Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

L-325 Sagebrush Habitat Mitigation Project: Final Compensation Area Monitoring Report

This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor), now Mission Support Alliance (MSA), Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades (2007). Three plantings have been installed on a 4.5-hectare mitigation area to date. This review provides a description and chronology of events, monitoring results, and mitigative actions through fiscal year (FY) 2012. Also provided is a review of the monitoring methods, transect layout, and FY 2012 monitoring activities and results for all planting years. Planting densities and performance criteria stipulated in the MAP were aimed at a desired future condition (DFC) of 10 percent mature sagebrush (Artemisia tridentata ssp wyomingensis) cover. Current recommendations for yielding this DFC are based upon a conceptual model planting of 1000 plants/ha (400/ac) exhibiting a 60-percent survival rate after 5 monitoring years (DOE 2003). Accordingly, a DFC after 5 monitoring years would not be less than 600 plants/ha (240/ac). To date, about 8700 sagebrush plants have been grown and transplanted onto the mitigation site. Harsh site conditions and low seedling survival have resulted in an estimated 489 transplants/ha on the mitigation site, which is 111 plants/ha short of the target DFC. Despite this apparent shortcoming, 71, 91, and 24 percent of the surviving seedlings planted in FY 2007 and FY 2008 and FY 2010, respectively, showed signs of blooming in FY 2012. Blooming status may be a positive indication of future sagebrush recruitment, and is therefore a potential source for reaching the target DFC of 600 plants/ha on this mitigation site over time. Because of the difficulty establishing small transplants on this site, we propose that no additional plantings be considered for this mitigation area and to rely upon the potential recruitment by established seedlings to achieve the mitigation commitment set forth in the MAP of 600 plants/ha.

Habitat↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

54 ENVIRONMENTAL SCIENCES↗

Investigation of a Novel NDE Method for Monitoring Thermomechanical Damage and Microstructure Evolution in Ferritic-Martensitic Steels for Generation IV Nuclear Energy Systems

The main goal of the proposed project is the development of validated nondestructive evaluation (NDE) techniques for in situ monitoring of ferritic-martensitic steels like Grade 91 9Cr-1Mo, which are candidate materials for Generation IV nuclear energy structural components operating at temperatures up to ≈650 °C and for steam-generator tubing for sodium-cooled fast reactors. Full assessment of thermomechanical damage requires a clear separation between thermally activated microstructural evolution and creep damage caused by simultaneous mechanical stress. Creep damage can be classified as "negligible" creep without significant plastic strain and "ordinary" creep of the primary, secondary, and tertiary kind that is accompanied by significant plastic deformation and/or cavity nucleation and growth. Under negligible creep conditions of interest in this project, minimal or no plastic strain occurs, and the accumulation of creep damage does not significantly reduce the fatigue life of a structural component so that low-temperature design rules, such as the ASME Section III, Subsection NB, can be applied with confidence. The proposed research project will utilize a multifaceted approach in which the feasibility of electrical conductivity and thermo-electric monitoring methods is researched and coupled with detailed post-thermal/creep exposure characterization of microstructural changes and damage processes using state-of-the-art electron microscopy techniques, with the aim of establishing the most effective nondestructive materials evaluation technique for particular degradation modes in high-temperature alloys that are candidates for use in the Next Generation Nuclear Plant (NGNP) as well as providing the necessary mechanism-based underpinnings for relating the two. Only techniques suitable for practical application in situ will be considered. As the project evolves and results accumulate, we will also study the use of this technique for monitoring other GEN IV materials. Through the results obtained from this integrated materials behavior and NDE study, new insight will be gained into the best nondestructive creep and microstructure monitoring methods for the particular mechanisms identified in these materials. The proposed project includes collaboration with a national laboratory partner and the results will also serve as a foundation to guide the efforts of scientists in the DOE laboratory, university, and industrial communities concerned with the technological challenges of monitoring creep and microstructural evolution in materials planned to be used in Generation IV Nuclear Energy Systems.

36 MATERIALS SCIENCE↗

2012 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site

Gnome-Coach was the site of a 3-kiloton underground nuclear test conducted in 1961. Surface and subsurface contamination resulted from the underground nuclear testing, post-test drilling, and a groundwater tracer test performed at the site. Surface reclamation and remediation began after the underground testing. A Completion Report was prepared, and the State of New Mexico is currently proceeding with a conditional certificate of completion for the surface. Subsurface corrective action activities began in 1972 and have generally consisted of annual sampling and monitoring of wells near the site. In 2008, the annual site inspections were refined to include hydraulic head monitoring and collection of samples from groundwater monitoring wells onsite using the low-flow sampling method. These activities were conducted during this monitoring period on January 18, 2012. Analytical results from this sampling event indicate that concentrations of tritium, strontium-90, and cesium-137 were generally consistent with concentrations from historical sampling events. The exceptions are the decreases in concentrations of strontium-90 in samples from wells USGS-4 and USGS-8, which were more than 2.5 times lower than last year's results. Well USGS-1 provides water for livestock belonging to area ranchers, and a dedicated submersible pump cycles on and off to maintain a constant volume in a nearby water tank. Water levels in wells USGS-4 and USGS-8 respond to the on/off cycling of the water supply pumping from well USGS-1. Well LRL-7 was not sampled in January, and water levels were still increasing when the transducer data were downloaded in September. A seismic reflection survey was also conducted this year. The survey acquired approximately 13.9 miles of seismic reflection data along 7 profiles on and near the site. These activities were conducted from February 23 through March 10, 2012. The site roads, monitoring well heads, and the monument at surface ground zero were in good condition at the time of the site inspection. However, it was reported in September 2012 that the USGS-1 well head had been damaged by a water truck in April 2012.

54 ENVIRONMENTAL SCIENCES↗

Ramona, Kansas, Corrective Action Monitoring Report for 2012

This Monitoring Report describes groundwater monitoring for the property at Ramona, Kansas, on which a grain storage facility was formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The monitoring was implemented on behalf of the CCC/USDA by Argonne National Laboratory. Monitoring was conducted as specified in the Long-Term Groundwater Monitoring Plan (Argonne 2012) approved by the Kansas Department of Health and Environment (KDHE 2012).

54 ENVIRONMENTAL SCIENCES↗

Efficiency Improvement Opportunities for Personal Computer Monitors. Implications for Market Transformation Programs

Displays account for a significant portion of electricity consumed in personal computer (PC) use, and global PC monitor shipments are expected to continue to increase. We assess the market trends in the energy efficiency of PC monitors that are likely to occur without any additional policy intervention and estimate that display efficiency will likely improve by over 40% by 2015 compared to today’s technology. We evaluate the cost effectiveness of a key technology which further improves efficiency beyond this level by at least 20% and find that its adoption is cost effective. We assess the potential for further improving efficiency taking into account the recent development of universal serial bus (USB) powered liquid crystal display (LCD) monitors and find that the current technology available and deployed in USB powered monitors has the potential to deeply reduce energy consumption by as much as 50%. We provide insights for policies and programs that can be used to accelerate the adoption of efficient technologies to capture global energy saving potential from PC monitors which we estimate to be 9.2 terawatt-hours [TWh] per year in 2015.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Synchronized Sensor Array for Remote Monitoring of Avian and Bat Interactions with Offshore Renewable Energy Facilities

Wind energy production in the U.S. is projected to increase to 35% of our nation’s energy by 2050. This substantial increase in the U.S. is only a portion of the global wind industry growth, as many countries strive to reduce greenhouse gas emissions. A major environmental concern and potential market barrier for expansion of wind energy is bird and bat mortality from impacts with turbine blades, towers, and nacelles. Carcass surveys are the standard protocol for quantifying mortality at onshore sites. This method is imperfect, however, due to survey frequency at remote sites, removal of carcasses by scavengers between surveys, searcher efficiency, and other biases as well as delays of days to weeks or more in obtaining information on collision events. Furthermore, carcass surveys are not feasible at offshore wind energy sites. Near-real-time detection and quantification of interaction rates is possible at both onshore and offshore wind facilities using an onboard, integrated sensor package with data transmitted to central processing centers. We developed and experimentally tested an array of sensors that continuously monitors for interactions (including impacts) of birds and bats with wind turbines. The synchronized array includes three sensor nodes: (1) vibration (accelerometers and contact microphones), (2) optical (visual and infrared spectrum cameras), and (3) bioacoustics (acoustic and ultrasonic microphones). Accelerometers and contact acoustic microphones are placed at the root of each blade to detect impact vibrations and sound waves propagating through the structure. On-board data processing algorithms using wavelet analysis detect impact signals exceeding background vibration. Stereo-visual and infrared cameras were placed on the nacelle to allow target tracking, distance, and size calculations. On-board image processing and target detection algorithms identify moving targets within the camera field of view. Bioacoustic recorders monitor vocalizations and echolocations to aid in identifying organisms involved in interactions. Data from all sensors are temporarily stored in ring (i.e., circular) buffers with a duration varying by sensor type. Detection of target presence or impact by any of the sensors can trigger the archiving of data from all buffers for transmission to a central data processing center for evaluation and post-processing. This mitigates the risk of “data mortgages” posed by continual recording and minimizes personnel time required to manually review event data. We first conducted individual component tests at laboratories and field sites in Corvallis and Newport, Oregon, and Seattle and Sequim, Washington. We conducted additional component tests on research wind turbines at the North American Wind Research and Training Center, Mesalands Community College (MCC; General Electric 1.5 MW turbine), New Mexico, and the National Wind Technology Center, National Renewable Energy Laboratory (NREL; Controls Advanced Research Turbines 3 [CART 3] 600 kW Westinghouse turbine), Colorado. We conducted fully integrated system tests at NREL in October 2014 and April 2015. We used only research wind turbines so that we could conduct controlled, experimentally generated impacts using empty and water-filled tennis balls shot from a compressed air cannon on the ground. The approx. 57-140 g tennis balls (depending on water content) were at the upper mass range for bats, but lower mass range for marine birds. Therefore, the ability to detect collisions of most seabirds is likely greater than our experiments demonstrate, but possibly lower for some bats depending on the background signal of a given turbine. Vibration data demonstrated that background signals of operating turbines varied markedly among the CART 3 under normal operation (greatest), GE (moderate), and CART 3 during idle rotation (generator not engaged; least). In total, we measured 63 experimental blade impacts on the two research turbines. Impaction detection was dependent on background signals, position of impact on the blade (a tip strike resulted in the strongest impact signal), and impact kinetics (velocity of ball and whether the ball struck the surface of the blade or the leading edge of the blade struck the ball). Overall detection percentage ranged from 100% for the “quietest” conditions (CART 3 idle rotation), down to 35% for the noisiest (CART 3 normal operation). Impact signals were detected from sensors on more than one blade (i.e., blades other than the blade struck) 50% - 75% of the time. Stereo imaging provided valuable metrics, but increased data processing and equipment cost. Given the cost of cameras with sufficient resolution for target identification, we suggest mounting cameras directly on the blades to continuously view the entire rotor swept area with the fewest number of cameras. Bioacoustic microphones provide taxonomic identification, as well as information on ambient noise levels. They also assist in identifying environmental conditions such as hail storms, high winds, thunder, lightning, etc., that may contribute to a collision or a false positive detection. We demonstrated a proof of concept for an integrated sensor array to detect and identify bird and bat collisions with wind turbines. The next phase of research and development for this system will miniaturize and integrate sensors from all three nodes into a single wireless package that can be attached directly to the blade. This next generation system would use all “smart” sensors capable of onboard data processing to drastically reduce data streams and processing time on a central computer. A provisional patent for the blade mounted system was submitted by Oregon State University and recorded by the U.S. Patent and Trademark Office (application no. 62313028). Eventually, technology and industry advances will allow this low cost monitoring system to be designed into materials during manufacturing so that all turbines could be monitored with either a subset or full suite of sensors. As standard equipment on all commercial turbines, the sensor suite would allow the industry to effectively monitor whether individual turbines were causing mortalities or not and under what circumstances. It would also provide real-time evaluation of mechanical and structural integrity of a turbine via vibration, image, and acoustic data streams, thereby permitting modifications in operation to limit environmental or mechanical damage.

17 WIND ENERGY↗

Model-Based Sensor Placement for Component Condition Monitoring and Fault Diagnosis in Fossil Energy Systems

Design and operation of energy producing, near “zero-emission” coal plants has become a national imperative. This report on model-based sensor placement describes a transformative two-tier approach to identify the optimum placement, number, and type of sensors for condition monitoring and fault diagnosis in fossil energy system operations. The algorithms are tested on a high fidelity model of the integrated gasification combined cycle (IGCC) plant. For a condition monitoring network, whether equipment should be considered at a unit level or a systems level depends upon the criticality of the process equipment, its likeliness to fail, and the level of resolution desired for any specific failure. Because of the presence of a high fidelity model at the unit level, a sensor network can be designed to monitor the spatial profile of the states and estimate fault severity levels. In an IGCC plant, besides the gasifier, the sour water gas shift (WGS) reactor plays an important role. In view of this, condition monitoring of the sour WGS reactor is considered at the unit level, while a detailed plant-wide model of gasification island, including sour WGS reactor and the Selexol process, is considered for fault diagnosis at the system-level. Finally, the developed algorithms unify the two levels and identifies an optimal sensor network that maximizes the effectiveness of the overall system-level fault diagnosis and component-level condition monitoring. This work could have a major impact on the design and operation of future fossil energy plants, particularly at the grassroots level where the sensor network is yet to be identified. In addition, the same algorithms developed in this report can be further enhanced to be used in retrofits, where the objectives could be upgrade (addition of more sensors) and relocation of existing sensors.

20 FOSSIL-FUELED POWER PLANTS↗

Structural Health Monitoring of Nuclear Spent Fuel Storage Facilities

Interim storage of spent nuclear fuel from reactor sites has gained additional importance and urgency for resolving waste-management-related technical issues. To ensure that nuclear power remains clean energy, monitoring has been identified by DOE as a high priority cross-cutting need, necessary to determine and predict the degradation state of the systems, structures, and components (SSCs) important to safety (ITS). Therefore, nondestructive structural condition monitoring becomes a need to be installed on existing or to be integrated into future storage system to quantify the state of health or to guarantee the safe operation of nuclear power plants (NPPs) during their extended life span. In this project, the lead university and the collaborating national laboratory teamed to develop a nuclear structural health monitoring (n-SHM) system based on in-situ piezoelectric sensing technologies that can monitor structural degradation and aging for nuclear spent fuel DCSS and similar structures. We also aimed to identify and quantify possible influences of nuclear spent fuel environment (temperature and radiation) to the piezoelectric sensor system and come up with adequate solutions and guidelines therefore. We have therefore developed analytical model for piezoelectric based n-SHM methods, with considerations of temperature and irradiation influence on the model of sensing and algorithms in acoustic emission (AE), guided ultrasonic waves (GUW), and electromechanical impedance spectroscopy (EMIS). On the other side, experimentally the temperature and irradiation influence on the piezoelectric sensors and sensing capabilities were investigated. Both short-term and long-term irradiation investigation with our collaborating national laboratory were performed. Moreover, we developed multi-modal sensing, validated in laboratory setup, and conducted the testing on the We performed multi-modal sensing development, verification and validation tests on very complex structures including a medium-scale vacuum drying chamber and a small-scale mockup canister available for the desired testing. Our work developed the potential candidate for long term structural health monitoring of spent fuel canister through piezoelectric wafer sensors and provided the sensing methodologies based on AE and GUW methodologies. It overall provides an innovative system and methodology for enhancing the safe operation of nuclear power plant. All major accomplishments planned in the original proposal were successfully achieved.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2017 Results for Avian Monitoring at the TA-36 Minie Site, TA-39 Point 6, and TA-16 Burn Ground at Los Alamos National Laboratory

Los Alamos National Security, LLC (LANS) biologists in the Environmental Compliance and Protection Division at Los Alamos National Laboratory (LANL) initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. Monitoring results from these efforts were compared among years to monitor trends. The objectives of this study were to determine whether LANL operations impact bird species richness, diversity, abundance, or composition. Additionally, nesting success of secondary-cavity nesting birds was examined using nestboxes. LANS biologists completed the fifth year of this effort in 2017. The overall results from 2017 continue to indicate that operations are not negatively affecting bird populations; however, we are seeing some species turnover through time and that will continue to be monitored. Three bird point count surveys were completed at each of the treatment sites at the Technical Area (TA) 36 Minie site, the TA-39 point 6, and the TA-16 burn ground between May and July 2017. A total of 785 birds representing 59 species were recorded at the treatment sites. Three bird point count surveys were also completed at each of the control sites between May and July 2017. Occupancy and nest success data from nestboxes at treatment sites were compared with the overall avian nestbox monitoring network. Species richness and diversity at the treatment sites were not statistically different than their associated controls. Avian abundance showed more variability but treatment and controls were trending together year to year. Species composition seems to indicate some species turnover in the habitat types but very little difference between treatment and control sites.

54 ENVIRONMENTAL SCIENCES↗

Development of Intelligent Monitoring System (IMS) Modules for the Aquistore CO 2 Storage Project

The monitoring data generated at a CO 2 storage site can quickly result in large amounts of data, often requiring significant labor- and time-intensive efforts to process and analyze before being able to make operational decisions. Implementing an intelligent monitoring system (IMS) can reduce the associated data-processing and analysis costs, which can thereby improve the efficiency of the monitoring process and enable real-time operational decision-making. The Energy & Environmental Research Center (EERC) has completed a 3-year project focused on developing an IMS comprising new workflows, algorithms, and a user interface for the automation and integration of geologic carbon dioxide (CO 2 ) storage site-monitoring and simulation data. The design for the IMS was based on using injection and monitoring data acquired from Aquistore, an operating CO 2 storage project. Managed by the Petroleum Technology Research Centre, the Aquistore Project is injecting CO 2 captured from SaskPower’s coal-fired Boundary Dam Power Station into a deep saline formation for geologic storage. Using data from the Aquistore Project provided a real-world basis to develop an IMS.

47 OTHER INSTRUMENTATION↗

Calendar Year 2013 Annual Groundwater Monitoring Report

Sandia National Laboratories, New Mexico (SNL/NM) is a government-owned/contractoroperated laboratory. Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, manages and operates SNL/NM for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The DOE/NNSA Sandia Field Office administers the contract and oversees contractor operations at the site. Sandia conducts two types of groundwater surveillance monitoring at SNL/NM: (1) on a site-wide basis as part of the SNL/NM Long-Term Stewardship (LTS) Program’s Groundwater Monitoring Program (GMP) Groundwater Surveillance Task and (2) as site-specific groundwater monitoring at LTS/Environmental Restoration (ER) Operations sites with ongoing groundwater investigations. This Annual Groundwater Monitoring Report documents the results of the groundwater monitoring activities at SNL/NM for Calendar Year (CY) 2013. This report has been prepared to meet the environmental reporting requirements for the CY 2013 Annual Site Environmental Report, providing an annual update of groundwater data to regulators, stakeholders, and outside agencies. In addition, it serves as a valuable tool to inform the public about the groundwater quality at SNL/NM. This report includes both water quality sampling results and water level measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Corrosion Monitoring System for Advanced Molten Salt Reactors

Molten salt reactors (MSRs) have been identified as one of several possible next-generation advanced reactor designs that could replace the aging fleet. There are many inherent advantages to MSRs, including higher power density, lower pressure, low stored energy, and prompt negative temperature reactivity coefficient Ezell et al. [2018]. However, there are challenges related to the operating temperatures, as well as, the corrosive salts attacking the structural materials. During the Molten Salt Reactor Experiment (MSRE), which was operated at Oak Ridge National Laboratory (ORNL) (Ignatiev et al. [2014], Forsberg et al. [2007], Forsberg et al. [2008], Delpech et al. [2009], Serp et al. [2014], Ignatiev and Surenkov [2017]) corrosion was monitored by sampling the salt for chromium. However, this type of monitoring does not identify the location of corrosion. In FY18, ORNL developed a novel in-situ corrosion sensor that could be placed on the outside of the structure to monitor changes in magnetic susceptibility of salt-wetted alloys as corrosion occurs Holcomb et al. [2019]. Initial testing with this novel sensor demonstrated a correlation between the change in signal output from the sensor to the various levels of pre-corroded test specimens. However, all initial testing was performed at room temperatures, which is not realistic for the harsh MSR environment. Based on this research, FY19 funding allowed for development of a high-temperature version of the sensor to be installed at various locations on the reactor infrastructure. The high-temperature sensor can operate at up to 750°C and can monitor development of corrosion inside the pipe. This sensor measures the increase in magnetic susceptibility that occurs as chromium dissolves from the inner surface of the pipe, when paramagnetic structural alloys become ferromagnetic with the loss of chromium. This report will discuss the development of corrosion monitoring sensor and the testing with results of corroded specimens at increasing temperatures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Monthly Sewer Monitoring Report for LLNL Livermore Site, April 2020

Lawrence Livermore National Laboratory (LLNL) collects effluent samples from its sewer outfall at the B196 Sewer Monitoring Station (SMS). Effluent flow-proportional composite samples are collected at the SMS on a daily (midnight-to-midnight), weekly (Thursday through Wednesday), and “monthly” (composited from daily) basis; effluent grab samples are also collected each month at that same location. Certified contract laboratories analyzes these compliance samples, and results (Tables 1–3) are used to establish LLNL compliance with the 2019–2020 Wastewater Discharge Permit (Permit 1250) granted by the City of Livermore Water Resources Division (WRD). Supplemental analyses for biochemical oxygen demand (BOD) and total suspended solids (TSS) are performed onsite and reported (Table 4) for the calculation and assessment of sewer service charges. Quarterly, effluent is sampled for metals (24-hour composite) and cyanide (grab sample) concentrations (mg/L). The results are presented in Table 5. In addition to the sampling noted above, the SMS continuously monitors LLNL sewage effluent in real-time for flow rate, pH, metals, and radioactivity. Standard measurement methods are used to monitor flow and pH to determine permit compliance. Unique nonstandard analytical methods monitor for the presence of metals and radioactivity using x-ray fluorescence (XRF) and gamma spectroscopy, respectively. If an anomalous condition is detected by the monitoring system, an alarm activates LLNL’s Sewer Diversion Facility (SDF) and Livermore Water Reclamation Plant (LWRP) operators are notified that a potential release has occurred.

54 ENVIRONMENTAL SCIENCES↗

NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for radionuclide-contaminated soil to be transported from the Plutonium Valley Dispersion Sites Contamination Area (CA) because of both wind and storm water runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Plutonium Valley Dispersion Sites Corrective Action Unit (CAU) 366. The DRI task was intended to identify the likely mechanism(s) of transport and determine the meteorological conditions that might cause the movement of radionuclide-contaminated soils. The emphasis of the work was on collecting sediment transported by channelized storm runoff and measuring airborne dust concentrations and associated wind conditions. These data will facilitate an appropriate post-closure monitoring program. In 2011, DRI installed meteorological monitoring stations north and south of the Plutonium Valley CA—known as Pu Valley North and Pu Valley South, respectively—as well as a fluvial sediment sampling station within the CA. Since installation, temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, volumetric soil moisture content, and airborne particulate concentrations have been collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters were recorded for each 10-minute interval. The sediment sampling station included an automatically activated sampling pump with collection bottles for suspended sediment, which was activated when sufficient flow was present in the channel, and passive traps for bedload material that was transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2019. During the FY2019 (October 1, 2018, through September 30, 2019) reporting period, the warmest month was July and the coldest month was February. Monthly total solar radiation was highest in June or July (depending on the station) and lowest in December. Monthly mean wind speeds were highest during February. At the Pu Valley North station, winds were commonly northerly, northwesterly, and southerly. At the Pu Valley South station, the wind direction was more variable and winds frequently came from most directions, excluding westerly and northwesterly winds. Winds above 15.0 miles per hour (mph) (24.1 kilometers per hour [km/hr]) were frequently southerly at both stations, and less-frequent strong winds were northerly (at the Pu Valley South station) or northwesterly (at the Pu Valley North station). Monthly average relative humidity ranged from 18 percent in August to 62 percent in January and February. Monthly total precipitation ranged from zero at both stations in September to 2.23 inches (in) (56.6 millimeters [mm]) during February at the Pu Valley South station and 2.09 in (53.1 mm) during March at the Pu Valley North station. From October 1, 2018, through September 30, 2019, the total precipitation was 8.23 in (209 mm) and 8.15 in (207 mm) at the Pu Valley South and Pu Valley North stations, respectively. The largest daily precipitation totals of 1.46 in (37.1 mm) and 1.14 in (29.0 mm) occurred at the Pu Valley South and Pu Valley North stations, respectively, on March 6, 2019. However, the ISCO autosampler was not activated during any storm event in FY2019 because the channel water depth measurements were insufficient for suspended sediment sample collection. Additionally, because no significant flow through the channel was indicated, no bedload samples were collected. Light breezes of 0.0 mph to 5.0 mph (0.0 km/hr to 8.0 km/hr) occurred most frequently (approximately 55 percent to 57 percent of the time). The frequency of occurrence diminished exponentially as the wind speed increased such that winds in excess of 25.0 mph (40.2 km/hr) occurred less than 0.01 percent of the time. Winds in excess of 15.0 mph (24.1 km/hr) were most commonly southerly, which is likely controlled by the topography of the valley because topographic highs define the east and west sides of the valley and converge toward the north.The concentrations of PM2.5 (particulate matter with an aerodynamic diameter ≤2.5 micrometers [μm]) and PM10 (particulate matter with an aerodynamic diameter ≤10 μm) in the air generally increase as wind speed increases. However, the particle profiler at the Pu Valley South station regularly malfunctioned, which resulted in poor data quality and a limited period of record within FY2019. Therefore, discussion of the annual dust observations is mostly limited to the Pu Valley North station. At the Pu Valley North station, significant increases in windblown dust concentrations were observed when wind speeds exceeded 15.0 mph (24.1 km/hr), especially during southerly winds. When all wind speeds were considered, high dust concentrations at the Pu Valley North station were frequently associated with northerly, northwesterly, or southerly winds. The majority of PM10 transport at the Pu Valley North station occurred when winds were blowing northerly and northwesterly because of the high frequency of winds up to 15.0 mph (24.1 km/hr). The ratio of PM10 to PM2.5 is a qualitative indicator of the proximity of dust sources to the observation point and the values of the PM10 to PM2.5 ratio tend to be higher nearer to the source. The PM10 to PM2.5 ratio increased from 1.2 to 2.8 with higher wind speeds at the Pu Valley North station. This increase suggests that some locally sourced PM10 was present in the air when local winds exceeded 15.0 mph (24.1 km/hr). Local dust suspension is interpreted during major dust events when peaks in the PM10 to PM2.5 ratio occur simultaneously with the maximum wind speed and the peak PM10 concentration. Analysis of the five major dust events in FY2019 revealed that northerly winds were dominant in three events and southerly winds were dominant in two events. Local suspension of dust within Plutonium Valley is suspected to have occurred during two of the five major events (April 9, 2019, and September 28 to 29, 2019), and a nonlocal source of dust is presumed for the three other major dust events (October 14, 2018; May 16, 2019; and September 2, 2019). The three suspected regional dust transport events exhibited winds that typically did not exceed the 15.0 mph (24.1 km/hr) wind speed threshold for local dust transport and featured PM10 to PM2.5 ratios that indicate large-scale regional dust transport. Similar event characteristics (e.g., wind speed and PM10 concentration) were observed at air monitoring stations approximately 70 mi (113 km) to the northwest within the Tonopah Test Range (TTR). Therefore, these three regional events may not reflect transport from the Plutonium Valley CA. Routine monitoring of meteorological and hydrologic parameters at Plutonium Valley has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition has been completed, and both Pu Valley North and Pu Valley South meteorological stations within Plutonium Valley as well as the ISCO autosampler station within the CA were removed on October 14, 2019.

54 ENVIRONMENTAL SCIENCES↗

Study of Muon Monitor Data to Maintain the Quality of the NuMI Neutrino Beam at Fermilab [Poster]

A muon monitor which measures muon beam profile, is a key beam element to maintain the quality of muon neutrino beam. Three arrays of muon monitors located in the downstream of the hadron absorber provide the measurements of the primary beam quality. We studied the response of muon monitors with the proton beam profile changes and focusing horn current variations. The responses of muon monitors have been used to implement Machine Learning (ML) algorithms to monitor the beam quality.

43 PARTICLE ACCELERATORS↗

LLNL Semiannual Wastewater Point Source Monitoring Report (July 2020)

In accordance with the Code of Federal Regulations, Title 40, Part 403.12(e), Lawrence Livermore National Laboratory (LLNL) submits a semiannual monitoring report regarding federally regulated wastewater generating processes (categorical processes) that discharge wastewater to the sanitary sewer system. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 granted to LLNL by the City of Livermore Water Resources Division (WRD) also mandate submission of this report. The LLNL Livermore Site is required to monitor identified electrical and electronic components processes (40 CFR Part 469) and metal finishing processes (40 CFR Part 433) semiannually and to submit monitoring reports in January and July of each year. Under authority delegated to enforce compliance with these regulations, the WRD reviews this report. This report provides information on the significant metal-finishing operations and electrical and electronic component operations located at the Livermore Site during the period from December 1, 2019 through May 31, 2020 and includes descriptions of the LLNL regulated (categorical) processes that discharge to the sanitary sewer. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 provide the list of categorical processes and the required self-monitoring program for point-source discharges at LLNL. The monitoring data collected for this report documents compliance with all federal and local pretreatment limits. Compliance certification accompanies this report, as required by federal regulations.

54 ENVIRONMENTAL SCIENCES↗

Recovery of Silicon Carbide monitor irradiation temperature via continuous resistance measurement during annealing (Pt. II)

Silicon carbide (SiC) monitors provide a means of measuring peak irradiation temperature of experiment capsules in nuclear irradiation experiments. Neutron irradiation of a SiC monitor causes permanent lattice changes that are removed by annealing via heating to a temperature that exceeds the peak irradiation temperature. The annealing process results in changes to SiC physical characteristics that can be observed during the annealing process. This paper presents results of a method aimed at using electrical resistance, measured during a two-pass heating – cooling cycle as a means of recovering the irradiation temperature of a SiC monitor. Results indicate that the relationship between resistance and temperature of a SiC monitor shows a significant change in slope when the peak irradiation temperature is reached. This demonstrates the potential for this method to replace the current manual, and lengthy, process of post irradiation examination used to extract the peak irradiation temperature from irradiated SiC monitors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗