Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

The Technical Work Plan Tracking Tool

The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

Chullen, Cinda↗

Initial Test Results for NASA Goddard’s Low-Cost Optical Terminal Adaptive Optics System

This presentation presents the testing approach and initial laboratory test results of the Adaptive Optics (AO) Subassembly (AOS) for the Low-Cost Optical Terminal (LCOT), a low-cost and flexible optical communications ground terminal. Leveraging commercial components and subassemblies wherever possible, LCOT is being developed by the NASA Goddard Space Flight Center (GSFC) Advanced Communications Capabilities for Exploration and Science Systems (ACCESS) project. An economical ground terminal allows NASA to create a global optical terminal network and enables the expansion of direct-to-Earth (DTE) optical communications. Located at the Goddard Geophysical and Astronomical Observatory (GGAO), LCOT is in the development phase and will receive first light during initial testing beginning in 2023. This new optical terminal includes a 700 mm Ritchey-Chretien commercial telescope, able to track Low Earth Orbit (LEO) spacecraft, receive instruments specified from 1500 - 1600 nm, and an uplink transmit optical system. Demodulation of optical coherent modulation formats requires downlink signal coupling into single-mode fiber. Due to atmospheric turbulence, signals experience wavefront distortions creating speckle patterns larger than the fiber core and high jitter requiring precise beam steering. AO is necessary to correct atmospheric turbulence effects and allow efficient coupling of received signals. In 2020, GSFC contracted with General Atomics to provide the LCOT AO system. This system has been delivered to GSFC in September 2021 and has been tested in laboratory to evaluate performance. This paper describes the laboratory testing approach, turbulence phase plate design, test results, and the AO field testing plan when installed on the LCOT telescope.

Adaptive Optics↗

Lunar base thermal management/power system analysis and design

A compilation of several lunar surface thermal management and power system studies completed under contract and IR&D is presented. The work includes analysis and preliminary design of all major components of an integrated thermal management system, including loads determination, active internal acquisition and transport equipment, external transport systems (active and passive), passive insulation, solar shielding, and a range of lunar surface radiator concepts. Several computer codes were utilized in support of this study, including RADSIM to calculate radiation exchange factors and view factors, RADIATOR (developed in-house) for heat rejection system sizing and performance analysis over a lunar day, SURPWER for power system sizing, and CRYSTORE for cryogenic system performance predictions. Although much of the work was performed in support of lunar rover studies, any or all of the results can be applied to a range of surface applications. Output data include thermal loads summaries, subsystem performance data, mass, and volume estimates (where applicable), integrated and worst-case lunar day radiator size/mass and effective sink temperatures for several concepts (shielded and unshielded), and external transport system performance estimates for both single and two-phase (heat pumped) transport loops. Several advanced radiator concepts are presented, along with brief assessments of possible system benefits and potential drawbacks. System point designs are presented for several cases, executed in support of the contract and IR&D studies, although the parametric nature of the analysis is stressed to illustrate applicability of the analysis procedure to a wide variety of lunar surface systems. The reference configuration(s) derived from the various studies will be presented along with supporting criteria. A preliminary design will also be presented for the reference basing scenario, including qualitative data regarding TPS concerns and issues.

Mcghee, Jerry R.↗

Human torque velocity adaptations to sprint, endurance, or combined modes of training

We had groups of athletes perform sprint and endurance run training independently or concurrently for 8 weeks to examine the voluntary in vivo mechanical responses to each type of training. Pre- and posttraining angle-specific peak torque during knee extension and flexion were determined at 0, 0.84, 1.65, 2.51, 3.35, 4.19, and 5.03 radian.sec-1 and normalized for lean body mass. Knee extension torque in the sprint-trained group increased across all test velocities, the endurance-trained group increased at 2.51, 3.34, 4.19, and 5.03 radian.sec-1, and the group performing the combined training showed no change at any velocity. Knee flexion torque of the sprint and combined groups decreased at 0.84, 1.65, and 2.51 radian.sec-1. Knee flexion torque in the sprint-trained group also decreased at 0 radian.sec-1 and in the combined group at 3.34 radian.sec-1. Knee flexion torque in the endurance-trained group showed no change at any velocity of contraction. Mean knee flexion:extension ratios across the test velocities significantly decreased in the sprint-trained group. Knee extension endurance during 30 seconds of maximal contractions significantly increased in all groups. Only the sprint-trained group showed a significant increase in endurance of the knee flexors. These data suggest that changes in the voluntary in vivo mechanical characteristics of knee extensor and flexor skeletal muscles are specific to the type of run training performed.

NASA Discipline Musculoskeletal↗

Stirling Research Laboratory Providing Independent Performance Verification of Convertors for a Stirling Radioisotope Generator

The Department of Energy (DOE), Germantown, Maryland, Stirling Technology Company (STC), Kennewick, Washington, and NASA Glenn Research Center are developing a free-piston Stirling convertor for a high-efficiency Stirling Radioisotope Generator for NASA Space Science missions. This generator is being developed for multimission use, including providing electric power for unmanned Mars rovers and for deep space missions. STC is developing the 55-W Technology Demonstration Convertor (TDC) under contract to DOE. Glenn is conducting an in-house technology project to assist in developing the convertor for readiness for space qualification and mission implementation. As part of this effort, a Stirling Research Laboratory was established to test the TDC's and related technologies. A key task is providing an independent verification and validation of the TDC performance. Four TDC's are now being tested at Glenn. Acceptance testing has been completed for all convertors, and in general, performance agreed well with that achieved by STC prior to the delivery of the convertors. Performance mapping has also been completed on two of the convertors over a range of hot-end temperatures (450 to 650 C), cold-end temperatures (80 to 120 C), and piston amplitudes (5.2 to 6.2 mm). These test data are available online at http://www.grc.nasa.gov/WWW/tmsb/. The TDC's can be tested in either a horizontal orientation with dual-opposed convertors or in a vertical orientation with a single convertor. Synchronized dual-opposed pairs are used for dynamically balanced operation that results in very low levels of vibration. The Stirling Research Laboratory also supports launch environment testing of the TDC's in Glenn's Structural Dynamics Laboratory and electromagnetic interference and electromagnetic compatibility characterization and reduction efforts. In addition, the TDC's will be used for long-term endurance testing, and preparations are underway for unattended operation.

Thieme, Lanny G.↗

Investigations of detail design issues for the high speed acoustic wind tunnel using a 60th scale model tunnel. Part 2: Tests with the closed circuit

This report summarizes the tests on the 1:60 scale model of the High Speed Acoustic Wind Tunnel (HSAWT) performed during the period June - August 1991. Throughout the testing the tunnel was operated in the 'closed circuit mode,' that is when the airflow was set up by an axial flow fan, which was located inside the tunnel circuit and was directly driven by a motor. The tests were first performed with the closed test section and were subsequently repeated with the open test section, the latter operating with the nozzle-diffuser at its optimum setting. On this subject, reference is made to the report (1) issued January 1991, under contract 17-GFY900125, which summarizes the result obtained with the tunnel operating in the 'open circuit mode.' The tests confirmed the viability of the tunnel design, and the flow distributions in most of the tunnel components were considered acceptable. There were found, however, some locations where the flow distribution requires improvement. This applies to the flow upstream of the fan where the flow was found skewed, thus affecting the flow downstream. As a result of this, the flow appeared separated at the end of the large diffuser at the outer side. All tests were performed at NASA LaRC.

Barna, P. Stephen↗

Qualification plan for the ultraviolet spectrometer experiment (S-169), revision A

The qualification methods used to verify that the UVS hardware meets the technical requirements of the contract are defined. Included in this plan are test location, the qualification UVS to be tested, test objectives, and all tests required to verify that the UVS meets all performance and environmental requirements of the CEI specification. Additionally, environmental test conditions, testing time or cycles, allowable maintenance, logging requirements, manner of analysis, and utilization of test results, disposition of test specimens, failure criteria, retest requirements, facilities and support requirements, and the time phasing of the tests are presented.

Eckard, L. D., Jr.↗

Space shuttle orbit maneuvering engine reusable thrust chamber. Task 10: Data dump comparison of 8- and 10- inch diameter thrust chambers

An analytical and design study was conducted to compare the high and low contraction ratio thrust chambers for regenratively cooled orbit maneuvering engines for the space shuttle was conducted. The design concepts were evaluated on the basis of weight, pressure drop, and performance. Only the basic thrust chamber assembly was considered. The assembly consists of the injector, the regeneratively cooled thrust chamber, and the radiation cooled nozzle. A two dimensional thermal analysis of the channel section is provided.

Pauckert, R. P.↗

Overview of escalator applications in rail transit

The difference in operating environment and in construction between escalators in transit and nontransit use, the impact of recent escalator innovations, and areas which could benefit from urban mass transportation administration sponsored research and development are determined. Several factors causing a more severe transit escalator operating environment are identified. There are no significant design differences between transit and nontransit escalators. Recent innovations that have affected performance and cost include outdoor escalators, extra flat steps at both landings, and modular escalators. Data were collected by interviews at transit agencies. Long term, unscheduled, escalator maintenance records were available for analysis from one property. A description of escalator operating principles is provided. Transit represents less than 5% of the U.S. escalator market. Transit agencies have limited leverage on escalator industry practices. A substantial impact on transit escalator cost and performance can be achieved by research identifying when and how to apply and specify several of the more recent innovations. Purchase of escalators under long term (25 year) maintenance contracts is one method that has been used to promote escalators manufactured for minimum life cycle cost.

Deshpande, G.↗

PREWATE: An interactive preprocessing computer code to the Weight Analysis of Turbine Engines (WATE) computer code

The Weight Analysis of Turbine Engines (WATE) computer code was developed by Boeing under contract to NASA Lewis. It was designed to function as an adjunct to the Navy/NASA Engine Program (NNEP). NNEP calculates the design and off-design thrust and sfc performance of User defined engine cycles. The thermodynamic parameters throughout the engine as generated by NNEP are then combined with input parameters defining the component characteristics in WATE to calculate the bare engine weight of this User defined engine. Preprocessor programs for NNEP were previously developed to simplify the task of creating input datasets. This report describes a similar preprocessor for the WATE code.

Fishbach, L. H.↗

Excess science accommodation capabilities and excess performance capabilities assessment for Mars Geoscience and Climatology Orbiter: Extended study

The excess science accommodation and excess performance capabilities of a candidate spacecraft bus for the Mars Geoscience and Climatology Orbiter MGCO mission are assessed. The appendices are included to support the conclusions obtained during this contract extension. The appendices address the mission analysis, the attitude determination and control, the propulsion subsystem, and the spacecraft configuration.

Clark, K.↗

Component-specific modeling

The overall objective of this program is to develop and verify a series of interdisciplinary modeling and analysis techniques which have been specialized to address three specific hot section components. These techniques will incorporate data as well as theoretical methods from many diverse areas, including cycle and performance analysis, heat transfer analysis, linear and nonlinear stress analysis, and mission analysis. Building on the proven techniques already available in these fields, the new methods developed through this contract will be integrated to provide an accurate, efficient, and unified approach to analyzing combustor burner liners, hollow air cooled turbine blades, and air cooled turbine vanes. For these components, the methods developed will predict temperature, deformation, stress, and strain histories throughout a complete flight mission.

Roberts, M. L.↗

Progress in MMIC technology for satellite communications

NASA's Lewis Research Center is actively involved in the development of monolithic microwave and millimeter-wave integrated circuits (MMICs). The approach of the program is to support basic research under grant or in-house, while MMIC development is done under contract, thereby facilitating the transfer of technology to users. Preliminary thrusts of the program have been the extension of technology to higher frequencies (60 GHz), degrees of complexity, and performance (power, efficiency, noise figure) by utilizing novel circuit designs, processes, and materials. A review of the progress made so far is presented.

Haugland, Edward J.↗

Testing of the Advanced Stirling Radioisotope Generator Engineering Unit at NASA Glenn Research Center

The Advanced Stirling Radioisotope Generator (ASRG) is a high-efficiency generator being developed for potential use on a Discovery 12 space mission. Lockheed Martin designed and fabricated the ASRG Engineering Unit (EU) under contract to the Department of Energy. This unit was delivered to NASA Glenn Research Center in 2008 and has been undergoing extended operation testing to generate long-term performance data for an integrated system. It has also been used for tests to characterize generator operation while varying control parameters and system inputs, both when controlled with an alternating current (AC) bus and with a digital controller. The ASRG EU currently has over 27,000 hours of operation. This paper summarizes all of the tests that have been conducted on the ASRG EU over the past 3 years and provides an overview of the test results and what was learned.

Lewandowski, Edward J.↗

Liquid Oxygen/Liquid Methane Component Technology Development at MSFC

The National Aeronautics & Space Administration (NASA) has identified Liquid Oxygen (LOX)/Liquid Methane (LCH4) as a potential propellant combination for future space vehicles based upon exploration studies. The technology is estimated to have higher performance and lower overall systems mass compared to existing hypergolic propulsion systems. Besides existing in-house risk reduction activities, NASA has solicited from industry their participation on component technologies based on the potential application to the lunar ascent main engine (AME). Contracted and NASA efforts have ranged from valve technologies to engine system testbeds. The application for the AME is anticipated to be an expendable, pressure-fed engine for ascent from the moon at completion of its lunar stay. Additionally, the hardware is expected to provide an abort capability prior to landing, in the event that descent systems malfunction. For the past 4 years, MSFC has been working with the Glenn Research Center and the Johnson Space Center on methane technology development. This paper will focus on efforts specific to MSFC in pursuing ignition, injector performance, chamber material assessments and cryogenic valve technologies. Ignition studies have examined characteristics for torch, spark and microwave systems. Injector testing has yielded insight into combustion performance for shear, swirl and impinging type injectors. The majority of chamber testing has been conducted with ablative and radiatively cooled chambers with planned activities for regenerative and transpiration cooled chambers. Lastly, an effort is underway to examine the long duration exposure issues of cryogenic valve internal components. The paper will summarize the status of these efforts.

Robinson, Joel W.↗

Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period Phase 2

Lockheed Martin Aeronautics Company (LM), working in conjunction with General Electric Global Research (GE GR) and Stanford University, executed a 19 month program responsive to the NASA sponsored "N+2 Supersonic Validation: Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period" contract. The key technical objective of this effort was to validate integrated airframe and propulsion technologies and design methodologies necessary to realize a supersonic vehicle capable of meeting the N+2 environmental and performance goals. The N+2 program is aligned with NASA's Supersonic Project and is focused on providing system level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight. The N+2 environmental and performance goals are outlined in the technical paper, AIAA-2014-2138 (Ref. 1) along with the validated N+2 Phase 2 results. Our Phase 2 efforts built upon our Phase 1 studies (Ref. 2) and successfully demonstrated the ability to design and test realistic configurations capable of shaped sonic booms over the width of the sonic boom carpet. Developing a shaped boom configuration capable of meeting the N+2 shaped boom targets is a key goal for the N+2 program. During the LM Phase 1 effort, LM successfully designed and tested a shaped boom trijet configuration (1021) capable of achieving 85 PLdB under track (forward and aft shock) and up to 28 deg off-track at Mach 1.6. In Phase 2 we developed a refined configuration (1044-2) that extended the under 85 PLdB sonic boom level over the entire carpet of 52 deg off-track at a cruise Mach number of 1.7. Further, the loudness level of the configuration throughout operational conditions calculates to an average of 79 PLdB. These calculations rely on propagation employing Burger's (sBOOM) rounding methodology, and there are indications that the configuration average loudness would actually be 75 PLdB. We also added significant fidelity to the design of the configuration in this phase by performing a low speed wind tunnel test at our LTWT facility in Palmdale, by more complete modelling of propulsion effects in our sonic boom analysis, and by refining our configuration packaging and performance assessments. Working with General Electric, LM performed an assessment of the impact of inlet and nozzle effects on the sonic boom signature of the LM N+2 configurations. Our results indicate that inlet/exhaust streamtube boundary conditions are adequate for conceptual design studies, but realistic propulsion modeling at similar stream-tube conditions does have a small but measurable impact on the sonic boom signature. Previous supersonic transport studies have identified aeroelastic effects as one of the major challenges associated with the long, slender vehicles particularly common with shaped boom aircraft (Ref. 3). Under the Phase 2 effort, we have developed a detailed structural analysis model to evaluate the impact of flexibility and structural considerations on the feasibility of future quiet supersonic transports. We looked in particular at dynamic structural modes and flutter as a failure that must be avoided. We found that for our N+2 design in particular, adequate flutter margin existed. Our flutter margin is large enough to cover uncertainties like large increases in engine weight and the margin is relatively easy to increase with additional stiffening mass. The lack of major aeroelastic problems probably derives somewhat from an early design bias. While shaped boom aircraft require long length, they are not required to be thin. We intentionally developed our structural depths to avoid major flexibility problems. So at the end of Phase 2, we have validated that aeroelastic problems are not necessarily endemic to shaped boom designs. Experimental validation of sonic boom design and analysis techniques was the primary objective of the N+2 Supersonic Validations contract; and in this Phase, LM participated in four high speed wind tunnel tests. The first so-called Parametric Test in the Ames 9x7 tunnel did an exhaustive look at variation effects of the parameters: humidity, total pressure, sample time, spatial averaging distance and number of measurement locations, and more. From the results we learned to obtain data faster and more accurately, and made test condition tolerances easy to meet (eliminating earlier 60 percent wasted time when condition tolerances could not be held). The next two tests used different tunnels. The Ames 11 ft tunnel was used to test lower Mach numbers of 1.2 and 1.4. There were several difficulties using this tunnel for the first time for sonic boom including having to shift the measurement Mach numbers to 1.15 and 1.3 to avoid flow problems. It is believed that the 11 ft could be used successfully to measure sonic boom but there are likely to be a number of test condition restrictions. The Glenn 8x6 ft tunnel was used next and the tunnel has a number of desirable features for sonic boom measurement. While the Ames 9x7 can only test Mach 1.55 to 2.55 and the 11 ft can only test Mach 1.3 and lower, the Glenn 8x6 can test continuously from Mach 0.3 to 2.0. Unfortunately test measurement accuracy was compromised by a reference pressure drift. Post-test analysis revealed that the drift occurred when Mach number drifted slightly. Test measurements indicated that if Mach number drift is eliminated, results from the 8x6 would be more accurate, especially at longer distances, than results from the 9x7. The fourth test in the 9x7, called LM4, used everything we learned to comprehensively and accurately measure our new 1044-02 configuration with a full-carpet shaped signature design. Productivity was 8 times greater than our Phase 1 LM3 test. Measurement accuracy and repeatability was excellent out to 42 in. However, measurements at greater distances require the rail in the aft position and become substantially less accurate. Further signature processing or measurement improvements are needed for beyond near-field signature validation.

Morgenstern, John↗

A summary of the ECAS performance and cost results for MHD system

The interagency-funded, NASA-coordinated Energy Conversion Alternatives Study (ECAS) has studied the potential of various advanced power plant concepts using coal and coal-derived fuel. Principle studies were conducted through prime contracts with the General Electric Company and the Westinghouse Electric Corporation. The results indicate that open-cycle coal-fired direct-preheat MHD systems have potentially one of the highest coal-pile-to-bus-bar efficiencies and also one of the lowest costs of electricity (COE) of the systems studied. Closed-cycle MHD systems may have the potential to approach the efficiency and COE of open-cycle MHD. The 1200-1500 F liquid-metal MHD systems studied do not appear to have the potential of exceeding the efficiency or competing with the COE of advanced steam plants.

Seikel, G. R.↗

Base heating methodology improvements, volume 1

This document is the final report for NASA MSFC Contract NAS8-38141. The contracted effort had the broad objective of improving the launch vehicles ascent base heating methodology to improve and simplify the determination of that environment for Advanced Launch System (ALS) concepts. It was pursued as an Advanced Development Plan (ADP) for the Joint DoD/NASA ALS program office with project management assigned to NASA/MSFC. The original study was to be completed in 26 months beginning Sep. 1989. Because of several program changes and emphasis on evolving launch vehicle concepts, the period of performance was extended to the current completion date of Nov. 1992. A computer code incorporating the methodology improvements into a quick prediction tool was developed and is operational for basic configuration and propulsion concepts. The code and its users guide are also provided as part of the contract documentation. Background information describing the specific objectives, limitations, and goals of the contract is summarized. A brief chronology of the ALS/NLS program history is also presented to provide the reader with an overview of the many variables influencing the development of the code over the past three years.

Bender, Robert L.↗