Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Vortex Wake Turbulence: Flight Tests Conducted During 1970

A flight test program designed to obtain data on the characteristics of wing-tip vortices generated by large jet aircraft was initiated on 12 February 1970. The objective was to update the interim air traffic separation standards issued on 21 January 1970 restricting the airspace behind the B-747 and C-5A aircraft 60 deg either side and 2,000 feet below to a distance of 10 miles. The program involved flight tests at three different locations, which were conducted simultaneously. (1) At the Edwards Air Force Base test range, a NASA CV-990 and F-104 probed the vortices of a C-5A. This supplemented previous flight tests in U-3A and F-104 behind a B-52 and C-5A. (2) At Seattle, the Boeing Company probed the vortices of a B-747 and a B-707-300 with a B-737 and F-86. In addition, approach, landing, takeoff, and crossing runway tests were conducted with a B-737 trailing a B-747. Immediately following the Edwards tests, the NASA CV-990 proceeded to Seattle and engaged in probing flights behind the same B-747 and B-707-300. (3) At Idaho Falls, Idaho, FAA personnel, utilizing the Atomic Energy Commission and Environmental Science Services Administration facilities and a 200 ft, instrumented tower, conducted 114 flights past the tower. The aircraft were positioned to permit their vortices to descend into the air flow sensors and smoke generated from various levels on the tower. This permitted obtaining measurements and photography of the vortex core diameters, tangential velocities and related characteristics. Immediately following this test phase, analysis of the interrelated data was completed by the project managers representing NASA, Boeing and FAA and a Compilation of Work Papers was issued on 30 April 1970. These data were the basis of a revised General Notice issued on 26 February 1970 which, in essence, modified the restricted airspace to five miles behind heavy jets in the 300,000 lb. gross takeoff weight category.

Source record↗

Los Alamos National Laboratory Hazardous Waste Facility Permit Community Relations Plan

The requirements of the Hazardous Waste Facility Permit are fulfilled through execution of LANL's fourth strategic goal: “Enabling mission delivery through next-generation facility, infrastructure, and operational excellence.” With input from our stakeholders, we will continue to fulfill those requirements and to improve our waste operations. In 2015, the Laboratory purpose statement focused waste management efforts by directing delivery of mission success through operational effectiveness and scientific excellence. This Plan advances that purpose through community involvement. In the process of achieving our national security mission, Los Alamos National Laboratory generates some hazardous and mixed waste. Hazardous waste is solid waste that is dangerous or potentially harmful to human health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded as commercial products, such as cleaning fluids or pesticides, or as the byproducts of operations. Specific substances are listed in 40 Code of Federal Regulations (CFR), Part 261: 40 CFR Part 261. Hazardous waste management activities are regulated by the U. S. Environmental Protection Agency and the New Mexico Environment Department (NMED) pursuant to New Mexico Hazardous Waste Act (HWA; Chapter 74, Article 4 NMSA 1978) and regulations under the Act. In 1989, NMED issued the Hazardous Waste Facility Permit (EPA ID Number NM0890010515-1) that established standards for the Laboratory to manage, store, and treat hazardous wastes on-site and to undertake the closure, post closure care, and cleanup as necessary, of permitted waste management units. On November 30, 2010, NMED renewed the Hazardous Waste Facility Permit (the Permit). In June 2020 the Permittees submitted a permit renewal application to the NMED for their review and approval. The Hazardous Waste Facility Permit Community Relations Plan (CRP) describes the scope of public involvement in the activities of the Permit. The CRP is specifically designed to facilitate the community outreach, engagement, and relations activities concerning the Laboratory’s Hazardous Waste Facility Permit and coordinates with but does not include public involvement for other Laboratory programs, initiatives, or environmental activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Webtop Components with Thin-Client Web Applicators using WDK Tickets

Contents include the folloving: Issues surrounding encryption/decryption of password strings when deploying on different machines and platforms. Security concerns when exposing docbases to internet users. Docbase Session management in Java Servlets. Customization of Webtop components. WDK Tickets as a silent login alternative. Encoding Tickets and Ticket syntax. Invoking Webtop components via an Action URL. Issues with accessing Webtop components on Mac OS X through SSL.

Duley, Jason↗

Cross-cultural issues in CRM training

The author presents six stages of intercultural awareness and relates them to cockpit resource management training. A case study examines cultural differences between South American and United States flight crews and the problems that can occur when pilots minimize differences. Differences in leadership styles are highlighted and strategies for training South American pilots are provided.

NASA Discipline Space Human Factors↗

CELSS system control: issues, methods, and directions

In the general control perspective, the CELSS concept implies a very complex system and presents challenges at every level. These challenges are generated by: (1) the prospect that the system will be inherently unstable, (2) the prospective difficulty of establishing an adequate mathematical model of the system for the purpose of control law synthesis (dimensionality is high, and the dynamics and interactive processes of some of the subsystems are not understood well), (3) assuring control law robustness (assuring that the resulting control law(s) will be effective over the domain of the specified uncertainties), (4) hardware realization of the control law, (5) hardware system robustness ("fault tolerance") and (6) achieving the logistics of the automation (or "management") aspects of the problem. A suggested organization of the problem, a sketch of the issues related to perceived difficulties, a commentary/evaluation of the issues, a review of methods available to address the issues, and a suggested strategy to address the broad CELSS systems control problem are presented.

NASA Center ARC↗

Sierra/SD – Verification Test Manual – 5.22

Verification and validation (V&V) of scientific computing programs are important at Sandia National Labs due to the expanding role of computational simulation in managing the United States nuclear stockpile. The complexities of structural response calculations used to analyze physical problems, the varieties of codes applied to the calculations, and the importance of accurate predictions when assessing field conditions demand confidence in the consistency and accuracy of computer codes. Confidence in the accuracy of the predictions arising from computer simulations must ultimately be gained through verification and validation. The Sierra salinas structural dynamics analysis code, Sierra/SD, is used at the DOE Laboratories, and in several DOD projects. The roles of Sierra/SD in the qualification of weapon systems and components for normal and hostile environments throughout the Stockpile-to-Target Sequence include to, • Redesign weapon components. • Certify weapon components and systems for target environments such as hypersonic vehicles. • Certify that components will survive the thermal mechanical shock loads associated with hostile environments. • Evaluate current stockpile issues, including issues associated with uncertainty quantification. • Address many other problems that are encountered in stockpile management. The Sierra/SD verification plan is described, and an evolving set of key verification tests are described in detail. The verification tests ensure the correctness of the mathematics and numerical algorithms associated with functionality describing engineering phenomena. Development is in accordance with a set of tailored Software Quality Engineering (SQE) practices. SQE practices guide the overall verification and validation effort.

97 MATHEMATICS AND COMPUTING↗

ASK Magazine

Not everyone looks forward to reviews. Dog and pony shows I've heard them called. Exercises in putting together Power Point charts. Other less tasteful descriptions abound, but I won't bother to summarize these. This is a tasteful magazine after all. In this issue, we've assembled a number of articles on the subject of reviews, particularly as they occur in the NASA project world (although we cover the subject from other perspectives too). Veteran NASA Project Manager Marty Davis, in his article Tangled Up in Reviews, writes, "Many people regard reviews as something onerous, but if we can tailor them so that they're not as bad as they have to be, it can be a great benefit to a project manager." Great benefits to the project manager is what you'll find in Marty's story as he describes not only tailoring a single review but the entire lifecycle of reviews in his project. In Jo Gunderson's story, Calling Down the Fire on Yourself, she describes a young NASA Project Manager who does just that because, as he tells her, I needed to know if there was anything that I had overlooked." How he brings fire down on himself at his project review will inspire other young Project Managers, seasoned managers, and anyone else who reads this powerful story. Leave Your Ego at the Door, by Jenny Baer-Reidhart and Ray Morgan, uses reviews to highlight the creative collaboration that existed between NASA and one of its industry partners. The protagonist of this story is a company who took advantage of NASAs expert advice during reviews and accomplished amazing feats as a result. The story also examines how disasters might well have been avoided by two other NASA partners had they been as open-minded as the first company during their reviews. In Roy Malone's story, Standing Offer, a NASA Project Manager describes how he used a crack review team to help him pass a critical certification inspection while he was a Combat Systems Officer in the Navy. Malone invited the reviewers to come back several times so that they would be able to focus in detail on the many areas of the program that would be scrutinized during the certification inspection. These are just a sampling of some of the articles you'll find in this issue of ASK. We believe this issue offers ample evidence that talented Project Managers know how to use reviews to the great benefit of their projects. A talented Project Manager will typically figure out a way to turn any onerous task into a useful learning exercise. These Project Managers demonstrate that the real value of reviews is that they provide a chance to learn something. No dog and pony shows here.

Laufer, Alexander↗

A Physics-Based Modeling Framework for Prognostic Studies

Prognostics and Health Management (PHM) methodologies have emerged as one of the key enablers for achieving efficient system level maintenance as part of a busy operations schedule, and lowering overall life cycle costs. PHM is also emerging as a high-priority issue in critical applications, where the focus is on conducting fundamental research in the field of integrated systems health management. The term diagnostics relates to the ability to detect and isolate faults or failures in a system. Prognostics on the other hand is the process of predicting health condition and remaining useful life based on current state, previous conditions and future operating conditions. PHM methods combine sensing, data collection, interpretation of environmental, operational, and performance related parameters to indicate systems health under its actual application conditions. The development of prognostics methodologies for the electronics field has become more important as more electrical systems are being used to replace traditional systems in several applications in the aeronautics, maritime, and automotive fields. The development of prognostics methods for electronics presents several challenges due to the great variety of components used in a system, a continuous development of new electronics technologies, and a general lack of understanding of how electronics fail. Similarly with electric unmanned aerial vehicles, electrichybrid cars, and commercial passenger aircraft, we are witnessing a drastic increase in the usage of batteries to power vehicles. However, for battery-powered vehicles to operate at maximum efficiency and reliability, it becomes crucial to both monitor battery health and performance and to predict end of discharge (EOD) and end of useful life (EOL) events. We develop an electrochemistry-based model of Li-ion batteries that capture the significant electrochemical processes, are computationally efficient, capture the effects of aging, and are of suitable accuracy for reliable EOD prediction in a variety of usage profiles.

Li-ion Batteries↗

Real-time artificial intelligence issues in the development of the adaptive tactical navigator

Adaptive Tactical Navigation (ATN) is a laboratory prototype of a knowledge based system to provide navigation system management and decision aiding in the next generation of tactical aircraft. ATN's purpose is to manage a set of multimode navigation equipment, dynamically selecting the best equipment to use in accordance with mission goals and phase, threat environment, equipment malfunction status, and battle damage. ATN encompasses functions as diverse as sensor data interpretation, diagnosis, and planning. Real time issues that were identified in ATN and the approaches used to address them are addressed. Functional requirements and a global architecture for the ATN system are described. Decision making with time constraints are discussed. Two subproblems are identified; making decisions with incomplete information and with limited resources. Approaches used in ATN to address real time performance are described and simulation results are discussed.

Green, Peter E.↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making intelligent systems team players: Case studies and design issues. Volume 1: Human-computer interaction design

Initial results are reported from a multi-year, interdisciplinary effort to provide guidance and assistance for designers of intelligent systems and their user interfaces. The objective is to achieve more effective human-computer interaction (HCI) for systems with real time fault management capabilities. Intelligent fault management systems within the NASA were evaluated for insight into the design of systems with complex HCI. Preliminary results include: (1) a description of real time fault management in aerospace domains; (2) recommendations and examples for improving intelligent systems design and user interface design; (3) identification of issues requiring further research; and (4) recommendations for a development methodology integrating HCI design into intelligent system design.

Malin, Jane T.↗

Seeing the Invisible: Embedding Tests in Code That Cannot be Modified

The difficulty of characterizing and observing valid software behavior during testing can be very difficult in flight systems. To address this issue, we evaluated several approaches to increasing test observability on the Shuttle Abort Flight Management (SAFM) system. To increase test observability, we added probes into the running system to evaluate the internal state and analyze test data. To minimize the impact of the instrumentation and reduce manual effort, we used Aspect-Oriented Programming (AOP) tools to instrument the source code. We developed and elicited a spectrum of properties, from generic to application specific properties, to be monitored via the instrumentation. To evaluate additional approaches, SAFM was ported to Linux, enabling the use of gcov for measuring test coverage, Valgrind for looking for memory usage errors, and libraries for finding non-normal floating point values. An in-house C++ source code scanning tool was also used to identify violations of SAFM coding standards, and other potentially problematic C++ constructs. Using these approaches with the existing test data sets, we were able to verify several important properties, confirm several problems and identify some previously unidentified issues.

O'Malley, Owen↗

Description of the SSF PMAD DC testbed control system data acquisition function

The NASA LeRC in Cleveland, Ohio has completed the development and integration of a Power Management and Distribution (PMAD) DC Testbed. This testbed is a reduced scale representation of the end to end, sources to loads, Space Station Freedom Electrical Power System (SSF EPS). This unique facility is being used to demonstrate DC power generation and distribution, power management and control, and system operation techniques considered to be prime candidates for the Space Station Freedom. A key capability of the testbed is its ability to be configured to address system level issues in support of critical SSF program design milestones. Electrical power system control and operation issues like source control, source regulation, system fault protection, end-to-end system stability, health monitoring, resource allocation, and resource management are being evaluated in the testbed. The SSF EPS control functional allocation between on-board computers and ground based systems is evolving. Initially, ground based systems will perform the bulk of power system control and operation. The EPS control system is required to continuously monitor and determine the current state of the power system. The DC Testbed Control System consists of standard controllers arranged in a hierarchical and distributed architecture. These controllers provide all the monitoring and control functions for the DC Testbed Electrical Power System. Higher level controllers include the Power Management Controller, Load Management Controller, Operator Interface System, and a network of computer systems that perform some of the SSF Ground based Control Center Operation. The lower level controllers include Main Bus Switch Controllers and Photovoltaic Controllers. Power system status information is periodically provided to the higher level controllers to perform system control and operation. The data acquisition function of the control system is distributed among the various levels of the hierarchy. Data requirements are dictated by the control system algorithms being implemented at each level. A functional description of the various levels of the testbed control system architecture, the data acquisition function, and the status of its implementationis presented.

Baez, Anastacio N.↗

Radiation Effects on Emerging Technologies: Implications of Space Weather Risk Management

As NASA and its space partners endeavor to develop a network of satellites capable of supporting humankind's needs for advanced space weather prediction and understanding, one of the key challenges is to design a space system to operate in the natural space radiation environment In this paper, we present a description of the natural space radiation environment, the effects of interest to electronic or photonic systems, and a sample of emerging technologies and their specific issues. We conclude with a discussion of operations in the space radiation hazard and considerations for risk management.

LaBel, Kenneth A.↗

Management of Alkali and Alkaline Earth Fission Products in Used Pyroprocessing Salt

Pyroprocessing of spent nuclear fuel (SNF) involves dissolving metallic fuel into a molten salt electrolyte (typically eutectic LiCl-KCl) and then preferentially depositing actinides onto inert cathodes. Subsequent operations include drawdown of residual actinides and lanthanides from the electrolyte prior to re-using the salt. The recovered actinides are recycled and the recovered lanthanides are disposed as waste. Alkali and alkaline earth metal fission products in the fuel, such as Cs, Sr and Ba, dissolve into the salt during electrorefining. The concentrations of these elements buildup over time in the molten salt electrolyte, which may change the freezing point. The radioactive decay of 137 Cs and 90 Sr (half life 30 and 29 years) generates significant heat and produces strong ionizing radiation fields (β and γ). The increasing heat load and radioactivity as these elements build up in the molten salt requires frequent replacement and disposal of the electrolyte salt. Alternatively, the salt can be treated to remove these and other elements and then recycled to the electrorefiner. An effective strategy to manage these alkali and alkaline earth metal fission products in the molten salt electrolyte would increase the efficiency of pyroprocessing and decrease the volume of salt waste requiring disposal. Alkali and alkaline earth metal fission products are extremely stable in molten salt as chlorides--even more stable than the LiCl-KCl eutectic base salt--making them challenging to remove. They are not removed during drawdown operations to recover residual actinides and lanthanides and a separate operation is required to sufficiently purify the salt for reuse. This work is focused on selecting a method for separating Cs, Sr and Ba from the salt recovered from the lanthanide drawdown operation prior to recycling the cleaned salt back to the electrorefiner. Not addressed in this work is the management of the waste stream produced by the separation. This report summarizes the issues to be addressed when developing removal strategies for cesium, strontium, and barium and reviews existing methods to identify suitable methods and any technological gaps in their application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

History of the Chemical Stockpile Emergency Preparedness Program – Volume 2: Lessons Learned (Final Report 2026)

The CSEP Program involved multiple federal agencies, multiple states, and numerous local units of government. The involvement of diverse agencies at different levels of government led to conflict and difficulty in resolving issues. That, in turn, led to slow progress in achieving program goals. Program management was criticized repeatedly by the U.S. General Accounting Office (GAO). After other mechanisms for interagency coordination had failed to give the desired results, FEMA and the Army agreed to form site-specific and national-level IPTs. The IPTs worked well to break the logjam and accelerate implementation of the program. Key elements of the IPTs’ success included constant interagency communication, solving problems at the lowest level, and obtaining buy-in from higher authority. The IPT technique could be applied to other emergency management and homeland security programs that require interagency coordination.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Integrated testing and verification system for research flight software

The MUST (Multipurpose User-oriented Software Technology) program is being developed to cut the cost of producing research flight software through a system of software support tools. An integrated verification and testing capability was designed as part of MUST. Documentation, verification and test options are provided with special attention on real-time, multiprocessing issues. The needs of the entire software production cycle were considered, with effective management and reduced lifecycle costs as foremost goals.

Taylor, R. N.↗

A study of spaceraft technology and design concepts, volume 1

Concepts for advancing the state of the art in the design of unmanned spacecraft, the requirements that gave rise to its configuration, and the programs of technology that are suggested as leading to its eventual development are examined. Particular technology issues discussed include: structures and materials; thermal control; propulsion; electrical power; communications; data management; and guidance, navigation, and control.

Zylius, F. A.↗