Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

On the accuracy of ERS-1 orbit predictions

Since the launch of ERS-1, the D-PAF (German Processing and Archiving Facility) provides regularly orbit predictions for the worldwide SLR (Satellite Laser Ranging) tracking network. The weekly distributed orbital elements are so called tuned IRV's and tuned SAO-elements. The tuning procedure, designed to improve the accuracy of the recovery of the orbit at the stations, is discussed based on numerical results. This shows that tuning of elements is essential for ERS-1 with the currently applied tracking procedures. The orbital elements are updated by daily distributed time bias functions. The generation of the time bias function is explained. Problems and numerical results are presented. The time bias function increases the prediction accuracy considerably. Finally, the quality assessment of ERS-1 orbit predictions is described. The accuracy is compiled for about 250 days since launch. The average accuracy lies in the range of 50-100 ms and has considerably improved.

Koenig, Rolf↗

Pre-Launch Noise Characterization of the Landsat-7 Enhanced Thematic Mapper Plus (ETM Plus)

A noise characterization of the Landsat-7 Enhanced Thematic Mapper Plus (ETM+) instrument was performed as part of a near-real time performance assessment and health monitoring program. Perl'ormance data for the integrated Landsat-7 spacecraft and ETM+ were collected before, during, and after the spacecraft thermal vacuum testing program at the Lockheed Martin Missiles and Space (LMMS) facilities in Valley Forge, PA. The Landsat-7 spacecraft and ETM+ instrument were successfully launched on April 15, 1999. The spacecraft and ETM+ are now nearing the end of the on orbit engineering checkout phase, and Landsat-7 is expected to be declared operational on or about July 15, 1999. A preliminary post-launch noise characterization was performed and compared with the pre-launch characterization. In general the overall noise levels in the ETM+ are at or below the specification levels. Coherent noise is seen in most bands, but is only operationally significant when imaging in (he panchromatic band (band 8). This coherent noise has an amplitude as high as approximately 3 DN (peak-to-peak, high gain) at the Nyquist rate of 104 kHz, and causes the noise levels in panchromatic band images at times to exceed the total noise specification by up to approximately 10%. However, this 104 kHz noise is now much weaker than it was prior to the successful repair of the ETM+ power supplies that was completed in May 1998. Weak and stable coherent noise at approximately 5 kHz is seen in all bands in the prime focal plane (bands 1-4 and 8) with the prime (side A) electronics. Very strong coherent noise at approximately 20 kHz is seen in a few detectors of bands 1 and 8, but this noise is almost entirely in the turn-around region between scans when the ETM+ is not imaging the Earth. Strong coherent noise was seen in 2 detectors of band 5 during some of the pre-launch testing; however, this noise seems to be temperature dependent, and has not been seen in the current on orbit environment. Strong 91 kHz coherent noise was observed in the redundant (side B) panchromatic band data after the completion of spacecraft thermal vacuum testing. The cause of this coherent noise was identified as a failed capacitor that was replaced prior to launch, and this noise has not been seen on orbit.

Pedelty, J. A.↗

JASPER Article

JASPER stands for Joint Actinide Shock Physics Experimental Research It is located in Area 27 at the NNSS. It houses a two-stage light-gas gun, using up to 3.5 kg gun powder in the first stage; the second stage uses hydrogen, helium, or nitrogen drive gasses to accelerate 28mm diameter, ≈ 25 g mass projectiles to reach launch velocities between 1.8-7.6 km/s. (7.6km/s ~ 17000 mph) The facility is operated by NSTec, and LLNS leads the scientific program, target design, fabrication, and engineering.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Soundings for Local Coupling Studies: 2015 ARM Climate Research Facility Field Campaign

Matching observed diurnal cycles is a fundamental yet extremely complex test for models. High temporal resolution measurements of surface turbulent heat fluxes and boundary layer properties are required to evaluate the daytime evolution of the boundary layer and its sensitivity to land-atmosphere coupling. To address this need, (12) one-day intensive observing periods (IOP) with enhanced radiosonding will be carried out at the ARM Southern Great Plains (SGP) Central Facility (CF) during summer 2015. Each IOP will comprise a single launch to correspond with the nighttime overpass of the A-Train of satellites (~0830 UTC) and hourly launches during daytime beginning from 1130 UTC and ending at 2130 UTC. At 3-hourly intervals (i.e., 1140 UTC, 1440 UTC, 1740 UTC, and 2040 UTC) a duplicate second radiosonde will be launched 10 minutes subsequent to launch of the on-hour radiosonde for the purpose of assessing horizontal atmospheric variability. In summary, each IOP will have a 14-sounding supplement to the 6-hourly operational sounding schedule at the ARM-SGP CF. The IOP days will be decided before sunset on the preceding day, according to the judgment of the PI’s and taking into consideration daily weather forecasts and the operability of complimentary ARM-SGP CF instrumentation. An overarching goal of the project is to address how ARM could better observe land-atmosphere coupling to support the evaluation and refinement of coupled weather and climate models.

Ferguson, CR↗

Summary of results of parametric studies of space shuttle booster, orbiter, and launch vehicle concepts

The results of analytical and experimental parametric studies of space shuttle booster, orbiter and launch vehicle aerodynamics are described. During this study over 1700 hours of experimental wind tunnel tests were conducted on several versions of the shuttle booster, orbiter and launch vehicle. Fifteen separate tests were conducted in three different test facilities. Due to the number of test programs conducted and the time required for test preparation, analysis of the test data has been limited to that required to drive the experimental program. A brief description of each of the experimental tests conducted including the test purpose and approach is included. Several test models were designed and fabricated in support of the experimental program. These models are described.

Bradley, D.↗

Calibration of the Berkeley EUV Airglow Rocket Spectrometer

The Berkeley Extreme-ultraviolet Airglow Rocket Spectrometer (BEARS), a multiinstrument sounding rocket payload, made comprehensive measurements of the earth's dayglow. The primary instruments consisted of two near-normal Rowland mount spectrometers: one channel to measure several atomic oxygen features at high spectral resolution (about 1.5 A) in the band passes 980-1040 and 1300-1360 A, and the other to measure EUV dayglow and the solar EUV simultaneously in a much broader bandpass (250-1150 A) at moderate resolution (about 10 A). The payload also included a hydrogen Lyman-alpha photometer to monitor the solar irradiance and goecoronal emissions. The instrument was calibrated at the EUV calibration facility at the University of California at Berkeley, and was subsequently launched successfully on September 30, 1988 aboard a four-stage experimental sounding rocket, Black Brant XII flight 12.041 WT. The calibration procedure and resulting data are presented.

Cotton, Daniel M.↗

A hypersonic research vehicle to develop scramjet engines

Four student design teams produced conceptual designs for a research vehicle to develop the supersonic combustion ramjet (scramjet) engines necessary for efficient hypersonic flight. This research aircraft would provide flight test data for prototype scramjets that is not available in groundbased test facilities. The design specifications call for a research aircraft to be launched from a carrier aircraft at 40,000 feet and a Mach number of 0.8. The aircraft must accelerate to Mach 6 while climbing to a 100,000 foot altitude and then ignite the experimental scramjet engines for acceleration to Mach 10. The research vehicle must then be recovered for another flight. The students responded with four different designs, two piloted waverider configurations, and two unmanned vehicles, one with a blended body-wing configuration, the other with a delta wing shape. All aircraft made use of an engine database provided by the General Electric Aircraft Engine Group; both turbofan ramjet and scramjet engine performance using liquid hydrogen fuel was available. Explained here are the students' conceptual designs and the aerodynamic and propulsion concepts that made their designs feasible.

Gregorek, G. M.↗

Satellite mobile data service for Canada

A commercial mobile satellite system which is to be constructed and operated in Canada is examined. This is done in two phases. First, mobile data services was introduced. Hub equipment and 3000 mobile data terminals were supplied. Over the satellite tests were performed. The mobile data service provides full two way digital messaging automatic vehicle location and fleet management services. The second phase is to construct, launch and make operational the MSAT satellite and associated network control facilities. The implementation is examined of the mobile data service in Canada, including the technical description. Marketing and applications are also examined.

Egan, Glenn R.↗

The X-ray Spectrometer - A cryogenic instrument on the Advanced X-ray Astrophysics Facility

The X-ray Spectrometer (XRS) is an instrument on the Advanced X-ray Astrophysics Facility (AXAF), the third of NASA's Great Observatories scheduled for launch in 1998. The XRS detectors have a resolution of approximately 10 eV over the range 0.3 - 10 keV. To achieve this resolution, the detectors are maintained at or below 0.1 Kelvin using an adiabatic demagnetization refrigerator inside a superfluid helium dewar. In addition, split-Stirling-cycle mechanical coolers are used to extend the anticipated on-orbit helium lifetime to a minimum of 4 years. This paper describes the challenges of developing this hybrid cryogenic system and presents an overview of the current design of the system.

Breon, Susan R.↗

A Method to Estimate the Probability That Any Individual Lightning Stroke Contacted the Surface Within Any Radius of Any Point

A technique has been developed to calculate the probability that any nearby lightning stroke is within any radius of any point of interest. In practice, this provides the probability that a nearby lightning stroke was within a key distance of a facility, rather than the error ellipses centered on the stroke. This process takes the current bivariate Gaussian distribution of probability density provided by the current lightning location error ellipse for the most likely location of a lightning stroke and integrates it to get the probability that the stroke is inside any specified radius. This new facility-centric technique will be much more useful to the space launch customers and may supersede the lightning error ellipse approach discussed in [5], [6].

Huddleston, Lisa L.↗

Design and Fabrication of a Tank-Applied Broad Area Cooling Shield Coupon

The small-scale broad area cooling (BAC) shield test panel represents a section of the cryogenic propellant storage and transfer ground test article, a flight-like cryogenic propellant storage tank. The test panel design includes an aluminum tank shell, primer, spray-on foam insulation, multilayer insulation (MLI), and BAC shield hardware. This assembly was sized to accurately represent the character of the MLI/BAC shield system, be quickly and inexpensively assembled, and be tested in the Marshall Space Flight Center Acoustic Test Facility. Investigating the BAC shield response to a worst-case launch dynamic load was the key purpose for developing the test article and performing the test. A preliminary method for structurally supporting the BAC shield using low-conductivity standoffs was designed, manufactured, and evaluated as part of the test. The BAC tube-standoff interface and unsupported BAC tube lengths were key parameters for evaluation. No noticeable damage to any system hardware element was observed after acoustic testing.

Wood, J. J.↗

Heat Transfer and Interfacial Flow Physics of Microgravity Flow Boiling in Single-Side-Heated Rectangular Channel with Subcooled Inlet Conditions – Experiments Onboard the International Space Station

This study is the culmination of a long-term collaborative effort between researchers from the Purdue University Boiling and Two-Phase Flow Laboratory (PU-BTPFL) and the NASA Glenn Research Center to investigate gravitational effects on flow boiling and flow condensation. The science and design concepts for this large-scale effort were initiated in 2011 and included several studies detailing various aspects of two-phase fluid physics in both Earth gravity and microgravity, culminating in construction of the large-scale experimental facility named “Flow Boiling and Condensation Experiment (FBCE)”. The experiment was launched to the International Space Station (ISS) in August 2021. Following the successful installation of FBCE, equipped with the Flow Boiling Module (FBM), onboard the ISS and completion of several safety checks, flow boiling experiments were performed for five months from February 2022 until July 2022. This resulted in a large flow boiling database covering broad ranges of operating parameters and heating configurations spanning several research objectives. This study investigates microgravity flow boiling of n-perfluorohexane with subcooled inlet in a single-side-heated rectangular channel of dimensions 114.6-mm heated length, 2.5-mm heated width, and 5.0-mm height. Key operating parameters investigated are mass velocity (199.90 – 3200.13 kg/m 2 s), inlet subcooling (0.10 – 45.76°C), and inlet pressure (113.30 – 164.29 kPa). Images and image sequences acquired via high-speed-video are presented to elucidate the interfacial flow physics. To analyze and explain the effects of various parameters in microgravity, heat transfer results are presented as flow boiling curves, streamwise profiles of wall temperature and heat transfer coefficient, and parametric trends of local and averaged heat transfer coefficient. Mass velocity and inlet subcooling significantly influenced most of the aforementioned aspects of flow boiling, whereas effects of inlet pressure were comparatively insignificant. Although the data and observed flow physics might be different, the parametric effects and trends in microgravity are similar to vertical upflow in Earth gravity. Some cases, especially low mass velocities, high heat fluxes, and large degrees of inlet subcooling, experienced temporally anomalous flow behaviors caused by two-phase flow instabilities manifesting as flow reversals and resulted in deviations in overall trends. Severe thermodynamic non-equilibrium is observed throughout the channel. Overall, FBCE’s ISS experiments were successful for subcooled inlet with single-sided heating of rectangular channel, and the collected data well established the various effects on flow boiling physics in highly controlled long-term microgravity conditions.

flow boiling↗

Alloy Evaluation and Flow Forming Process Modeling for Net Shape Aerospace Structures

Over the past decade, NASA Langley Research Center (LaRC) has led several manufacturing demonstration projects exploiting flow forming technology. The work has resulted in the commercial-scale manufacture of 10-ft. diameter single-piece, integrally stiffened cylinders. Near-net-shape flow forming offers simplified manufacturing schedules and cost savings through reduced part count. Reduction or elimination of machining, welding, and/or riveting can also lead to significant performance gains. NASA LaRC recently established a flow forming research facility to investigate new alloys and stiffener geometries for fuselage and launch vehicle cryotank applications. Candidate aluminum alloys and heat treatment combinations have been characterized through advanced mechanical testing and microscopy to maximize workability during flow forming trials. Elasto-plastic deformation simulations of the forming process have been performed using the finite element software DEFORM and correlated with forming trial results. The overall objective is to optimize structural performance through a combination of innovative materials, processes, and designs.

single-piece↗

Evaluation of the Mechanical Properties of Innovative Spacecraft Materials under a LEO Simulated Atomic Oxygen Environment

External spacecraft materials are crucial for protecting satellites from the harsh space environment. This study evaluates the radiation effects of low Earth orbit (LEO) space weather, focusing on high-energy electron and atomic oxygen (AO) exposure, on several modern spacecraft materials. The materials under investigation are “flight duplicates" of samples scheduled for launch as part of the Materials International Space Station Experiment Flight Facility (MISSE-FF) mission in 2025. To observe changes in stress distribution within weathered polymers, the experimental setup based on the photo elasticity technique was developed

Yuliya Kuznetsova↗

Evaluation of the Mechanical Properties of Innovative Spacecraft Materials Under a Low Earth Orbit-Simulated Atomic Oxygen Environment

External spacecraft materials are crucial for protecting satellites from the harsh space environment. This study evaluates the radiation effects of low Earth orbit (LEO) space weather, focusing on high-energy electron and atomic oxygen (AO) exposure, on several modern spacecraft materials. The materials under investigation are “flight duplicates" of samples scheduled for launch as part of the Materials International Space Station Experiment Flight Facility (MISSE-FF) mission in 2025. To observe changes in stress distribution within weathered polymers, the experimental setup based on the photo elasticity technique was developed.

Yuliya Kuznetsova↗

NASA's Space Launch System Takes Shape

Major hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of a major new capability for deep space human exploration. SLS continues to pursue a 2018 first launch of Exploration Mission 1 (EM-1). At NASA's Michoud Assembly Facility near New Orleans, LA, Boeing completed welding of structural test and flight liquid hydrogen tanks, and engine sections. Test stands for core stage structural tests at NASA's Marshall Space Flight Center, Huntsville, AL. neared completion. The B2 test stand at NASA's Stennis Space Center, MS, completed major structural renovation to support core stage green run testing in 2018. Orbital ATK successfully test fired its second qualification solid rocket motor in the Utah desert and began casting the motor segments for EM-1. Aerojet Rocketdyne completed its series of test firings to adapt the heritage RS-25 engine to SLS performance requirements. Production is under way on the first five new engine controllers. NASA also signed a contract with Aerojet Rocketdyne for propulsion of the RL10 engines for the Exploration Upper Stage. United Launch Alliance delivered the structural test article for the Interim Cryogenic Propulsion Stage to MSFC for tests and construction was under way on the flight stage. Flight software testing at MSFC, including power quality and command and data handling, was completed. Substantial progress is planned for 2017. Liquid oxygen tank production will be completed at Michoud. Structural testing at Marshall will get under way. RS-25 hotfire testing will verify the new engine controllers. Core stage horizontal integration will begin. The core stage pathfinder mockup will arrive at the B2 test stand for fit checks and tests. EUS will complete preliminary design review. This paper will discuss the technical and programmatic successes and challenges of 2016 and look ahead to plans for 2017.

Askins, Bruce↗

NASA's Space Launch System Progress Report

Exploration beyond Earth will be an enduring legacy for future generations, confirming America's commitment to explore, learn, and progress. NASA's Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program's Saturn V that sent Americans to the Moon. The SLS offers a flexible design that may be configured for the MultiPurpose Crew Vehicle and associated equipment, or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Both options support a national capability that will pay dividends for future generations. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 metric tons (mT) and will be evolvable to 130 mT. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of asteroids and Mars. With its superior lift capability, the SLS can expand the interplanetary highway to many possible destinations, conducting revolutionary missions that will change the way we view ourselves, our planet and its place in the cosmos. To perform missions such as these, the SLS will be the largest launch vehicle ever built. It is being designed for safety and affordability - to sustain our journey into the space age. Current plans include launching the first flight, without crew, later this decade, with crewed flights beginning early next decade. Development work now in progress is based on heritage space systems and working knowledge, allowing for a relatively quick start and for maturing the SLS rocket as future technologies become available. Together, NASA and the U.S. aerospace industry are partnering to develop this one-of-a-kind asset. Many of NASA's space centers across the country will provide their unique expertise to the Space Launch System endeavor. Unique infrastructure to be used includes the Michoud Assembly Facility for tank manufacturing, Stennis Space Center for engine testing, and Kennedy Space Center for processing and launch. As this panel will discuss, the SLS team is dedicated to doing things differently-from applying lean oversight/insight models to smartly using legacy hardware and existing facilities. Building on the foundation laid by over 50 years of human and scientific space flight--and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs-the SLS team has delivered both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable.

Singer, Joan A.↗