Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

54 ENVIRONMENTAL SCIENCES↗

Wholesale Electricity Markets and Resource Adequacy with High Clean Energy Generation Targets

Wholesale electricity markets are intended to incentivize system generation investments and operations outcomes that meet evolving system needs. In this work, we evaluate the effectiveness of wholesale market structures, rules and policies in achieving system resource adequacy (RA) and clean energy targets in the presence of self-interested generation investors using the Electricity Markets and Investment Suite Agent-based Simulation (EMIS-AS) model. Results highlight that both capacity markets and operating reserve demand curves (ORDCs) can help achieve a reliable system but with different RA compliance timelines and distribution of generation technologies. Structures with capacity markets tend to favor more capital-intensive peaking technologies while reducing wind and solar build-outs due to suppressed energy and clean energy market prices, particularly in the absence of strong clean energy targets. Conversely, ORDCs improve the commitment of available generation units, but this comes at the expense of higher system costs and renewable generation curtailment. We also find that well-calibrated static capacity demand curves can yield similar reliability and total cost compared to capacity market demand curves informed dynamically by resource adequacy while also yielding stable annual capacity prices. Different approaches to formulating ORDC curves can also yield key trade-offs, namely that a more efficient treatment of storage chronology results in lower ORDC curves and prices, yielding less investment and cost but at the expense of reliability. Finally, the effectiveness of wholesale electricity markets in practically achieving very high clean energy generation targets highly depends on the cost-competitiveness of clean energy technologies that can support critical balancing needs across multiple timescales.

capacity expansion↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

43 PARTICLE ACCELERATORS↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Radiological Impact of 2023 Operations at the Savannah River Site

This report presents the environmental dose assessment methods and the estimated potential doses to the public from 2023 Savannah River Site (SRS) air and liquid radioactive releases. Also documented are potential doses from special-case exposure scenarios, such as the consumption of wildlife or goat milk. Dose to the Offsite Representative Person The 2023 dose to the offsite representative person from SRS liquid releases was 0.14 mrem and from SRS air releases it was 0.016 mrem. To show compliance with the U. S. Department of Energy (DOE) all pathway dose standard of 100 mrem/yr, SRS conservatively adds these two doses for a total representative person dose of 0.16 mrem which is 0.16% of the DOE standard. Sportsman Doses Onsite Hunter: SRS conducts annual hunts to control onsite deer and feral hog populations. The estimated dose from consuming harvested deer or hog meat is determined for every onsite hunter. During 2023, the maximum potential dose an onsite hunter received was 9.42 mrem, or 9.42% of DOE’s 100 mrem/yr all pathway dose standard. Creek Mouth Fisherman: SRS estimated the maximum potential dose from fish consumption at 0.17 mrem from bass collected at the mouth of Lower Three Runs. This dose is 0.17% of the DOE standard. SRS bases this hypothetical dose on the low probability scenario that, during 2023, a fisherman consumed 24 kg (53 lbs) of bass caught exclusively from the mouth of Lower Three Runs. Release of Material Containing Residual Radioactivity SRS did not release any real property (land or buildings) in 2023. SRS unconditionally released a total of 13,324 items of personal property (such as tools) from radiological areas in 2023. Most of these items did not leave the Site. However, all of these items required no additional radiological controls post-survey as they met DOE Order 458.1 release criteria. Radiation Dose to Aquatic and Terrestrial Biota SRS conducts screening evaluations of plant and animal doses for aquatic and terrestrial ecosystems. For 2023, all SRS aquatic system locations passed the initial (Level 1) screenings and no further assessments were required at those locations. For the land-based systems evaluation, SRS performed initial screenings using concentration data from the five onsite radiological soil sampling locations. Typically, SRS collects and analyzes only one soil sample per year from each location. For 2023, all land-based locations passed their initial (Level 1) pathway screenings.

54 ENVIRONMENTAL SCIENCES↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗

Improved Modeling of Waste Isolation Pilot Plant Disposal Room Porosity

Disposal rooms at the Waste Isolation Pilot Plant (WIPP) contain waste and gas, and their porosity evolves over time. This report presents several improvements to the disposal room porosity model and presents new porosity predictions for use in future WIPP Performance Assessment activities. The improvements pertain to three sub-models: the geomechanical model, the waste compaction model, and the gas pressurization model. The impacts of each major improvement were quantified and the new porosity predictions were shown to be both mesh and domain size converged. Also, sensitivity studies on the disposal room horizon, clay seam friction coefficients, and homogenized waste representation were performed to support assumptions in the disposal room porosity model. To compare the legacy and new porosity predictions, the simulation results were plotted as a response surface, where gas pressure and time are inputs and porosity is the output. The new porosity response surface is insensitive to pressures beneath lithostatic pressure and highly sensitive to pressures above lithostatic pressure. The legacy porosity response surface, on the other hand, has moderate porosity gradients over all pressures. The new porosity response surface has a stronger scientific foundation than the legacy surface and may now be used for Compliance Decision Analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stack Test Summary for TA-59-0001

The Radioactive Air Emissions Management (RAEM) team performed stack flow characterization tests at Technical Area (TA) 59 Building 0001 Exhaust Stack (ES) 8. These tests were completed in accordance with Title 40 of the Code of Federal Regulations (CFR), Part 61, Subpart H and the American National Standards Institute (ANSI) N13.1-1999 required by the Clean Air Act. Subpart H of the regulation is the National Emission Standards for Hazardous Air Pollutants (NESHAP) for radionuclides, which compliance with is maintained by the REAM team.

54 ENVIRONMENTAL SCIENCES↗

Wholesale Electricity Market Design to Support Resource Adequacy

Wholesale electricity markets are intended to incentivize system generation investments and operations outcomes that meet evolving system needs. In this work, we evaluate the effectiveness of wholesale market structures, rules and policies in achieving system resource adequacy (RA) and clean energy targets in the presence of self-interested generation investors using the Electricity Markets and Investment Suite Agent-based Simulation (EMIS-AS) model. Results highlight that both capacity markets and operating reserve demand curves (ORDCs) can help achieve a reliable system but with different RA compliance timelines and distribution of generation technologies. Structures with capacity markets tend to favor more capital-intensive peaking technologies while reducing wind and solar build-outs due to suppressed energy and clean energy market prices, particularly in the absence of strong clean energy targets. Conversely, ORDCs improve the commitment of available generation units, but this comes at the expense of higher system costs and renewable generation curtailment. We also find that well-calibrated static capacity demand curves can yield similar reliability and total cost compared to capacity market demand curves informed dynamically by resource adequacy while also yielding stable annual capacity prices. Different approaches to formulating ORDC curves can also yield key trade-offs, namely that a more efficient treatment of storage chronology results in lower ORDC curves and prices, yielding less investment and cost but at the expense of reliability. Finally, the effectiveness of wholesale electricity markets in practically achieving very high clean energy generation targets highly depends on the cost-competitiveness of clean energy technologies that can support critical balancing needs across multiple timescales.

agent based modeling↗

Filling in Subsurface Storage Open Data Gaps - Updates to CCS Data Availability on EDX and EDX Spatial (FWP-1022465)

There is a need to preserve and efficiently access data resources to drive the next generation of research and development while ensuring compliance with DOE regulations. Over the last 10+ years, there has been ongoing efforts by the DOE Carbon Storage Program to ensure that there is effective data curation and preservation of DOE funded research leveraging the NETL-FECM data repository, the Energy Data eXchange (EDX). This talk presents updates about ongoing efforts to continue to support the mission of ensuring that carbon storage data is findable, accessible, interoperable, and reusable to the carbon storage stakeholder community through EDX and EDX Spatial. Presented at the NETL Carbon Management Review Meeting, Pittsburgh, 2024.

Morkner, Paige↗

Argonne National Laboratory Site Environmental Report for Calendar Year 2023

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2023. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, sustainability efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off site population groups was estimated. Results are interpreted with respect to the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 computer code, was used in preparing this report.

54 ENVIRONMENTAL SCIENCES↗

2023 Site Environmental Report: Volume 1

Brookhaven National Laboratory (BNL) is managed on behalf of the Department of Energy (DOE) by Brookhaven Science Associates (BSA), a partnership between Stony Brook University and Battelle, and six core universities: Columbia, Cornell, Harvard, Massachusetts Institute of Technology, Princeton, and Yale. For over 75 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research operations with sensitivity to environmental issues and community concerns. The Laboratory’s Environmental, Safety, Security, and Health (ESSH) Policy reflects the commitment of BNL’s management to fully integrate environmental stewardship into all facets of its mission and operations. BNL prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1B, Environment, Safety, and Health Reporting. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory’s environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all its environmental history since the Laboratory’s inception in 1947. Volume II of the SER, the Groundwater Status Report, is also prepared annually to report on the status of groundwater protection and restoration efforts. Volume II includes detailed technical summaries of groundwater data and treatment system operations and is intended for regulators and other technically oriented stakeholders. A summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2023 (ASER) for the SLAC National Accelerator Laboratory

This report, prepared by the SLAC National Accelerator Laboratory (SLAC) for the U.S. Department of Energy (DOE), SLAC Site Office (SSO), provides a comprehensive summary of the environmental program activities at SLAC for calendar year 2023. Annual Site Environmental Reports (ASERs) are prepared for all DOE sites with significant environmental activities and distributed to relevant external regulatory agencies and other interested organizations or individuals. To the best of my knowledge, this report accurately summarizes the results of the 2023 environmental monitoring, compliance, and restoration programs at SLAC. This assurance can be made based on SSO and SLAC review of the ASER, and quality assurance protocols applied to monitoring and data analyses at SLAC.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Annual Site Environmental Report for Pantex Plant, Calendar Year 2023

The 2023 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE O 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Integrating PCTRAN with AI-Driven Host-Intrusion Detection and Secured Container Systems for Advanced Malware Analysis (Summer Internship Report)

This study presents a solution for enhancing the security of the Personal Computer Transient Analyzer (PCTRAN) PC-based Nuclear Power Plant Simulator by integrating the software with an artificial intelligence (AI)-driven host-intrusion detection system (HIDS), in addition to a secured container system, for malware analysis. PCTRAN is a Windows XP-based software package that has the ability to simulate a variety of accident and transient conditions for nuclear power plants (NPPs). It offers a high-resolution replica of the Nuclear Steam Supply System (NSSS) and displays the status of important parameters allowing for operator interaction. By including AI-driven HIDS for the NSSS, the framework can identify security threats in real-time, ensuring the integrity of the nuclear simulation environment. Additionally, the secured container system offers the ability to isolate and analyze malware, preventing potential threats from affecting core systems. The integration process involves extensive testing and validation in order to ensure accuracy, reliability, and compliance with security policies. This framework sets a new precedent for secure simulation and training in NPP operations, and offers insight for future advancements in cybersecurity.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗