Short-Term Electric Load Forecasting for a Residential Household in Alaska

Accurate short-term load forecasting at a fine scale is essential for demand response programs, peak shaving, and load-shedding strategies [1]. While traditionally, only aggregate short-term consumption data was available, advanced metering infrastructure (AMI) now provides data at the individual consumer level [1]. There is increasing interest in utilizing this data for short-term load forecasting (from an hour to a few days) to optimize grid operations. Electricity consumption in individual households is highly influenced by residents’ personal behaviors [2]. As a result, unlike aggregate loads, electrical power usage in single households often shows significant volatility, making meter-level load forecasting for individual users particularly challenging [3], [4]. Deep learning methods, with their strong ability to model nonlinear data, have become popular for improving the accuracy of household electricity consumption forecasting [4]. Notably, the Long ShortTerm Memory (LSTM) has attracted significant attention [5], [6].

42 ENGINEERING↗

Ultra-large-scale cosmology in next-generation experiments with single tracers

Future surveys of large-scale structure will be able to measure perturbations on the scale of the cosmological horizon, and so could potentially probe a number of novel relativistic effects that are negligibly small on sub-horizon scales. These effects leave distinctive signatures in the power spectra of clustering observables and, if measurable, would open a new window on relativistic cosmology. We quantify the size and detectability of the effects for the most relevant future large-scale structure experiments: spectroscopic and photometric galaxy redshift surveys, intensity mapping surveys of neutral hydrogen, and radio continuum surveys. Our forecasts show that next-generation experiments, reaching out to redshifts z≃4, will not be able to detect previously undetected general-relativistic effects by using individual tracers of the density field, although the contribution of weak lensing magnification on large scales should be clearly detectable. We also perform a rigorous joint forecast for the detection of primordial non-Gaussianity through the excess power it produces in the clustering of biased tracers on large scales, finding that uncertainties of σ(f{sub NL})∼1−2 should be achievable. We study the level of degeneracy of these large-scale effects with several tracer-dependent nuisance parameters, quantifying the minimal priors on the latter that are needed for an optimal measurement of the former. Finally, we discuss the systematic effects that must be mitigated to achieve this level of sensitivity, and some alternative approaches that should help to improve the constraints. The computational tools developed to carry out this study, which requires the full-sky computation of the theoretical angular power spectra for O(100) redshift bins, as well as realistic models of the luminosity function, are publicly available at http://intensitymapping.physics.ox.ac.uk/codes.html.

79 ASTRONOMY AND ASTROPHYSICS↗

Modeling hydro power plants in deregulated electricity markets : integration and application of EMCAS and VALORAGUA.

In this paper, we present details of integrating an agent-based model, Electricity Market Complex Adaptive System (EMCAS) with a hydro-thermal coordination model, VALORAGUA. EMCAS provides a framework for simulating deregulated markets with flexible regulatory structure along with bidding strategies for supply offers and demand bids. VALORAGUA provides longer-term operation plans by optimizing hydro and thermal power plant operation for the entire year. In addition, EMCAS uses the price forecasts and weekly hydro schedules from VALORAGUA to provide intra-week hydro plant optimization for hourly supply offers. The integrated model is then applied to the Iberian electricity market which includes about 111 thermal plants and 38 hydro power plants. We then analyze the impact of hydro plant supply offers on the market prices and ways to minimize the Gencospsila exposure to price risk.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Swinging Door Algorithm as Applied to Photovoltaic Power Ramping Event Detection

Photovoltaic (PV) power generation experiences power ramping events due to cloud interference. Depending on the extent of PV aggregation and local grid features, such power variability can be constructive or destructive to measures of uncertainty regarding renewable power generation; however, it directly influences contingency planning, production costs, and the overall reliable operation of power systems. For enhanced power system flexibility, and to help mitigate the negative impacts of power ramping, it is desirable to analyze events in a probabilistic fashion so degrees of beliefs concerning system states and forecastability are better captured and uncertainty is explicitly quantified. A probabilistic swinging door algorithm is developed and presented in this paper. It is then applied to a solar data set of PV power generation. The probabilistic swinging door algorithm builds on results from the original swinging door algorithm, first used for data compression in trend logging, and it is described by two uncertain parameters: (i) e, the threshold sensitivity to a given ramp, and (ii) s, the residual of the piecewise linear ramps. These two parameters determine the distribution of ramps and capture the uncertainty in PV power generation.

14 SOLAR ENERGY↗

Model-Free Probabilistic Forecasting of Nodal Voltages in Distribution Systems

As the penetration of distributed energy resources (DERs) into distribution systems increases, so does the interest in forecasting relevant system variables to help mitigate the associated challenges. One such challenge is the more frequent occurrence of excessive voltages in distribution systems with higher shares of DERs. Accurate and reliable estimates together with forecasts of system states (i.e., nodal voltages) will therefore play a key role in improving the utilization of these variable and uncertain sources while mitigating potential operational risks. Whilst recent literature has explored machine learning (ML) methods for voltage estimation and their extrapolation for a short-time period into the future, few have taken uncertainty quantification into account, and these methods have not yet been translated into operations. This paper discusses the advantages offered by probabilistic voltage forecasts and proposes a non-parametric Bayesian method suitable for forecasting nodal voltages at short-term time horizons while accounting for uncertainties in load and distributed photovoltaic (PV) generation. We demonstrate the value of the proposed Gaussian process (GP) model for a case study using historical forecasts and observation data.

distribution system↗

It's Not Just About the Megawatts - ARC Industry Forum, The Future of Power Generation

As the world transitions to less carbon intensive energy portfolios, much of the attention understandably centers on generating capacity – replacing megawatts of fossil fuel with megawatts of solar, wind, nuclear, hydroelectric, hydrogen, and more. The actual operation of a reliable grid needs more than just megawatts though: adequate quantities of a portfolio of essential reliability services; flexible and capable power delivery systems; governance to operate in 5-10 minute intervals, forecast hourly, and plan and build on a generational time horizon; and dependable and secure communications. We can choose our fuel mix for climate reasons, but the grid itself and the society that relies upon it impose constraints on those choices that we ignore at our peril.

13 HYDRO ENERGY↗

Modern Radar Techniques for Geophysical Applications: Two Examples

The last decade of the evolution of radar was heavily influenced by the rapid increase in the information processing capabilities. Advances in solid state radio HF devices, digital technology, computing architectures and software offered the designers to develop very efficient radars. In designing modern radars the emphasis goes towards the simplification of the system hardware, reduction of overall power, which is compensated by coding and real time signal processing techniques. Radars are commonly employed in geophysical radio soundings like probing the ionosphere; stratosphere-mesosphere measurement, weather forecast, GPR and radio-glaciology etc. In the laboratorio di Geofisica Ambientale of the Istituto Nazionale di Geofisica e Vulcanologia (INGV), Rome, Italy, we developed two pulse compression radars. The first is a HF radar called AIS-INGV; Advanced Ionospheric Sounder designed both for the purpose of research and for routine service of the HF radio wave propagation forecast. The second is a VHF radar called GLACIORADAR, which will be substituting the high power envelope radar used by the Italian Glaciological group. This will be employed in studying the sub glacial structures of Antarctica, giving information about layering, the bed rock and sub glacial lakes if present. These are low power radars, which heavily rely on advanced hardware and powerful real time signal processing. Additional information is included in the original extended abstract.

Arokiasamy, B. J.↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mountain waves can impact wind power generation

Abstract. Mountains can modify the weather downstream of the terrain. In particular, when stably stratified air ascends a mountain barrier, buoyancy perturbations develop. These perturbations can trigger mountain waves downstream of the mountains that can reach deep into the atmospheric boundary layer where wind turbines operate. Several such cases of mountain waves occurred during the Second Wind Forecast Improvement Project (WFIP2) in the Columbia River basin in the lee of the Cascade Range bounding the states of Washington and Oregon in the Pacific Northwest of the United States. Signals from the mountain waves appear in boundary layer sodar and lidar observations as well as in nacelle wind speeds and power observations from wind plants. Weather Research and Forecasting (WRF) model simulations also produce mountain waves and are compared to satellite, lidar, and sodar observations. Simulated mountain wave wavelengths and wave propagation speeds (group velocities) are analyzed using the fast Fourier transform. We found that not all mountain waves exhibit the same speed and conclude that the speed of propagation, magnitudes of wind speeds, or wavelengths are important parameters for forecasters to recognize the risk for mountain waves and associated large drops or surges in power. When analyzing wind farm power output and nacelle wind speeds, we found that even small oscillations in wind speed caused by mountain waves can induce oscillations between full-rated power of a wind farm and half of the power output, depending on the position of the mountain wave's crests and troughs. For the wind plant analyzed in this paper, mountain-wave-induced fluctuations translate to approximately 11 % of the total wind farm output being influenced by mountain waves. Oscillations in measured wind speeds agree well with WRF simulations in timing and magnitude. We conclude that mountain waves can impact wind turbine and wind farm power output and, therefore, should be considered in complex terrain when designing, building, and forecasting for wind farms.

17 WIND ENERGY↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement: Preprint

Distribution system resilience enhancement is an important topic to ensure customers have access to the power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecasts. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Solar Irradiance Ramp Forecasting Based on All-Sky Imagers

Solar forecasting constitutes a critical tool for operating, producing and storing generated power from solar farms. In the framework of the International Energy Agency’s Photovoltaic Power Systems Program Task 16, the solar irradiance nowcast algorithms, based on five all-sky imagers (ASIs), are used to investigate the feasibility of ASIs to foresee ramp events. ASIs 1–2 and ASIs 3–5 can capture the true ramp events by 26.0–51.0% and 49.0–92.0% of the cases, respectively. ASIs 1–2 provided the lowest (<10.0%) falsely documented ramp events while ASIs 3–5 recorded false ramp events up to 85.0%. On the other hand, ASIs 3–5 revealed the lowest falsely documented no ramp events (8.0–51.0%). ASIs 1–2 are developed to provide spatial solar irradiance forecasts and have been delimited only to a small area for the purposes of this benchmark, which penalizes these approaches. These findings show that ASI-based nowcasts could be considered as a valuable tool for predicting solar irradiance ramp events for a variety of solar energy technologies. The combination of physical and deep learning-based methods is identified as a potential approach to further improve the ramp event forecasts.

14 SOLAR ENERGY↗

Eastern Renewable Generation Integration Study Solar Dataset (Presentation)

The National Renewable Energy Laboratory produced solar power production data for the Eastern Renewable Generation Integration Study (ERGIS) including "real time" 5-minute interval data, "four hour ahead forecast" 60-minute interval data, and "day-ahead forecast" 60-minute interval data for the year 2006. This presentation provides a brief overview of the three solar power datasets.

14 SOLAR ENERGY↗

Pozzolanic reactivity of natural pozzolans, ground glasses and coal bottom ashes and implication of their incorporation on the chloride permeability of concrete

It is well understood that the partial replacement of portland cement with pozzolans in sufficient proportions results in improved long-term performance of concrete. However, dwindling availability of the most widely used pozzolan in the construction industry, fly ash, is forecast due to the termination of coal-fired electricity power stations around the world, necessitating the exploration of alternative pozzolans. Experimental investigations are conducted to study the performance of traditional pozzolans such as fly ash, silica fume and natural pozzolans (metakaolin, pumice, perlite and lassenite) together with novel pozzolans, including ground glasses (high-alkali and low-alkali), and ground bottom ash. Twenty-one concrete mixtures are examined for compressive strength, electrical conductivity, electrical resistivity, chloride permeability, and chloride migration coefficient. The reactivity of pozzolans studied is also determined in terms of compressive strength in lime-pozzolan mortar using a modified lime-reactivity test method. Many of the materials tested demonstrate the potential to be used in place of fly ash. However, a wide variation in the performance of these materials is evident which highlights the need for a reliable test to determine the level of reactivity of a pozzolan. The results indicate that the 7-day strength in the modified lime-reactivity test provides a good indication of the pozzolanic reactivity of the material and of how the material can be expected to contribute to the strength and permeability of concrete. The use of electrical resistivity as an indicator of the performance of pozzolans in terms of strength development and chloride penetration resistance when used to partially replace portland cement in concrete is also discussed.

36 MATERIALS SCIENCE↗

Statistical analysis of the performance and simulation of a two-axis tracking PV system

The energy produced by a photovoltaic system over a given period can be estimated from the incident radiation at the site where the Grid Connected PV System (GCPVS) is located, assuming knowledge of certain basic features of the system under study. Due to the inherently stochastic nature of solar radiation, the question ''How much energy will a GCPVS produce at this location over the next few years?'' involves an exercise of prediction inevitably subjected to a degree of uncertainty. Moreover, during the life cycle of the GCPVS, another question arises: ''Is the system working correctly?''. This paper proposes and examines several methods to cope with these questions. The daily performance of a PV system is simulated. This simulation and the interannual variability of both radiation and productivity are statistically analyzed. From the results several regression adjustments are obtained. This analysis is shown to be useful both for productivity prediction and performance checking exercises. Finally, a statistical analysis of the performance of a GCPVS is carried out as a detection method of malfunctioning parts of the system. (author)

14 SOLAR ENERGY↗

Calif. ISO gears up for growing renewables portfolio

Operating the grid is going to become more of a challenge as wind and solar generation -- the biggest two contributors with the most hourly and daily variations -- grow over time. Forecasting exactly how much capacity will be available a mere one hour ahead still remains difficult. More renewable generation is not good business for conventional peaking and load-following thermal generation, mostly burning natural gas. Their revenues, depending on the specific scenario considered, may drop by 20 to 40 percent. Something has to be done to sustain these critical players even as their output is not required as much as in the past.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data-Driven Day-Ahead PV Estimation Using Hybrid Deep Learning

Ongoing smart grid activities and associated automation resulted in rich set of data. Here, these data can be utilized for monitoring and estimation of real time photovoltaic (PV) generation. Inherent variability in PV and related impact on power systems is a challenging problem. Improving the accuracy of PV generation estimation is beneficial for both the PV owners and the grid operators. Recently, deep learning algorithms possible by the availability of data have shown its advantages for time series estimation; however, its application on PV generation estimation is still in the early stage. In this paper, a hybrid estimation model with a combination of long-short-term-memory network (LSTM) and persistence model (PM) is developed to provide day-ahead PV estimation at 15-minute time interval with high accuracy and robustness. Simulation results show the superior performance of the proposed method over existing methods for most of the test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Penetration of Photovoltaic Generation Study

Arizona Public Service Company (APS) expects that by 2027, renewable energy will account for 6,590 GWh in energy consumption by its customers. While much of this future energy will come from large centrally-located power plants, distributed renewable energy, sited at the point of end-use will also play an important role in meeting the needs of APS customers and is expected to provide 1,734 GWh.

14 SOLAR ENERGY↗

Temperature-based Instanton Analysis: Identifying Vulnerability in Transmission Networks

A time-coupled instanton method for characterizing transmission network vulnerability to wind generation fluctuation is presented. To extend prior instanton work to multiple-time-step analysis, line constraints are specified in terms of temperature rather than current. An optimization formulation is developed to express the minimum wind forecast deviation such that at least one line is driven to its thermal limit. Results are shown for an IEEE RTS-96 system with several wind-farms.

24 POWER TRANSMISSION AND DISTRIBUTION↗