Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Orbit Determination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Cosmic background explorer (COBE) navigation with TDRSS one-way return-link Doppler in the post-helium-venting phase

A navigation experiment was performed which establishes Ultra-Stable Oscillator (USO) frequency stabilized one way return link Doppler TDRSS tracking data as a feasible option for mission orbit determination support at the Goddard Space Center Flight Dynamics Facility. The study was conducted using both one way and two way Tracking and Data Relay Satellite System (TDRSS) tracking measurements for the Cosmic Background Explorer (COBE) spacecraft. Tracking data for a 4 week period immediately follow the depletion of the helium supply was used. The study showed that, for both definitive orbit solution and short term orbit prediction (up to 4 weeks), orbit determination results based on one way return link Doppler tracking measurements are comparable to orbit determination results based on two way range and two way Doppler tracking measurements.

Nemesure, M.↗

Navigation strategy and filter design for solar electric missions

Methods which have been proposed to improve the navigation accuracy for the low-thrust space vehicle include modifications to the standard Sequential- and Batch-type orbit determination procedures and the use of inertial measuring units (IMU) which measures directly the acceleration applied to the vehicle. The navigation accuracy obtained using one of the more promising modifications to the orbit determination procedures is compared with a combined IMU-Standard. The unknown accelerations are approximated as both first-order and second-order Gauss-Markov processes. The comparison is based on numerical results obtained in a study of the navigation requirements of a numerically simulated 152-day low-thrust mission to the asteroid Eros. The results obtained in the simulation indicate that the DMC algorithm will yield a significant improvement over the navigation accuracies achieved with previous estimation algorithms. In addition, the DMC algorithms will yield better navigation accuracies than the IMU-Standard Orbit Determination algorithm, except for extremely precise IMU measurements, i.e., gyroplatform alignment .01 deg and accelerometer signal-to-noise ratio .07. Unless these accuracies are achieved, the IMU navigation accuracies are generally unacceptable.

Tapley, B. D.↗

Message Mode Operations for Spacecraft: A Proposal for Operating Spacecraft During Cruise and Mitigating the Network Loading Crunch

The NASA Deep Space Network (DSN) is a world-class spacecraft tracking facility with stations located in Spain, Australia and USA, servicing Deep Space Missions of many space agencies. The current system of scheduling spacecraft during cruise for multiple 8 hour tracking sessions per week currently leads to an overcommitted DSN. Studies indicate that future projected mission demands upon the Network will only make the loading problem worse. Therefore, a more efficient scheduling of DSN resources is necessary in order to support the additional network loading envisioned in the next few years: The number of missions is projected to increase from 25 in 1998 to 34 by 2001. In fact given the challenge of the NASA administrator, Dan Goldin, of launching 12 spacecraft per year, the DSN would be tracking approximately 90 spacecraft by 2010. Currently a large amount of antenna time and network resources are subscribed by a project in order to have their mission supported during the cruise phase. The recently completed Mars Pathfinder mission was tracked 3 times a week (8 hours/day) during the majority of its cruise to Mars. This paper proposes an innovative approach called Message Mode Operations (MMO) for mitigating the Network loading problem while continuing to meet the tracking, reporting, time management, and scheduling requirements of these missions during Cruise while occupying very short tracking times. MMO satisfies these requirements by providing the following services: Spacecraft Health and Welfare Monitoring Service Command Delivery Service Adaptive Spacecraft Scheduling Service Orbit Determination Service Time Calibration Service Utilizing more efficient engineering telemetry summarization and filtering techniques on-board the spacecraft and collapsing the navigation requirements for Doppler and Range into shorter tracks, we believe spacecraft can be adequately serviced using short 10 to 30 minute tracking sessions. This claim assumes that certain changes would have to he made in the way the Network traditionally services missions in Cruise. Furthermore, limiting spacecraft to short sessions will free up larger blocks of time in the tracking schedule to help accommodate future tracking demands soon to be placed upon the Network. This paper describes the key characteristics and benefits of MMO, the operational scenarios for its use, the required changes to the ground system in order to make this approach feasible and the results of two simulations: 1) to determine the effects of MMO on projected mission loading on the DSN and, 2) to determine the effect MMO has on spacecraft orbit determination.

Greenberg, Ed↗

Orbiter-orbiter and orbiter-lander tracking using same-beam interferometry

Two spacecraft orbiting Mars may be tracked simultaneously by a single earth-based antenna. Same-beam interferometric techniques, using two widely separated antennas, produce a spacecraft-spacecraft measurement in the plane of the sky, complementary to the line-of-sight Doppler information. This paper presents an overview of the same-beam interferometric measurement technique, a measurement error analysis, and examples of the application of same-beam interferometry to orbit determination. For the case of Mars Observer and the Soviet Mars '94 mission, orbit determination improvement up to an order of magnitude is found. Relative tracking between a Mars orbiter and a lander fixed on the surface of Mars is also studied. The lander location may be determined to a few meters, while the orbiter ephemeris may be determined with accuracy similar to the orbiter-orbiter case.

Folkner, W. M.↗

Motion Parameters Determination of the SC and Phobos in the Project Phobos-Grunt

The SC "Phobos-Grunt" flight is planned to 2009 in Russia with the purpose to deliver to the Earth the soil samples of the Mars satellite Phobos. The mission will pass under the following scheme [1-4]: the SC flight from the Earth to the Mars, the SC transit on the Mars satellite orbit, the motion round the Mars on the observation orbit and on the quasi-synchronous one [5], landing on Phobos, taking of a ground and start in the direction to the Earth. The implementation of complicated dynamical operations in the Phobos vicinity is foreseen by the project. The SC will be in a disturbance sphere of gravitational fields from the Sun, the Mars and the Phobos. The SC orbit determination is carried out on a totality of trajectory measurements executed from ground tracking stations and measurements of autonomous systems onboard space vehicle relatively the Phobos. As ground measurements the radio engineering measurements of range and range rate are used. There are possible as onboard optical observations of the Phobos by a television system and ranges from the SC up to the Phobos surface by laser locator. As soon as the Phobos orbit accuracy is insufficient for a solution of a problem of landing its orbit determination will be carried out together with determination of the SC orbit. Therefore the algorithms for joint improving of initial conditions of the SC and the Phobos are necessary to determine parameters of the SC relative the Phobos motion within a single dynamical motion model. After putting on the martial satellite orbit, on the Phobos observation orbit, on the quasi-synchronous orbit in the Phobos vicinity the equipment guidance and the following process of the SC orbit determination relatively Phobos requires a priori knowledge of the Phobos orbit parameters with sufficiently high precision. These parameters should be obtained beforehand using both all modern observations and historical ones.

Akim, E. L.↗

Stardust Navigation Covariance Analysis

The Stardust spacecraft was launched on February 7, 1999 aboard a Boeing Delta-II rocket. Mission participants include the National Aeronautics and Space Administration (NASA), the Jet Propulsion Laboratory (JPL), Lockheed Martin Astronautics (LMA) and the University of Washington. The primary objective of the mission is to collect in-situ samples of the coma of comet Wild-2 and return those samples to the Earth for analysis. Mission design and operational navigation for Stardust is performed by the Jet Propulsion Laboratory (JPL). This paper will describe the extensive JPL effort in support of the Stardust pre-launch analysis of the orbit determination component of the mission covariance study. A description of the mission and it's trajectory will be provided first, followed by a discussion of the covariance procedure and models. Predicted accuracy's will be examined as they relate to navigation delivery requirements for specific critical events during the mission. Stardust was launched into a heliocentric trajectory in early 1999. It will perform an Earth Gravity Assist (EGA) on January 15, 2001 to acquire an orbit for the eventual rendezvous with comet Wild-2. The spacecraft will fly through the coma (atmosphere) on the dayside of Wild-2 on January 2, 2004. At that time samples will be obtained using an aerogel collector. After the comet encounter Stardust will return to Earth when the Sample Return Capsule (SRC) will separate and land at the Utah Test Site (UTTR) on January 15, 2006. The spacecraft will however be deflected off into a heliocentric orbit. The mission is divided into three phases for the covariance analysis. They are 1) Launch to EGA, 2) EGA to Wild-2 encounter and 3) Wild-2 encounter to Earth reentry. Orbit determination assumptions for each phase are provided. These include estimated and consider parameters and their associated a-priori uncertainties. Major perturbations to the trajectory include 19 deterministic and statistical maneuvers planned for the mission. The spacecraft is three axis stabilized and has unbalanced thrusters for attitude control. Accelerations due to the attitude control system are treated stochastically. The tracking scenario for the study is patterned after the actual schedule employed during the different phases of the mission. Conventional X-band two-way Doppler and SRA range data was simulated and the standard accuracy for these data types was assumed throughout most of the mission. However, a deweighting scheme was used for the Doppler data during times of low Sun-Earth-Probe angles, especially in the case of the DSM. Optical data is assumed to be available starting at 50 days prior to the comet encounter. The optical data will be used to improve the ephemeris of Wild-2, which is considered crucial to properly target the comet flyby. Results of the covariance analysis are presented for all mission phases. Navigation capability will be discussed in terms of the uncertainty in the encounter B-Plane (B.R and B.T) and linearized time of flight. Delivery errors based on the final maneuver prior to the comet encounter will be presented. The most stringent navigation requirement is for the Earth reentry. The uncertainty in the flight path angle must be less than 0.02 degree (orbit determination and maneuver performance) to assure successful recovery of the SRC. Results presented show that this requirement can be met.

Menon, Premkumar R.↗

Interplanetary optical navigation - Voyager Uranus encounter

Optical observations were necessary during the Voyager II Uranus approach and encounter in order to meet mission navigational requirements. In this paper, the overall optical navigation system and operation at Uranus are outlined. The formulation of the optical observables are presented, as well as their subsequent integration into the overall orbit determination products. Optical data analysis and some resulting orbit determination results from Uranus are shown. Certain scientifically important results were natural outcomes of the optical data analysis, and these are also reviewed. Finally, certain optical navigation related problems are anticipated at the forthcoming Neptune encounter in 1989; these are briefly discussed as are plans to deal with them.

Synnott, S. P.↗

Cassini-Huygens maneuver automation for navigation

Many times during the Cassini-Huygens mission to Saturn, propulsive maneuvers must be spaced so closely together that there isn't enough time or workforce to execute the maneuver-related software manually, one subsystem at a time. Automation is required. Automating the maneuver design process has involved close cooperation between teams. We present the contribution from the Navigation system. In scope, this includes trajectory propagation and search, generation of ephemerides, general tasks such as email notification and file transfer, and presentation materials. The software has been used to help understand maneuver optimization results, Huygens probe delivery statistics, and Saturn ring-plane crossing geometry. The Maneuver Automation Software (MAS), developed for the Cassini-Huygens program enables frequent maneuvers by handling mundane tasks such as creation of deliverable files, file delivery, generation and transmission of email announcements, generation of presentation material and other supporting documentation. By hand, these tasks took up hours, if not days, of work for each maneuver. Automated, these tasks may be completed in under an hour. During the cruise trajectory the spacing of maneuvers was such that development of a maneuver design could span about a month, involving several other processes in addition to that described, above. Often, about the last five days of this process covered the generation of a final design using an updated orbit-determination estimate. To support the tour trajectory, the orbit determination data cut-off of five days before the maneuver needed to be reduced to approximately one day and the whole maneuver development process needed to be reduced to less than a week..

propulsion maneuvers↗

Goddard Enhanced Onboard Navigation System (GEONS) Mathematical Specifications

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has developed the capability to provide high-accuracy attitude, orbit, and time autonomously onboard NASA spacecraft. The GSFC Mission Engineering and Systems Analysis Division has implemented NASA-developed navigation algorithms for high-accuracy real-time onboard orbit determination in the Global Positioning System (GPS) Enhanced Orbit Determination (GEODE) flight software. The Goddard Enhanced Onboard Navigation System (GEONS) extends the capabilities of the GEODE flight software to include additional measurement types and additional navigation algorithms.

Anne C. Long↗

Navigation Performance of the BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis- 1 campaign. The BioSentinel navigation team successfully tracked and guided the spacecraft through a lunar gravity assist to its destination Earth-trailing heliocentric orbit. This 6U CubeSat carries live yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also an uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. We present the results of Monte Carlo analyses and compute the pertinent maneuvers to avoid it. In addition, we present a comparison with the actual deployment once the mission launched by reconstructing our trajectory with tracking data. On November 16th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive 2-way Doppler and Sequential Ranging data from the DSN. We processed early data to try to obtain a first ephemeris using Initial Orbit Determination (IOD) methods such as the least squares. Soon after deployment, the spacecraft was tumbling and entered safe mode, creating a period where the tracking data were sparse. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days (from DSN as well as ESA antennas) allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators aborted any correction maneuvers. This periselene altitude also gave us the necessary energy to achieve a heliocentric orbit. The next challenge was due to the necessary adjustments in our orbit determination method due to the large energy boost resulting from the lunar flyby. After a series of tracking passes we were able to get a nominal solution that resulted into a stable trajectory. This paper discusses in detail the navigation performance using the X-band IRIS transponder, as well as the challenges and lessons learned prior to and during this deep space, CubeSat mission.

Andres Dono Perez↗

Navigation for the new millennium: Autonomous navigation for Deep Space 1

The autonomous optical navigation system technology for the Deep Space 1 (DS1) mission is reported on. The DS1 navigation system will be the first to use autonomous navigation in deep space. The systems tasks are to: perform interplanetary cruise orbit determination using images of distant asteroids; control and maintain the orbit of the spacecraft with an ion propulsion system and conventional thrusters, and perform late knowledge updates of target position during close flybys in order to facilitate high quality data return from asteroid MaAuliffe and comet West-Kohoutek-Ikemura. To accomplish these tasks, the following functions are required: picture planning; image processing; dynamical modeling and integration; planetary ephemeris and star catalog handling; orbit determination; data filtering and estimation; maneuver estimation, and spacecraft ephemeris updating. These systems and functions are described and preliminary performance data are presented.

Reidel, J. E.↗

Flight Mechanics/Estimation Theory Symposium

Satellite attitude determination and control, orbit determination, and onboard and ground attitude determination procedures are among the topics discussed. Other topics covered include: effect of atmosphere on Venus orbiter navigation; satellite-to-satellite tracking; and satellite onboard navigation using global positioning system data.

Source record↗

Performance of the square root information filter for navigation of the Mariner 10 spacecraft

The use is described of a sequential least squares filter in the orbit determination for the Mariner Venus-Mercury (Mariner 10) spacecraft. The orbit determination strategy outlining the use of both the sequential filter and a conventional batch filter is given. Highlighted are the mission events from launch to the first Mercury encounter with emphasis on the sequential filter performance. Advantages to the mission derived from the sequential filter are pointed out.

Christensen, C. S.↗

The Measurement of Mars Rotation Rate and Pole Position with MGS

Laser altimeter data and microwave tracking of the MGS (Mars Global Surveyor) spacecraft have been used to estimate rotation parameters for Mars. With the recent development of new high resolution gravity models for Mars and the determination of the orbit of the MGS spacecraft to the few meter level it has become possible to obtain rotational information about the planet. Perturbations of the spacecraft orbit by the planet's gravity field permit the gravity field to be estimated from the tracking data. But the perturbations arising from the non-zonal components of the gravity field have a periodicity related to the rotation of Mars on its axis and these perturbations enable the rotation rate and direction of the rotation pole in inertial space to be measured with respect to the orbit of the spacecraft. It is the anomalies in the gravity field that permit these parameters to be obtained. Similarly, altimetry data are sensitive to errors in the orbital altitude at orbital cross-over locations and the locations themselves are a function of the rotation of the planet. Thus, altimetric measurements by MOLA provide a geometric constraint on the rotation of the planet through the timing of the orbital cross-over pattern as well as information that improves the orbit determination. For a few months in 1999 MGS tracking and altimetry data have been used in a preliminary experiment to estimate the rotation rate of Mars and the right ascension and declination of the pole from an orbiting spacecraft. These preliminary results appear to have sufficient accuracy to permit detection of seasonal changes in rotation rate and also precession of the pole thus leading to a possible eventual measurement of the moment of inertia.

Smith, David E.↗

Performance of three-way data types during Voyager's encounter with Neptune

Voyager's flyby of Neptune in August of 1989 was the most distant planetary encounter ever achieved. Round trip light travel time was more than eight hours, exceeding view periods at two of the three tracking station sites. Consequently, the majority of radiometric tracking was accomplished by transmitting the uplink from one station, and receiving the downlink at a different station. This procedure defines three-way data. Dependence on three-way data for orbit determination is one distinguishing element of Voyager's successful encounter with Neptune. This paper addresses the performance of three-way range and Doppler data supporting pre-encounter orbit determination and post-encounter orbit reconstruction. Also, calibrations which reduce systematic errors inherent to three-way data are described and analyzed.

Roth, D. C.↗