Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Model of Procedure Usage – Results from a Qualitative Study to Inform Design of Computer-Based Procedures

The nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. As a step toward the goal of improving procedure use performance, researchers, together with the nuclear industry, have been looking at replacing the current paper-based procedures with computer-based procedure systems. The concept of computer-based procedures is not new by any means; however most research has focused on procedures used in the main control room. Procedures reviewed in these efforts are mainly emergency operating procedures and normal operating procedures. Based on lessons learned for these previous efforts we are now exploring a more unknown application for computer based procedures - field procedures, i.e. procedures used by nuclear equipment operators and maintenance technicians. The Idaho National Laboratory, the Institute for Energy Technology, and participants from the U.S. commercial nuclear industry are collaborating in an applied research effort with the objective of developing requirements and specifications for a computer-based procedure system to be used by field operators. The goal is to identify the types of human errors that can be mitigated by using computer-based procedures and how to best design the computer-based procedures to do this. The underlying philosophy in the research effort is “Stop – Start – Continue”, i.e. what features from the use of paper-based procedures should we not incorporate (Stop), what should we keep (Continue), and what new features or work processes should be added (Start). One step in identifying the Stop – Start – Continue was to conduct a baseline study where affordances related to the current usage of paper-based procedures were identified. The purpose of the study was to develop a model of paper based procedure use which will help to identify desirable features for computer based procedure prototypes. Affordances such as note taking, markups, sharing procedures between fellow coworkers, the use of multiple procedures at once, etc. were considered. The model describes which affordances associated with paper based procedures should be transferred to computer-based procedures as well as what features should not be incorporated. The model also provides a means to identify what new features not present in paper based procedures need to be added to the computer-based procedures to further enhance performance. The next step is to use the requirements and specifications to develop concepts and prototypes of computer-based procedures. User tests and other data collection efforts will be conducted to ensure that the real issues with field procedures and their usage are being addressed and solved in the best manner possible. This paper describes the baseline study, the construction of the model of procedure use, and the requirements and specifications for computer-based procedures that were developed based on the model. It also addresses how the model and the insights gained from it were used to develop concepts and prototypes for computer based procedures.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration Strategy

EXECUTIVE SUMMARY The Light Water Reactor Sustainability Program Plant Modernization Pathway has been working with industry for a number of years to leverage digital technology to extend the life and improve the performance of the existing fleet through modernized technologies and improved processes for plant operation and power generation. This includes development of modernization solutions to improve reliability and economic performance while addressing US nuclear industry’s aging and obsolescence challenges. The objective of these efforts is to deliver a sustainable business model that enables US nuclear industry to remain competitive. Digital Infrastructure (DI) research has established a technical foundation for these efforts. This effort began with technical analysis and support for a safety-related instrumentation and control (I&C) pilot upgrade being performed at Constellation Energy Generation’s Limerick Nuclear Plant. The following publicly available reports were produced as part of this effort. • INL/EXT-20-61079, Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade [1] • INL/EXT-20-59371, Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations [2] • INL/EXT-20-59809, “Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation Report and Lessons Learned [3] • INL/RPT-23-72105, Safety-Related Instrumentation and Control Upgrade: Conceptual – Detailed Design Phase Report and Lessons Learned [4]

99 GENERAL AND MISCELLANEOUS↗

Approaches for Successful Implementation of DOE-STD-3009-2014 - 18585

The U.S. Department of Energy (DOE) released a new version of the standard for the Preparation of Non-reactor Nuclear Facility Documented Safety Analysis, DOE-STD-3009-2014. Although this revised standard only specifically applies to new facilities, major modifications to existing facilities, and existing facilities with mitigated offsite consequences greater than 25 rem, other existing DOE nuclear facilities are beginning to implement the new requirements in this revised standard as well. The most obvious change is the consolidation of the eleven Safety Management Program (SMP) chapters into a single chapter. However, development of a compliant safety analysis is more than an effort in shuffling these sections. Examples of the substantive changes include: a more rigorous approach to defense-in-depth; a more comprehensive process for functionally classifying safety-supporting structures, systems and components; explicit direction for evaluating chemical hazards; and additional quantitative analysis for co-located workers. For any facility, the publication of an approved Documented Safety Analysis (DSA) and associated Technical Safety Requirements (TSRs) is a significant milestone. However, implementation of the DSA/TSR is often the greater challenge. Ensuring that the implementing assumptions, analysis inputs, and operational limitations are realistic is critical to this success. This should be addressed in the safety basis strategy document. In addition, DSA implementation must occur using a logical and planned approach. The approach should address the following: - Procedure preparation, review and verification; - Operator, mechanic, technician, and support staff training; - Management assessments to evaluate SMP effectiveness; and - Independent assessments to confirm effective DSA implementation. This project approach to managing DSA/TSR development and implementation has been demonstrated as successful at multiple DOE sites. Lessons learned associated with all of these topics will be discussed in the context of the new DOE-STD-3009-2014 requirements. The discussed lessons are taken from the multiple DOE sites and facilities. The presentation describes implemented approaches for successful incorporation of these lessons. While the context for the presentation is DOE-STD-3009-2014, the need to properly manage safety basis development and implementation applies to all nuclear facilities. Thus the lessons and implementation strategies should appeal to a general audience interested in safety basis development. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Incineration of European non-nuclear radioactive waste in the USA

Incineration of dry low level radioactive waste from nuclear stations is a well established process achieving high volume reduction factors to minimise disposal costs and to stabilise residues for disposal. Incineration has also been applied successfully in many European Union member countries to wastes arising from use of radionuclides in medicine, nonnuclear research and industry. However, some nations have preferred to accumulate wastes over many years in decay stores to reduce the radioactive burden at point of processing. After decay and sorting the waste, they then require a safe, industrial scale and affordable processing solution for the large volumes accumulated. This paper reports the regulatory, logistical and technical issues encountered in a programme delivered for Eckert and Ziegler Nuclitec to incinerate safely 100 te of waste collected originally from German research, hospital and industrial centres, applying for the first time a 'burn and return' process model for European waste in the US. The EnergySolutions incinerators at Bear Creek, Oak Ridge, Tennessee, USA routinely incinerate waste arising from the non-nuclear user community. To address the requirement from Germany, EnergySolutions had to run a dedicated campaign to reduce cross-contamination with non-German radionuclides to the practical minimum. The waste itself had to be sampled in a carefully controlled programme to ensure the exacting standards of Bear Creek's license and US emissions laws were maintained. Innovation was required in packaging of the waste to minimise transportation costs, including sea freight. The incineration was inspected on behalf of the German regulator (the BfS) to ensure suitability for return to Germany and disposal. This first 'burn and return' programme has safely completed the incineration phase in February and the arising ash will be returned to Germany presently. The paper reports the main findings and lessons learned on this first of its kind project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cleanup at Los Alamos National Laboratory - the challenges - 9493

This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy Laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup -- the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: Plans to retrieve buried waste at Material Disposal Area B, across the street from oen of Los Alamos' commercial districts and the local newspaper; Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned on University Education Programs of Chemical Engineering Principles for Nuclear Plant Operations - 13588

University education aims to supply qualified human resources for industries. In complex large scale engineering systems such as nuclear power plants, the importance of qualified human resources cannot be underestimated. The corresponding education program should involve many topics systematically. Recently a nuclear engineering program has been initiated in Dongguk University, South Korea. The current education program focuses on undergraduate level nuclear engineering students. Our main objective is to provide industries fresh engineers with the understanding on the interconnection of local parts and the entire systems of nuclear power plants and the associated systems. From the experience there is a huge opportunity for chemical engineering disciple in the context of giving macroscopic overview on nuclear power plant and waste treatment management by strengthening the analyzing capability of fundamental situations. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Transitioning From Operations to Decommissioning - 16049

With the recent unplanned shutdown of a number of U.S. Nuclear Power Plants, a benchmarking effort was conducted in late 2104 to capture the lessons learned from these recently shutdown sites. The specific plants benchmarked for this effort included San Onofre Nuclear Generating Station (SONGS), Kewaunee, Zion, and Crystal River Nuclear Power Stations. The benchmark results found for the most part, site personnel had little or no decommissioning experience and in fact, were not aware of the challenges facing a plant in transitioning from operations to decommissioning. This lack of experience and knowledge resulted in a steep learning curve, a loss of productivity, and significant challenges by plant personnel prepared the site for decommissioning. The results of the benchmark identified a number of areas and challenges facing an operating plant during this period. All sites visited identified four key areas where significant cost savings and planning effectiveness could have been realized if they had been better prepared. The areas included transition planning, staffing, stakeholder involvement, and cost estimating. It was recognized if these areas are aggressively managed early in the process, it will have a significant positive impact on the effectiveness and cost of decommissioning and can better set the stage for a successful project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The EGS Collab project: Outcomes and lessons learned from hydraulic fracture stimulations in crystalline rock at 1.25 and 1.5 km depth

With the goal of better understanding stimulation in crystalline rock for improving enhanced geothermal systems (EGS), the EGS Collab Project performed a series of stimulations and flow tests at 1.25 and 1.5 km depths. The tests were performed in two well-instrumented testbeds in the Sanford Underground Research Facility in Lead, South Dakota, United States. The testbed for Experiment 1 at 1.5 km depth contained two open wells for injection and production and six instrumented monitoring wells surrounding the targeted stimulation zone. Four multi-step stimulation tests targeting hydraulic fracturing and nearly year-long ambient temperature and chilled water flow tests were performed in Experiment 1. The testbed for Experiments 2 and 3 was at 1.25 km depth and contained five open wells in an outwardly fanning five-spot pattern and two fans of well-instrumented monitoring wells surrounding the targeted stimulation zone. Experiment 2 targeted shear stimulation, and Experiment 3 targeted low-flow, high-flow, and oscillating pressure stimulation strategies. Hydraulic fracturing was successful in Experiments 1 and 3 in generating a connected system wherein injected water could be collected. However, the resulting flow was distributed dynamically, and not entirely collected at the anticipated production well. Thermal breakthrough was not observed in the production well, but that could have been masked by the Joule-Thomson effect. Shear stimulation in Experiment 2 did not occur - despite attempting to pressurize the fractures most likely to shear - because of the inability to inject water into a mostly-healed fracture, and the low shear-to-normal stress ratio. The EGS Collab experiments are described to provide a background for lessons learned on topics including induced seismicity, the correlation between seismicity and permeability, distributed and dynamic flow systems, thermoelastic and pressure effects, shear stimulation, local geology, thermal breakthrough, monitoring stimulation, grouting boreholes, modeling, and system management.

15 - GEOTHERMAL ENERGY↗

Updating the Dry Transfer System - 18110

The Dry Transfer System (DTS) was examined for its ability to be redesigned in order to meet needs associated with repackaging used/spent nuclear fuel (UNF/SNF) from existing storage cask systems into alternative systems, while also incorporating design advances based on some lessons learned from Orano's dry UNF handling facility (T0) located at the La Hague recycling plant. In this redesign, the DTS is envisioned to provide some flexibility through the ability to perform repackaging activities from multiple differently designed cask systems, including those with canisters that will require cutting and welding activities, and potentially with waste packages designed for disposal. The redesigned DTS is also intended to provide some operational flexibility by providing lag storage and include a means for examining UNF/SNF during repackaging, using some features implemented at the T0 facility at La Hague. This paper provides a summary of: the original DTS design, which was evaluated by the NRC and portions of which were cold-tested at Idaho National Lab; the lag storage system designed for the DTS, which is able to flexibly handle different fuel assembly designs while providing structural support for design basis events (e.g., seismic); the incorporation of lessons learned from the La Hague T0 facility into the DTS design to facilitate dry handling of UNF/SNF; and identification of other challenges towards designing a complete system. A revised DTS is envisioned to provide an important tool for the future management of UNF/SNF in preparation for transportation, re-storage, re-transportation, and/or disposal and also provides a means for repackaging UNF/SNF in case recovery from a cask/canister system is necessary (e.g., due to extended storage or a transportation event). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operating supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Crystallization kinetics and nanoparticle ordering in semicrystalline polymer nanocomposites

There has been considerable interest in the nucleation and crystallization of polymers in the presence of nanoparticles (NPs, or nanofillers in general, NFs). Most of the extensive work in this area has focused on anisotropic, non-Brownian NFs (e.g., clay sheets, carbon nanotubes) whose spatial dispersion state in these nanocomposites is controlled by the process by which they are formed. Hence, NF spatial dispersion is generally limited and often remains poorly characterized. Thermodynamic handles that can be used to control NF dispersion state in the polymer melt include (a) favorable interactions between the polymer chains and the bare NP surfaces, or (b) the density and length of the chains, with the same chemistry as the matrix, grafted to the NP surface. These relatively large NFs merely act as stationary objects that affect the kinetics of nucleation by providing heterogeneous sites, and the crystallization rate by confining the polymer in the melt state. The dispersion state of the NFs can dramatically affect the nucleation and crystallization of the matrix, but in most cases reported, the NFs increase nucleation efficiency relative to the neat polymer. At higher NF loadings, the effect of polymer confinement by the NFs dominates, leading to a decrease in crystal growth rates. This review describes the most important lessons learned from these commonly studied systems and then extends to polymer composite systems containing small, mobile spherical NPs (typically smaller than 100 nm in size). The role of NP mobility, which provides for dynamic confinement of the polymer melt, on the kinetics of polymer crystallization (nucleation, growth, and overall crystallization) and how this behavior is mostly consistent with the case of immobile NF is a second important focus of this review. In addition to the role of NFs on crystallization kinetics, recently reported nanoparticle ordering phenomena such as the effect of matrix crystallization on the organization of small spherical NPs within the amorphous regions of the semicrystalline morphology are discussed. In conclusion, such phenomena are clearly not observed for large NFs and hence provide a point of departure from past works in this area.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Monitor and Evaluate the Genetic Characteristics of Supplemented Salmon and Steelhead, 2006-2007 Progress Report.

This progress report offers a summary of genetic monitoring and evaluation research related to artificial propagation of Chinook salmon and steelhead in the Snake River basin. Our principal goal has been to characterize the relative (and net) reproductive success of hatchery fish spawning in the wild in multiple sub-basins. We address a critical uncertainty identified in essentially all tribal, state, and federal recovery planning efforts. Beyond simple description of those patterns of differential reproductive success, we seek to understand the biotic and abiotic factors that contribute to our observations, including genetic and environmental elements, and the real time effects of hatchery reform. We adopt two fundamentally different approaches that capture processes operating at different geographic scales. Our tier 2 design monitors changes in gene frequency through time in hatchery and wild populations. These studies monitor spatial and temporal genetic change over broad river basins and sub-basins. Tier 3 studies, by contrast, are able to construct pedigrees in naturally spawning populations that include hatchery and wild fish. We can then use actual matings to infer the fitness of hatchery versus wild individuals, based on the numbers of offspring we observe in our progeny samples. We get extraordinary detail from the tier 3 studies but only for a single river system. Thus, tier 2 studies provide breadth of information, whereas tier 3 studies offer unparalleled depth of insight for single discrete systems. We exceeded our goals in almost all areas for both tier 2 and tier 3 studies, and, where we did not, we offer an explanation of why, and what future action will be taken (Lessons Learned). All subcontracts were let as expected, providing smolt trapping, tissue sampling, genotyping, and analysis. Our inter-laboratory standardization efforts with tribal, state, and federal agencies were highly successful in this period. These standardization activities have been an on-going element of this study, beginning with WDFW's forays into DNA markers in the late 1990s and continuing and becoming more formalized with the initiation of the newer genetics laboratories (CRITFC, USFWS, and IDFG). This report is intended to document success in achieving collection and genotyping goals. Data analyses, presentation, and publication are keeping pace with data collection; however, detailed results are not presented at this time. A complete and comprehensive analysis and description of results will be provided in published manuscripts and in the 2009 annual report (the culmination of the current 3-year rolling review cycle). In the first section of this report, we present accomplishments related to individual projects within this genetic monitoring program. Subsequent to the standard reporting categories, we provide a Specific Obligations section that lists accomplishments exactly as the deliverables are presented in the Pisces Statement of Work. This approach results in a small amount of redundancy, but we try to minimize obvious cases. The goal is to provide our accomplishments in a format that is easily compared to the Work-Element-driven format of Pisces, yet also provide a narrative that shows continuity with the individual studies that make up this research program.

13 HYDRO ENERGY↗

Advanced Gas Reactor (AGR)-5/6/7 Fuel Irradiation Experiments in the Advanced Test Reactor

The United States Department of Energy’s Very High Temperature Reactor (VHTR) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating up to seven separate low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The goals of the irradiation experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which each consist of at least five separate capsules, are being irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gases also have on-line fission product monitoring the effluent from each capsule to track performance of the fuel during irradiation. The first two experiments (designated AGR-1 and AGR-2), have been completed. The third and fourth experiments have been combined into a single experiment designated AGR-3/4, which started its irradiation in December 2011 and is currently scheduled to be completed in April 2014. The design of the fuel qualification experiment, designated AGR-5/6/7, is well underway and incorporates lessons learned from the three previous experiments. Various design issues will be discussed with particular details related to selection of thermometry.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable.Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems.To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable. Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems. To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

43 PARTICLE ACCELERATORS↗

Dynamic Earth Energy Storage: Terawatt-year, Grid-scale Energy Storage Using Planet Earth as a Thermal Battery (GeoTES): Phase I Project (Final Report)

Grid-scale energy storage has been identified by the U.S. Department of Energy’s (DOE) Energy Storage Grand Challenge as a necessary technology to support the continued build-out of intermittent renewable energy resources required to attain a carbon-free energy future. To meet this goal, the 2018 Department of Energy Research and Innovation Act mandated the creation of a comprehensive program to accelerate the development and commercialization of next-generation energy storage technologies. One of numerous energy storage technology options is the storage of excess energy as heated geothermal brine in suitable geologic formations. This concept, known as reservoir thermal energy storage (RTES), geologic thermal energy storage (GeoTES), aquifer thermal energy storage (ATES), etc., relies on the storage of thermal energy in geologic formations for recovery and use in large-scale direct use geothermal (e.g., district heating, industrial processes, etc.) and electrical power generation applications. This thermal energy is derived from excess or waste heat from any high-temperature heat source, such as concentrated solar or from conventional thermal/nuclear generation. As such, RTES can potentially play a significant role in meeting the energy storage shortfall in the coming decades. RTES can provide energy arbitrage through both the storage and production of thermal energy stored in geologic formations for direct use applications and can serve as a source of hot fluids that can be used to generate electricity to support peak demand ramping, thus easing stress on transmission and distribution. This energy storage option has geographic benefits in that energy can be stored locally or regionally depending on the various needs/loads. RTES can also be located across an enormous geographic area, without the need for a traditional hydrothermal resource but where thermal gradients and hydrogeology allow economic exploitation of subsurface heat. The work conducted for this project includes (1) a review of lessons learned from past high-temperature RTES international projects; (2) geochemical experimental investigation and numerical simulations of potential domestic sedimentary reservoirs and (3) development of a thermo-hydrological-mechanical (THM) numerical simulation tool for optimizing formation properties and design parameters to maximize thermal energy storage performance.

15 GEOTHERMAL ENERGY↗

Evaluation of H-Canyon Ventilation Exhaust Tunnel Inspection at the Savannah River Site - 20052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program [1] provides a process to inspect, evaluate, and document the conditions of passive safety related structural systems and components, their degradation mechanisms and their impact on the safety envelope. The Structural Integrity Program performs periodic visual inspections to confirm the systems and components can perform their safety function and recommend corrective actions before the function is compromised. The H-Canyon Exhaust Tunnel is part of the H-Canyon Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The underground reinforced concrete Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel to perform the inspection. Unlike active systems that can be subjected to physical testing to confirm capability, qualification calculations, including modeling, is performed to assess passive design feature capabilities relative to operational, accident and natural phenomena hazards events. Input for these calculations come from knowledge of field conditions, design drawings and conservative assumptions. The knowledge of field conditions comes from concrete and soil testing activities as well as inspection data. The use of cameras on crawlers to obtain inspection data and how that data is used in qualification calculations is the focus of this discussion. Remote Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras, prior to Calendar Year 2003 (CY2003). Since CY2003, six camera equipped crawlers have been used. Crawlers have evolved and improved by incorporating lessons learned from the previous inspections. The latest 2019 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System and captured images that were previously unseen, thus providing key visual data for the Structural Integrity Program report [2]. The inspection data serves as 1) input to qualification calculations, 2) validates current conditions remain bounded by qualification calculations, and 3) documents a record of change over time. This data is vital for the effective evaluation of the tunnel structure and aids with predicting the life cycle service life safety envelope to protect the public, environment, and facility worker. The goal of the 2019 deployment was to use a more robust vehicle to ensure travel over obstacles, perform the inspection with higher resolution cameras, and have the ability to elevate the cameras to view surfaces previously obscured by abandon-in-place ducts in the tunnel. The inspection information will serve to strengthen the input basis for qualification calculations, versus using excessive conservative calculation assumptions. This 2019 inspection was compared with previous crawler visual evidence to identify change over time to project remaining service life and confirm field conditions remain bounded by qualification calculations. The results of the 2019 Exhaust Tunnel inspection continue to improve and provide a firm basis to make sound engineering judgements regarding tunnel capability and approaches in projecting remaining service life with an aging system and component. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗