Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nuclear infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Wireless Sensor Network Technologies

Wireless sensor network (WSN) technologies have become a focus of development for instrumentation and control (I&C) applications in many critical infrastructure industries. Their implementation includes factories, electric plants and distribution systems, municipal water and sewer facilities, natural gas storage and distribution facilities, and even nuclear facilities. The promise of lower installation cost combined with reliable monitoring of process parameters at virtually any location, when needed, has driven many I&C vendors to offer WSN technology. These technologies are in their infancy and have not been fully tested for security, reliability, and compatibility when used in resilient control systems. The end user now has the difficult task of selecting which technology to use and how to implement a WSN. One of the key parameters in a WSN is sensor battery life. In a WSN some sensors pass on data from other sensors that do not have a direct communication path to the process controller. This extra work takes more power from the battery which decreases the battery life. The current work at CAES investigates how fast these batteries degrade compared to sensor batteries that do not have to process other sensor data. The result of this investigation will indicate how this effects the reliability of sensor networks.

47 OTHER INSTRUMENTATION↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Digital Infrastructure Migration Framework Report

This document presents a full-scope Digital Infrastructure implementation and associated lifecycle support recommendations that enable a plant life of 80+ years. Specific technologies and software applications are researched, developed, selected, implemented, and then integrated by utilities to enhance safety, reliability, and economic performance such that the result provides much more than the sum of its parts. Specific selection of these technologies is driven by business case analyses which are utility, station, and unit specific.

42 ENGINEERING↗

High-level fuel fabrication facility designs from discrete-event simulation

Like other industrial processes, the production of metallic nuclear fuels (MNF) requires that fabrication facilities be able to reliably meet production demands, operate efficiently, and adhere to federal and local safety regulations. In turn, the set of design variables employed by such a facility, such as operations policies, infrastructure and machinery purchased, and the type and number of staff hired, directly impact a facility’s ability to satisfy these goals. Therefore, facility designers must carefully determine which set of design variable values optimally satisfies these constraints. In this paper, we explore how values for these high-level design variables, namely hiring requirements, can be determined in the context of nuclear fuel manufacturing through the coupling of physics-based and discrete-event simulation technologies. Using the Versatile Test Reactor (VTR) program as a case study, we demonstrate how SCALE and MCNP nuclear physics model outputs can be integrated into ExtendSim discrete-event simulation (DES) models of the fuel fabrication process to determine the optimal number of staff hired to ensure fuel production goals are met, operations comply with effective dose limit regulations, and overall project costs are reduced.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Categorizing threat : building and using a generic threat matrix.

The key piece of knowledge necessary for building defenses capable of withstanding or surviving cyber and kinetic attacks is an understanding of the capabilities posed by threats to a government, function, or system. With the number of threats continuing to increase, it is no longer feasible to enumerate the capabilities of all known threats and then build defenses based on those threats that are considered, at the time, to be the most relevant. Exacerbating the problem for critical infrastructure entities is the fact that the majority of detailed threat information for higher-level threats is held in classified status and is not available for general use, such as the design of defenses and the development of mitigation strategies. To reduce the complexity of analyzing threat, the threat space must first be reduced. This is achieved by taking the continuous nature of the threat space and creating an abstraction that allows the entire space to be grouped, based on measurable attributes, into a small number of distinctly different levels. The work documented in this report is an effort to create such an abstraction.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Progress in Decommissioning the Humboldt Bay Power Plant - 13604

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) to Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Computational Infrastructure for Lattice Gauge Theory

SciDAC-2 Project The Secret Life of Quarks: National Computational Infrastructure for Lattice Gauge Theory, from March 15, 2011 through March 14, 2012. The objective of this project is to construct the software needed to study quantum chromodynamics (QCD), the theory of the strong interactions of sub-atomic physics, and other strongly coupled gauge field theories anticipated to be of importance in the energy regime made accessible by the Large Hadron Collider (LHC). It builds upon the successful efforts of the SciDAC-1 project National Computational Infrastructure for Lattice Gauge Theory, in which a QCD Applications Programming Interface (QCD API) was developed that enables lattice gauge theorists to make effective use of a wide variety of massively parallel computers. This project serves the entire USQCD Collaboration, which consists of nearly all the high energy and nuclear physicists in the United States engaged in the numerical study of QCD and related strongly interacting quantum field theories.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Power generation technology options for a Mars mission

The power requirements and resultant power system performances of an aggressive Mars mission are characterized. The power system technologies discussed will support both cargo and piloted space transport vehicles as well as a six-person crew on the Martian surface for 600 days. The mission uses materials transported by cargo vehicles and materials produced using in-situ planetary feed stock to establish a life-support cache and infrastructure for the follow-on piloted lander. Numerous power system technical options are sized to meet the mission power requirements using conventional and solar, nuclear, and wireless power transmission technologies for stationary, mobile surface, and space applications. Technology selections will depend on key criteria such as mass, volume, area, maturity, and application flexibility.

Bozek, John M.↗

BigPanDA: PanDA Workload Management System and its Applications beyond ATLAS

Modern experiments collect peta-scale volumes of data and utilize vast, geographically distributed computing infrastructure that serves thousands of scientists around the world. Requirements for rapid, near real-time data processing, fast analysis cycles and need to run massive detector simulations to support data analysis pose special premium on efficient use of available computational resources. A sophisticated Workload Management System (WMS) is needed to coordinate the distribution and processing of data and jobs in such environment. The ATLAS experiment at CERN uses PanDA (Production and Data Analysis) Workload Management System for managing the workflow for all data processing on over 150 data centers. While PanDAcurrently uses more than 250,000 cores with a peak performance of 0.3 petaFLOPS, it runs around 2 million jobs per day on hundreds of Grid sites and serving thousands of ATLAS users. In 2017 about 1.5 exabytes of data were processed with PanDA.In 2012 BigPanDA project project was started with aim to introduce new types of computing resources into ATLAS computing infrastructure, but also to offering PanDA features to different data-intensive applications for projects and experiments outside of ATLAS and High-Energy and Nuclear Physics. In this article we will present accomplishments and discuss possible directions for future work.

Svirin, Pavlo↗

Legacy Facility Risk Reduction - Challenges, Strategies, Partnerships, and Benefits Lawrence Livermore National Laboratory - 18463

As Lawrence Livermore National Laboratory (LLNL) carries out its national security missions, we strive to ensure our facility portfolio meets the latest technologies and addresses challenges presented by its aging infrastructure. Established in 1942 as a Naval Air Station, repurposed in 1952 by the Atomic Energy Commission (AEC), LLNL continues to host a robust National Nuclear Security Administration (NNSA) Research and Development (R and D) mission. As an aging site, many of its facilities have met their life cycle contribution. As process contaminated facilities are decommissioned, new challenges arise in their near-term stewardship and long-term disposition actions, presenting risk reduction opportunities. The challenge has been to determine approaches to steward such risks, stabilize, advocate for long-term mitigation, and take actions to eliminate risks. Encumbered within is the balance of priorities in supporting ongoing and emerging mission and those of past legacy activities. This paper will endeavor to highlight Challenges and Benefits presented by such a paradigm, where we identified Strategies and Partnerships working towards mutual Risk Reduction activities. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

In this paper, a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown sites was conducted. Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: • characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory • a description of the on-site infrastructure and conditions relevant to transportation activities • an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF from the shutdown sites, including gaps in information • an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste from the shutdown sites. The primary sources for the inventory of UNF and GTCC waste are the DOE RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the NRC. The primary sources for the information on the site conditions and near-site transportation infrastructure and experience include site visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site visits. All sites were found to have at least one off-site transportation mode option for removing their UNF and GTCC waste, and some sites have two options. Large component removals during reactor decommissioning provided an important source of information in determining transportation mode options. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: • Although there are common aspects, each site has some unique features and/or conditions. • The 12 sites use designs from 4 different suppliers, including 9 different (horizontal and vertical) storage systems that would require 8 different transportation cask designs. • Although some regulatory actions will be required, all UNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in licensed systems that can be transported, including a small amount of high-burnup fuel. • Each site indicated that 2-3 years of advanced time is required for preparations prior to pick-up. • Most sites have multiple transportation options, e.g., rail, barge, or heavy haul truck, as well as constraints and preferences. It is expected that additional site visits will be conducted to update the information used in the evaluation. Additional sites may be added to the evaluation if further site closures are announced.

shutdown sites, used nuclear fuel, NFST, Nuclear F↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites - 2016 Update - 17086

An updated evaluation of removing used or spent nuclear fuel (SNF)2 from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating spent nuclear fuel data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Suitability and Hazard Assessment Guide for Small Modular Reactors

Commercial nuclear reactor projects in the U.S. have traditionally employed large light water reactors (LWR) to generate regional supplies of electricity. Although large LWRs have consistently dominated commercial nuclear markets both domestically and abroad, the concept of small modular reactors (SMRs) capable of producing between 30 MW(t) and 900 MW(t) to generating steam for electricity is not new. Nor is the idea of locating small nuclear reactors in close proximity to and in physical connection with industrial processes to provide a long-term source of thermal energy. Growing problems associated continued use of fossil fuels and enhancements in efficiency and safety because of recent advancements in reactor technology suggest that the likelihood of near-term SMR technology(s) deployment at multiple locations within the United States is growing. Many different types of SMR technology are viable for siting in the domestic commercial energy market. However, the potential application of a particular proprietary SMR design will vary according to the target heat end-use application and the site upon which it is proposed to be located. Reactor heat applications most commonly referenced in connection with the SMR market include electric power production, district heating, desalinization, and the supply of thermal energy to various processes that require high temperature over long time periods, or a combination thereof. Indeed, the modular construction, reliability and long operational life purported to be associated with some SMR concepts now being discussed may offer flexibility and benefits no other technology can offer. Effective siting is one of the many early challenges that face a proposed SMR installation project. Site-specific factors dealing with support to facility construction and operation, risks to the plant and the surrounding area, and the consequences subsequent to those risks must be fully identified, analyzed, and possibly mitigated before a license will be granted to construct and operate a nuclear facility. Examples of significant site-related concerns include area geotechnical and geological hazard properties, local climatology and meteorology, water resource availability, the vulnerability of surrounding populations and the environmental to adverse effects in the unlikely event of radionuclide release, the socioeconomic impacts of SMR plant installation and the effects it has on aesthetics, proximity to energy use customers, the topography and area infrastructure that affect plant constructability and security, and concerns related to the transport, installation, operation and decommissioning of major plant components.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Acceptance Strategy for Nuclear Power Plant In Indonesia

Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R and D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quality Assurance for Kilo- and Megavoltage In-Room Imaging and Localization for Off- and Online Setup Error Correction

In-room radiography is not a new concept for image-guided radiation therapy. Rapid advances in technology, however, have made this positioning method convenient, and thus radiograph-based positioning has propagated widely. The paradigms for quality assurance of radiograph-based positioning include imager performance, systems integration, infrastructure, procedure documentation and testing, and support for positioning strategy implementation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗