Power electronics reliability analysis.

This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Metrication study for large space telescope

Various approaches which could be taken in developing a metric-system design for the Large Space Telescope, considering potential penalties on development cost and time, commonality with other satellite programs, and contribution to national goals for conversion to the metric system of units were investigated. Information on the problems, potential approaches, and impacts of metrication was collected from published reports on previous aerospace-industry metrication-impact studies and through numerous telephone interviews. The recommended approach to LST metrication formulated in this study cells for new components and subsystems to be designed in metric-module dimensions, but U.S. customary practice is allowed where U.S. metric standards and metric components are not available or would be unsuitable. Electrical/electronic-system design, which is presently largely metric, is considered exempt from futher metrication. An important guideline is that metric design and fabrication should in no way compromise the effectiveness of the LST equipment.

Creswick, F. A.↗

Multifuel evaluation of rich/quench/lean combustor

Test results on the RQL low NO(x) industrial gas turbine engine are reported. The air-staged combustor comprises an initial rich burning zone, followed by a quench zone, and a lean reaction and dilution zone. The combustor was tested as part of the DoE/NASA program to define the technology for developing a durable, low-emission gas turbine combustor capable of operation with minimally processed petroleum residual, synthetic, or low/mid-heating value gaseous fuels. The properties of three liquid and two gaseous fuels burned in the combustor trials are detailed. The combustor featured air staging, variable geometry, and generative/convective cooling. The lean/rich mixtures could be varied in zones simultaneously or separately while maintaining a specified pressure drop. Low NO(x) and smoke emissions were produced with each fuel burned, while high combustor efficiencies were obtained.

Novick, A. S.↗

Performance of multimirror quartzline lamps in a high-pressure, underwater environment

Multimirror Quartzline Lamps are extremely versatile and effective for nonconventional imaging requirements such as high-speed photo and video instrumentation and high-magnification imaging. The lamps' versatility though, is not limited to conventional environments. Many research experiments and projects require a high pressure environment. Continuous photographic data acquisition in a high-pressure vessel requires wall penetrations and creates design problems as well as potential failure sites. Underwater photography adds the extra consideration of a liquid. This report expands upon the basic research presented in, Performance of Multimirror Quartzline Lamps in High-Pressure Environments, (NASA-TM-83793, Ernie Walker and Howard Slater, 1984). The report provides information to professional industrial, scientific, and technical photographers as well as research personnel on the survivability of lighting a multimirror quartzline lamp in a nonconventional high-pressure underwater environment. Test results of lighted ELH 300 W multimirror quartzline lamps under high-pressure conditions are documented and general information on the lamps' intensity (footcandle output), cone of light coverage, approximate color temperature is provided. Continuous lighting considerations in liquids are also discussed.

Slater, Howard A.↗

Acoustics Discipline Overview

As part of the Fundamental Aeronautics Program Annual Review, a summary of the progress made in 2007 in acoustics research under the Subsonic Fixed Wing project is given. The presentation describes highlights from in-house and external activities including partnerships and NRA-funded research with industry and academia. Brief progress reports from all acoustics Phase 1 NRAs are also included as are outlines of the planned activities for 2008 and all Phase 2 NRAs. N+1 and N+2 technology paths outlined for Subsonic Fixed Wing noise targets. NRA Round 1 progressing with focus on prediction method advancement. NRA Round 2 initiating work focused on N+2 technology, prediction methods, and validation. Excellent partnerships in progress supporting N+1 technology targets and providing key data sets.

Envia, Edmane↗

Problem Reporting System

The Problem Reporting System (PRS) is a Web application, running on two Web servers (load-balanced) and two database servers (RAID-5), which establishes a system for submission, editing, and sharing of reports to manage risk assessment of anomalies identified in NASA's flight projects. PRS consolidates diverse anomaly-reporting systems, maintains a rich database set, and incorporates a robust engine, which allows tracking of any hardware, software, or paper process by configuring an appropriate life cycle. Global and specific project administration and setup tools allow lifecycle tailoring, along with customizable controls for user, e-mail, notifications, and more. PRS is accessible via the World Wide Web for authorized user at most any location. Upon successful log-in, the user receives a customizable window, which displays time-critical 'To Do' items (anomalies requiring the user s input before the system moves the anomaly to the next phase of the lifecycle), anomalies originated by the user, anomalies the user has addressed, and custom queries that can be saved for future use. Access controls exist depending on a user's role as system administrator, project administrator, user, or developer, and then, further by association with user, project, subsystem, company, or item with provisions for business-to-business exclusions, limitations on access according to the covert or overt nature of a given project, all with multiple layers of filtration, as needed. Reporting of metrics is built in. There is a provision for proxy access (in which the user may choose to grant one or more other users to view screens and perform actions as though they were the user, during any part of a tracking life cycle - especially useful during tight build schedules and vacations to keep things moving). The system also provides users the ability to have an anomaly link to or notify other systems, including QA Inspection Reports, Safety, GIDEP (Government-Industry Data Exchange Program) Alert, Corrective Actions, and Lessons Learned. The PRS tracking engine was designed as a very extensible and scalable system, able to support additional applications, with future development possibilities already discussed, including Incident Surprise Anomalies (for anomalies occurring during Operations phases of NASA Flight projects), GIDEP and NASA Alerts, and others.

Potter, Don↗

Developments in Assisting Countries in Implementing the IAEA Additional Protocol

In 2008, the U.S. Department of Energy (DOE) began assisting selected non-nuclear weapon states in planning and preparing for implementation of the International Atomic Energy Agency’s Additional Protocol (AP). Since then, the AP international implementation program has contributed to the substantial progress made by Vietnam, Thailand, Iraq, and Malaysia in preparing for entry-into-force of the AP. An overall engagement plan has been developed with components designed to train government AP implementing agencies, inform policy makers, conduct outreach to industry and universities, make AP reporting software available and useful, and plan a detailed approach for implementing the declaration and complementary access provisions of the AP. DOE recently began collaborating with Indonesia, which has already entered the AP into force, requiring a second method of engagement somewhat different from that taken with countries that have not entered the AP into force. The AP international implementation program, administered by the International Nuclear Safeguards and Engagement Program, is working more closely with DOE’s International Nonproliferation Export Control Program to ensure countries are aware of and prepared to implement the export/import provisions of the AP. As the AP implementation program matures and helps move countries closer to entry-into-force or improved AP implementation, it is identifying characteristics of a country’s “end-state” that indicate that DOE assistance is no longer required. The U.S. AP Implementation Act and Senate Resolution of Ratification require the Administration to report annually to Congress on measures taken to achieve the adoption of the AP in non-nuclear weapon states. DOE’s AP international implementation program is a significant part of these measures. This paper describes recent developments to increase the scope and effectiveness of the program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Identification of Human Factors in Unmanned Aviation Via Pilot Incident Reports

There is a need for incident data relevant to the operation of civilian unmanned aircraft systems (UAS) in the National Air Space (NAS). Currently, very limited incident and accident data are available from military sources, and the tightly-restricted civilian UAS industry has produced very few incident reports that could shed light on design issues relevant to human factors. An exploratory study is being conducted to examine the feasibility of collecting voluntary critical incident reports from UAS pilots, and using the information to identify areas where human factors guidelines will be of assistance. Experienced UAS pilots are participating in small focus groups in which they are prompted to describe critical incidents that either reveal a system flaw, or highlight a case where the human operator contributed to system resilience or mission success. The de-identified incidents are being analyzed to identify contributing factors, with a focus on design issues that either hindered or assisted the pilot in dealing with the incident. Preliminary findings will be described.

human factors↗

Dragonstone Strategy Kickoff Report [Slides]

The oil & natural gas (ONG) system like any other heavy industrial process, relies on a complex system of information technology (IT) and operational technology (OT) devices. Cyber-preparedness varies across the ONG industry from organization to organization. Common challenges include remote locations, long-lived field assets, and insufficient capabilities to find and track malware. ONG companies tend to be concerned with lack of cyber-awareness from employees, risk stemming from remote access for operations & maintenance, and software vulnerabilities within third-party equipment. For a variety of reasons, the general consensus from stakeholders interviewed by LLNL is that the state of cybersecurity within the electric grid is currently outpacing its ONG cousin. Existing strategies for the resilience and cybersecurity of the electric grid can and should be leveraged to provide immediate benefits to the ONG system. In LLNL’s view, there are two key factors currently limiting the development of necessary cyber-practices within the ONG industry: regulatory overlap and inefficiencies, and lack of industry awareness of potentially useful technologies for solving known issues. In the months following this report, LLNL will develop a cyber-resilience roadmap for the oil & gas pipeline sector, coupling threat intelligence, industry knowledge base, and ongoing outreach

02 PETROLEUM↗

Technical Data to Justify Full Burnup Credit in Criticality Safety Licensing Analyses

Enercon Services, Inc. (ENERCON) was requested under Task Order #2 to identify scientific and technical data needed to benchmark and justify Full Burnup Credit, which adds 16 fission products and 4 minor actinides to Actinide-Only burnup credit. The historical perspective for Full Burnup Credit is discussed, and interviews of organizations participating in burnup credit activities are summarized as a basis for identifying additional data needs and making recommendation. Input from burnup credit participants representing two segments of the commercial nuclear industry is provided. First, the Electric Power Research Institute (EPRI) has been very active in the development of Full Burnup Credit, representing the interests of nuclear utilities in achieving capacity gains for storage and transport casks. EPRI and its utility customers are interested in a swift resolution of the validation issues that are delaying the implementation of Full Burnup Credit [EPRI 2010b]. Second, used nuclear fuel storage and transportation Cask Vendors favor improving burnup credit beyond Actinide-Only burnup credit, although their discussion of specific burnup credit achievements and data needs was limited citing business sensitive and technical proprietary concerns. While Cask Vendor proprietary items are not specifically identified in this report, the needs of all nuclear industry participants are reflected in the conclusions and recommendations of this report. In addition, Oak Ridge National Laboratory (ORNL) and Sandia National Laboratory (SNL) were interviewed for their input into additional data needs to achieve Full Burnup Credit. ORNL was very open to discussions of Full Burnup Credit, with several telecoms and a visit by ENERCON to ORNL. For many years, ORNL has provided extensive support to the NRC regarding burnup credit in all of its forms. Discussions with ORNL focused on potential resolutions to the validation issues for the use of fission products. SNL was helpful in ENERCON's understanding of the difficult issues related to obtaining and analyzing additional cross section test data to support Full Burnup Credit. A PIRT (Phenomena Identification and Ranking Table) analysis was performed by ENERCON to evaluate the costs and benefits of acquiring different types of nuclear data in support of Full Burnup Credit. A PIRT exercise is a formal expert elicitation process with the final output being the ranking tables. The PIRT analysis (Table 7-4: Results of PIRT Evaluation) showed that the acquisition of additional Actinide-Only experimental data, although beneficial, was associated with high cost and is not necessarily needed. The conclusion was that the existing Radiochemical Assay (RCA) data plus the French Haut Taux de Combustion (HTC) and handbook Laboratory Critical Experiment (LCE) data provide adequate benchmark validation for Actinide-Only Burnup Credit. The PIRT analysis indicated that the costs and schedule to obtain sufficient additional experimental data to support the addition of 16 fission products to Actinide-Only Burnup Credit to produce Full Burnup Credit are quite substantial. ENERCON estimates the cost to be $50M to $100M with a schedule of five or more years. The PIRT analysis highlights another option for fission product burnup credit, which is the application of computer-based uncertainty analyses (S/U - Sensitivity/Uncertainty methodologies), confirmed by the limited experimental data that is already available. S/U analyses essentially transform cross section uncertainty information contained in the cross section libraries into a reactivity bias and uncertainty. Recent work by ORNL and EPRI has shown that a methodology to support Full Burnup Credit is possible using a combination of traditional RCA and LCE validation plus S/U validation for fission product isotopics and cross sections. Further, the most recent cross section data (ENDF/B-VII) can be incorporated into the burnup credit codes at a reasonable cost compared to the acquisition of equivalent experimental data. ENERCON concludes that even with the costs of code data library updating, the use of S/U analysis methodologies could be accomplished on a shorter schedule and a lower cost than the gathering of sufficient experimental data. ENERCON estimates of the costs of an updated S/U computer code and data suite are $5M to $10M with a schedule of two to three years. Recent ORNL analyses using the S/U analysis method show that the bias and uncertainty values for fission product cross sections are smaller than previously expected. This result is confirmed by a similar EPRI approach using different data and computer codes. ENERCON also found that some issues regarding the implementation of burnup credit appear to have been successfully resolved especially the axial burnup profile issue and the depletion parameter issue. These issues were resolved through data gathering activities at the Yucca Mountain Project and ORNL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants: 2020 Update

This report documents the quantitative results of the current industry-average performance for components and initiating events (IEs) at U.S. commercial nuclear power plants (NPPs). It represents the third update of the original analysis in NUREG/CR-6928 with data through 2020. Continuous characterization and updating of current industry-average performance with the latest industry data available are important steps in maintaining up-to-date risk models. Typically, data from 1998–2002 were used in NUREG/CR-6928, data from 1998–2010 in the first update, data from 1998–2015 in the second update, and data from 2006–2020 in this update, although many IEs required longer periods for adequate characterization of frequencies in all these analyses. As with NUREG/CR-6928 and previous updates, four types of events are covered in this report: component unreliability (e.g., a pump that fails to start or fails to run), component or train unavailability resulting from test or maintenance outages, special event probabilities covering operational issues (e.g., pump restarts and injection valve re-openings during unplanned demands), and IE frequencies. Results (in the form of beta distributions for failure probabilities upon demand and gamma distributions for rates) are used as inputs to the U.S. Nuclear Regulatory Commission standardized plant analysis risk models covering U.S. commercial NPPs.

99 GENERAL AND MISCELLANEOUS↗

Authentication of Electromagnetic Interference Removal in Johnson Noise Thermometry

This report summarizes the testing performed offsite at the TVA Kingston Fossil Plant (KFP). This location is selected as a valid offsite test facility because the environment is very similar to the expected industrial nuclear power plant environment. This report will discuss the EMI discovered in the environment, the removal technique validity, and results from the measurements.

47 OTHER INSTRUMENTATION↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

Robust Indicators of Nonproliferation Performance

Understanding how the nuclear industry may benefit from self-regulation is closely linked with understanding how to report compliance activities for nonproliferation and export control objectives, as well as how to distinguish high and low compliance performance. Drawing on the corporate sustainability reporting model, nuclear and dual-use commodities industries can frame socially responsible self-regulatory activities to distinguish themselves as good nonproliferators.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Exploring Offshore Regional Atlantic Carbon Storage and Infrastructure for Eastern USA (Supporting Communities and Industry for Mid-Atlantic Offshore Carbon Storage Hub)

This final technical report presents a summary of work completed for the project Supporting Communities and Industry for Mid-Atlantic Offshore Carbon Storage Hub (FE0032407), which has been designated EXPLORE-ACS (Exploring Potential Long-Term Offshore Regional Atlantic Carbon Storage). The project is part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) funding opportunity announcement 2799 for Regional Initiatives to Accelerate Carbon Capture, Utilization, and Storage (CCUS) Deployment. The objective of the DOE 2799 program is to identify and address the challenges facing commercial deployment of carbon capture, transport, and storage in specific regions of the United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Industrializing Offshore Wind Power with Serial Assembly and Lower-cost Deployment - Final Report

A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assembly ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.

17 WIND ENERGY↗

ReACT Methodology Proof of Concept Final Report

The Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) funded INL Researchers to evaluate a novel process for assessing and mitigating cyber security risks. The proof of concept level of the method was tested in an industry environment. This case study, plus additional case studies will support the further development of the method into a tool to assist industry in securing their critical networks. This report provides an understanding of the process developed in the Response Analysis and Characterization Tool (ReACT) project. This report concludes with lessons learned and a roadmap for final development of these tools for use by industry.

99 GENERAL AND MISCELLANEOUS↗