Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROOFS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Ground control for highwall mining

Perhaps the greatest risk to both equipment and personnel associated with highwall mining is from ground control. The two most significant ground control hazards are rock falls from highwall and equipment entrapment underground. In the central Appalachians, where the majority of highwall mining occurs in the USA, hillseams (or mountain cracks) are the most prominent structure that affects highwall stability. The article discusses measures to minimise the risk of failure associated with hillstreams. A 'stuck' or trapped highwall miner, and the ensuring retrieval or recovery operation, can be extremely disruptive to the highwall mining process. Most entrapment, are due to roof falls in the hole. The options for recovery are surface retrieval, surface excavation or underground recovery. Proper pillar design is essential to maintain highwall stability and prevent entrapments. NIOSH has developed the Analysis of Retreat Mining Pillar stability-Highwall Mining (ARMPS-HWM) computer program to help mine planners with this process. 10 figs.

01 COAL, LIGNITE, AND PEAT↗

Decommissioning of the 247-F Fuel Manufacturing Facility at the Savannah River Site (SRS)

Building 247-F at SRS was a roughly 110,000 ft{sup 2} two-story facility designed and constructed during the height of the cold war naval buildup to provide additional naval nuclear fuel manufacturing capacity in early 1980's. The manufacturing process employed a wide variety of acids, bases, and other hazardous materials. As the need for naval fuel declined, the facility was shut down and underwent initial deactivation, which was completed in 1990. All process systems were flushed with water and drained using the existing process drain valves. However, since these drains were not always installed at the lowest point in piping and equipment systems, a significant volume of liquid remained after initial deactivation. After initial deactivation, a non-destructive assay of the process area identified approximately 17 ({+-}100%) kg of uranium held up in equipment and piping. The facility was placed in Surveillance and Maintenance mode until 2003, when the decision was made to perform final deactivation, and then decommission the facility. The following lessons were learned as a result of the D and D of building 247-F. Successful D and D of a major radiochemical process building requires significant up-front planning by a team of knowledgeable personnel led by a strong project manager. The level of uncertainty and resultant risk to timely, cost effective project execution was found to be high. Examples of the types of problems encountered which had high potential to adversely impact cost and schedule performance are described below. Low level and sanitary waste acceptance criteria do not allow free liquids in waste containers. These liquids, which are often corrosive, must be safely removed from the equipment before it is loaded to waste containers. Drained liquids must be properly managed, often as hazardous or mixed waste. Tapping and draining of process lines is a dangerous operation, which must be performed carefully. The temptation to become complacent when breaking into lines is great. Incidents of personnel exposure to liquids during draining are likely. Records from the initial 1990 deactivation led early work planners to assume the facility was cold, dark and dry. This turned out to be a poor assumption. Work instructions had to be modified to require that engineers evaluate each of several hundred process lines to identify the low point, where a tap and drain system could be installed to allow positive verification that the line was empty before the line was cut for removal. During the period between facility shut down in 1990 and the start of final deactivation in 2003, roof leaks had developed, allowing rain water to enter building 247-F, which provided an environment for mold growth. Sampling confirmed the presence of Stachybotrys chartarum, a toxic indoor mold that grows on wet cellulosic material, such as drywall paper. D and D workers in areas where this hazard was identified were required to where proper personal protective equipment, which complicated work execution. Discovery of the potential presence of uniquely hazardous chemicals such as shock sensitive compounds and toxic uranium hexafluoride became issues which required investigation and special handling strategies. Team access to subject matter experts, who could quickly provide the required guidance for safe material handling, was critical to keeping the project on schedule. In old legacy facilities, it is possible that the D and D workers will be exposed to undocumented energy sources such as energized electrical conductors and pipes containing hazardous materials that originate outside the boundaries of the facility. Significant effort must be expended on adequate mechanical and electrical isolation. Subdividing the facility into well defined zones for which detailed zone-specific end points could be developed proved to be a highly effective project management strategy. Waste management must be carefully planned. The rate of waste generation as the facility is converted from a structure to waste can frequently exceed the D and D team's resources to characterize, package, store and transport the waste to a disposal facility in a timely manner. This can lead to schedule delays and/or increased project cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors

Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU{sup TM} design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU{sup TM} prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant and presently operating facilities. Several significant issues have arisen over the decades these reactors have been in the SWS phase. With the long time frames encompassed by this approach to decommissioning, the storage and maintenance of facility information for future decommissioning, and the knowledge and training of successive generations of staff to perform facility inspections and maintenance are major issues. Complacency of both staff and management is a potential issue. The problem arises primarily because these facilities have been put into a comparatively low hazard state, are remotely located, and not much changes over time and changes are slow. During the period that these facilities have been in this state, regulatory scrutiny and expectations have increased. This along with continuing changes in regulatory staff requires a continuous education and communication activity with the regulator. Because of the long time frames involved, the building structures continue to deteriorate slowly, and repairs and maintenance are required upon occasion. The costs can be significant, for example, to replace a roof. When these occasions arise, the balance of cost and benefit is always questioned, i.e., 'Wouldn't it be better to spend the money on dismantling rather than fixing?'. One positive note is that ancillary buildings that either have very low radiation hazards or were decontaminated during the initial decommissioning activities have been used for several alternate uses. This has helped to defray costs, and also keeps an interest in maintaining the building structures and systems in good condition during the SWS phase. Over the past few years, the lessons learnt from these and other facilities in SWS, have been addressed in a holistic manner by moving from a short-term, project-oriented approach to a comprehensive, long term stewardship approach. Key to this approach was the development of an integrated plan to decommission all of AECL's facilities. One of the prime results of the implementation of this plan was the development of an organizational structure that addressed the lessons learnt to date including information management, quality assurance, training, waste management, funding, etc. that are required to successfully maintain these prototype reactors until they can be fully decommissioned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cleanup of Nuclear Licensed Facility 57

This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a minimum of HLW.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IR keeps coal miners safe and reduces downtime

Infrared (IR) cameras can inspect the direct current trolley system that powers mantrips and locomotives that transport men and supplies to an underground mine. If trolley insulators become shorted or electrically leaky they can heat the roof and cause a fire or cave-in. The article explains how IR inspection works and describes typical problems that can be identified by thermograms. 8 figs.

01 COAL, LIGNITE, AND PEAT↗

Uncertainties In Performance Assessments For The Yucca Mountain Site And The Edge-of-Compliance

Numerical performance assessments of deep geologic disposal systems of long-lived radioactive wastes serve as the primary tool for quantitatively assessing projected performance and for making regulatory compliance decisions, both in the U.S. and disposal programs abroad. However there is a significant body of opinion, expressed in the international literature, that the confidence that can be placed on such assessments decreases significantly as the analysis time frames increase into the many hundreds of thousands of years. With the inclusion of highly corrosion resistant metals in the planned waste package designs for the Yucca Mountain (YM) system commercial spent fuel and defense-generated high-level radioactive waste disposal, published projections for the site show doses to the receptor at times extending into the many hundreds of thousands of years. The question of relative confidence in dose projections becomes more important at very long time frames, particularly when the time frame for significant doses increases dramatically reflecting the effects of using highly corrosion resistant materials. To examine uncertainties in performance assessments of the YM disposal system over very long time frames, a site model developed by the U.S. Department of Energy to assess sensitivities in peak dose performance was modified and used to examine the propagation of uncertainties for a hypothetical disposal system. These analyses start with a hypothetical disposal system at the 'edge-of-compliance' at 10,000 years, reflecting the generic repository standard in 40 CFR Part 191. The hypothetical system was poised to give a mean dose of 0.15 milli-sievert/year (15 mrem/yr.) at 10,000 years, by allowing a fixed number of waste packages to 'fail' within the first 5,000 years after closure. By maintaining the number failed waste packages constant over time, the spread in dose estimates over the time to peak dose was calculated for this system perched at the 'edge-of-compliance' at 10,000 years. This hypothetical construct removes waste package performance from the analyses and allows the site model to explore the effects of uncertainties in the natural barrier and site conditions on the dose projections out to the time of peak dose. The sensitivities of these projections to various 'driver' parameters were examined, including infiltration rates, solubility constraints, water chemistry and roof collapse assumptions. Overall, the initial construct showed a one and one-half order of magnitude spread between the 5. and 95. percentiles at 10,000 years, the initial state for the analyses. This spread increased to approximately three and one-half orders of magnitude at peak dose, reflecting the effects of transport and retardation mechanisms on the fixed source term. The model eliminated portions of the transport path from the repository where relatively little retardation would be expected. Travel times were therefore significantly reduced thereby eliminating radioactive decay as an important mechanism in reducing projected doses. Solubility controls appear to be a major source of uncertainties in the dose projections for the model used. These results support the general international consensus that confidence in dose projections over very long time frames does decrease, and illustrates that this conclusion also applies to assessments of the YM projected performance as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning an Active Historical Reactor Facility at the Savannah River Site - 13453

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions (SRNS). In 2004, DOE recognized SRS as structure within the Cold War Historic District of national, state and local significance composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. This reactor has five primary areas within it, including a Disassembly Basin (DB) that received irradiated materials from the reactor, cooled them and prepared the components for loading and transport to a Separation Canyon for processing. The 6,317 square meter area was divided into numerous work/storage areas. The walls between the individual basin compartments have narrow vertical openings called 'slots' that permit the transfer of material from one section to another. Data indicated there was over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 M liters of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The need for an action was identified in 2010 to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. DOE, its regulators [U. S. Environmental Protection Agency (USEPA)-Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC)] and the SC Historical Preservation Office (SHPO) agreed/concurred to perform a non-time critical removal action for the In Situ Decommissioning (ISD) of the 105-C Disassembly Basin. ISD consisted of stabilization/isolation of remaining contaminated water, sediment, activated reactor equipment, and scrap metal by filling the DB with underwater non-structural grout to the appropriate (-4.877 meter) grade-level, thence with dry area non-structural grout to the final -10 centimeter level. The roof over the DB was preserved due to its potential historical significance and to prevent the infiltration of precipitation. Forced evaporation was the form of treatment implemented to remove the approximately 9.1 M liters of contaminated basin water. Using specially formulated grouts, irradiated materials and sediment were treated by solidification/isolation thus reducing their mobility, reducing radiation exposure and creating an engineered barrier thereby preventing access to the contaminants. Grouting provided a low permeability barrier to minimize any potential transport of contaminants to the aquifer. Efforts were made to preserve the historical significance of the Reactor in accordance with the National Historic Preservation Act. ISD provides a cost effective means to isolate and contain residual radioactivity from past nuclear operations allowing natural radioactive decay to reduce hazards to manageable levels. This method limits release of radiological contamination to the environment, minimizes radiation exposure to workers, prevents human/animal access to the hazardous substances, and allows for ongoing monitoring of the decommissioned facility. Field construction was initiated in August 2011; evaporator operations commenced January 2012 and ended July 2012 with over 9 M liters of water treated/removed. Over 8,525 cubic meters of grout were placed, completing in August 2012. The project completed with an excellent safety record, on schedule and under budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval System for Calcined Waste for the Idaho Cleanup Project - 12104

This paper describes the conceptual approach to retrieve radioactive calcine waste, hereafter called calcine, from stainless steel storage bins contained within concrete vaults. The retrieval system will allow evacuation of the granular solids (calcine) from the storage bins through the use of stationary vacuum nozzles. The nozzles will use air jets for calcine fluidization and will be able to rotate and direct the fluidization or displacement of the calcine within the bin. Each bin will have a single retrieval system installed prior to operation to prevent worker exposure to the high radiation fields. The addition of an articulated camera arm will allow for operations monitoring and will be equipped with contingency tools to aid in calcine removal. Possible challenges (calcine bridging and rat-holing) associated with calcine retrieval and transport, including potential solutions for bin pressurization, calcine fluidization and waste confinement, are also addressed. The Calcine Disposition Project has the responsibility to retrieve, treat, and package HLW calcine. The calcine retrieval system has been designed to incorporate the functions and technical characteristics as established by the retrieval system functional analysis. By adequately implementing the highest ranking technical characteristics into the design of the retrieval system, the system will be able to satisfy the functional requirements. The retrieval system conceptual design provides the means for removing bulk calcine from the bins of the CSSF vaults. Top-down vacuum retrieval coupled with an articulating camera arm will allow for a robust, contained process capable of evacuating bulk calcine from bins and transporting it to the processing facility. The system is designed to fluidize, vacuum, transport and direct the calcine from its current location to the CSSF roof-top transport lines. An articulating camera arm, deployed through an adjacent access riser, will work in conjunction with the retrieval nozzle to aid in calcine fluidization, remote viewing, clumped calcine breaking and recovery from off-normal conditions. As the design of the retrieval system progresses from conceptual to preliminary, increasing attention will be directed toward detailed design and proof-of- concept testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The MARSAME Methodology: Fundamentals, Benefits and Applications - 12135

MARSAME is an acronym for the 'Multi-Agency Radiation Survey and Assessment of Materials and Equipment'. Published in January 2009, MARSAME was a joint effort between the U.S. Department of Energy (DOE), the U.S. Department of Defense, the U.S. Department of Energy, and the U.S. Nuclear Regulatory Commission (NRC) to aid sites in the clearance of materials and equipment (M and E). The MARSAME manual supplements the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), published in 1997. As cited in the MARSAME, applicable M and E includes metals, concrete, tools, equipment, piping, conduit, and furniture. Also included are dispersible bulk materials such as trash, rubble, roofing materials, and sludge. Solids stored in containers, as well as liquids and gases, represent additional M and E. The MARSAME methodology covers multiple technical areas, including the initial assessment (IA), Measurement Quality Objectives (MQOs), survey approaches and considerations, survey plans, survey implementation, and Data Quality Assessment (DQA). These topics are generally captured under four phases of the data life cycle, which are Planning, Implementation, Assessment, and Decision-Making. Flexibility and a graded approach are inherent components of the MARSAME methodology pertaining to M and E property clearance programs. Because large quantities of M and E potentially affected by radioactivity are present in the United States, owners of the M and E need to identify acceptable disposition options. Thirteen disposition options, broadly defined under both release and interdiction scenarios, are described in MARSAME. Nine disposition options are listed for release; these options are categorized into two for reuse, two for recycle, four for disposal, and one that is essentially 'status quo' (i.e., maintain current radiological controls). Four interdiction options are also cited. To date, applications of the MARSAME approach for M and E property clearance under reuse scenarios have been limited. However, this should change as familiarity increases. Known examples are provided from DOE-contractor and NRC-licensee facilities. If the methodology is appropriately planned and implemented, the benefits of the MARSAME approach include worker and public protection, reduction in the amount of disposed radioactive waste, reuse of materials (resulting in environmental and material sustainability advantages), and cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Direct Path To WIPP - 12471

Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant (WIPP) will be discussed. Lessons learned from the RH campaigns are: - Some containers that were originally identified as HC-3 have been re-evaluated and became < HC-3 due to the conservative estimates made by the original generators - Operators at the AHCF were not accustomed to the detail required by the VE operators. However, they worked well together and the repackaging was completed ahead of schedule. - The AK was not always accurate as was demonstrated by the solid waste found in the drum during the first visit by EPA. That waste has since been determined to be low-level. - Two drums originally thought to be RH turned out to be CH and arrangement for RTR had to be made quickly. - Six of the original RH repacked drums became low level. - Lessons learned from the CH campaigns were helpful in avoiding many issues. The RH repackaging effort has been a success due to the expertise of the AHCF operators, supervisor, and manager, the conscientious attention to detail of the CCP VE operators, the experience of the CCP DTC and headspace gas sampling staff, and the guidance and support from CCP and CBFO. Sometimes schedules had to be adjusted, processes updated, and issues discussed, but the communication between CCP and SNL/NM was good. SNL/NM hopes to have the legacy RH TRU waste shipped off-site by early 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidated Nuclear Security, LLC, Excess Facility Disposition Program - 17289

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Wash-Aid, Treatment, and Emergency Reuse System (IWATERS) for Strontium Contaminations - 17390

The Integrated Wash-Aid, Treatment, and Emergency Reuse System (IWATERS) is being developed to mitigate the release of radioactivity to the urban environment by disseminating, collecting, and processing decontamination wash water. Previously, IWATERS was designed for the treatment of surfaces contaminated with radioactive cesium. Experiments were performed to investigate the expansion of IWATERS for strontium contamination. Bench-scale tests were performed to investigate various counter-ions and chelators to promote ion exchange of strontium from building surfaces. Desorption results for Cs, Sr, and Eu from concrete aggregate and concrete, brick, and asphalt coupons using low- and high-pressure flow with Ca{sup 2+} and Ba{sup 2+} rich wash water are reported along with those from non-porous surfaces such as glass and vinyl siding. Several sorbents were tested for their ability to specifically separate Sr{sup 2+} from these high ionic strength wash waters. Alkali metal and alkaline earth salts were found to be effective counter-ions for decontamination of Sr{sup 2+}, which may facilitate the use of common sorbents, even if their K{sub d} values are <100 mL/g. In practice, low K{sub d} values require the use of large quantities of sorbent. Computer simulations were run using the GoldSim Contaminant Fate Module software package to optimize the efficiency of IWATERS for strontium and account for the technical limitations of the sorbents. This modeling allows greater flexibility to design the wash water recycling system for various end-user specifications including options from rain barrel designs for treating runoff from roofs and facades to larger options like drainage basins for larger-scale wash down activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term stewardship - surveillance and maintenance at Hanford - 15155

In FY 2015, Hanford's Long-Term Stewardship (LTS) Program is tasked to complete the required entries into five cocooned plutonium production reactors (105-C, 105-D, 105-F, 105-H and 105-N), which sit adjacent to the Columbia River. The first reactor entered in October 2014, the cocooned plutonium production reactor, 105-F, signaled the LTS Program's entry into the Surveillance and Maintenance (S and M) era. Reactor entries at Hanford are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls and roof. The cocooned structures are designed to protect the reactor core for up to 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The 105-F entry demonstrates that the LTS program at Hanford is shifting from a program focused on transitioning cleaned up land and waste sites to a program focused primarily on S and M activities. The entry process is carefully planned, choreographed and monitored to ensure safety of the workers and minimize the time the reactor structure is opened. The process includes controlled opening of the reactor, air quality monitoring, structural safety inspections, and radiological clearance. Once the structure is cleared for entry, assessments of the structural integrity and radiologic conditions are completed. Evaluation of the interior temperature and flood monitoring equipment is conducted. Facility visits by regulators and DOE personnel close out the process prior to welding the door closed until the next assessment, five years later. This paper will document execution of the entry work package, identify challenges overcome, and provide video documentation as reference material for future workers and the public. The current LTS program has responsibility for approximately 100,000 acres, over 200 waste sites and six cocooned reactors. Just over 5,600 documents have been identified, indexed and tagged for storage in the LTS document library. The program has successfully completed seven consecutive transitions since July 2011, with six more transitions planned in the next 18 months to support the U.S. Department of Energy Richland Operations Office's (DOE-RL) near-term cleanup objectives to significantly reduce the footprint of active cleanup operations for the River Corridor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mock-Up activities for the extraction of samples from a salt-stone disposal unit - 15502

Mock-up testing with respect to the core-drilling of simulant salt-stone grout was conducted to support the future retrieval of field-emplaced salt-stone samples from salt-stone Disposal Unit (SDU) Cell 2A. The primary objectives of extracting samples from SDU Cell 2A are to enable measurement of field-emplaced samples with respect to properties that influence long-term performance, such as saturated hydraulic conductivity, and to compare the measured properties for field-emplaced and comparable samples prepared in the laboratory. Initial mock-up activities (Phases 1 and 2) were conducted in Fiscal Years (FY) 2013 and 2014 in order to demonstrate the viability of standard core-drilling techniques that are typically employed for sampling concrete structures. The primary requirement for the core-drilling technique was that it should minimize the potential of physical or chemical sample changes that would artificially degrade key grout properties. Mock-up activities were aimed at optimizing the techniques for core-drilling, and subsequent sample extraction, using a set-up that mimicked, to the extent practical, both the physical characteristics, and operational complexities, of core-drilling salt-stone grout from the roof of the SDU. Samples extracted from the grout monolith were subsequently characterized with respect to saturated hydraulic conductivity and compressive strength, and compared to data for cast samples prepared using the same simulant salt-stone material. The comparison of these properties for the two sample types was expected to highlight potential flaws (e.g., micro-cracking) introduced by the core-drilling process. While the data for saturated hydraulic conductivity were virtually identical (approximately 2 E-09 cm/sec), the compressive strength of the core-drilled samples (approximately 3.5 MPa (500 psi)) was on average half that measured for the cast samples. It was suspected that increased water saturation and surface scoring of the core-drilled samples might account for the disparate compressive Strength data. During Phases 1 and 2 it was determined that cores could be successfully drilled and extracted to a depth of approximately 0.9 meters (3 feet) below the grout surface. Phase 3 (FY 2105) has been initiated and is primarily directed at demonstrating the ability to core-drill through approximately 1.8 meters (6 feet) of overlying grout to retrieve the desired sample from the SDU. The original drill depth of 0.6 - 0.9 meters (2-3 feet) was based on an SDU fill height of 5.6 meters (18.5 feet) and sample location of approximately 4.9 meters (16 feet); recently the allowable fill height in the SDUs has been increased to 6.5 meters (21.25 feet); hence the increased depth of overlying grout above the samples to be retrieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of a Loess-Cement Cushion as an Integral Component of an SL-LILW Repository - 16077

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for short-lived low and intermediate level radioactive waste, the National Disposal Facility (NDF), adjacent to the Kozloduy Nuclear Power Plant (KNPP). The NDF will be constructed as a reinforced concrete vault-type repository system, where prefabricated cubic waste packages (2 m on a side) will be emplaced in large reinforced concrete disposal cells. Waste emplacement operations will be conducted in three phases over a total of 60 years of operations. After the last waste packages have been disposed, an engineered multilayer cover will be installed over the site to further isolate the waste from the accessible environment. The Radiana Site where the NDF will be constructed is a sloping area located between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. The unsaturated zone at the location selected for waste disposal ranges from 13 m to 16 m in thickness. After construction, the unsaturated zone will consist of a 5 m thick, engineered loess-cement cushion installed over naturally occurring Pliocene clays and sandy clayey sediments of the Brusarci Formation with a thickness above the top of groundwater ranging from 8 m to 11 m. The loess-cement cushion is a key component of the 'engineered fill' barrier as identified in the Intermediate Safety Assessment Report (ISAR) for the NDF. This barrier consists of engineered fill both below the disposal cells, i.e., the loess-cement cushion, and above the disposal cells, i.e. the final multilayer cover to be installed at closure of the facility. The loess-cement cushion component of this barrier will act to provide a geo-technically stable foundation for the disposal system. In addition, the barrier will raise the base of the disposal cells and increases the unsaturated zone thickness above the top of the groundwater table, as well as to serve as a chemical barrier that will act to sorb radionuclides thereby retarding their migration to the underlying groundwater. In addition to its assigned barrier functions the loess cement cushion also houses key embedded components required as part of the overall NDF safety concept, including systems necessary for operational and post-closure performance monitoring as well as the support foundation structures required for the mobile roofs, which are designed to handle and protect the waste during emplacement operations. The post-closure monitoring period, i.e., the period of institutional control, is given by as 300 years. While similar although less massive cushions have been previously constructed as foundations for various structures at the KNPP, the loess-cement cushion planned for construction at the NDF including the embedded structures will represent a first of its kind construction in terms of both its physical dimensioning as well as its requirements for long-term performance. This paper describes the design of the cushion, its functions and its construction as planned for the NDF as an integral component of the site safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of Removable Shield Modules for Nuclear Plant Applications Using Monte Carlo Modeling - 16264

A new modular shielding system has been designed and developed for nuclear plant applications as a replacement for traditional concrete blocks and plugs. The shield comprises interlocking modules that are custom designed using CAD and Monte Carlo modelling methods. The key benefit of these new modules is that they can be quickly removed and re-installed to allow temporary access to high radiation environments e.g. for maintenance and repair of plant equipment at nuclear power plants or waste handling facilities. The traditional method for construction of these removable concrete blocks and plugs was to cast them in place. Within the aging fleet of commercial reactors, some plants are experiencing concrete degradation of these shield blocks and plugs as well as failure of lifting points. Additionally, the existing plugs are difficult to remove and re-install. The new modular system comprises a rigid steel enclosure filled with lead that can be installed in a fraction of the normal time. This approach can accelerate outage times leading to reduced dose uptake to operators and provide significant long term cost savings. Use of Monte Carlo methods enables the shielding modules to be designed efficiently for neutron and gamma ray attenuation with the minimum necessary thickness of lead and steel. Furthermore, the modelling ensures the design is not compromised by streaming pathways, for example at the overlaps between modules or through internal structural components. Shielding modules were supplied to the Brunswick Nuclear Power station (BNP), operated by Duke Energy, located in southeast United States. These modules have been installed to replace concrete shield plugs that are located on the roof above a Feed Water Heaters (FWH) bay. While specific in application, this project demonstrates that the shield module design concept could be expanded to address vertical block walls routinely found in personnel and equipment access hatches. This approach is applicable to a wide variety of new and existing nuclear facilities and will lead to improved safety and reduced lifetime costs all the way through to future decommissioning and dismantling operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗