Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Developing A Fully Implicit Compressible Flow Valve Model in RELAP-7 and Its Application in Short Term BWR Station Black-Out Analyses

This paper presents a set of dynamical models for SRV simulation and their implementation in the RELAP-7 code, which is a new reactor system analysis code being developed at INL. RELAP-7 is based on the MOOSE (the Multi-Physics Object-Oriented Simulation Environment) framework. The compressible flow SRV model covers three different sets of models: fully closed case, subsonic case, and choking case. The RELAP-7 is a fully implicit code and the preconditioned Jacobian-free Newton-Krylov (JFNK) method is used to solve the discretized nonlinear problem. The JFNK method generally needs a good preconditioning scheme to be effective and efficient. There are different ways to precondition the JFNK method. In RELAP-7, two main options are used to obtain the preconditioning matrix: (1) FDP (Finite Difference Preconditioning) option which uses the default finite differencing method provided in the PETSc package. PETSc is the numerical solver software developed by Argonne National Laboratory and used by MOOSE as the numerical solution engine; (2) SMP (Single Matrix Preconditioning) option which requires code developers to provide approximate analytical Jacobian inputs for the important diagonal and off-diagonal terms. Due to the strong discontinuity in the residual vector space when the compressible flow valve model switches from one set of model to another, FDP option cannot guarantee convergence. Instead, accurate analytical Jacobain terms are provided for the compressible flow valve model. With the SMP option selected, the compressible flow valve model can be solved efficiently under different cases. The developed compressible flow valve model has been used for SRV component simulation in several simplified BWR SBO (Station Black-Out) simulations with RELAP-7. This paper only presents cases for short-term SBO in which all the safety systems fail to start and function properly when SBO occurs. Consequently, only the SRVs automatically open and close periodically to control the primary system pressure and discharge the high temperature and high pressure steam into the suppression pool. Although simplified, this case is quite similar to what happened in Fukushima Daiichi Unit 1. Unit 1 had no RCIC system, while the isolation condenser system was believed to be non-functioning, or only available for a very short period of time during the accident. Therefore, the Unit 1 reactor core reached a fuel failure temperature only a few hours into the accident. Two short-term SBO cases will be compared: one with single SRV discharge line which represents all the SRV lines and another case with multi-group SRVs which represent each group of SRV line with different setting points.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Kite ground station and system using same

A kite system with a ground station adapted for airborne power generation. The kite system may include a kite which includes one or more airfoils which have mounted thereon a plurality of turbine driven generators. The turbine driven generators may also function as motor driven propellers in a powered flight mode, which may be used during take-off, which may include aspects of vertical take-off and landing. A perch adapted to facilitate the take-off and landing may be used as part of the system. The perch may pivot such that the pivot is oriented towards the tension direction of the tether.

Vander Lind, Damon↗

Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line (BTS) for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this enhancement. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

43 PARTICLE ACCELERATORS↗

Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

43 PARTICLE ACCELERATORS↗

Viability of an Unattended Verification Station for UF6 Cylinders: Phase I Findings

In recent years, the International Atomic Energy Agency (IAEA) has pursued innovative techniques and an integrated suite of safeguards measures to address the verification challenges posed by the front end of the nuclear fuel cycle. Among the unattended instruments currently being explored by the IAEA is an Unattended Cylinder Verification Station (UCVS), which could provide automated, independent verification of the declared relative enrichment, 235U mass, total uranium mass, and identification for all declared uranium hexafluoride (UF6) cylinders in a facility (e.g., uranium enrichment plants and fuel fabrication plants). Under the auspices of the United States and European Commission Support Programs to the IAEA, a project was undertaken to assess the technical and practical viability of the UCVS concept. Phase I of the UCVS viability study was centered on a long-term field trial of a prototype UCVS system at the Westinghouse Fuel Fabrication Facility in South Carolina, USA. A key outcome of the study was a quantitative performance evaluation of two nondestructive assay (NDA) methods being considered for inclusion in a UCVS: Hybrid Enrichment Verification Array (HEVA), and Passive Neutron Enrichment Meter (PNEM). This paper will provide context for the UCVS and potential implementation concepts, a description of the UCVS prototype design, and an overview of the long-term field trial at a fuel fabrication facility. Selected field-trial results and interpretation are presented, including the performance of PNEM and HEVA for the verification of declared enrichment and 235U mass in over 200 “typical” Type 30B cylinders. Example results from a modeling study provide a preliminary assessment of sensitivity to material-substitution scenarios, for the as-fielded NDA methods.

Smith, Leon E.↗

Peña Station NEXT: Visualizing a net-zero energy district

Learn how NREL researchers are using advanced modeling and visualization tools to help create the planned net-zero energy district, Peña Station NEXT, near the Denver International Airport in Denver, Colorado. This project will result in tools for smart city design that can be applied across the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accessibility and Availability of Gas Stations for Liquid Fuel Supply During Severe Weather Events

Energy infrastructure is a pivotal lifeline with wider inter-dependencies. Electric power is essential to the continued functioning of critical assets; liquid fuels and other physical primary energy commodities that are used to supply the local energy needs of these assets during extreme events when electricity infrastructure is compromised. During Superstorm Sandy, the disruption of fuel supplies in the Tri-state area necessitated increasing situational awareness about oil and natural gas (ONG) systems to redirect fuel supplies to first responders and for restoration efforts. During winter storm events over the past several years, the demand for ONG for heating and power generation has skyrocketed in the north-east, which subsequently had caused ONG price to hit their highest level in years. ONG is a major energy source for restoration and recovery activities. However, very little, if any, situational awareness information about ONG supply and demand is available to those coordinating emergency efforts. Often this lack of information is due to the decentralized nature of the ONG supply chain and proprietary data maintained by private entities. To understand the impact of fuel availability on response and recovery efforts, this research focuses on (i) determining the accessibility to gas stations for liquid fuel supply across space and time, and (ii) examining the spatio-temporal variation of fuel availability and demand during extreme weather events. The broader scope of the project focuses on providing spatio-temporal situational awareness information about ONG availability and demand across the fuel supply chain for positioning of resources for response activities.

Kar, Bandana↗

Space vehicle with customizable payload and docking station

A “black box” space vehicle solution may allow a payload developer to define the mission space and provide mission hardware within a predetermined volume and with predetermined connectivity. Components such as the power module, radios and boards, attitude determination and control system (ADCS), command and data handling (C&DH), etc. may all be provided as part of a “stock” (i.e., core) space vehicle. The payload provided by the payload developer may be plugged into the space vehicle payload section, tested, and launched without custom development of core space vehicle components by the payload developer. A docking station may facilitate convenient development and testing of the space vehicle while reducing handling thereof.

Judd, Stephen↗

Shielding Experiments Under JASMIN Collaboration at Fermilab(IV) - Measurement and Analyses of High-Energy Neutron Spectra in the Anti-Proton Target Station

Neutron spectra in high-energy region between 1 and 100-MeV in the shield configuration of the anti-proton target station and a 120-GeV proton beam at Fermi National Accelerator Laboratory (Fermilab) were determined using the reaction rate data obtained with the multi-foil activation method. Two kinds of methods were employed for the determination of neutron spectra: one is the fitting method which is newly developed in this work, another is the unfolding method with SAND-II code. The calculations were performed using the PHITS. From the comparison between the calculated and experimental neutron spectra, it concluded that the PHITS can be used for shielding design of high-energy proton accelerators.

43 PARTICLE ACCELERATORS↗

Integrated Controls for Plug Loads and Lighting Systems - Case Study: Minnesota DOT Cedar Avenue Truck Station

This case study highlights the strategies the Minnesota Department of Transportation used at Cedar Avenue Truck Station for integrating plug load and lighting systems. An integrated controls pilot project with retrofit installation was conducted from October 2019 to April 2020 and was recognized by DOE's Integrated Lighting Campaign.

integrated lighting, lighting, controls, plug load↗

Experimental and code simulation of a station blackout scenario for APR1400 with test facility ATLAS and MARS code

A SBO (station blackout) experiment named SBO-01 was performed at full-pressure IET (Integral Effect Test) facility ATLAS (Advanced Test Loop for Accident Simulation) which is scaled down from the APR1400 (Advanced Power Reactor 1400 MWe). In this study, the transient of SBO-01 is discussed and is subdivided into three phases: the SG fluid loss phase, the RCS fluid loss phase, and the core coolant depletion and core heatup phase. In addition, the typical phenomena in SBO-01 test - SG dryout, natural circulation, core coolant boiling, the PRZ full, core heat-up - are identified. Furthermore, the SBO-01 test is reproduced by the MARS code calculation with the ATLAS model which represents the ATLAS test facility. The experimental and calculated transients are then compared and discussed. The comparison reveals there was malfunction of equipments: the SG leakage through SG MSSV and the measurement error of loop flow meter. As the ATLAS model is validated against the experimental results, it can be further employed to investigate the other possible SBO scenarios and to study the scaling distortions in the ATLAS. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhancement of NRC station blackout requirements for nuclear power plants

The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Steam Dryer Segmentation and Packaging at Grand Gulf Nuclear Station - 13577

Entergy recently performed an Extended Power Up-rate (EPU) on their Grand Gulf Nuclear Station, near Port Gibson, Mississippi. To support the EPU, a new Steam Dryer Assembly was installed during the last refueling outage. Due to limited access into the containment, the large Replacement Steam Dryer (RSD) had to be brought into the containment in pieces and then final assembly was completed on the refueling floor before installation into the reactor. Likewise, the highly contaminated Original Steam Dryer (OSD) had to be segmented into manageable sections, loaded into specially designed shielded containers, and rigged out of containment where they will be safely stored until final disposal is accomplished at an acceptable waste repository. Westinghouse Nuclear Services was contracted by Entergy to segment, package and remove the OSD from containment. This work was performed on critical path during the most recent refueling outage. The segmentation was performed underwater to minimize radiation exposure to the workers. Special hydraulic saws were developed for the cutting operations based on Westinghouse designs previously used in Sweden to segment ABB Reactor Internals. The mechanical cutting method was selected because of its proven reliability and the minimal cutting debris that is generated by the process. Maintaining stability of the large OSD sections during cutting was accomplished using a custom built support stand that was installed into the Moisture Separator Pool after the Moisture Separator was installed back in the reactor vessel. The OSD was then moved from the Steam Dryer Pool to the Moisture Separator Pool for segmentation. This scenario resolved the logistical challenge of having two steam dryers and a moisture separator in containment simultaneously. A water filtration/vacuum unit was supplied to maintain water clarity during the cutting and handling operations and to collect the cutting chips. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dense Non Aqueous Phase Liquid Source Area Delineation Using Membrane Interface Probe and Hydraulic Profile Tool Technology at Space Launch Complex 16, Cape Canaveral Air Force Station, Florida - 16352

The historical use and disposal of chlorinated solvents throughout Department of Defense and Department of Energy sites has resulted in subsurface contamination by dense non-aqueous phase liquids (DNAPL). The nature and environmental persistence of DNAPLs makes delineation and remediation of these compounds challenging and costly. This paper examines the utilization of data from a membrane interface probe (MIP) and hydraulic profile tool (HPT) to reduce a typical 18 to 24 month field investigation to 3 months; thereby, significantly reducing costs and resulting in a three-dimensional (3D) imagery of a deep DNAPL plume in order to support an aggressive remedial design for Space Launch Complex 16 (SLC16) at Cape Canaveral Air Force Station, Florida. During the early stages of the U.S. space program, chlorinated solvents were routinely used at space complexes. Spent solvents were discharged to surface impoundments where they migrated into the subsurface. Over time, these chlorinated solvents reached concentrations high enough to form a DNAPL plume. Recent investigations near SLC16 identified a previously unknown DNAPL plume co-mingled with dissolved-phase chlorinated compounds. The DNAPL source area (concentrations of trichloroethene [TCE] as high as 1,000,000 micrograms per liter [μg/L]) was discovered approximately 1,200 feet (ft) west of the existing monitoring network area. The U.S. Air Force, along with the U.S. Army Corps of Engineers, developed data quality objectives (DQO) to delineate the extent of the DNAPL and the dissolved-phase contaminant plume. A multi-phase investigation approach was developed by HydroGeoLogic, Inc. (HGL) emphasizing the use of MIP and HPT sampling technologies, conventional direct push technology (DPT), and monitoring well sampling methods. This approach allowed the collection of real-time data that supported the project DQOs and significantly reduced overall project costs and the field implementation schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Demonstration - San Onofre Nuclear Generating Station South Yard Facility - 16544

Following the decision to retire Units 2 and 3 at the San Onofre Nuclear Generating Station (SONGS), Southern California Edison (SCE) staffed a multi-discipline team to investigate decommissioning best practices. SCE also tasked this team with reducing the overall radiological footprint and radioactive material inventory in the near term. The SCE decommissioning activities investigation team targeted projects at the facility which could reduce the source term and risk, and investigate management approaches with decommissioning contractors. SCE, through this team, contracted EnergySolutions to provide a solution for processing and disposal of equipment and materials at a storage facility south of the plant. The South Yard Facility included offices, instrument repair facilities, a large machine shop, outage equipment storage, waste management facilities, and decontamination facilities. SCE contracted EnergySolutions to manage, supervise, plan, and provide labor for the disposition of the legacy waste stored at the South Yard to include the Radioactive Equipment/Materials Storage (REMS) Pad and South Yard Facility. Under the Contractor Work Authorization (CWA), SCE authorized EnergySolutions to consolidate, package, transport, and dispose of the Low Level Radioactive Waste (Class A) and Mixed Low Level Radioactive Waste from the aforementioned areas. The scope also included disposition of material that was expected to be free from radiological contamination, but required management as a hazardous waste. The legacy waste consisted of an inventory of containers designated as trash provided by SCE, as well as, all materials stored within the rooms of the SYF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Cleaning of the Total Dissolved Solids Tanks at the Palo Verde Nuclear Generating Station - 18337

Westinghouse is executing a contract from Arizona Public Services to provide a system capable of removing highly radioactive sediment from eight Total Dissolved Solids (TDS) Tanks located at the Palo Verde Nuclear Generating Station. The scope of work covers the design, procurement, fabrication, and eventual operation of the system at the Palo Verde Site. It also includes the factory acceptance testing of the system, prior to operation at the site. Previous attempts to clean the tanks involved working inside and around the tanks for extended periods of time in a high radiation field. Spray hoses were used to wash down the sediment, and hand tools were used to scrape out the remaining sludge at the bottom. This methodology also required the lower manway to be removed. As a result, the worker radiation exposure limit was exceeded on the first of the nine tanks. As a solution to the high radiation environment of the TDS tanks, Westinghouse will provide and operate a pneumatically powered robotic crawler. This crawler traverses the bottom of the tank with a 4,000 psi high-pressure spray head affixed to the front of the crawler to blast sediment from the walls and floor of the TDS tanks. This paper will present the conceptual design of the TDS Tank cleaning system, noting the key benefits of specific components in the overall technology basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Processing System at Pilgrim Nuclear Station - 19665

Pilgrim Nuclear Power Station (PNPS) has been using reverse osmosis (RO) to process equipment and floor drain water to the condensate storage tank for 23 years. In 1996 a Thermex unit was designed, fabricated and installed by Chem-Nuclear Systems, now EnergySolutions. This unit consisted of a dual pass RO followed by ion exchange for polishing. In April 2017, PNPS and EnergySolutions commissioned a new Thermex unit consisting of a single pass RO followed by electrodeionization (EDI) for polishing. The new Thermex unit provides consistence product water quality meeting specifications for reactor reuse and lowering the amount of ion exchange usage when compared to the previous generation of Thermex. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗