under the Montreal Protocol (HCFC-22, HCFC-141b, and HCFC-142b, halon-1211, and halon-1301, and CFC-114 and CFC-115) along with CFC-11, 12 and 113 in order to quantify a fuller range of ozone-depleting substance banks by chemical and equipment type. We show that if atmospheric lifetime and prior assumptions are accurate, banks are very likely larger than previous international assessments suggest, and that total production has been very likely higher than reported. We identify that banks of greatest climate-relevance, as determined by global warming potential weighting, are largely concentrated in CFC-11 foams and CFC-12 and HCFC-22 non-hermetic refrigeration. Halons, CFC-11, and 12 banks dominate the banks weighted by ozone depletion potential. Thus, we identify and quantify the uncertainties in substantial banks whose future emissions will contribute to future global warming and delay ozone hole recovery if left unrecovered.

Halocarbons↗

Probabilistic Hydrological Estimation of LandSlides (PHELS): Global Ensemble Landslide Hazard Modelling

In this study we present a model for the global Probabilistic Hydrological Estimation of LandSlides (PHELS). PHELS estimates the daily hazard of hydrologically triggered landslides at a coarse spatial resolution of 36 km, by combining landslide susceptibility (LSS) and (percentiles of) hydrological variable(s). The latter include daily rainfall, a 7-day antecedent rainfall index (ARI7) or root-zone soil moisture content (rzmc) as hydrological predictor variables, or the combination of rainfall and rzmc. The hazard estimates with any of these predictor variables have areas under the receiver operating characteristic curve (AUC) above 0.68. The best performance was found with combined rainfall and rzmc predictors (AUC = 0.79), which resulted in the lowest number of missed alarms (especially during spring) and false alarms. Furthermore, PHELS provides hazard uncertainty estimates by generating ensemble simulations based on repeated sampling of LSS and the hydrological predictor variables. The estimated hazard uncertainty follows the behaviour of the input variable uncertainties, is about 13.6 % of the estimated hazard value on average across the globe and in time and is smallest for very low and very high hazard values.

Anne Felsberg↗

Comparison of Artemis 2 and Artemis 5 Model Outcomes Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. This presentation will seek to compare IMPACT’s computational results upon potential complex space medical conditions (e.g., sprain/strain back or sleep disturbance) using IMPACT’s risk metrics and the associated optimized medical sets/kits between two Artemis missions: single segment Artemis 2 and multi-segmented Artemis 5. OVERVIEW By identifying potential medical conditions in space using input criteria such as crew quantity and composition, certain crew physical characteristics, mission duration and mission activities, IMPACT can produce analyses on the type of medical resources and capabilities needed to produce an optimized medical set/kit to address those medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. IMPACT’s risk metrics include loss of crew life (LOCL) – a measure of crew mortality due to medical conditions in space, return to definitive care (RTDC) – the need to perform crew evacuation, and task time lost (TTL) – a measure of the inability to perform activities due to crew disability. These risk metrics are applied to every medical condition identified by IMPACT’s computation analyses for every segment of the mission. Medical sets/kits are optimized to address these medical conditions but must fit within the stated Artemis Design Reference Mission (DRM) request for mass and volume physical size constraints. ANTICIPATED ANALYSIS AND CONCLUSION Using two Artemis missions, Artemis 2 and Artemis 5, IMPACT will provide the analyses for comparison of medical set/kit contents based upon mass and/or volume requirements and identify the at-risk medical conditions within both missions. This paper serves as an initial exploration of probabilistic risk assessment (PRA) medical risk calculations between two crewed Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

probabilistic risk assessment↗

Update on multipactoring in coaxial waveguides using CST Particle Studio

CST Particle Studio combines electromagnetic field simulation, multi-particle tracking, adequate post-processing and advanced probabilistic emission model, which is the most important new capability in multipactor simulation. The emission model includes in simulation the stochastic properties of emission and adds primary electron elastic and inelastic reflection from the surfaces. The simulation of multipactor in coaxial waveguides have been performed to study the effects of the innovations on the multipactor threshold and the range over which multipactor can occur. The results compared with available previous experiments and simulations as well as the technique of MP simulation with CST PS are presented and discussed.

43 PARTICLE ACCELERATORS↗

Stochastic features of multipactor in coaxial waveguides for travelling and standing waves

CST Particle Studio combines electromagnetic field simulation, multi-particle tracking, adequate post-processing and advanced probabilistic emission model, which is the most important new capability in multipactor simulation. The emission model includes in simulation the stochastic properties of emission and adds primary electron elastic and inelastic reflection from the surfaces. The simulation of multipactor in coaxial waveguides have been performed to study the effects of the innovations on the multipactor threshold and the range over which multipactor can occur. The results compared with available previous experiments and simulations as well as the technique of MP simulation with CST PS are presented and discussed.

43 PARTICLE ACCELERATORS↗

The Treatment of ISI Uncertainty in xLPR

The U.S. Nuclear Regulatory Commission (NRC) in cooperation with the nuclear industry is constructing an improved probabilistic fracture model for 'extremely Low Probability of Rupture' in the piping of a nuclear power plant called xLPR. This paper focuses on the xLPR model's treatment of uncertainty for in-service inspection. In the xLPR model, uncertainty is classified as either aleatory or epistemic, and both types of uncertainty are described with probability distributions. Earlier PFM models included aleatory, but ignored epistemic, uncertainty, or attempted to deal with epistemic uncertainty by use of conservative bounds. Thus, inclusion of both types of uncertainty in xLPR should produce more realistic results than the earlier models. This work shows that by including epistemic uncertainty in the xLPR ISI module, there can be a significant effect on rupture probability; however, this depends upon the specific scenarios being studied. Some simple scenarios are presented to illustrate those where there is no effect and those having a significant effect on the probability of rupture.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Flexible Framework for Building Occupancy Detection Using Spatiotemporal Pattern Networks: Preprint

This paper presents a reliable, scalable, and transferable framework to predict occupancy in a building utilizing diverse, multi-modal information. We propose a new methodology for learning-driven occupancy detection built on the concepts of probabilistic graphical modeling and observable Markov chain modeling. To capture the relationship between multi-sensor data and occupancy, we propose this Occ-STPN framework that is flexible to support both multivariate and univariate formulations. While the multivariate Occ-STPN performs feature-level fusion of multiple predictors and occupancy time-series data, the univariate Occ-STPN involves decision fusion of occupancy predictions using individual predictors based on a mutual information weighted fusion scheme. We also propose a new metric to evaluate the performance of occupancy prediction algorithms. Two popular datasets are used to validate our approach and demonstrate that our framework is scalable in terms of the number of information sources (e.g., sensors) as well as it is possible to transfer trained models from one building to another without significant reduction in performance. Reliability of the algorithm is also tested by injecting noise into the datasets.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Flexible Framework for Building Occupancy Detection Using Spatiotemporal Pattern Networks

This paper presents a reliable, scalable, and transferable framework to predict occupancy in a building utilizing diverse, multi-modal information. We propose a new methodology for learning-driven occupancy detection built on the concepts of probabilistic graphical modeling and observable Markov chain modeling. To capture the relationship between multi-sensor data and occupancy, we propose this Occ-STPN framework that is flexible to support both multivariate and univariate formulations. While the multivariate Occ-STPN performs feature-level fusion of multiple predictors and occupancy time-series data, the univariate Occ-STPN involves decision fusion of occupancy predictions using individual predictors based on a mutual information weighted fusion scheme. We also propose a new metric to evaluate the performance of occupancy prediction algorithms. Two popular datasets are used to validate our approach and demonstrate that our framework is scalable in terms of the number of information sources (e.g., sensors) as well as it is possible to transfer trained models from one building to another without significant reduction in performance. Reliability of the algorithm is also tested by injecting noise into the datasets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber Physical Grid-Interactive Distributed Energy Resources Control for VPP Dispatch and Regulation: Preprint

This paper presents a cyber-physical algorithm for grid interactive DER control to enable two features of Virtual Power Plants (VPPs) dispatch and grid voltage regulation, considering the communication and security impacts. We first formulate the DER dispatch problem as a real-time, iterative, and grid-interactive DER control problem. Thereafter, we consider a probabilistic traffic model to characterize packet delays and loss in a communication network, and study how the delays enter the process of information exchange among the grid measurement units, local DER controllers and the grid control center that coordinately execute this dispatch algorithm. Finally, we propose a cyber-physical grid-interactive DER control algorithm using the previous message strategy. The tracking and regulation capabilities of this proposed algorithm can be made immune to the asynchrony resulting from the communications network traffic. We carry out simulations to show possible numerical instabilities and sensitivities of the tracking and regulation capabilities on the proposed strategy. Our results exhibit that the uncertainties of the underlying communications infrastructure must be considered in the control algorithm for the VPP tracking and regulation capabilities of any DER in a generic Cyber-Physical System (CPS).

co-simulation↗

NE-COST plug-in: Expanding ACCERT's Capabilities for Life-Cycle Cost Modeling

The Algorithm for the Capital Cost Estimation of Reactor Technologies (ACCERT) is a structured methodology and software tool designed to simplify and standardize cost estimation for nuclear reactor technologies [1]. By utilizing a relational database structure and modular cost estimation algorithms, ACCERT delivers a robust, flexible, and scalable framework for evaluating costs across various reactor types and configurations [2]. The recent integration of the NE-COST plugin further expands ACCERT’s scope by introducing detailed life-cycle cost modeling and probabilistic analysis of uncertainties. This addition enables users to evaluate costs across front-end processes such as uranium enrichment and fabrication, as well as back-end activities including waste disposal and geologic storage. Through Monte Carlo statistical cost simulations, the plugin provides probabilistic insights into cost ranges, offering critical decision-making support for stakeholders including reactor developers, policymakers, and researchers.

Zhou, Jia↗