Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Extraction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

A Ka-band TM{sub 02} mode relativistic backward wave oscillator with cascaded resonators

By combining the Cerenkov-type generator with the cascaded resonators, this paper proposes a Ka-band relativistic backward wave oscillator operating under the guide magnetic field 1.0 T with high power handling capability and high conversion efficiency. It is found that TM{sub 02} can be selected as the operation mode in order to increase the power handling capability and provide sufficient coupling with the electron beam. In slow wave structure (SWS), ripples composed of semicircle on top of the rectangle enhance the wave-beam interaction and decrease the intensity of the electric field on the metallic surface. Taking advantage of the resonator cascades, the output power and the conversion efficiency are promoted greatly. The front cascaded resonators efficiently prevent the power generated in SWS from leaking into the diode region, and quicken the startup of the oscillation due to the premodulation of the beam. However, the post cascade slightly postpones the startup because of the further energy extraction from the electron beam. The numerical simulation shows that generation with power 514 MW and efficiency 41% is obtained under the diode voltage 520 kV and current 2.4 kA. And the microwave with the pure frequency spectrum of 29.35 GHz radiates in the pure TM{sub 01} mode.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

1 GW peak power and 100 J pulsed operation of a diode-pumped Tm:YLF laser

We report on the generation of high energy, high power pulses in a tabletop diode-pumped Tm:YLF-based laser system, which delivers amplified pulse energies up to 108 J, as well as GW peak power performance when seeded with nanosecond duration pulses. Furthermore, the high power and efficiency capabilities of operating Tm:YLF in the multi-pulse extraction (MPE) regime were explored by seeding the experimental setup with a multi-kHz burst of pulses exhibiting a low individual pulse fluence, resulting in a 3.6 kW average power train of multi-joule-level pulses with an optical-to-optical efficiency of 19%.

47 OTHER INSTRUMENTATION↗

Probing Time-dependent Dark Energy with the Flux Power Spectrum of the Ly$α$ Forest

Herein we present new simulations of the flux power spectrum of the Ly$α$ forest as a means to investigate the effects of time-dependent dark energy on structure formation. We use a linearized parameterization of the time-dependence of the dark energy equation of state and sample the parameters ($w_0, w_a$) from the extrema of the allowed observational values as determined by the Planck results. Each chosen ($w_0, w_a$) pair is then used in a high-resolution, large-scale cosmological simulation run with a modified version of the publicly available SPH code GADGET-2 . From each of these simulations we extract synthetic Ly$α$ forest spectra and calculate the flux power spectrum. We use the $k$-sample Anderson–Darling test to analyze the effects of dark energy on the Ly$α$ forest. We compare each dark energy power spectrum to that due to a cosmological constant power spectrum. We find, however, that there is only a marginal effect of the choice of allowed dark energy models on the flux power spectrum.

79 ASTRONOMY AND ASTROPHYSICS↗

Integrated CO 2 Storage and Brine Extraction

Carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) can reduce CO 2 emissions from fossil fuel power plants by injecting CO 2 into deep saline aquifers for storage. CCUS typically increases reservoir pressure which increases costs, because less CO 2 can be injected, and risks such as induced seismicity. Extracting brine with enhanced water recovery (EWR) from the CO 2 storage reservoir can manage and reduce pressure in the formation, decrease the risks linked to reservoir overpressure (e.g., induced seismicity), increase CO 2 storage capacity, and enable CO 2 plume management. We modeled scenarios of CO 2 injection with EWR into the Rock Springs Uplift (RSU) formation in southwest Wyoming. The Finite Element Heat and Mass Transfer Code (FEHM) was used to model CO 2 injection with brine extraction and the corresponding increase in pressure within the RSU. We analyzed the model for pressure management, CO 2 storage, CO 2 saturation, and brine extraction due to the quantity and location of brine extraction wells. The model limited CO 2 injection to a constant pressure increase of two MPa at the injection well with and without extracting brine at hydrostatic pressure. Finally, we found that brine extraction can be used as a technical and cost-effective pressure management strategy to limit reservoir pressure buildup and increase CO 2 storage associated with a single injection well.

54 ENVIRONMENTAL SCIENCES↗

Quasi-Elastic Neutron Scattering Studies of the Slow Dynamics of Supercooled and Glassy Aspirin

Aspirin, also known as acetylsalicylic acid (ASA), is not only a wonderful drug, but also a good glass former. Therefore, it serves as an important molecular system to study the near-arrest and arrested phenomena. In this paper, a high-resolution quasi-elastic neutron scattering (QENS) technique is used to investigate the slow dynamics of supercooled liquid and glassy aspirin from 410 K down to 350 K. The measured QENS spectra can be analyzed with a stretched exponential model. We find that (i) the stretched exponent (Q) is independent of the wave vector transfer Q in the measured Q-range, and (ii) the structural relaxation time (Q) follows a power law dependence on Q. Consequently, the Q-independent structural relaxation time 0 can be extracted for each temperature to characterize the slow dynamics of aspirin. The temperature dependence of 0 can be fitted with the mode coupling power law, the Vogel-Fulcher-Tammann equation and a universal equation for fragile glass forming liquids recently proposed by M. Tokuyama in the measured temperature range. The calculated dynamic response function T(Q,t) using the experimentally determined self-intermediate scattering function of the hydrogen atoms of aspirin shows a direct evidence of the enhanced dynamic fluctuations as the aspirin is increasingly supercooled, in agreement with the fixed-time mean squared displacement x2 and non-Gaussian parameter 2 extracted from the elastic scattering.

08 HYDROGEN↗

Thermal Energy Storage for Dispatchable Geothermal Power

Dispatchable generation refers to sources of electricity that can be turned on or off, or can adjust their power output accordingly to an order. Geothermal plants are usually used for base-load power rather than dispatchable power. Flexibility is a challenge for a geothermal plant because the heat source does not naturally respond quickly to changes in demand. The current state-of-the-art approach to address this challenge is to maintain the geothermal fluid flows at relatively steady rates while providing a bypass around the generation equipment as needed. Under part load, some of the geothermal fluid is pumped to the surface, bypasses the generation equipment, and is re-injected to the ground without extracting any useful enthalpy. This approach is robust but necessarily incurs high parasitic power draws at part load due to the constant, full-flow pumping power requirements. There are even more challenges and unknowns for steam and flash geothermal plants, which were the focus for this project. As a process improvement to this existing configuration of a dispatchable geothermal plant, we examined the use of a phase-change thermal-energy storage (TES) unit that will provide some “inertia” against temperature fluctuations. The TES phase change material (PCM) could be in the form of eutectic molten nitrate salts, organic sugar alcohols, or the like based on the required temperature. This configuration allowed the power plant to meet the ramp rate requirements while allowing the geothermal resource to drawn down at the duty-cycle-averaged extraction rate rather than the full-rated-output extraction rate. The project team performed an experimental and computational evaluation of a peak shaving technical approach that used thermal storage to switch between two nominal operating points: full rated power and 50% power. In the initial requirements definition phase, the team decided to examine the PCM/TES-enhanced geothermal plant in the context of a 40-MW two-stage flash plant operating in mid-Southern California. Steady-state process simulations were used to understand the equipment sizing and the energetics. Dynamic process simulations were used to understand the response rate of the system to changes in requested power output from the utility. The technical approach was also guided by a techno-economic analysis (TEA) and a high-level analysis of the reservoir. Recognizing that performance of the thermal storage was a key risk element, high-fidelity finite-element simulations of the PCM-TES heat exchanger were performed to better understand its performance and temporal response. These simulations were validated with a subscale PCM-TES experimental apparatus that mimicked the geometry of the full-scale system. The key outcomes of this Phase I project were that: 1) the PCM-TES heat exchanger met the target for gravimetric energy storage density, 2) the dispatchable geothermal plant met its target for response rate, 3) the peak shaving approach reduces the number of production wells and does not disturb the wellfield, and 4) the incentives for properly remunerating dispatchable operation were identified.

15 GEOTHERMAL ENERGY↗

Development of versatile multiaperture negative ion sources

Enhancement of negative ion sources for production of large ion beams is a very active research field nowadays, driven from demand of plasma heating in nuclear fusion devices and accelerator applications. As a versatile test bench, the ion source NIO1 (Negative Ion Optimization 1) is being commissioned by Consorzio RFX and INFN. The nominal beam current of 135 mA at −60 kV is divided into 9 beamlets, with multiaperture extraction electrodes. The plasma is sustained by a 2 MHz radiofrequency power supply, with a standard matching box. A High Voltage Deck (HVD) placed inside the lead shielding surrounding NIO1 contains the radiofrequency generator, the gas control, electronics and power supplies for the ion source. An autonomous closed circuit water cooling system was installed for the whole system, with a branch towards the HVD, using carefully optimized helical tubing. Insulation transformer is installed in a nearby box. Tests of several magnetic configurations can be performed. Status of experiments, measured spectra and plasma luminosity are described. Upgrades of magnetic filter, beam calorimeter and extraction grid and related theoretical issues are reviewed.

43 PARTICLE ACCELERATORS↗

Development of a low-energy and high-current pulsed neutral beam injector with a washer-gun plasma source for high-beta plasma experiments

We have developed a novel and economical neutral-beam injection system by employing a washer-gun plasma source. It provides a low-cost and maintenance-free ion beam, thus eliminating the need for the filaments and water-cooling systems employed conventionally. In our primary experiments, the washer gun produced a source plasma with an electron temperature of approximately 5 eV and an electron density of 5 Multiplication-Sign 10{sup 17} m{sup -3}, i.e., conditions suitable for ion-beam extraction. The dependence of the extracted beam current on the acceleration voltage is consistent with space-charge current limitation, because the observed current density is almost proportional to the 3/2 power of the acceleration voltage below approximately 8 kV. By optimizing plasma formation, we successfully achieved beam extraction of up to 40 A at 15 kV and a pulse length in excess of 0.25 ms. Its low-voltage and high-current pulsed-beam properties enable us to apply this high-power neutral beam injection into a high-beta compact torus plasma characterized by a low magnetic field.

43 PARTICLE ACCELERATORS↗

Domain Adaptive Graph Neural Networks for Constraining Cosmological Parameters Across Multiple Data Sets

State of the art astronomical simulations have provided datasets which enabled the training of novel deep learning techniques for constraining cosmological parameters. However, differences in subgrid physics implementation and numerical approximations among simulation suites lead to differences in simulated datasets, which pose a hard challenge when trying to generalize across diverse data domains and ultimately when applying models to observational data. Recent work reveals deep learning algorithms are able to extract more information from complex cosmological simulations than summary statistics like power spectra. We introduce Domain Adaptive Graph Neural Networks (DA-GNNs), trained on CAMELS data, inspired by CosmoGraphNet (Villanueva-Domingo et al 2023). By utilizing GNNs, we can capitalize on their capacity to capture both astrophysical and topological features of galaxy distributions. Mixing these capabilities with domain adaptation techniques such as Maximum Mean Discrepancy (MMD), which enable extraction of domain-invariant features, our framework demonstrates enhanced accuracy and robustness. We present experimental results, including the alignment of distributions across domains through data visualization. These findings suggest that DA-GNNs are an efficient way of extracting domain independent cosmological information, a vital step toward robust deep learning for real cosmic survey data.

79 ASTRONOMY AND ASTROPHYSICS↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Foundation Models for the Electric Power Grid

Foundation models (FMs) currently dominate news headlines. They employ advanced deep learning architectures to extract structural information autonomously from vast datasets through self-supervision. The resulting rich representations of complex systems and dynamics can be applied to many downstream applications. Therefore, advances in FMs can find uses in electric power grids, challenged by the energy transition and climate change. This paper calls for the development of FMs for electric grids. We highlight their strengths and weaknesses amidst the challenges of a changing grid. It is argued that FMs learning from diverse grid data and topologies, which we call grid foundation models (GridFMs), could unlock transformative capabilities, pioneering a new approach to leveraging AI to redefine how we manage complexity and uncertainty in the electric grid. Finally, we discuss a practical implementation pathway and road map of a GridFM-v0, a first GridFM for power flow applications based on graph neural networks, and explore how various downstream use cases will benefit from this model and future GridFMs.

AI-based power flow simulation↗

Mixer-Ejector Wind Turbine: Breakthrough High Efficiency Shrouded Wind Turbine

Broad Funding Opportunity Announcement Project: FloDesign Wind Turbine’s innovative wind turbine, inspired by the design of jet engines, could deliver 300% more power than existing wind turbines of the same rotor diameter by extracting more energy over a larger area. FloDesign Wind Turbine’s unique shrouded design expands the wind capture area, and the mixing vortex downstream allows more energy to flow through the rotor without stalling the turbine. The unique rotor and shrouded design also provide significant opportunity for mass production and simplified assembly, enabling mid-scale turbines (approximately 100 kW) to produce power at a cost that is comparable to larger-scale conventional turbines.

ARPA-E↗

Rate-equation modelling and ensemble approach to extraction of parameters for viral infection-induced cell apoptosis and necrosis

We develop a theoretical approach that uses physiochemical kinetics modelling to describe cell population dynamics upon progression of viral infection in cell culture, which results in cell apoptosis (programmed cell death) and necrosis (direct cell death). Several model parameters necessary for computer simulation were determined by reviewing and analyzing available published experimental data. By comparing experimental data to computer modelling results, we identify the parameters that are the most sensitive to the measured system properties and allow for the best data fitting. Our model allows extraction of parameters from experimental data and also has predictive power. Using the model we describe interesting time-dependent quantities that were not directly measured in the experiment and identify correlations among the fitted parameter values. Numerical simulation of viral infection progression is done by a rate-equation approach resulting in a system of “stiff” equations, which are solved by using a novel variant of the stochastic ensemble modelling approach. The latter was originally developed for coupled chemical reactions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Incorporating Equipment Condition Assessment in Risk Monitors for Advanced Small Modular Reactors

Advanced small modular reactors (aSMRs) can complement the current fleet of large light-water reactors in the USA for baseload and peak demand power production and process heat applications (e.g., water desalination, shale oil extraction, hydrogen production). The day-to-day costs of aSMRs are expected to be dominated by operations and maintenance (O&M); however, the effect of diverse operating missions and unit modularity on O&M is not fully understood. These costs could potentially be reduced by optimized scheduling, with risk-informed scheduling of maintenance, repair, and replacement of equipment. Currently, most nuclear power plants have a “living” probabilistic risk assessment (PRA), which reflects the as-operated, as-modified plant and combine event probabilities with population-based probability of failure (POF) for key components. “Risk monitors” extend the PRA by incorporating the actual and dynamic plant configuration (equipment availability, operating regime, environmental conditions, etc.) into risk assessment. In fact, PRAs are more integrated into plant management in today’s nuclear power plants than at any other time in the history of nuclear power. However, population-based POF curves are still used to populate fault trees; this approach neglects the time-varying condition of equipment that is relied on during standard and non-standard configurations. Equipment condition monitoring techniques can be used to estimate the component POF. Incorporating this unit-specific estimate of POF in the risk monitor can provide a more accurate estimate of risk in different operating and maintenance configurations. This enhanced risk assessment will be especially important for aSMRs that have advanced component designs, which don’t have an available operating history to draw from, and often use passive design features, which present challenges to PRA. This paper presents the requirements and technical gaps for developing a framework to integrate unit-specific estimates of POF into risk monitors, resulting in enhanced risk monitors that support optimized operation and maintenance of aSMRs.

Advanced Small Modular Reactors↗

Detecting and Analyzing Power System Disturbances in PMU Data with the Open-Source Archive Walker Tool

As the number of Phasor Measurement Units (PMUs) deployed in power systems increases, so do the archives of synchrophasor measurements stored by utilities. Significant value can be extracted from these archives by using them to support studies such as frequency response analysis, small-signal stability analysis, and power plant model validation. To better enable utilities to perform these studies, the open-source Archive Walker tool was developed. This tool examines PMU data for grid disturbances and periods of interest. Once identified, the data can be further analyzed inside Archive Walker or exported to specialty tools. In this paper, the various disturbance detectors available in Archive Walker are described, and its interactions with other openly-available tools are highlighted.

Follum, James D.↗

Demonstration of a compact, multi-joule, diode-pumped Tm:YLF laser

We report the demonstration of a diode-pumped Tm:YLF laser operating at 1.88 µm that produces pulse energies up to 3.88 J in 20 ns. The compact system consists of a Q-switched cavity-dumped oscillator generating 18 mJ pulses, which are then amplified in a 4-pass power amplifier. Energies up to 38.1 J were obtained with long-pulse amplifier operation. These results illustrate the high energy storage and extraction capabilities of diode-pumped Tm:YLF, opening the path to high peak and average power mid-infrared solid-state lasers

47 OTHER INSTRUMENTATION↗

Institutional impediments to using alternative water sources in thermoelectric power plants.

This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Obtaining adequate water supplies for cooling and other operations at a reasonable cost is a key factor in siting new and maintaining existing thermoelectric power plant operations. One way to reduce freshwater consumption is to use alternative water sources such as reclaimed (or recycled) water, mine pool water, and other nontraditional sources. The use of these alternative sources can pose institutional challenges that can cause schedule delays, increase costs, or even require plants to abandon their plans to use alternative sources. This report identifies and describes a variety of institutional challenges experienced by power plant owners and operators across the country, and for many of these challenges it identifies potential mitigating approaches. The information comes from publically available sources and from conversations with power plant owners/operators familiar with using alternative sources. Institutional challenges identified in this investigation include, but are not limited to, the following: (1) Institutional actions and decisions that are beyond the control of the power plant. Such actions can include changes in local administrative policies that can affect the use of reclaimed water, inaccurate growth projections regarding the amount of water that will be available when needed, and agency workloads and other priorities that can cause delays in the permitting and approval processes. (2) Developing, cultivating, and maintaining institutional relationships with the purveyor(s) of the alternative water source, typically a municipal wastewater treatment plant (WWTP), and with the local political organizations that can influence decisions regarding the use of the alternative source. Often a plan to use reclaimed water will work only if local politics and power plant goals converge. Even then, lengthy negotiations are often needed for the plans to come to fruition. (3) Regulatory requirements for planning and developing associated infrastructure such as pipelines, storage facilities, and back-up supplies that can require numerous approvals, permits, and public participation, all of which can create delays and increased costs. (4) Permitting requirements that may be difficult to meet, such as load-based discharge limits for wastewater or air emissions limitations for particulate matter (which will be in the mist of cooling towers that use reclaimed water high in dissolved solids). (5) Finding discharge options for cooling tower blowdown of reclaimed water that are acceptable to permitting authorities. Constituents in this wastewater can limit options for discharge. For example, discharge to rivers requires National Pollutant Discharge Elimination System (NPDES) permits whose limits may be difficult to meet, and underground injection can be limited because many potential injection sites have already been claimed for disposal of produced waters from oil and gas wells or waters associated with gas shale extraction. (6) Potential liabilities associated with using alternative sources. A power plant can be liable for damages associated with leaks from reclaimed water conveyance systems or storage areas, or with mine water that has been contaminated by unscrupulous drillers that is subsequently discharged by the power plant. (7) Community concerns that include, but are not limited to, increased saltwater drift on farmers fields; the possibility that the reclaimed water will contaminate local drinking water aquifers; determining the 'best' use of WWTP effluent; and potential health concerns associated with emissions from the cooling towers that use recycled water. (8) Interveners that raise public concerns about the potential for emissions of emerging pollutants of concern to cause health or environmental problems. Mitigating solutions range from proactive communications with the local communities (which can be implemented by the power plants) to technical solutions, such as developing means to reduce the concentrations of total dissolved solids (TDS) and other contaminants in cooling water to maintain plant efficiency and while meeting discharge limits. These kinds of solutions may be appropriate for DOE research and development (R&D) funding.

03 NATURAL GAS↗

Simulation of the supercritical CO 2 recompression Brayton power cycle with a high-temperature regenerator

The supercritical carbon dioxide (sCO 2 ) recompression Brayton cycle promises higher efficiency and lower capital cost than traditional steam Rankine power cycles. However, achieving high efficiency requires large, highly effective recuperators. Regenerators may be a low-cost alternative to printed circuit and micro-tube heat exchangers for recuperation in sCO 2 power cycles. Regenerators are a periodic heat exchanger in which thermal energy is extracted from the hot stream, stored in solid media, and then released to the cold stream at a later time. Fixed bed regenerators with valves to direct fluid are the preferred method for implementing regenerators in power cycles, but the inherently transient nature of these systems has not been characterized for this application. This study presents the simulation of a high-temperature regenerator within a 10 MWe sCO 2 recompression Brayton cycle. A transient, one-dimensional regenerator model presented in a previous study is used to simulate the regenerator. Dynamic heat exchanger models are also developed for the precooler, low-temperature recuperator, and primary heat exchanger, and the compressors and the turbine are modeled with off-design performance maps. We assess two regenerator-valve design options; one for fast switching, and one for reduced flow rate fluctuations. System simulation finds that both designs see significant fluctuations in turbomachinery flow rate, turbomachinery and system power, and regenerator discharge process outlet temperature. While designing the regenerator-valve subsystem for lower fluctuations is possible, the regenerator cold discharge temperature and net power still fluctuate by ±77.6°C and 6%, respectively. Increasing buffer volume is not effective at sufficiently reducing these fluctuations, but adding a packed bed in between the regenerator and the primary heat exchanger can reduce regenerator discharge process outlet temperature fluctuations to 6.4°C. Further reductions could be possible by increasing the size of this packed bed.

42 ENGINEERING↗