Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Advanced Reactors Spent Fuel & Waste Science and Technology Program

Based on the higher interest in Advanced Reactor (AR) deployment (e.g., ARDP ) for potential new fuel cycles, the Spent Fuel & Waste Science and Technology (SFWST) Program has begun to evaluate the possible implications of long-term management and final disposition of potential Advance Reactor spent nuclear fuels (SNF) that would be generated in potential advanced reactors. Safely managing and dispositioning the potential future AR SNF, and any other associated radioactive wastes, is the primary focus of this initial preliminary assessment of those. This paper summarizes three primary tasks the Spent Fuel & Waste Science and Technology (SFWST) Program is executing (or collaborating on) related to the back end of the nuclear fuel cycle (BENFC) for potential future advanced reactors: 1. Advanced Reactors Spent Fuel and Waste Streams: Strategies for the BENFC This set of activities define a high-level strategy for how to systematically approach, identify, and close research and development (R&D) gaps/potential issues associated with long-term management and final disposition of AR SNF and other possible AR waste streams. This task involves summarizing advanced reactor concepts, their likely SNF and other waste forms, and identifying previous experience with similar materials, for example from DOE-managed SNF, with closely related characteristics to the potential future AR SNF. Technical R&D gaps between the breadth of detailed understanding for safe storage, transportation and disposal of the existing light water reactor SNF fuel cycle (e.g., see NASEM, 2022) and potential future fuel cycles based on advanced reactors would then be identified. 2. Characterization and Packaging Options of Advanced Reactor SNF These activities evaluate characteristics and packaging options for advanced reactor spent fuel forms. The fuel forms are categorized into three types: (1) tri-structural isotropic (TRISO), (2) metallic, and (3) fuel salt. Emphasis is given to TRISO and metallic SNF and additional waste streams from such AR as driven by the near-term anticipated operation of the Xe-100 and the Natrium reactors as advanced-reactor demonstrations1. Preliminary information for the spent-fuel salt discharged from molten-salt reactors (MSRs) is examined to provide a baseline for future efforts. All calculations and assumptions in this work are based on publicly available information. The following characteristics are calculated or estimated for use in the preliminary assessments: SNF volume and mass, radiation/activity levels through time, thermal conditions through time, potential radionuclide source terms, chemical interactions and evolutions, disposal inventories, and waste-form lifetime. Using those characteristics, calculations to determine the applicability of existing canister designs were performed. These evaluations included geometric (e.g., dimension, volume) and mass/weight considerations, known operational approaches and loading procedures, physical and chemical considerations/conditions for storage environments, as-loaded radiation, thermal, and criticality analyses to identify constraints for storage, transportation, and disposal. 3. Back-End Management of Advanced Reactors (BEMAR) The DOE NE-8 organization has defined an Integrated Project Team to evaluate the Back End Management of Advanced Reactors (BEMAR) (includes DOE staff from a range of organizations (e.g., NE-81, NE-82, OCED) and national laboratory technical staff within the DOE NE-81 and NE-82 programs). This BEMAR group works directly with advance reactors developers to assess for the DOE the technical feasibility of storage, transportation, and disposal of AR SNF based on the characteristics provided by the developers to DOE (much of which is proprietary). The BEMAR is also tasked to develop rough-order-of-magnitude cost estimates to compare the waste management system for individual advanced reactors to existing light-water reactor management practices. To accomplish this, the BEMAR group is implementing a Systems Engineering approach.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Prospective implementation of a software application for pre-disposal L/ILW waste management activities in Romania

Romania is actively engaged to update the Medium and Long Term National Strategy for Safe Management of Radioactive Waste and to approve the Road Map for Geological Repository Development. Considering relevant documents to be further updated, about 122,000 m{sup 3} SL-LILW are to be disposed in a near surface facility that will have room, also, for quantities of VLLW. Planned date for commissioning is under revision. Taking into account that in this moment there are initiated several actions for the improvement of the technical capability for LILW treatment and conditioning, several steps for the possible use of SAFRAN software were considered. In view of specific data for Romanian radioactive waste inventory, authors are trying to highlight the expected limitations and unknown data related with the implementation of SAFRAN software for the foreseen pre-disposal waste management activities. There are challenges that have to be faced in the near future related with clear definition of the properties of each room, area and waste management activity. This work has the aim to address several LILW management issues in accordance with national and international regulatory framework for the assurance of nuclear safety. Also, authors intend to develop their institutional capability for the safety demonstration of the existent and future radioactive waste management facilities and activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Teaching Radioactive Waste Management in an Undergraduate Engineering Program - 13269

The University of Ontario Institute of Technology is Ontario's newest university and the only one in Canada that offers an accredited Bachelor of Nuclear Engineering (Honours) degree. The nuclear engineering program consists of 48 full-semester courses, including one on radioactive waste management. This is a design course that challenges young engineers to develop a fundamental understanding of how to manage the storage and disposal of various types and forms of radioactive waste, and to recognize the social consequences of their practices and decisions. Students are tasked with developing a major project based on an environmental assessment of a simple conceptual design for a waste disposal facility. They use collaborative learning and self-directed exploration to gain the requisite knowledge of the waste management system. The project constitutes 70% of their mark, but is broken down into several small components that include, an environmental assessment comprehensive study report, a technical review, a facility design, and a public defense of their proposal. Many aspects of the project mirror industry team project situations, including the various levels of participation. The success of the students is correlated with their engagement in the project, the highest final examination scores achieved by students with the strongest effort in the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Execution Strategy Analysis (ESA) Capability and Tool for the Management of Spent Nuclear Fuel (SNF) - 16575

An Execution Strategy Analysis (ESA) capability and tool are being developed to evaluate alternative execution strategies for future deployment of a consolidated Interim Storage Facility using a consent-based siting process per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy). Application of an ESA approach not only leverages but also goes beyond traditional project analysis tools. The ESA tool allows for ongoing performance assessment of the evolving project execution plan that takes into account significant assumptions, risks, and uncertainties throughout the project lifecycle. The ESA process and tool will be used to support the development of plans, budgets, and alternative execution/implementation strategies for meeting the goals of the Strategy. This paper describes the development of the ESA capability and tool and identifies the value of applying such a capability in implementing a long-term strategy for managing spent nuclear fuel and high-level radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Fuel/Reactor Cycle to Implement the 300 Years Nuclear Waste Policy Approach - 12377

A thorium-based fuel cycle system can effectively burn the currently accumulated commercial used nuclear fuel and move to a sustainable equilibrium where the actinide levels in the high level waste are low enough to yield a radiotoxicity after 300 years lower than that of the equivalent uranium ore. The second step of the Westinghouse approach to solving the waste 'problem' has been completed. The thorium fuel cycle has indeed the potential of burning the legacy TRU and achieve the waste objective proposed. Initial evaluations have been started for the third step, development and selection of appropriate reactors. Indications are that the probability of show-stoppers is rather remote. It is, therefore, believed that development of the thorium cycle and associated technologies will provide a permanent solution to the waste management. Westinghouse is open to the widest collaboration to make this a reality. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Groundwork for Universal Canister System Development

The mission of the United States Department of Energy’s Office of Environmental Management is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. Some of the wastes that that must be managed have been identified as good candidates for disposal in a deep borehole in crystalline rock (SNL 2014a). In particular, wastes that can be disposed of in a small package are good candidates for this disposal concept. A canister-based system that can be used for handling these wastes during the disposition process (i.e., storage, transfers, transportation, and disposal) could facilitate the eventual disposal of these wastes. This report provides information for a program plan for developing specifications regarding a canister-based system that facilitates small waste form packaging and disposal and that is integrated with the overall efforts of the DOE’s Office of Nuclear Energy Used Fuel Disposition Campaign's Deep Borehole Field Test. Wastes to be considered as candidates for the universal canister system include capsules containing cesium and strontium currently stored in pools at the Hanford Site, cesium to be processed using elutable or nonelutable resins at the Hanford Site, and calcine waste from Idaho National Laboratory. The initial emphasis will be on disposal of the cesium and strontium capsules in a deep borehole that has been drilled into crystalline rock. Specifications for a universal canister system are derived from operational, performance, and regulatory requirements for storage, transfers, transportation, and disposal of radioactive waste. Agreements between the Department of Energy and the States of Washington and Idaho, as well as the Deep Borehole Field Test plan provide schedule requirements for development of the universal canister system. Future work includes collaboration with the Hanford Site to move the cesium and strontium capsules into dry storage, collaboration with the Deep Borehole Field Test to develop surface handling and emplacement techniques and to develop the waste package design requirements, developing universal canister system design options and concepts of operations, and developing system analysis tools. Areas in which further research and development are needed include material properties and structural integrity, in-package sorbents and fillers, waste form tolerance to heat and postweld stress relief, waste package impact limiters, sensors, cesium mobility under downhole conditions, and the impact of high pressure and high temperature environment on seals design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Canadian Solution for Management of Mixed Liquid Waste - 13384

Mixed liquid wastes (MLW) from Canadian nuclear facilities consist of solvents, PCB (Poly Chlorinated Biphenyls) and non-PCB contaminated oils and aqueous wastes. Historically, MLW drums were shipped to a licensed US facility for destruction via incineration. This option is relatively expensive considering the significant logistics and destruction costs involved. In addition, commercial waste destruction facilities in US cannot accept PCB wastes from non-US jurisdictions. Because of this, Kinectrics has recently developed a novel and flexible process for disposing both PCB as well as non-PCB contaminated MLW within Canada. This avoids the need for cross-border shipments which significantly reduces the complexity and cost for waste disposal. This paper presents an overview of the various approaches and activities undertaken to date by Kinectrics for successfully processing and disposing the MLW drums. A summary of the results, challenges and how they were overcome are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Challenges of Extended Dry Storage of Spent Nuclear Fuel - 12550

As a result of the termination of the Yucca Mountain used fuel repository program and a continuing climate of uncertainty in the national policy for nuclear fuel disposition, the likelihood has increased that extended storage, defined as more than 60 years, and subsequent transportation of used nuclear fuel after periods of extended storage may become necessary. Whether at the nation's 104 nuclear energy facilities, or at one or more consolidated interim storage facilities, the operational challenges of extended storage and transportation will depend upon the future US policy for Used Fuel Management and the future Regulatory Framework for EST, both of which should be developed with consideration of their operational impacts. Risk insights into the regulatory framework may conclude that dry storage and transportation operations should focus primarily on ensuring canister integrity. Assurance of cladding integrity may not be beneficial from an overall risk perspective. If assurance of canister integrity becomes more important, then mitigation techniques for potential canister degradation mechanisms will be the primary source of operational focus. If cladding integrity remains as an important focus, then operational challenges to assure it would require much more effort. Fundamental shifts in the approach to design a repository and optimize the back-end of the fuel cycle will need to occur in order to address the realities of the changes that have taken place over the last 30 years. Direct disposal of existing dual purpose storage and transportation casks will be essential to optimizing the back end of the fuel cycle. The federal used fuel management should focus on siting and designing a repository that meets this objective along with the development of CIS, and possibly recycling. An integrated approach to developing US policy and the regulatory framework must consider the potential operational challenges that they would create. Therefore, it should be integral to these efforts to redefine retrievability to apply to the dual purpose cask, and not to apply to individual assemblies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 69: Ensuring Strong Return on Investment for DOE EM Technology Development: Global Views

This panel focused on DOE and Non-US Technology Development Projects discussing how they approach tech development to maximize return on investment (ROI). Successful examples were discussed. After the individual panelist's presentations, the three panelists were joined by Kurt Gerdes in discussing the genesis of this panel and why it is important. Panelists with presentations: Ensuring a Strong Return on Investment for DOE EM Technology Development (Anthony Banford) DOE Technology Development Projects that Provided a Strong Return on Investment (ROI (Mark Lesinski) Australian Nuclear Science and Technology Organisation (Gerry Triani) Decommissioning Situation of Nuclear Power Plant in Japan (Teruyuki Hirai)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing generic design alternatives for dry storage of used nuclear fuel at an interim storage facility - 15480

The Department of Energy (DOE) is beginning to lay the groundwork for implementing interim storage of used nuclear fuel (UNF) as recommended by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published on January 26, 2012. These plans include activities to 1) establish one or more Interim Storage Facilities (ISF) using consent-based siting, and 2) prepare for large-scale transport of UNF. The Administration released its Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy) on January 11, 2013. The Strategy includes a phased, adaptive, and consent-based approach to siting and implementing a comprehensive management and disposal system. The Strategy calls for an operational Pilot ISF by 2021, a Larger ISF by 2025, and a geological repository by 2048. The DOE Nuclear Fuels Storage and Transportation Planning Project (NFST) prepared a report in April 2013 titled, -A Project Concept for Nuclear Fuels Storage and Transportation.- This report developed the functions and requirements necessary for development of a Pilot and Larger ISF to meet the framework outlined in the Strategy as follows: - The UNF inventory is limited for the Pilot and Larger ISF as described in the Strategy. - It is assumed that bare fuel will be received in reusable transportation casks in significant quantities for the larger ISF and will not be solely limited to the receipt of fuel in dry storage canister (DSC) as is the Pilot ISF. This assumption was made because the method for accepting UNF from the utilities once the larger ISF begins operating has not yet been decided. - UNF storage alternative concepts identified in previous reports must be more fully developed to support alternative analysis. The purpose of this topic is to report on the development of the generic design alternatives that have been evaluated for the receipt and storage of the UNF at the initial Pilot ISF and Larger ISF. The generic design alternatives have been developed over the past few months by collaboration between the DOE and industry experts experienced in UNF facilities. The design alternatives will enable volunteer host communities to investigate generic design alternatives that could be fully developed for a site-specific location based on their unique design requirements. The design alternatives provide flexibility for additional capabilities to be developed and executed in a modular fashion such that expansion from a Pilot ISF to a Larger ISF could be achieved in an orderly manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Radiological Risk Assessment Model for Disposition of Remote-Handled Transuranic Wastes at Los Alamos National Laboratory Area G - 20116

The U.S. Department of Energy (DOE) operates a low-level radioactive waste (LLW) disposal site at Material Disposal Area G, in Los Alamos, New Mexico, USA. Area G has been the primary LLW disposal site for Los Alamos National Laboratory (LANL) since the 1960's. In addition to LLW, Area G is host to a variety of other wastes, the disposition of which must be determined before closure of the site. A probabilistic Radiological Risk Assessment (RRA) for Area G is used in order to support decision making regarding some wastes that are not addressed in the extant Area G Performance Assessment (PA) and Composite Analysis (CA). Between 1979 and 1987, 33 special shafts were augered into the Bandelier Tuff at Area G. This volcanic tuff is present across Pajarito Plateau on the eastern slopes of the Jemez Mountains, and varies widely in its consistency, from weakly indurated non-welded layers to welded layers that uphold the mesa cliffs of the Plateau. These mesas are home to LANL, Area G, and the townsites of Los Alamos and White Rock, with residences about 1400 m from Area G. The 33 Shafts were lined with steel casing, and contain remote-handled (RH) transuranic wastes (TRU) resulting from experiments and analysis performed in special glove boxes at the Chemistry and Metallurgy Research (CMR) facility at LANL. Some of these wastes originated as used nuclear fuel. The purpose of the Area G RRA is to evaluate the potential future risk to humans and the environment from the RH TRU in the 33 Shafts in the context of the risk associated with the surrounding wastes at Area G. The analysis is responsive to expectations outlined in DOE Order 458.1, Radiation Protection of the Public and the Environment, and is informed by the Manual and Guidance accompanying DOE O 435.1, Radioactive Waste Management. Because the waste meets the definition of TRU, the regulatory context necessarily takes into consideration the regulation governing the disposal of TRU from the U.S. Environmental Protection Agency (EPA): 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Given the broader regulatory context for the RRA, the analysis is subject to different assumptions from those made in the existing DOE O 435.1 PA and CA, such as allowing for future occupation of the site. The analysis begins with a comprehensive evaluation of features, events, processes, and exposure scenarios (FEPS) for Area G and the wastes it contains. These FEPSs are screened to eliminate from further consideration those of extremely low probability and/or consequence, and a conceptual site model (CSM) is subsequently developed. The scope and structure of the Area G RRA Model is informed by this CSM, and the Area G RRA Model is developed using the GoldSim systems analysis modeling platform. This paper presents the initial version of a defensible, transparent, and reasonably realistic model, which is based on the state of knowledge of the wastes, the site, and the FEPSs that govern contaminant transport from wastes into the environment and subsequent exposures to humans and other biota. Probabilistic model input distributions represent uncertainties inherent in the real and modeled systems. The results of the Area G RRA Model inform decisions regarding the disposition of the RH TRU in the 33 Shafts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a multi-purpose container system for the storage, transport and disposal of PWR spent fuel in the UK - 15466

Radioactive Waste Management Limited (RWM) is a wholly owned subsidiary of UK's Nuclear Decommissioning Authority, and is responsible for implementing UK Government policy on geological disposal of higher activity radioactive waste. An aspect of the generic work programme that underpins the current generic disposal concepts includes the development of the associated disposal containers. To date RWM has focused on the development of a range of disposal container designs that fulfil the requirements for transport and disposal in a Geological Disposal Facility (GDF) for legacy high heat generating wastes, one of which includes legacy Pressurised Water Reactor (PWR) spent nuclear fuel (SF). In line with a number of European countries exploring deep geological disposal, the conceptual disposal container solution developed for this waste type has a capacity of 4 PWR fuel assemblies. Since 2013, the feasibility of developing an alternative higher capacity disposal container design based around the Multi-Purpose Container (MPC) concept has been explored. In general terms, MPCs are containers that are designed to meet requirements for safe containment of radioactive waste during storage, transport and disposal. The fundamental design philosophy of the MPC is that once the waste is packaged in an MPC, it would not need to be handled again. That is, after a period of initial cooling in a fuel pond, the SF could be packaged for long term dry storage and would not require direct handling for its eventual transport to, and disposal in, a GDF. The novel feature of the MPC system design considered is the inclusion of an additional overpack specifically for the final deep geological disposal phase. The conceptual MPC and its associated storage, transfer, transport and thick walled carbon steel disposal overpack have been developed to a conceptual level of design detail to demonstrate concept feasibility, with the final design solution confirming a MPC system with a capacity of 12 PWR SF assembles. This represents the highest capacity PWR MPC system that complies with the mass and rail gauge limits of the UK W6a rail gauge. Such a capacity realises a contents loading three times that of the standard PWR disposal container and presented technical challenges from both a structural performance and thermal perspective; necessitating the need for the inclusion of features to enhance heat transfer from the central fuel assemblies within the MPC and novel lid features on the transport container overpack to maintain structural integrity and containment during the hypothetical accident conditions of transport tests. In developing the MPC system conceptual design it is recognised that, depending upon the safety functions of the MPC disposal overpack, the choice of carbon steel material may not be suitable for all geological environments. Consequently, the MPC system design and its materials of construction will require further evaluation once detailed knowledge of the disposal concept to be implemented, its safety functions and geological environment are known. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Testing of a First-of-a-Kind Process to Support Commissioning a New Hazard Category 2 Nuclear Facility - 16573

The Department of Energy's Department of Environmental Management faces the complex task of cleaning up waste from nuclear weapons production. Often, the clean-up requires novel and untested technologies and approaches. In these cases, it is always necessary to provide some measure of assurance that the design engineers will be able to produce a design that will function in the means intended. Too many times we have seen first of a kind nuclear processing technologies put forth as commercially ready, only to be found insufficiently mature once attempted to be readied for operation. As now required by the DOE's Technology Readiness Assessment Process, it is necessary to demonstrate technologies in a similar environment to the current application and tested with a range of bounding simulants, or actual waste materials, if possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Knowledge Over Time for Supporting Radioactive Waste Geological Disposal Project Development - 19028

Projects designed to define, build, operate and monitor radioactive waste disposal solutions require the transmission of knowledge over several decades and the preservation of memory over several centuries. This is particularly acute for the geological disposal project 'Cigeo' led by the French national radioactive waste management agency (Andra) as far as the requirements in terms of reversibility lead to the choice of an incremental design that allows to integrate learning resulting from continuous improvement of knowledge. For instance, for robustness purposes, Cigeo is designed on the basis of currently proven technologies, but its step-by-step construction in successive stages must make it possible to integrate improvements derived from the scientific and technical progress as well as from experience feedback from its exploitation. In the field of industrial activity, a significant proportion of the knowledge and skills implemented by employees of a company are not known or even identified by the human resources organization or the mid-management staff. This is mainly due to the fact that (i) the organized knowledge-sharing is often based on documentary tools but little on social modalities and (ii) the organization of knowledge is mostly cross-cutting to the managerial lines. To overcome this bias, a global and integrated approach to knowledge management is currently the focus of Andra's specific efforts. Cross-disciplinary groups and close intergenerational links positioned throughout the life of the projects aim specifically at continuous and participative knowledge sharing, capitalization and transmission. Then, devices aiming at systematic dissemination of and access to knowledge support experience feedback and provide unified collaboration, traceability and decision-support at all scales. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NWMO Canadian used nuclear fuel repository - 16314

A brief introduction to Canada's Used Fuel Repository Plan, including the status of site selection and the conceptual design. Canada's plan for the long-term care of used nuclear fuel is known as Adaptive Phased Management (APM). It emerged from dialogue with Canadians and experts and best meets the key priorities considered important by citizens. The Federal Government selected APM as Canada's plan in June 2007. The plan is consistent with the long-term management approach adopted by other countries with nuclear power programs, such as Finland, Sweden, Switzerland, the United Kingdom and France. Canada's plan is both a technical method and a management system. The project is designed to be implemented in phases over many decades. New learning and social priorities will be incorporated into Canada's plan for the long-term management of used nuclear fuel, driving refinement and adaptation of the plan throughout its implementation. The major phases for the APM project are described.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing the Shift Technical Engineer Pipeline to Develop the Next Generation of Engineers - 17354

As the liquid waste contractor for the U.S. Department of Energy's (DOE) Savannah River Site (SRS), Savannah River Remediation (SRR) is responsible for safely treating and dispositioning approximately 35 million gallons of liquid waste stored at SRS. To achieve this mission, SRR manages and operates several complex nuclear facilities. These nuclear facilities include the H and F Tank Farms, the Defense Waste Processing Facility (DWPF), and the Saltstone Processing and Disposal Facility. To support the operations of these complex nuclear facilities, a Shift Technical Engineer (STE) is stationed for every shift. The STE is the sole Engineering Organization representative on-shift and serves as a direct technical resource for operations, including safety basis interpretation, process monitoring and prompt troubleshooting support. The training and qualification for an STE is more intensive than for typical technical staff personnel at SRR, involving additional classes, under-instruction watches, demonstration of practical factors, and culminating in an intense oral board examination. Like many other contractors in the DOE complex, SRR faces the challenge of preparing a significant number of new generation engineers to take the place of an aging workforce. Beyond the traditional training to establish minimum technical qualifications, SRR has established a number of initiatives aimed at accelerating the process of preparing early career engineers to replace experienced senior engineers. These initiatives include an internal rotational program, technical exchange activities with companies at other DOE sites, and an STE pipeline. The STE role provides a unique mechanism for select, early career engineers to gain in-depth knowledge and significant responsibility normally not achieved until much later in their careers. Once qualification is complete, the engineers perform the STE duties, providing technical support for nuclear facility operations. In addition, creating an STE pipeline, where promising young engineers are continually being qualified to replace the on-shift STEs, provides the company with a source of experienced engineers with in-depth technical knowledge as well as valuable experience interfacing with operations and other facility support groups. This paper will discuss the STE position, the qualification process, and how SRR is using the STE qualification pipeline to benefit both the company and the individual engineer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Collaboration Activities in Geologic Disposal Research (FY24 Progress Report)

This report describes the FY24 status of international collaboration regarding geologic disposal research in the Office of Spent Fuel and Waste Science and Technology (SFWST) in the Department of Energy’s (DOE) Office of Nuclear Energy (NE). The mission of SFWST is to provide confidence in the safe long-term management of the nation’s spent nuclear fuel and high-level radioactive waste by reducing uncertainty and advancing technology for extended storage, transportation, and geologic disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗