Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OCCUPATION NUMBER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Cashew nut roasting: Chemical characterization of particulate matter and genotocixity analysis

Background: Particulate matter (PM) is potentially harmful to health and related to genotoxic events, an increase in the number of hospitalizations and mortality from respiratory and cardiovascular diseases. The present study conducted the first characterization of elemental composition and polycyclic aromatic hydrocarbon (PAH) analysis of PM, as well as the biomonitoring of genotoxic activity associated to artisanal cashew nut roasting, an important economic and social activity worldwide. Methods: The levels of PM{sub 2.5} and black carbon were also measured by gravimetric analysis and light reflectance. The elemental composition was determined using X-ray fluorescence spectrometry and PAH analysis was carried out by gas chromatography–mass spectrometry. Genotoxic activity was measured by the Tradescantia pallida micronucleus bioassay (Trad-MCN). Other biomarkers of DNA damage, such as nucleoplasmic bridges and nuclear fragments, were also quantified. Results: The mean amount of PM{sub 2.5} accumulated in the filters (January 2124.2 µg/m{sup 3}; May 1022.2 µg/m{sup 3}; September 1291.9 µg/m{sup 3}), black carbon (January 363.6 µg/m{sup 3}; May 70 µg/m{sup 3}; September 69.4 µg/m{sup 3}) and concentrations of Al, Si, P, S, Cl, K, Ca, Ti, Cr, Mn, Fe, Ni, Cu, Zn, Se, Br and Pb were significantly higher than the non-exposed area. Biomass burning tracers K, Cl, and S were the major inorganic compounds found. Benzo[k]fluoranthene, indene[1,2,3-c,d]pyrene, benzo[ghi]perylene, phenanthrene and benzo[b]fluoranthene were the most abundant PAHs. Mean benzo[a]pyrene-equivalent carcinogenic power values showed a significant cancer risk. The Trad-MCN bioassay revealed an increase in micronucleus frequency, 2–7 times higher than the negative control and significantly higher in all the months analyzed, possibly related to the mutagenic PAHs found. Conclusions: This study demonstrated that artisanal cashew nut roasting is a serious occupational problem, with harmful effects on workers' health. Those involved in this activity are exposed to higher PM{sub 2.5} concentrations and to 12 PAHs considered potentially mutagenic and/or carcinogenic. The Trad-MCN with T. pallida was sensitive and efficient in evaluating the genotoxicity of the components and other nuclear alterations may be used as effective biomarkers of DNA damage. - Highlights: • The cashew nut roasting generated high concentrations of particulate matter fine. • The biomass burning tracers K, Cl, S were the major inorganic compounds found. • It was identified 12 PAHs considered to be potentially mutagenic and/or carcinogenic. • The genotoxic potential of this activity was confirmed by the Trad MCN assay. • This activity is a serious occupational problem with harmful effects to health workers.

54 ENVIRONMENTAL SCIENCES↗

Effects of Weak Intermolecular Interactions on the Molecular Isomerism of Tricobalt Metal Chains

Depending on the number of interstitial solvent molecules, n, crystals of the linear chain compound Co3(dipyridylamide)4Cl2{center_dot}nCH2Cl2 adopt either symmetrical or unsymmetrical metal chain structures. We explore here the possible reasons for such behavior using Hirshfeld surface analysis of intermolecular interactions as well as the charge density determined from 100(1) K X-ray diffraction data on the unsymmetrical complex Co3(dipyridylamide)4Cl2{center_dot}2.11CH2Cl2, u-1, and crystal structures of u-1 determined from single crystal synchrotron X-ray diffraction data at 20, 150, and 300 K. The new crystal structures are compared with previous structural results on a crystal with slightly different solvent content. This change in solvent content only affects the bond distances to atom Co(3), which are also strongly affected by temperature changes due to a spin crossover transition. Large differences in intermolecular interactions are revealed by the Hirshfeld surface analysis between symmetrical (s-1) and unsymmetrical (u-1) crystal solvates, suggesting that the molecular isomerism is strongly influenced by crystal packing effects. Topological analysis of the static electron density of u-1 suggests that there is direct metal-metal bonding for both the shorter Co(1)-Co(2) and the longer Co(2)-Co(3) contact. The approximate description of the system as a (Co2)2+-dimer and an isolated Co2+-ion is reflected in the character of the metal-ligand interactions, which are more ionic for the isolated Co(3) atom, and the topological charges Co(1)+0.50, Co(2)+0.77, and Co(3)+1.36. The two termini of u-1 are found to be very different, both in terms of structural surroundings as well as topology. The central Co(2) atom is similar to a cobalt atom in a tetragonally distorted octahedral environment resulting in preferred occupancy in the t2g orbitals. The Co(1) atom has significant deformation in the xz and yz planes (z along the chain axis, x and y toward ligands) reflecting covalent interactions with the terminal chlorine atom Cl(1). The Co(3) atom has a relatively high occupancy of the dx2-y2 orbital and a relatively low occupancy of the dxy orbital confirming that these orbitals are involved in the spin crossover process and predominantly responsible for the observed variation in bond lengths with temperature.

36 MATERIALS SCIENCE↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pitfalls of tungsten multileaf collimator in proton beam therapy

Purpose: Particle beam therapy is associated with significant startup and operational cost. Multileaf collimator (MLC) provides an attractive option to improve the efficiency and reduce the treatment cost. A direct transfer of the MLC technology from external beam radiation therapy is intuitively straightforward to proton therapy. However, activation, neutron production, and the associated secondary cancer risk in proton beam should be an important consideration which is evaluated. Methods: Monte Carlo simulation with FLUKA particle transport code was applied in this study for a number of treatment models. The authors have performed a detailed study of the neutron generation, ambient dose equivalent [H*(10)], and activation of a typical tungsten MLC and compared with those obtained from a brass aperture used in a typical proton therapy system. Brass aperture and tungsten MLC were modeled by absorber blocks in this study, representing worst-case scenario of a fully closed collimator. Results: With a tungsten MLC, the secondary neutron dose to the patient is at least 1.5 times higher than that from a brass aperture. The H*(10) from a tungsten MLC at 10 cm downstream is about 22.3 mSv/Gy delivered to water phantom by noncollimated 200 MeV beam of 20 cm diameter compared to 14 mSv/Gy for the brass aperture. For a 30-fraction treatment course, the activity per unit volume in brass aperture reaches 5.3 x 10{sup 4} Bq cm{sup -3} at the end of the last treatment. The activity in brass decreases by a factor of 380 after 24 h, additional 6.2 times after 40 days of cooling, and is reduced to background level after 1 yr. Initial activity in tungsten after 30 days of treating 30 patients per day is about 3.4 times higher than in brass that decreases only by a factor of 2 after 40 days and accumulates to 1.2 x 10{sup 6} Bq cm{sup -3} after a full year of operation. The daily utilization of the MLC leads to buildup of activity with time. The overall activity continues to increase due to {sup 179}Ta with a half-life of 1.82 yr and thus require prolonged storage for activity cooling. The H*(10) near the patient side of the tungsten block is about 100 {mu}Sv/h and is 27 times higher at the upstream side of the block. This would lead to an accumulated dose for therapists in a year that may exceed occupational maximum permissible dose (50 mSv/yr). The value of H*(10) at the upstream surface of the tungsten block is about 220 times higher than that of the brass. Conclusions: MLC is an efficient way for beam shaping and overall cost reduction device in proton therapy. However, based on this study, tungsten seems to be not an optimal material for MLC in proton beam therapy. Usage of tungsten MLC in clinic may create unnecessary risks associated with the secondary neutrons and induced radioactivity for patients and staff depending on the patient load. A careful selection of material for manufacturing of an optimal MLC for proton therapy is thus desired.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Orange County Photovoltaic Project & Educational COmponent

The purpose of this report is to discuss the projects implemented, utilizing Department of Energy grant funds, to support the use and understanding of renewable energy in Orange County, Florida and the Greater Orlando Area. Orange County is located in the State of Florida and is most popularly referred to as Orlando. The greater Orlando area’s current population is 1,225,267 and in 2015 was the first destination to surpass 60 million visitors. Orange County utilized grant funds to add to the growing demand for access to charging stations by installing one level 2 dual NovaCharge CT4021 electric vehicle charging station at the Orange County/University of Florida Cooperative Extension Center. The charging station is considered a “smart” charger connected to a central network operated by a third party. Data collected includes the number of charging sessions, session start and end times, the electricity usage, greenhouse gases saved and other pertinent data used for reporting purposes. Orange County continues to support the use of electric vehicles in Metro Orlando and this project continues to bring awareness to our public regarding using alternative vehicles. Additionally, we offer all visitors to the Orange County/University of Florida Cooperative Extension Center free charges for their electric vehicles 24 hours a day. Since the operation of the charging station there have been 52 unique driver users, a total of 532.2258 kg of greenhouse gas savings and 159.03 gallons of gasoline savings. The installation of the additional electric vehicle charging station is part of a county-wide goal of promoting implementation of renewable energy technologies as well as supporting the use of electric vehicles including the Drive Electric Orlando & Florida programs. http://driveelectricorlando.com/ & ; http://www.driveelectricflorida.org/ . Grant funds were also used for Outreach and Educational efforts. Educational efforts about renewable energy were accomplished through the continued support as well as a proposed expansion and potential relocation of the Climate Change Education Center. The growth of the Climate Change Education Center focused on 2 educational subsectors. The first educational sector focused on an apprenticeship with university students. The second sector Orange County partnered with a hospitality college that held seminars to educate students in sustainability best practices that would influence the industry as a whole as students take jobs around the U.S. and other parts of the world. Orange County completed five of the originally proposed six educational seminars. The first seminar focused on community based social marketing techniques for driving sustainable behavior changes. The second seminar held was a green team workshop. The third seminar focused on urban sustainability planning. The fourth and fifth seminars held were Florida Energy Code workshops for building inspectors. A sixth transit oriented development seminar in partnership with Rollins College was explored, but was not conducted because the proposed on campus venue was not accessible for an extended period of time due to renovations. Additionally, an ENERGY STAR training program was conducted with students from the University of Central Florida; three of the five buildings assessed received ENERGY STAR ratings; one student completed the training and received their certification as an ENERGY STAR Specialist. Background: Location: Orange County is located in the central region of the State of Florida and is most popularly known for including the City of Orlando. The greater Orlando area’s current population is 1,225,267 and is home to large corporations such as Walt Disney World, Universal Studios Orlando, Ritz Carlton, Darden Restaurants, and the nation’s second largest convention center. Opportunities Identified: Encouraging Sustainability in Major Sectors: The Central Florida economy is largely dependent on the hospitality industry and in 2015 it was the first destination to surpass 60 million visitors. With over 60 million visitors each year, 120,000 hotel rooms, 4,000 restaurants, and 75 theme parks and attractions, the local hospitality industry provided a wealth of opportunity to reduce greenhouse gas emissions through building energy efficiency and renewable energy. Accordingly, Central Florida is an ideal training ground for teaching best practices for sustainability focused on the hospitality industry. Meeting the Growing Demand for Electric Vehicle Infrastructure: According to the 2014 U.S Clean Tech Leadership Index Report, nationwide electric vehicle ownership in the top 50 largest metro areas increased sharply in 2013; the Orlando Metro Area was ranked #5 in the nation in in terms of electric vehicle charging stations per one million people. Additionally, the Orange County 2014-2015 Annual Sustainable Orange County Report indicated there are 300 electric vehicle charging stations in Central Florida (roughly 300 charging stations within ~70 mile radius available to our residents of Orange County). By increasing and improving access to charging stations, Orange County supports the growing demand for renewable energy technologies. Project Achievements/Accomplishments: Installed an Electric Charging Station: Orange County utilized grant funds to install one level 2 dual NovaCharge CT4021 electric vehicle charging station at the Orange County/University of Florida Cooperative Extension Center. The charging station is considered a “smart” charger connected to a central network operated by a third party that monitors the number of charging sessions, session start and end times, the electricity usage, greenhouse gases saved and other pertinent data. During the six months of operation of the charging station there have been 52 unique driver users of the charging station; a total of 532.2258 kg of greenhouse gas savings and 159.03 gallons of gasoline savings. Operation and Potential Relocation of the Orange County Climate Change Education Center: The Climate Change Education Center, originally located within the Orange County Convention Center, served as a central place to inform and educate commercial and residential sectors of environmental, health, and economic benefits of renewable energy, energy efficiency, and greenhouse gas emission reductions. Grant funds were used to pay for the rent required to maintain a lease at the Convention Center, conduct five educational workshops, and for planned upgrades to the Center displays highlighting a number of energy efficiency and renewable energy projects implemented at the Orange County Convention Center and Downtown Orange County. An initial design concept for an upgraded Climate Change Education Center and educational displays was proposed. However, after the Convention Center determined the space occupied by the Climate Change Education Center; a feasibility study for relocation to the proposed area was conducted in October 2013. In December 2013, it was determined that the desired location of the for the Climate Change Education Center at the Orange County Extension Education Center provided too many construction challenges for relocation with too many building retrofits and access problems, including lack of access for loading and unloading exhibits as well as roof drainage relocations and sewer service connection issues. Another suitable location for relocating the Climate Change Education Center could not be located so the project was terminated. The Climate Change Education Center is no longer in existence in Orange County and has been eliminated. Grant funds were used to pay for marketing services for a state wide marketing program including solar & other renewable energy technologies for rebranding and developing marketing materials including web site design and updating. A website was maintained and updated the www.PowerUpGreenEnergy.com website (no longer in service). Sustainability Training for the Hospitality Industry and Major Sectors: To introduce energy efficiency and renewable energy concepts to the hospitality industry, Orange County partnered with a hospitality college that held seminars to educate students in sustainability best practices that would influence the industry as a whole as students take jobs around the U.S. and other parts of the world. Orange County completed five of the originally proposed six education seminars. Seminar topics included: driving sustainable behavior change through community based social marketing; green team programs; urban sustainability planning; and Florida Energy Code workshops for building inspectors. In partnership with Rollins College, a sixth seminar focused on transit-oriented development was explored, but was not conducted due to extended renovations at the proposed on-campus venue. Green Job Training Development: To promote green industry development and on-the-job training in occupations that encourage energy efficiency and resource reduction, Orange County piloted an ENERGY STAR training and apprenticeship program with students from the University of Central Florida; three students applied for the program; one student completed the training and received their certification as an ENERGY STAR specialist; three of the five buildings assessed received ENERGY STAR Ratings.

14 SOLAR ENERGY↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Development of Advanced T-OZON{sup TM} for PWR Decommissioning (2) - 18170

The number of aging nuclear power plants (NPPs) slated for closure around the world has increased. The majority of them are PWRs. Minimization of radiation exposure for PWR decommissioning workers is one of the key factors in decommissioning in order to apply the as low as reasonably achievable (ALARA) principle. To this end, it is desirable to establish a chemical decontamination method to reduce the exposure of PWR decommissioning workers. Toshiba developed T-OZON{sup TM}, a chemical decontamination method for BWRs [1, 2, 3]. To date, the method has been applied more than 90 times in Japanese BWR plants. The reduction in radiation exposure of workers achieved by applying T-OZON{sup TM} is estimated at about 300-2700 man mSv [4]. A major feature of T-OZON{sup TM} is the reduced amount of radioactive waste produced when compared to other decontamination processes. Oxide films on PWR wetted surfaces are harder to decontaminate than those in a BWR due to their chemical composition. To apply T-OZON{sup TM} to PWR oxide films, it is necessary to modify the process conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Generalizable Evaluated Approach, Applying Advanced Geospatial Statistical Methods, to Identify High Lead Exposure Locations at Census Tract Scale: Michigan Case Study

BACKGROUND: Despite great progress in reducing environmental lead (Pb) levels, many children in the United States are still being exposed. OBJECTIVE: Our aim was to develop a generalizable approach for systematically identifying, verifying, and analyzing locations with high prevalence of children’s elevated blood Pb levels (EBLLs) and to assess available Pb models/indices as surrogates, using a Michigan case study. METHODS: We obtained ~1:9 million BLL test results of children <6 years of age in Michigan from 2006–2016; we then evaluated them for data representativeness by comparing two percentage EBLL (%EBLL) rates (number of children tested with EBLL divided by both number of children tested and total population). We analyzed %EBLLs across census tracts over three time periods and between two EBLL reference values (≥5 vs. ≥10 μg/dL) to evaluate consistency. Locations with high %EBLLs were identified by a top 20 percentile method and a Getis-Ord Gi* geospatial cluster “hotspot” analysis. For the locations identified, we analyzed convergences with three available Pb exposure models/indices based on old housing and sociodemographics. RESULTS: Analyses of 2014–2016 %EBLL data identified 11 Michigan locations via cluster analysis and 80 additional locations via the top 20 percentile method and their associated census tracts. Data representativeness and consistency were supported by a 0.93 correlation coefficient between the two EBLL rates over 11 y, and a Kappa score of ~0:8 of %EBLL hotspots across the time periods (2014–2016) and reference values. Many EBLL hotspot locations converge with current Pb exposure models/indices; others diverge, suggesting additional Pb sources for targeted interventions. DISCUSSION: This analysis confirmed known Pb hotspot locations and revealed new ones at a finer geographic resolution than previously available, using advanced geospatial statistical methods and mapping/visualization. It also assessed the utility of surrogates in the absence of blood Pb data. This approach could be applied to other states to inform Pb mitigation and prevention efforts. https://doi.org/10.1289/EHP9705

54 ENVIRONMENTAL SCIENCES↗

Combined effects of space flight factors and radiation on humans

The probability that a dose of ionizing radiation kills a cell is about 10,000 times the probability that the cell will be transformed to malignancy. On the other hand, the number of cells killed required to significantly impact health is about 10,000 times the number that must be transformed to cause a late malignancy. If these two risks, cell killing and malignant transformation, are about equal, then the risk that occurs during a mission is more significant than the risk that occurs after a mission. The latent period for acute irradiation effects (cell killing) is about 2-4 weeks; the latent period for malignancy is 10-20 years. If these statements are approximately true, then the impact of cell killing on health in the low-gravity environment of space flight should be examined to establish an estimate of risk. The objective of this study is to synthesize data and conclusions from three areas of space biology and environmental health to arrive at rational risk assessment for radiations received by spacecraft crews: (1) the increased physiological demands of the space flight environment; (2) the effects of the space flight environment on physiological systems; and (3) the effects of radiation on physiological systems. One physiological system has been chosen: the immune response and its components, consisting of myeloid and lymphoid proliferative cell compartments. Best-case and worst-case scenarios are considered. In the worst case, a doubling of immune-function demand, accompanied by a halving of immune capacity, would reduce the endangering dose to a crew member to around 1 Gy.

Non-NASA Center↗

Phase diagram of SrO-InO{sub 1.5}-CoO{sub x} and a new compound Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6}

Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6}, isostructural to Ca{sub 3}Co{sub 2}O{sub 6}, is revealed by the study of the phase relations in the system SrO-InO{sub 1.5}-CoO{sub x} (1000 {sup o}C). The structure of Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6} is refined by the combination of powder X-ray and neutron diffraction. Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6} crystallizes in a trigonal lattice with the cell parameters a=b=9.59438(3) A, c=11.02172(4) A with the space group R-3c. Its structure possesses 1D (In/Co)O{sub 3} chains running along the c-axis constructed by alternating face-sharing CoO{sub 6} octahedra and (In{sub 0.9}Co{sub 0.1})O{sub 6} trigonal prisms. The co-occupation of In{sup 3+} and Co{sup 3+} at the trigonal prismatic site is evidenced by elementary analysis and determined by the structure refinement. Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6} is paramagnetic, and the susceptibility is consistent with the occupation of Co{sup 3+} at 10% of the trigonal prismatic positions in a high spin state (HS, S=2). The HS Co{sup 3+} is well separated by diamagnetic CoO{sub 6} octahedra and InO{sub 6} trigonal prisms and shows a g factor of 2.0 in the magnetic measurements. -- Graphical abstract: Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6} possesses 1D chains constructed by alternating face-sharing CoO{sub 6} octahedra and (In{sub 0.9}Co{sub 0.1})O{sub 6} trigonal prisms. The high spin Co{sup 3+} (S=2) in trigonal prism shows a g factor of 2.0. Display Omitted Research highlights: {yields} Phase diagram of SrO-InO{sub 1.5-}CoO{sub x} at 1000 {sup o}C in air atmosphere is presented. {yields} A new compound Sr{sub 3}In{sub 0.9}Co{sub 1.1}O{sub 6} that is isostructural to Ca{sub 3}Co{sub 2}O{sub 6} is revealed. {yields} 1D chain is formed by alternating face-sharing CoO{sub 6} octahedra and (In{sub 0.9}Co{sub 0.1})O{sub 6} trigonal prisms.{yields} Co{sup 3+} at trigonal prismatic site is in high spin state (S=2) with a g factor of 2.0.

36 MATERIALS SCIENCE↗

Integrated Environmental Management System Communication at Large Sites - 20480

At a large Department of Energy-owned (DOE) site, there are challenges to communicating Environmental Management System (EMS) topics effectively. With multiple contractors and Environmental Management System scopes, as well as a large number of employees, communication preferences and possibilities vary, providing both the benefit and the challenge of differing pathways for sharing information. Additionally, data collection for site-wide environmental reporting involves numerous points of contact spread across contractors and requires organization and integrated communication. Focusing on the value of communication to enhance EMS education and awareness to drive environmental performance, we discuss the communication methods used both at a site-wide level and by individual organizations. Example methods include site-wide working group meetings, internal Share Point, site-wide surveys, collaborative reporting, weekly newsletters, and combined communication efforts with the Integrated Safety Management System (ISMS). Using external audit results to gauge employee environmental awareness and culture, we analyze the effectiveness of EMS communications. In conclusion, integration of EMS communication in alignment with the ISMS has assisted in meeting International Organization of Standardization 14001 (ISO 14001) requirements and strengthened the concept that environmental protection is part of safety for workers and the site. Increased environmental enthusiasm and awareness supports the effectiveness of EMS communication methods and positive external audit results. These results benefit other sites with EMS to gain knowledge of integrated communication efforts that increase the effectiveness of the EMS, environmental performance, and conformance with ISO 14001. By assessing the effectiveness of actual EMS communication methods, contractors will be able to take away tools to enhance environmental communication in their workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Exploratory Roadmaps - 20054

The U.S. Department of Energy manages nearly 2,500 metric tons of heavy metal (MTHM) of spent nuclear fuel (SNF) resulting from several decades of research, testing, and production reactors [DOE 1995]. This SNF is managed at the DOE Hanford Site in Washington State (Hanford), Idaho National Laboratory (INL), and Savannah River Site in South Carolina (SRS). From 1995 to 2004, the Department of Energy (DOE) made several key programmatic decisions, supported by appropriate documentation in accordance with the National Environmental Policy Act (NEPA) for the management of SNF [DOE 1995]. These decisions have provided an overarching framework for SNF management, as well as site-specific and SNF-related management decisions for the past two decades. In the years since these decisions were made, with the notable exception of the successful drying and packaging of the production reactor fuel at Hanford, a majority of the decisions have been largely unimplemented. Also, since these decisions were made, a number of changes that bear on considerations relative to the path forward have occurred. A SNF Exploratory Road map activity, identified reasonable alternate pathways for DoE's inventory of SNF. Three fundamental pathways were identified in this activity for the long-term management and disposition of DOE SNF: Direct Disposal Pathway, Existing Processing Pathway and Alternate Processing Pathway. Further actions would be required (e.g., evaluation of NEPA analysis, technology maturity evaluations, refinement of cost and risks, benefits and advantages relative to other alternate paths) to define and inform many key decisions that will result in the selection of the disposition pathways that are most beneficial to the US Government in dispositioning DoE's SNF inventory. DOE is currently managing all SNF safely; however, the age of DOE-owned SNF and facilities for storing and processing SNF, coupled with the uncertainty of the storage duration, necessitates decisions and actions to ensure that the infrastructure will be in place to ensure continued safe and effective long-term management and eventual disposal. The identification of reasonable alternate pathways took these considerations into account in an effort to proactively manage conditions that could challenge the safety of storing and managing DOE SNF over the time periods now contemplated and also to ensure that flexibility is preserved to ensure that the DOE SNF remains compatible with final disposition pathways when they become available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Full-Scale Fire Program to Evaluate New Furnishings and Textile Materials Developed by the National Aeronautics and Space Administration

The plans for the present series of full-scale experimental fires were initiated at the suggestion of NASA following the presentation of a film and discussion illustrating Battelle-Columbus' recent work in fire research. That film showed bedroom-type fires carried out as a part of a program to determine the influence of the cyclic characteristics of real fires under limited ventilation on the burning and pyrolysis properties of the room furnishings. A new series of fires was suggested by NASA designed to show the performance of new fire resistant and fire retardant materials by providing comparative fire and smoldering environmental conditions. More recently, the goal for the new series of fires was written in a meeting with NASA personnel and others at Battelle on May 3 and 4, 1972. The goal was as follows: To establish the need for special materials of improved fire safety in domiciliary settings of public concern, and to assess, in a professionally acceptable manner, the potential of materials arising from the new space-age technology for this purpose. It was anticipated that some new materials arising from the space-age technology and not yet available through conventional commercial channels might provide significant improvements in fire safety if the best of the commercially available materials showed important shortcomings in this area. It was the intent of this program to assess the benefits that could accrue from the use of these new materials. Fire safety is a matter requiring the evaluation of a number of factors. For example, fire resistance and fire spread, visibility during the fire, toxicity of evolved gases, and the fire-fighting problem that is created must be evaluated before the relative hazard can be assessed. The plan of the program provided for sampling and instrumentation to evaluate these factors, consistent with the goal of technological utilization that has been specified. Arrangements were made with the Columbus Fire Department to use an existing six-story concrete building', designed and used as a fire training tower, as the site for the experimental fires. The visual evidence provided by TV and photographic coverage of the four experimental room fires showed clearly that the rooms responded very differently to a common ignition condition. In particular: (1) The Typical room, furnished from conventional retail sources, ignited easily and burned rapidly so that after 8 minutes the contents of the room were nearly destroyed. (2) The Improved room, furnished with materials selected as being among the best commercially available, showed substantial improvement over the Typical room in that there was slower fire spread. However, the relatively complete destruction of the room contents that resulted, and the large amounts of smoke, made it clear that substantial further improvements were needed. This fire was stopped after 29 minutes. (3) The Space-age room, furnished completely with new materials that were not yet commercially available, did not ignite under the common ignition condition and soon demonstrated the substantial improvement in fire resistance available for those components close to the ignition source. A second and larger ignition arrangement showed that this room can burn, but the difficulty with which this was brought about confirmed the improved fire resistance available with use of these materials. (4) The Mixed room ensemble, furnished with 'materials identical to the Typical room except for the substitution of the bed from the Space-age room, illustrated the improvement in control of fire spread available by careful placement of fire materials in the important paths of fire development of an otherwise ordinary room. The most significant hazards at early times in each fire were due to the rapid rise in heat flux and the abrupt obscuration of vision by smoke. The most consistent toxicity hazard was due to CO and its importance would depend on the ability of the occupant to survive the initial heat and smoke menace which characterized each fire room. Other gases and vapors were shown to reach hazardous levels in certain fire rooms and, again, their significance to an occupant, would relate to the times in which such hazards occurred, and probably to the synergistic nature of the hazard arising from mixtures of such gases. Fire retardant items in the room are caused to pyrolyze by the heat of burning from other items in the room and so contribute to combustible and toxic vapor accumulations, even though they may not have entered into the burning process. This effect of a mixture of combustible materials to produce burning and pyrolysis not characteristic of any one item individually we have chosen to call the "ensemble effect". Further full-scale fire trials may be expected to show the significant changes that control the burning and pyrolytic processes and in that event a programmed fire chamber should be developed to yield realistic laboratory results.

Hillenbrand, L. J.↗

Evaluation of Serial Testing After Exposure to COVID-19 in Early Care and Education Facilities, Illinois, March–May 2022

Objective: To understand SARS-CoV-2 transmission in early care and education (ECE) settings, we implemented a Test to Stay (TTS) strategy, which allowed children and staff who were close contacts to COVID-19 to remain in person if they agreed to test twice after exposure. We describe SARS-CoV-2 transmission, testing preferences, and the number of in-person days saved among participating ECE facilities. Methods: From March 21 through May 27, 2022, 32 ECE facilities in Illinois implemented TTS. Unvaccinated children and staff who were not up to date with COVID-19 vaccination could participate if exposed to COVID-19. Participants received 2 tests within 7 days after exposure and were given the option to test at home or at the ECE facility. Results: During the study period, 331 TTS participants were exposed to index cases (defined as people attending the ECE facility with a positive SARS-CoV-2 test result during the infectious period); 14 participants tested positive, resulting in a secondary attack rate of 4.2%. No tertiary cases (defined as a person with a positive SARS-CoV-2 test result within 10 days after exposure to a secondary case) occurred in the ECE facilities. Most participants (366 of 383; 95.6%) chose to test at home. Remaining in-person after an exposure to COVID-19 saved approximately 1915 in-person days among children and staff and approximately 1870 parent workdays. Conclusion: SARS-CoV-2 transmission rates were low in ECE facilities during the study period. Serial testing after COVID-19 exposure among children and staff at ECE facilities is a valuable strategy to allow children to remain in person and parents to avoid missing workdays.

Public, Environmental & Occupational Health↗

Management of multiple groundwater contaminant plumes extending beyond property boundaries at the young - Rainey STAR Center (Science, Technology, and Research Center) - 15623

The US DOE Pinellas Plant-now known as the Young - Rainey STAR Center, located in Largo, Florida-manufactured components for nuclear weapons from 1956 to 1995. During decades of operations, chlorinated solvents were released from a drum storage area and from underground piping at multiple points adjacent to and beneath a 4.5-hectare (11-acre) building. Two groundwater contaminant plumes associated with contaminant sources beneath the building have been identified, delineated, and are being monitored. During a focused delineation campaign in 2008 to better define the plume boundaries prior to municipal construction projects in the area, the plumes were determined to extend beyond the site boundaries, beneath the adjacent roadway easements, and beneath four adjacent privately owned properties. US DOE has performed a number of activities in response to the discovery of the offsite contaminant plumes, including performing a high-resolution delineation of contaminant plumes; coordinating with local municipalities to complete two linear construction projects requiring dewatering in the vicinity of the plumes; performing risk assessment, risk management, risk communication, and community relations tasks associated with the project; coordinating with state regulators to identify a risk-based corrective action regulatory approach; and coordinating with impacted property owners to develop and implement institutional controls. During the replacement of a 1.2-meter (48-inch) municipal potable water line directly over the contaminant plume area, US DOE (1) constructed infrastructure to receive and treat dewatering effluent at a rate of 20 gallons per minute around the clock for 6 weeks, and (2) conducted breathing-zone air monitoring during excavation of a 3.0-meter (10-foot) deep trench. This degree of diligence was necessary to ensure and document that no site workers were exposed to chlorinated solvent vapors during the construction process, and that a large volume of potentially contaminated groundwater was properly treated and dispositioned. US DOE also took aggressive actions to pro-actively address claims regarding loss of property value on two properties associated with the groundwater contamination, which resulted in a teaming arrangement with each party for future management of the ongoing corrective actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the Emissions and Crystalline Silica Content of Airborne Dust Generated from Grinding Natural and Engineered Stones

Abstract In this study, we systematically characterized the airborne dust generated from grinding engineered and natural stone products using a laboratory testing system designed and operated to collect representative respirable dust samples. Four stone samples tested included two engineered stones consisting of crystalline silica in a polyester resin matrix (formulations differed with Stones A having up to 90wt% crystalline silica and Stone B up to 50wt% crystalline silica), an engineered stone consisting of recycled glass in a cement matrix (Stone C), and a granite. Aerosol samples were collected by respirable dust samplers, total dust samplers, and a Micro-Orifice Uniform Deposit Impactor. Aerosol samples were analyzed by gravimetric analysis and x-ray diffraction to determine dust generation rates, crystalline silica generation rates, and crystalline silica content. Additionally, bulk dust settled on the floor of the testing system was analyzed for crystalline silica content. Real-time particle size distributions were measured using an Aerodynamic Particle Sizer. All stone types generated similar trimodal lognormal number-weighted particle size distributions during grinding with the most prominent mode at an aerodynamic diameter of about 2.0-2.3 μm, suggesting dust formation from grinding different stones is similar. Bulk dust from Stone C contained no crystalline silica. Bulk dust from Stone A, Stone B, and granite contained 60, 23, and 30wt% crystalline silica, respectively. In Stones A and B, the cristobalite form of crystalline silica was more plentiful than the quartz form. Only the quartz form was detected in granite. The bulk dust, respirable dust, and total dust for each stone had comparable amounts of crystalline silica, suggesting that crystalline silica content in the bulk dust could be representative of that in respirable dust generated during grinding. Granite generated more dust per unit volume of material removed than the engineered stones, which all had similar normalized dust generation rates. Stone A had the highest normalized generation rates of crystalline silica, followed by granite, Stone B, and Stone C (no crystalline silica), which likely leads to the same trend of respirable crystalline silica (RCS) exposure when working with these different stones. Manufacturing and adoption of engineered stone products with formulations such as Stone B or Stone C could potentially lower or eliminate RCS exposure risks. Combining all the effects of dust generation rate, size-dependent silica content, and respirable fraction, the highest normalized generation rate of RCS consistently occurs at 3.2-5.6 µm for all the stones containing crystalline silica. Therefore, removing particles in this size range near the generation sources should be prioritized when developing engineering control measures.

Public, Environmental & Occupational Health↗

Argonne National Laboratory Annual Report of Laboratory Directed Research and Development Program Activities FY 2012

Our plans to upgrade the Advanced Photon Source are proceeding on schedule, and we hope to receive CD-2 approval sometime in spring 2013. When complete, the APS Upgrade will equip this vital facility for continued scientific leadership in the 21st century, providing the 5,000-plus members of our user community with greatly increased time, energy and spatial resolution. We also have successfully installed “Mira,” the new IBM Blue Gene/Q system at the Argonne Leadership Computing Facility. The world’s fourth-fastest supercomputer, Mira is now providing leading-edge computational power across all scientific disciplines. I am also pleased to report that Argonne’s new Energy Sciences Building is proceeding on schedule; we expect it to be finished and ready for occupancy by June 30, 2013. When complete, the ESB will be one of the most modern and most flexible energy labs in the world, creating a new home for researchers focused on a wide range of energy science challenges. Research is under way at the new multidisciplinary Institute for Molecular Engineering (IME), a joint program of the University of Chicago and Argonne. Over the past year, four new faculty members, including IME’s director, – all pre-eminent researchers who hold joint appointments at Argonne – have joined the IME. We look forward to working in collaboration with the IME to find new ways to address the interfaces between molecular-level science and powerful new technologies. In FY 2012, we continued support for the final year of the “Beyond Lithium-Ion” Director’s Grand Challenge LDRD project. That project enabled significant work on the performance of lithium-based energy storage systems, pointing the way to new high-energy-density lithium-air batteries. I believe this Grand Challenge contributed significantly to our successful bid to win designation of the Argonne-based Joint Center for Energy Storage Research (JCESR) as the DOE’s new Batteries and Energy Storage Hub. JCESR, which brings together a world-class “dream team” of national laboratories, universities and private sector partners, strongly benefited from LDRD program investments, both in FY2012 and in previous years. As we move forward in FY2013, the Director’s Grand Challenge is now focused on new ways to address the challenges of “big data” – the acquisition, storage, transfer, and analysis of both experimental and simulated data at scales approaching the limits of our current computational capacities. In managing Argonne’s LDRD program, we have adhered to the requirements of DOE Order 413.2b and associated guidelines. Our program management continually strives for increased efficiency. In addition to meeting all reporting requirements during FY 2012, our LDRD Program Office continues to implement intranet-based process enhancements to better serve all LDRD stakeholders, including our DOE Site Office colleagues. As the following individual project reports demonstrate, Argonne’s researchers are pursuing projects at the leading edge of science and engineering, and making significant contributions to the advancement of our laboratory’s major strategic initiatives. Evidence of the continuing strength of this program is found in the follow-on sponsorship won by many of these research projects, as well as in the numbers of publications, invited presentations, inventions, and new staff hires that are direct results of LDRD. LDRD enables exploration of new scientific directions and makes it possible to adapt quickly to a changing landscape with unexpected opportunities, while enhancing the capabilities of our researchers and our scientific facilities. For these reasons, LDRD remains an invaluable resource to address the future science and technology needs of DOE, and of our nation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Nuclear Waste Tank Emission Contributions to Particle Size Distribution

Pollutants from anthropogenic activities including industrial processes are ubiquitous to the environment. To understand the impact from industrial aerosol on climate and human health, industrial aerosol needs to be better characterized. Here, in this study, particle number concentrations were used as a proxy for atmospheric pollutants, which include both particles and gases. Particle concentration and size distribution were measured using a scanning mobility particle sizer (SMPS) approximately 4.5 km from primary industrial areas at the Savannah River Site in Aiken, SC. Industrial areas include numerous nuclear waste storage and processing tanks. The SMPS data were divided into two groups depending on the wind direction measured onsite to categorize transport from the industrial area or from elsewhere. Industrial contributions were found to have a higher concentration of particles with sizes less than 200 nm, 859 ± 564 cm -3 , in comparison to non-industrial attributed particles, 733 ± 495 cm -3 on average from March-July 2021. For sizes larger than 200 nm, industrial and non-industrial particles have a similar concentration, 89 ± 59 cm -3 and 99 ± 61 cm -3 , with non-industrial concentrations being slightly larger. To confirm that industrial particles could travel to the sampling location, air dispersion modeling was completed for specific case studies during the sampling period. The atmospheric dispersion modeling results confirmed that particles released at the industrial areas reached the sampling location when the wind direction was favorable for transport from the industrial areas. The greater concentration of smaller-sized particles in industrial emissions has implications for typical particulate measurements (PM2.5), heath impacts, and climatological influences.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗