Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Titan III Feasibility for HL-20 Prototype Missions

A set of studies was performed to investigate the feasibility of using the Titan III launch vehicle to launch an unmanned prototype HL-20 personnel launch system and, potentially, operational HL-20 missions. The launch of an HL-20 spacecraft on a Titan III poses a unique set of concerns, primarily because the lifting body vehicle is carried on top of the Titan vehicle without a fairing. The Titan III/HL-20 feasibility study addressed the primary vehicle issues of performance, aerodynamics, loads, control and stability, launch availability, and vehicle configuration for the launch of an unmanned HL-20 prototype vehicle. Titan launch operations, launch site systems, and facilities were assessed to determine HL-20 operations compatibility. Additional studies determined the potential launch opportunity and window capabilities of the Titan III for the operational HL-20 mission and the existing Titan III's reliability. The feasibility study determined that the Titan III system, with minor changes, is compatible with the HL-20 vehicle and mission. It could provide nearly daily launch windows for a rendezvous with Space Station Freedom. Titan III reliability, when combined with the HL-20 launch escape system, provides a sufficiently high probability of crew survival to support its consideration as the primary vehicle for HL-20 operational missions.

Benson, Scott W.↗

Attitude control challenges for earth orbiters of the 1980's

Experience gained in designing attitude control systems for orbiting spacecraft of the late 1980's is related. Implications for satellite attitude control design of the guidance capabilities, rendezvous and recovery requirements, use of multiple-use spacecraft and the development of large spacecraft associated with the advent of the Space Shuttle are considered. Attention is then given to satellite attitude control requirements posed by the Tracking and Data Relay Satellite System, the Global Positioning System, the NASA End-to-End Data System, and Shuttle-associated subsatellites. The anticipated completion and launch of the Space Telescope, which will provide one of the first experiences with the new generation of attitude control, is also pointed out.

Hibbard, W.↗

2011 Ground Testing Highlights Article

Two tests supporting development of the launch abort system for the Orion MultiPurpose Crew Vehicle were run in the NASA Ames Unitary Plan wind tunnel last year. The first test used a fully metric model to examine the stability and controllability of the Launch Abort Vehicle during potential abort scenarios for Mach numbers ranging from 0.3 to 2.5. The aerodynamic effects of the Abort Motor and Attitude Control Motor plumes were simulated using high-pressure air flowing through independent paths. The aerodynamic effects of the proximity to the launch vehicle during the early moments of an abort were simulated with a remotely actuated Service Module that allowed the position relative to the Crew Module to be varied appropriately. The second test simulated the acoustic environment around the Launch Abort Vehicle caused by the plumes from the 400,000-pound thrust, solid-fueled Abort Motor. To obtain the proper acoustic characteristics of the hot rocket plumes for the flight vehicle, heated Helium was used. A custom Helium supply system was developed for the test consisting of 2 jumbo high-pressure Helium trailers, a twelve-tube accumulator, and a 13MW gas-fired heater borrowed from the Propulsion Simulation Laboratory at NASA Glenn Research Center. The test provided fluctuating surface pressure measurements at over 200 points on the vehicle surface that have now been used to define the ground-testing requirements for the Orion Launch Abort Vehicle.

Ross, James C.↗

Study of thermal control systems for orbiting power systems. Materials experiment carrier thermal control system study

Four possible arrangements of the materials experiment carrier (MEC) and power system (PS) thermal control loops were defined which would provide one kW of heat rejection for each kW of power to the MEC payload. These arrangements were compared to the baseline reference concept which provides only 16 kW heat rejection to show the cost of obtaining symmetry in terms of dollars, weight, complexity, growth potential, ease of integration, technology and total launch weight. The results of these comparisons was that the concept which splits the PS thermal control loop into two systems, one to reject PS waste heat and one payload waste heat, appeared favorable. The fluid selection study resulted in recommendation of FC72 as the MEC heat transport fluid based on the thermal and physical characteristics. The coatings reviewed indicated anodized and alodine treated aluminum surfaces or silver teflon are the best choices for the MEC vehicle where durability is an important factor. For high temperature radiators silver teflon or zinc orthotitanate are recommended choices.

Fleming, M. L.↗

On-Chip AC self-test controller

A system for performing AC self-test on an integrated circuit that includes a system clock for normal operation is provided. The system includes the system clock, self-test circuitry, a first and second test register to capture and launch test data in response to a sequence of data pulses, and a logic circuit to be tested. The self-test circuitry includes an AC self-test controller and a clock splitter. The clock splitter generates the sequence of data pulses including a long data capture pulse followed by an at speed data launch pulse and an at speed data capture pulse followed by a long data launch pulse. The at speed data launch pulse and the at speed data capture pulse are generated for a common cycle of the system clock.

47 OTHER INSTRUMENTATION↗

ISS GN and C - First Year Surprises

Assembly of the International Space Station (ISS) began in late 1998 with the joining of the first two US and Russ ian elements. For more than two years, the outpost was served by two Russian Guidance, Navigation, and Control (GN&C) systems. The station requires orbital translation and attitude control functions for its 100+ configurations, from the nascent two-module station to the half million kilogram completed station owned and operated by seventeen nations. With the launch of the US Laboratory module in February 2001, the integration of the US GN&C system with its Russian counterpart laid the foundation for such a robust system. In its first year of combined operation, the ISS GN&C system has performed admirably, even better than many expected, but there have been surprises. Loss of command capability, loss of communication between segments, a control system force-fight, and "non-propulsive vents" that weren't - such events have repeatedly underscored the importance of thorough program integration, testing, and operation, both across subsystem boundaries and across international borders.

Begley, Michael↗

Global Positioning System Navigation Above 76,000 km for NASA's Magnetospheric Multiscale Mission

NASA's Magnetospheric Multiscale (MMS) mission, launched in March of 2015, consists of a controlled formation of four spin-stabilized spacecraft in similar highly elliptic orbits reaching apogee at radial distances of 12 and 25 Earth radii (RE) in the first and second phases of the mission. Navigation for MMSis achieved independently on-board each spacecraft by processing Global Positioning System (GPS) observables using NASA Goddard Space Flight Center (GSFC)'s Navigator GPS receiver and the Goddard Enhanced Onboard Navigation System (GEONS) extended Kalman filter software. To our knowledge, MMS constitutes, by far, the highest-altitude operational use of GPS to date and represents a high point of over a decade of high-altitude GPS navigation research and development at GSFC. In this paper we will briefly describe past and ongoing high-altitude GPS research efforts at NASA GSFC and elsewhere, provide details on the design of the MMS GPS navigation system, and present on-orbit performance data from the first phase. We extrapolate these results to predict performance in the second phase orbit, and conclude with a discussion of the implications of the MMS results for future high-altitude GPS navigation, which we believe to be broad and far-reaching.

navigation↗

Global Assimilation of Loon Stratospheric Balloon Observations

Accurate analyses of stratospheric winds are important for determining realistic constituent transport and providing improved diagnostic studies and forecasts of the stratosphere. This study examines impacts on global meteorological analyses resulting from using winds derived from Loon superpressure balloons in the lower stratosphere (hereafter Loon winds) as additional input observations to the Goddard Earth Observing System (GEOS) data assimilation system. To fully investigate the impacts of assimilating the Loon winds, two steps are taken: (1) comparison of the GEOS analysis winds with Loon winds (Control experiment) and (2) examination of the impacts of assimilating the Loon winds into the GEOS data assimilation system (Loon experiment). The time period selected is June–August 2014 when over 150 Loon balloons were launched, mainly in the Southern Hemisphere. In the middle latitudes, the Loon winds and Control winds agree well (Loon balloon zonal wind observation minus forecast, O − F, root‐mean‐square (RMS) values of ~2.75 m/s) and assimilating the Loon winds has a small impact (O − F RMS values unchanged). In the tropics, the Loon observations and Control analysis winds differ more than in middle latitudes (zonal wind O − F RMS ~3.75 m/s) and assimilating the Loon winds improves the zonal wind O − F RMS by ~1 m/s. In selected cases where the Loon observations and Control analysis differ greatly (O − F RMS values greater than 10 m/s), assimilating Loon winds significantly decreases the zonal wind O − F RMS by 5 m/s. These decreases in O − F RMS values show that the 6‐hr forecasts are improved at the Loon balloon observation locations. While satellites routinely measure Earth's global temperatures from space, in situ wind measurements are relatively scarce, consisting mainly of a network of ground‐based weather balloons. Since only a limited number of the weather balloons even reach stratospheric altitudes, there is a need for additional stratospheric observations. One option for addition wind information is the use of experimental superpressure balloons (SPBs). SPBs can remain in the stratosphere for many months traveling with the winds and hence, by reporting their changing positions, providing in situ wind observations. These SPBs experiments are generally limited in terms of time period and number of balloons. However, over the past few years Loon has been launching hundreds of SPBs (hereafter called Loon balloons) providing a more consistent set of observations of wind in the stratosphere. Here we assimilate some of the Loon balloon winds into the NASA GEOS global data assimilation system. The data assimilation system combines all observations with an atmospheric model to produce global analysis of winds and temperatures. Results show that including the Loon balloon wind information noticeably affects the global analysis as well as forecasts with the largest impact in the tropics. These results provide direction to future model and analysis improvements.

L. Coy↗

Global Positioning System Navigation Above 76,000 km for NASA's Magnetospheric Multiscale Mission

NASA's Magnetospheric Multiscale (MMS) mission, launched in March of 2015, consists of a controlled formation of four spin-stabilized spacecraft in similar highly elliptic orbits reaching apogee at radial distances of 12 and 25 Earth radii (RE) in the first and second phases of the mission. Navigation for MMS is achieved independently on-board each spacecraft by processing Global Positioning System (GPS) observables using NASA Goddard Space Flight Center (GSFC)'s Navigator GPS receiver and the Goddard Enhanced Onboard Navigation System (GEONS) extended Kalman filter software. To our knowledge, MMS constitutes, by far, the highest-altitude operational use of GPS to date and represents a high point of over a decade of high-altitude GPS navigation research and development at GSFC. In this paper we will briefly describe past and ongoing high-altitude GPS research efforts at NASA GSFC and elsewhere, provide details on the design of the MMS GPS navigation system, and present on-orbit performance data from the first phase. We extrapolate these results to predict performance in the second phase orbit, and conclude with a discussion of the implications of the MMS results for future high-altitude GPS navigation, which we believe to be broad and far-reaching.

GPS↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

A review of nuclear electric propulsion spacecraft system concepts

The last 25-30 years of system concepts and design philosophies for spacecraft employing nuclear-electric propulsion (NEP) are reviewed. NEP spacecraft-system design constraints and criteria are identified, including radiation exposure of humans and electronics, thermal control requirements, effluent contamination of spacecraft surfaces, surface erosion, launch-vehicle integration, operations and safety requirements, attitude control, EM interference, and power control and distribution. The impact on spacecraft design philosophy of these constraints and criteria is explored. Several NEP spacecraft are characterized and discussed with respect to the propulsion system used. The electric propulsion system catagories are electrothermal (arcjet), EM (magnetoplasmadynamic and pulsed-inductive thruster) and electrostatic (ion engine). A brief summary of the mission, nuclear power source, electric propulsion system, and spacecraft configuration are provided for each NEP spacecraft concept.

Deininger, W. D.↗

Control System Design Implementation and Preliminary Demonstration for a Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN)

Satellite servicing is a high priority task for NASA and the space industry, addressing the needs of a variety of missions, and potentially lowering the overall cost of missions through refurbishment and reuse. However, the ability to service satellites is severely limited by the lack of long reach manipulation capability and inability to launch new devices due the end of the Space Transport System, or Space Shuttle Program. This paper describes the design and implementation of a control system for a Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN), including; defining the forward and inverse kinematics, endpoint velocity to motor velocity, required cable tensions, and a proportional-integral-derivative (PID) controller. The tensions and velocities necessary to maneuver and capture small and large payloads are also discussed. To demonstrate the utility of the TALISMAN for satellite servicing, this paper also describes a satellite servicing demonstration using two TALISMAN prototypes to grasp and inspect a satellite mockup. Potential avenues for improving the control system are discussed.

Komendera, Erik E.↗

A mission design for the Halley comet rendezvous using Ion Drive

The Ion Drive propulsion system, a derivative of the old Solar Electric Propulsion (SEP) technology is considered adequate to perform all mission objectives of a proposed Halley's comet rendezvous (scheduled for launch in 1982) except one: control of thermal energy from the concentrating solar arrays. This problem can be solved, however, by adding a separable tail probe to the baseline system. The system consists of an Ion Propulsion Module (IPM) and a Mission Module (MM). Scientific objectives include a determination of the structure of the comet nucleus, an evaluation of nucleus evolution, an assay of the comet's atmosphere and ionosphere, and a study of the interaction between the comet and the interplanetary medium. Attention is given to the navigation parameters necessary for heliocentric transfer and post-rendezvous circumnavigation of the comet.

Boain, R. J.↗

Chandra X-Ray Observatory Pointing Control System Performance During Transfer Orbit and Initial On-Orbit Operations

The Chandra X-ray Observatory (CXO, formerly AXAF) is the third of the four NASA great observatories. It was launched from Kennedy Space Flight Center on 23 July 1999 aboard the Space Shuttle Columbia and was successfully inserted in a 330 x 72,000 km orbit by the Inertial Upper Stage (IUS). Through a series of five Integral Propulsion System burns, CXO was placed in a 10,000 x 139,000 km orbit. After initial on-orbit checkout, Chandra's first light images were unveiled to the public on 26 August, 1999. The CXO Pointing Control and Aspect Determination (PCAD) subsystem is designed to perform attitude control and determination functions in support of transfer orbit operations and on-orbit science mission. After a brief description of the PCAD subsystem, the paper highlights the PCAD activities during the transfer orbit and initial on-orbit operations. These activities include: CXO/IUS separation, attitude and gyro bias estimation with earth sensor and sun sensor, attitude control and disturbance torque estimation for delta-v burns, momentum build-up due to gravity gradient and solar pressure, momentum unloading with thrusters, attitude initialization with star measurements, gyro alignment calibration, maneuvering and transition to normal pointing, and PCAD pointing and stability performance.

Quast, Peter↗

Flight loads and control

The prediction of flight loads and their potential reduction, using various control logics for the space shuttle vehicles, is very complex. Some factors, not found on previous launch vehicles, that increase the complexity are large lifting surfaces, unsymmetrical structure, unsymmetrical aerodynamics, trajectory control system coupling, and large aeroelastic effects. Discussed are these load producing factors and load reducing techniques. Identification of potential technology areas is included.

Mowery, D. K.↗

Representative Space Shuttle missions and their impact on shuttle design.

Four representative Space Shuttle missions for the 1980's are described: mission 1, a third stage deployment and retrieval mission; mission 2, a combination orbiting element revisit and sortie mission; mission 3, a rapid payload retrieval and return mission; and mission 4, a 30-day earth observation sortie mission. The first three missions are proposed baseline reference missions, and, as such, their mission requirements must be met by the baseline shuttle configuration developed by NASA contractors. Typically, these missions impact the design in terms of such basics as shuttle launch payload capability, payload bay size, performance of the orbital maneuvering system (OMS) and the reaction control system (RCS), the basic 7-day orbital system lifetime, and the thermal protection system for high cross-range entry. To illustrate that vehicle design may be subject to requirements from other mission types as well, mission 4 is included. Each description stresses mission requirements having unique impact on vehicle design.

Young, K. A.↗

Wind

A space vehicle's response to atmospheric disturbances includes many parameters, the choice of criteria (parameters) depending upon the vehicle configuration and the specific mission. Response calculation methods for all phases of vehicle design are separated into their various phases and parts, using different approaches and methods of evaluation, as the particular phase demands. Although not independent, these phases include: (1) preliminary design; (2) final structural design; (3) guidance and control system design and optimization (preliminary and final); and (4) establishment of limits and procedures for launch and flight operations. Thus, the proper selection, representation, and use of wind information require the skillfully coordinated efforts of aerospace meteorologists and engineers.

Margaret B Alexander↗

The Shuttle Mission Simulator computer generated imagery

Equipment available in the primary training facility for the Space Transportation System (STS) flight crews includes the Fixed Base Simulator, the Motion Base Simulator, the Spacelab Simulator, and the Guidance and Navigation Simulator. The Shuttle Mission Simulator (SMS) consists of the Fixed Base Simulator and the Motion Base Simulator. The SMS utilizes four visual Computer Generated Image (CGI) systems. The Motion Base Simulator has a forward crew station with six-degrees of freedom motion simulation. Operation of the Spacelab Simulator is planned for the spring of 1983. The Guidance and Navigation Simulator went into operation in 1982. Aspects of orbital visual simulation are discussed, taking into account the earth scene, payload simulation, the generation and display of 1079 stars, the simulation of sun glare, and Reaction Control System jet firing plumes. Attention is also given to landing site visual simulation, and night launch and landing simulation.

Henderson, T. H.↗