Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Degradation and Accelerated Recovery of Surface Passivation in n+ Poly-Si/SiOx Passivating Contacts for TOPCon Solar Cells

We studied the surface degradation and recovery of fired poly-Si/SiOx passivating contacts during subsequent dark and illuminated annealing. We report on an industrially-viable path for accelerated recovery of surface passivation. The degradation is influenced by the type of doping in the poly-Si. Phosphorus doped n+ poly-Si/SiOx contacts show degradation followed by recovery, undoped poly-Si/SiOx contacts only show recovery during annealing. Boron doped p+ poly-Si/SiOx contacts show neither degradation nor improvement with annealing. Both degradation and recovery are thermally-activated processes and are completely reversible and cyclic in nature. The activation energy of degradation and recovery in dark for n+ poly-Si/SiOx contacts are 1.27 and 1.33 eV respectively. Dark annealing at elevated temperatures is effective for complete recovery but takes a long time (~30 min at 350 degrees C) due to higher activation energies. Annealing under 7.5 Suns of illumination lowers the activation energy for degradation and recovery to 0.88 and 0.90 eV, respectively. Using this data, we have developed an industrially viable post-firing treatment for accelerated recovery of TOPCon cells by annealing them at elevated temperatures and under intense illumination for a few minutes.

14 SOLAR ENERGY↗

Modernizing Accelerator Responsiveness and Controls in Operations

Accelerators increasingly use artificial intelligence (AI) and machine learning (ML) software and workflows for a variety of tasks, from optimization to fault detection and recovery. Efficient and sustainable application of these technologies necessitates specialized and facility-specific infrastructure commitments. Accelerator facilities also introduce unique radiation and security hazards, placing additional demands on operational infrastructure. These needs further escalate the prioritization of effective collaboration models and associated funding mechanisms and legal frameworks.

43 PARTICLE ACCELERATORS↗

GPU Acceleration in SRW: Design and Considerations

Synchrotron Radiation Workshop (SRW) is a powerful tool for simulation synchrotron radiation emission and propagation through beamline elements, enabling advanced beamline design and experimental optimization. Recently, GPU acceleration has been developed for SRW to support highly detailed end-to-end simulations of experiments at synchrotron light sources. This work documents the design and implementation of this GPU acceleration support, addressing the complexities of adapting CPU-based components to heterogeneous computing architectures.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Modernization Project Conceptual Design Report

The accelerator complex now known as the Los Alamos Neutron Science Center (LANSCE) began operation in 1972 as LAMPF, the Los Alamos Meson Production Facility. In the intervening 53 years, the complex has been expanded in capability several times, both in terms of its accelerator performance and the user facilities it supports.

43 PARTICLE ACCELERATORS↗

Accelerator Science & Engineering (AS&E) Workforce Roundtable and AS&E Traineeship Principal Investigator Meeting

A one-and-half-day meeting on the Accelerator Science & Engineering (AS&E) Workforce Roundtable and a one-day meeting of Traineeship Principal Investigators took place at Facility for Rare Isotope Beams at Michigan State University on January 21-23, 2025. The meeting identified critical issues in the AS&E workforce and potential solutions, with a focus on DOE’s major accelerator facilities. The Traineeship PIs meeting focused on sharing experience, efficiency, and improvements of the Traineeship Programs conducted in six US universities. Several managers from the DOE High Energy Physics Office participated in the meetings. The discussions resulted in a decision to conduct similar meetings every year.

43 PARTICLE ACCELERATORS↗

Fast Ramping Accelerator Dipole Models for Fermilab’s Booster Upgrade and Muon Collider

The future discoveries in the field of High Energy Physics are led by the development of new types of accelerators. Around the world, there are a lot of researchers that are studying some possible designs for the future accelerators and some of them are considering the use of alternating current inside the superconducting magnets in order to have better efficiency. The work described in this report tries to compare some superconducting magnets made of different materials and to understand which one of them can be considered for its better performance working in a variable magnetic field. For this goal, becomes really important to control the temperature of the coil, and, as visible in the next chapter, to relate this parameter to the frequency of the magnetic field, in order to find, as will be named, the critical frequency .

43 PARTICLE ACCELERATORS↗

Rockies / Plains Energy Accelerator for Commercializing Hardtech (REACH)

This document is the final report for the Rockies/Plains Energy Accelerator for Commercializing Hard-Tech (REACH), a U.S. Department of Energy (USDOE)-funded energy hard tech accelerator jointly led by Colorado State University and Innosphere Ventures. Both organizations are located in Fort Collins, CO.

08 HYDROGEN↗

Graduate Traineeships in Accelerator Engineering and Physics

This final report summarizes the Norfolk State University portion of the project Graduate Traineeships in Accelerator Engineering and Physics. In the funded proposal, Norfolk State University participated as a collaborating institution in a broader multi-institution traineeship effort designed to prepare graduate students for work in accelerator engineering and physics, including students from Old Dominion University, Norfolk State University, and Hampton University.

43 PARTICLE ACCELERATORS↗

Manufacturing Full-Scale High Gradient Copper Accelerators: Electron Beam Welding and Allied Processes

This DOE ARDAP-funded study examines the technical and business feasibility of manufacturing high-gradient normal conducting RF (NCRF) copper accelerating structures using electron beam welding (EBW) instead of conventional high-temperature brazing. The core motivation is material performance: brazing softens copper significantly, while hard copper alloys have demonstrated ~75% higher operational gradients in SLAC tests, making cold-joining techniques highly attractive. EBW, applied to split-cell (half or quadrant) structure designs, preserves copper hardness away from the weld joint and simplifies machining — but industrial process optimization remains immature and a substantial learning curve is expected. The business case was modeled for two scenarios: a greenfield EBW linac company (> $10M upfront costs, viable above ~30 units/year) and an EBW division added to an existing accelerator firm to reduce risk and upfront costs, at the expense of being less optimal structure for the higher volume production. The study concludes that without a significant increase in demand, private investment alone cannot sustain this capability, and recommends federal support through R&D grants, procurement incentives, and CAPEX cost-sharing to incubate domestic EBW-NCRF manufacturing — with the existing-company model.

43 PARTICLE ACCELERATORS↗

Acceleration of Thermochemistry Solves in MOOSE and Pronghorn

This work focuses on the development and implementation of strategies to accelerate thermochemical calculations within MOOSE-based multiphysics simulations, particularly for applications in MSRs. We highlight the inherent complexity of nuclear materials, which require a multiscale approach to accurately model their behavior across various physical domains, including mechanical, chemical, and thermal phenomena. Thermochemical equilibrium calculations are crucial for predicting material properties and enhancing the fidelity of these simulations. The integration of Thermochimica, a Gibbs energy minimizer, into MOOSE allows for the direct minimization of Gibbs energy at every point on the mesh. However, the computational cost of such integration is significant. To address this, we explored acceleration strategies such as multi-threading support and the use of a thermodynamic ValueCache to reduce redundant calculations. Additionally, we investigated modifications to Thermochimica to enable phase constraints and improve its coupling with phase-field models, which are essential for simulating microstructural evolution and corrosion in MSR. These efforts aim to optimize the computational efficiency and accuracy of multiphysics simulations, thereby supporting the development of reliable and efficient nuclear materials for next-generation reactor technologies.

36 - MATERIALS SCIENCE↗

Detector Simulation Challenges for Future Accelerator Experiments

Detector simulation is a key component for studies on prospective future high-energy colliders, the design, optimization, testing and operation of particle physics experiments, and the analysis of the data collected to perform physics measurements. This review starts from the current state of the art technology applied to detector simulation in high-energy physics and elaborates on the evolution of software tools developed to address the challenges posed by future accelerator programs beyond the HL-LHC era, into the 2030–2050 period. New accelerator, detector, and computing technologies set the stage for an exercise in how detector simulation will serve the needs of the high-energy physics programs of the mid 21st century, and its potential impact on other research domains.

43 PARTICLE ACCELERATORS↗

European Contributions to Fermilab Accelerator Upgrades and Facilities for the DUNE Experiment

The Proton Improvement Plan (PIP-II) to the FNAL accelerator chain and the Long-Baseline Neutrino Facility (LBNF) will provide the world's most intense neutrino beam to the Deep Underground Neutrino Experiment (DUNE) enabling a wide-ranging physics program. This document outlines the significant contributions made by European national laboratories and institutes towards realizing the first phase of the project with a 1.2 MW neutrino beam. Construction of this first phase is well underway. For DUNE Phase II, this will be closely followed by an upgrade of the beam power to > 2 MW, for which the European groups again have a key role and which will require the continued support of the European community for machine aspects of neutrino physics. Beyond the neutrino beam aspects, LBNF is also responsible for providing unique infrastructure to install and operate the DUNE neutrino detectors at FNAL and at the Sanford Underground Research Facility (SURF). The cryostats for the first two Liquid Argon Time Projection Chamber detector modules at SURF, a contribution of CERN to LBNF, are central to the success of the ongoing execution of DUNE Phase I. Likewise, successful and timely procurement of cryostats for two additional detector modules at SURF will be critical to the success of DUNE Phase II and the overall physics program. The DUNE Collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This paper is being submitted to the 'Accelerator technologies' and 'Projects and Large Experiments' streams. Additional inputs related to the DUNE science program, DUNE detector technologies and R&D, and DUNE software and computing, are also being submitted to other streams.

43 PARTICLE ACCELERATORS↗

Measurement of internal dark current in a 17 GHz accelerator structure with an elliptical sidewall

A 17 GHz single cell, standing wave, copper accelerator structure with an axisymmetric elliptical central cell sidewall was tested for internal and downstream dark current as a function of gradient up to 93 MV/m. The elliptical sidewall was predicted to suppress the internal dark current and the lower order multipactor modes as compared with a previously tested structure having a straight sidewall. During the conditioning phase of the elliptical sidewall structure, strong internal dark current generated by an N = 1 multipactor mode was observed at gradients in the 10 to 20 MV/m range. After conditioning with 2.2x10^5 pulses to 93 MV/m, the N = 1 mode was completely suppressed and no multipactor resonances were observed. The internal dark current was reduced to a comparatively low level, much smaller than in the previously studied, straight sidewall structure, in good agreement with simulations. The energy spectrum of the electrons colliding with the sidewall was measured using an isolated side dark current monitor and a bias voltage. As the conditioning progressed, the electron energy spectrum showed an increase in the concentration of lower energy electrons, also in good agreement with simulations. Studies of internal dark current may help to understand the rf conditioning and ultimate performance of high gradient accelerator structures.

43 PARTICLE ACCELERATORS↗

Results: Smart Labs Accelerator

This fact sheet highlights the results of DOE's Better Buildings Smart Labs Accelerator, which was a 3-year partnership between DOE and 17 volunteer partners to promote and implement energy efficiency and Smart Labs Programs in laboratory environments. The results review the savings achieved by participants and assess how well the Accelerator performed against its original goals.

laboratory, smart labs, smart laboratories, energy↗

ACCELERATED CREEP TEST (ACT) QUALIFICATION OF CREEP RESISTANCE USING THE WCS CONSTITUTIVE MODEL AND STEPPED ISOSTRESS METHOD (SSM)

In this study, a qualification of accelerated creep-resistance of Inconel 718 is assessed using the novel Wilshire-Cano-Stewart (WCS) model and the stepped isostress method (SSM) and predictions are made to conventional creep data. Conventional creep testing (CCT) is a long-term continuous process, in fact, the ASME B&PV III requires that 10,000+ hours of experiments must be conducted to each heat for materials employed in boilers and/or pressure vessel components. This process is costly and not feasible for rapid development of new materials. As an alternative, accelerated creep testing techniques have been developed to reduce the time needed to characterize the creep resistance of materials. Most techniques are based upon the time-temperature-stress superposition principle (TTSSP) that predicts minimum-creep-strain-rate (MCSR) and stress-rupture behaviors but lack the ability to predict creep deformation and consider deformation mechanisms that occur for experiments of longer duration. The stepped isostress method (SSM) has been developed which enables the prediction of creep deformation response as well as reduce the time needed for qualification of materials. The SSM approach has been successful for polymer, polymeric composites, and recently has been introduced for metals. In this study, the WCS constitutive model, calibrated to SSM test data, qualifies the creep resistance of Inconel 718 at 750°C and predictions are compared to CCT data. The WCS model has proven to make long-term predictions for stress-rupture, minimum-creep-strain-rate (MCSR), creep deformation, and damage in metallic materials. The SSM varies stress levels after time interval adding damage to the material, which can be tracked by the WCS model. The SSM data is calibrated into the model and the WCS model generates realistic predictions of stress-rupture, MSCR, damage, and creep deformation. The calibrated material constants are used to generate predictions of stress-rupture and are post-audit validated using the National Institute of Material Science (NIMS) database. Similarly, the MCSR predictions are compared from previous studies. Finally the creep deformation predictions are compared with real data and is determined that the results are well in between the expected boundaries. Material characterization and mechanical properties can be determined at a faster rate and with a more cost-effective method. This is beneficial for multiple applications such as in additive manufacturing, composites, spacecraft, and Industrial Gas Turbines (IGT).

36 MATERIALS SCIENCE↗

Coupled Bunch Instabilities Growth in the Fermilab Booster during Acceleration Cycle

Currently, Fermilab Booster accelerates ~4.5E12 protons per pulse (ppp) in 81 bunches from 400 MeV to 8 GeV at 15 Hz to provide beam to multiple HEP experiments and is being upgraded to handle higher beam intensity >6.7E12 ppp at a repetition rate of 20 Hz. In the current mode of operation, we control longitudinal coupled bunch instabilities (LCBI) using combination of passive and active dampers. The issues with LCBI are expected to worsen at higher beam intensities. Here, we would like to investigate at what time in the beam cycle a particular mode is going to originate and how much it contributes at a different time of the acceleration cycle using the collected wall current monitor data from injection to extraction. Also, measure growth rates as a function of beam intensity for some dominant modes. Finally, this paper presents results from the observed LCBI analysis for the highest available beam intensities, unexpected findings, and future plans to mitigate the LCBI at higher beam intensities

43 PARTICLE ACCELERATORS↗