Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee
This is the eighth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. The general condition of the site continues to improve. The repair of Outfall 014 is complete and sampling was performed in 2020 from the new Outfall 014 structure. This repair marks a significant improvement in the storm drain network infrastructure. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility, the Mercury Treatment Facility on EFPC, the site-wide power grid upgrade, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2020; however, moving forward, these projects will present challenges for the protection of stormwater. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2021. Y-12 will continue to implement appropriate best management practices and reduce outside material storage areas where possible.