Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

The Continuously Evolving Land Use Control Climate in FUSRAP - 12285

In recent years the topic of Land Use Controls (LUCs) has become much more prevalent in the Formerly Utilized Sites Remedial Action Program (FUSRAP) for a number of reasons. Some regulatory agencies have been placing much more emphasis on this topic than they historically did. Also as the FUSRAP has matured, more sites are approaching a point in the project lifecycle that LUCs are needed to be implemented. There are many issues, some site specific, some agency specific, and some programmatic, that may arise when addressing LUCs on a FUSRAP site. These issues can span the life of a project from planning to implementation. As the emphasis on LUCs increases at a fast pace, USACE is faced with the task of developing consistency in how we respond, and at the same time leaving enough latitude for projects to accomplish their individual missions while taking into consideration the site specific concerns. The Land Use Controls arena encompasses a large number of tools to address the matter at hand. There are numerous mechanisms that can accomplish Land Use Control goals, some of which include administrative controls and engineering controls. This paper will discuss some of the mechanisms being utilized by USACE at our FUSRAP projects. Having a better understanding of how LUCs are currently being handled in the FUSRAP will be beneficial to project delivery teams in order to make the best decisions moving through the project lifecycle. Being aware of LUC requirements and options at an early stage in a project will help a team effectively plan for and execute the chosen alternative for remedial action. There are a number of guidance tools from various other agencies that exist for consideration during Land Use Control planning and implementation. The USACE is currently evaluating these guidance tools to determine applicability and impact to FUSRAP projects. Some of these tools are under review at Army and the Department of Defense. Critical to this evaluation is internal team coordination as well as coordination and input from stakeholders. With guidance on LUCs available from a number of entities, the USACE now has the opportunity to develop consistency in determining how LUCs are handled on FUSRAP projects. The FUSRAP ER, ER 200-1-4, is currently being revised and will broadly touch on LUCs. This broad approach was a result of recognizing the magnitude of variances and site specific components that come into play when applying LUCs to our FUSRAP sites. As land use controls scenarios continue to arise on our FUSRAP sites, the methods for how our project teams address those will continue to evolve. The Program is continuing to develop guidance on how to address LUCs. In the interim, our FUSRAP projects can share lessons learned on the LUCs they are implementing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current wind tunnel capability and planned improvements at the NASA Langley Research Center

NASA Langley's major wing wind tunnels and the projected facilities planned to be completed by 1988 are presented. Special capabilities, uses, and the improvements done during the Langley's tunnel revitalization program are described for the following facilities: (1) the 30 x 60-ft subsonic tunnel, (2) the 4 x 7-m low-speed testing tunnel, (3) the Low-Turbulence Tunnel, (4) the Spin Tunnel, (5) the National Transonic Pressure Tunnel, (6) Transonic Cryogenic Tunnel, (7) the National Transonic Facility, (8) the 16-ft Transonic Tunnel, (9) the Transonic Dynamic Tunnel, (10) the Unitary Plan Wind Tunnel, and (11) a new 20-inch supersonic wind tunnel which is currently undergoing final checkout. The design concept of an extremely-low disturbance level supersonic tunnel, the upgrading plans for the hypersonic aerothermal complex, and the present and planned capabilities for testing the hydrogen-fueled Scramjet engines are also presented. In addition, uses of inexpensive simple-to-operate research wind tunnels are discussed. Tunnel diagrams and graphs of upgrade results are included.

Bower, R. E.↗

Developing a Regional Recovery Framework

Abstract A biological attack would present an unprecedented challenge for local, state, and federal agencies; the military; the private sector; and individuals on many fronts ranging from vaccination and treatment to prioritization of cleanup actions to waste disposal. To prepare the Seattle region to recover from a biological attack, the Seattle Urban Area Security Initiative (UASI) partners collaborated with military and federal agencies to develop a Regional Recovery Framework for a Biological Attack in the Seattle Urban Area. The goal was to reduce the time and resources required to recover and restore wide urban areas, military installations, and other critical infrastructure following a biological incident by providing a coordinated systems approach. Based on discussions in small workshops, tabletop exercises, and interviews with emergency response agency staff, the partners identified concepts of operation for various areas to address critical issues the region will face as recovery progresses. Key to this recovery is the recovery of the economy. Although the Framework is specific to a catastrophic, wide-area biological attack using anthrax, it was designed to be flexible and scalable so it could also serve as the recovery framework for an all-hazards approach. The Framework also served to coalesce policy questions that must be addressed for long-term recovery. These questions cover such areas as safety and health, security, financial management, waste management, legal issues, and economic development.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Solarize Guidebook: A Community Guide to Collective Purchasing of Residential PV Systems

This handbook is intended as a road map for project planners and solar advocates who want to convert interest into action, to break through market barriers and permanently transform the market for residential solar installations in their communities. It describes the key elements of the Solarize campaigns in Portland, and offers several program refinements from projects beyond Portland. Thehandbook provides lessons, considerations, and step-by-step plans for project organizers to replicate the success of Solarize Portland.

14 SOLAR ENERGY↗

Solarize Guidebook: A Community Guide to Collective Purchasing of Residential PV Systems (Book)

This guidebook is intended as a road map for project planners and solar advocates who want to convert 'interest' into 'action,' to break through market barriers and permanently transform the market for residential solar installations in their communities. It describes the key elements of the Solarize campaigns in Portland, and offers several program refinements from projects beyond Portland. Theguidebook provides lessons, considerations, and step-by-step plans for project organizers to replicate the success of Solarize Portland.

14 SOLAR ENERGY↗

Experiments and Computational Theory for Electrical Breakdown in Critical Components: THz Imaging of Electronic Plasmas.

This report describes the development of ultra-short pulse laser (USPL) induced terahertz (THz) radiation to image electronic plasmas during electrical breakdown. The technique uses three pulses from two USPLs to (1) trigger the breakdown, (2) create a 2 picosecond (ps, 10 -12 s), THz pulse to illuminate the breakdown, and (3) record the THz image of the breakdown. During this three year internal research program, sub-picosecond jitter timing for the lasers, THz generation, high bandwidth (BW) diagnostics, and THz image acquisition was demonstrated. High intensity THz radiation was optically-induced in a pulse-charged gallium arsenide photoconductive switch. The radiation was collected, transported, concentrated, and co-propagated through an electro-optic crystal with an 800 nm USPL pulse whose polarization was rotated due to the spatially varying electric field of the THz image. The polarization modulated USPL pulse was then passed through a polarizer and the resulting spatially varying intensity was detected in a high resolution digital camera. Single shot images had a signal to noise of %7E3:1. Signal to noise was improved to %7E30:1 with several experimental techniques and by averaging the THz images from %7E4000 laser pulses internally and externally with the camera and the acquisition system (40 pulses per readout). THz shadows of metallic films and objects were also recorded with this system to demonstrate free-carrier absorption of the THz radiation and improve image contrast and resolution. These 2 ps THz pulses were created and resolved with 100 femtosecond (fs, 10 -15 s) long USPL pulses. Thus this technology has the capability to time-resolve extremely fast repetitive or single shot phenomena, such as those that occur during the initiation of electrical breakdown. The goal of imaging electrical breakdown was not reached during this three year project. However, plans to achieve this goal as part of a follow-on project are described in this document. Further modifications to improve the THz image contrast and resolution are proposed, and after they are made, images of photo-induced carriers in gallium arsenide and silicon will be acquired to evaluate image sensitivity versus carrier density. Finally electrical breakdown will be induced with the first USPL pulse, illuminated with THz radiation produced with the second USPL pulse and recorded with the third USPL pulse.

36 MATERIALS SCIENCE↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Software Management Environment (SME): Components and algorithms

This document presents the components and algorithms of the Software Management Environment (SME), a management tool developed for the Software Engineering Branch (Code 552) of the Flight Dynamics Division (FDD) of the Goddard Space Flight Center (GSFC). The SME provides an integrated set of visually oriented experienced-based tools that can assist software development managers in managing and planning software development projects. This document describes and illustrates the analysis functions that underlie the SME's project monitoring, estimation, and planning tools. 'SME Components and Algorithms' is a companion reference to 'SME Concepts and Architecture' and 'Software Engineering Laboratory (SEL) Relationships, Models, and Management Rules.'

Hendrick, Robert↗

Defect measurement and analysis of JPL ground software: a case study

Ground software systems at JPL must meet high assurance standards while remaining on schedule due to relatively immovable launch dates for spacecraft that will be controlled by such systems. Toward this end, the Software Quality Improvement (SQI) project's Measurement and Benchmarking (M&B) team is collecting and analyzing defect data of JPL ground system software projects to build software defect prediction models. The aim of these models is to improve predictability with regard to software quality activities. Predictive models will quantitatively define typical trends for JPL ground systems as well as Critical Discriminators (CDs) to provide explanations for atypical deviations from the norm at JPL. CDs are software characteristics that can be estimated or foreseen early in a software project's planning. Thus, these CDs will assist in planning for the predicted degree to which software quality activities for a project are likely to deviation from the normal JPL ground system based on pasted experience across the lab.

defects↗

Further Development of an Execution Strategy Analysis (ESA) Capability and Tool for the Management of Spent Nuclear Fuel (SNF) - 17146

An Execution Strategy Analysis (ESA) capability and tool are being developed to evaluate alternative execution strategies for the potential future deployment of a consolidated Interim Storage Facility as part of an integrated waste management system. Application of the ESA approach not only leverages but also goes beyond traditional project analysis tools. The ESA tool allows for ongoing performance assessment of the evolving project execution plans that take into account significant assumptions, risks, and uncertainties throughout the project lifecycle. Development and application of the ESA capability and tool continued in 2016, primarily focusing on enhancing its flexibility to model a range of scenarios regarding how an integrated system for managing spent nuclear fuel and high-level radioactive waste could be deployed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ocean color observations of phytoplankton distributions and primary productivity

The primary goal of this activity is to develop the means to assess the mean and variability of phytoplankton biomass and primary productivity on global scales. There are three major approaches whose goals are to provide global scale observations. These are processing and analysis of the complete CZCS data set in a consistent manner; preparing science mission and project implementation plans for the SeaWiFS sensor to be launched on LANDSAT 6 in 1991; and providing guidance to EOS flight projects for ocean color observations using the MODIS sensor planned for the Polar Platform in the mid 1990's. This processing presents the first consistent view of phytoplankton pigments on global scales, and analysis of this temporally undersampled data set is proving very instructive in specifying mission requirements for SeaWiFS and future algorithm development.

Esaias, W.↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

LBNL Laboratory Directed Research and Development Program FY2016

The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measuring research progress in photovoltaics

The role and some results of the project analysis and integration function in the Flat-plate Solar Array (FSA) Project are presented. Activities included supporting the decision-making process, preparation of plans for project direction, setting goals for project activities, measuring progress within the project, and the development and maintenance of analytical models.

Jackson, B.↗

Accelerating the Deployment of Advanced Energy Communities: The Oakland EcoBlock A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project

This report describes the design development process and recommendations of a Community-Scale Zero Net Energy Master Plan for a residential block in Oakland, the Oakland EcoBlock. The recommended master plan includes an integrated system of energy efficiency retrofits, a direct current solar/storage/electric vehicle microgrid, alternating/direct current houses, and water efficiency retrofits with rainwater capture. The recommended master plan is projected to be close to zero-net energy (95 percent) for homes, reduce carbon emissions by 65 percent at the block scale (including transportation), and reduce water use 60–70 percent. The integrated system of energy efficiency and a direct current solar/storage/electric vehicle (EV) charging microgrid is the first of its kind at the residential block scale. This breakthrough because the deep energy efficiency retrofit savings free up enough capacity in the solar supply and storage to enable residents to switch from natural gas to electricity for heating and domestic hot water and to provide EV charging for 33 percent of vehicle miles traveled. The savings in household transportation costs are a game changer because when combined with savings in the electric and water utility bills, the total cash flow savings are projected to fund the capital improvements of the proposed systems. This project’s benefits include lower and more predictable utility bills; greater resiliency because the system can operate during outages, and vastly improved indoor air quality by reducing natural gas consumption. The local energy storage reduces peak demand for the utility. California benefits from a model that exceeds the targets for reductions in energy consumption and carbon emissions and the reductions in water use address California’s severe water challenges. The Oakland EcoBlock is a transformative model for accelerating the rapid deployment of advanced energy communities.

decarbonization codes↗

Summary of Differences in Approach to Executing the NGNP Project

The following discuss the summary differences between the NGNP Industry Alliance’s approach to execution of the NGNP Project as described in its Project Execution Strategy, and that included in the DOE’s Report to Congress on the Next Generation Nuclear Plant dated April 2010. These summary differences are not a comprehensive description of the results of a detailed gap analysis, but rather are those differences that warrant discussion in meetings between DOE executives and the private sector represented by the Alliance. In practical fact, the full range and content of the differences will not be understood until such time as detailed discussions are engaged between the DOE and the Alliance to develop a mutually agreed-to project execution plan.

42 ENGINEERING↗

Staffing Analyses Tool

The Staffing Analyses Tool is an interactive resource planning tool used for visualizing programmatic staffing financial information. This dashboard provides historical and current staff charging data under organizations’ and/or programs’ views. This tool is used to manage staffing cost and inform outyear planning. It was developed in collaboration with Associate Laboratory Directorate for Infrastructure and Capital Projects (ALDICP) Planning Office.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗