Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Energy Management Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Improving Remedial Effectiveness at U.S. Department of Energy through Optimization Review and Performance Basis

The U.S. Department of Energy (DOE), Office of Environmental Management (EM) conducted its first Remediation Process Optimization (RPO) review in 2004, following the methodology and guidance issued by the Interstate Technology and Regulatory Council (ITRC). The intent of this paper is to briefly summarize the following: (1) the overall benefits of the review process toward improving remedial effectiveness and efficiency at DOE, (2) the types and objectives of completed reviews, and (3) how RPO facilitates technology transfer and is complementary to performance-based environmental management (PBEM). Contract reform began in 1993, at the U.S. Department of Energy (DOE) as a result of the Government Performance and Results Act, followed by recommendations from oversight groups. The precedence of using management and operating (M and O) contracts at DOE facilities, exempt from open competition by definition, shifted to performance basis. Since 1994, DOE has competed over 70% of its then existing M and O contracts; most now contain specific performance objectives, measures, and targets that focus on results in mission critical areas. In 2001, DOE's Office of Environmental Management (EM) integrated performance-based contracting as a core business process. EM resolved to manage cleanup as a project, encourage innovative contracting strategies, as well as incentives to accelerate risk reduction and cleanup. DOE's efforts to implement performance-based environmental management (PBEM) were further realized by establishing a centralized Office of Acquisitions and the Consolidated Business Center, which support all EM procurements. In 2004, EM began conducting Remediation Process Optimization (RPO) reviews at select field sites, following the methodology published in the 2004 ITRC guidance. To date, EM has completed nine RPO reviews, including: pump and treat system optimization, monitoring program optimization, in situ barrier performance improvement, remedial design review, as well as strategic planning for feasibility studies and Records of Decision. At a higher level, RPO reviews provide EM valuable insight as to how environmental contracts can be improved toward defining better cleanup goals, incentive fees, implementing emerging technologies, and measuring performance against appropriate metrics. As DOE works toward improving its PBEM approach, alliances with other federal agencies have proven valuable in sharing evaluation methods, contracting strategies, software, cost and performance reports, and lessons learned. (authors)

54 ENVIRONMENTAL SCIENCES↗

BUILDING A NETWORK FOR NEUTRON SCATTERING EDUCATION

In a concerted effort supported by the National Science Foundation, the Department of Commerce, and the Department of Energy, the United States is rebuilding its leadership in neutron scattering capability through a significant investment in U.S. neutron scattering user facilities and related instrumentation. These unique facilities provide opportunities in neutron scattering to a broad community of researchers from academic institutions, federal laboratories, and industry. However, neutron scattering is often considered to be a tool for 'experts only' and in order for the U.S. research community to take full advantage of these new and powerful tools, a comprehensive education and outreach program must be developed. The workshop described below is the first step in developing a national program that takes full advantage of modern education methods and leverages the existing educational capacity at universities and national facilities. During March 27-28, 2008, a workshop entitled 'Building a Network for Neutron Scattering Education' was held in Washington, D.C. The goal of the workshop was to define and design a roadmap for a comprehensive neutron scattering education program in the United States. Successful implementation of the roadmap will maximize the national intellectual capital in neutron sciences and will increase the sophistication of research questions addressed by neutron scattering at the nation's forefront facilities. (See Appendix A for the list of attendees, Appendix B for the workshop agenda, Appendix C for a list of references. Appendix D contains the results of a survey given at the workshop; Appendix E contains summaries of the contributed talks.) The workshop brought together U.S. academicians, representatives from neutron sources, scientists who have developed nontraditional educational programs, educational specialists, and managers from government agencies to create a national structure for providing ongoing neutron scattering education. A concerted effort was made to involve representatives from historically black colleges and universities (HBCUs) and minority educational institutions (MEIs). The roadmap contained herein provides the path to a national infrastructure for education of students, faculty, and professional researchers who wish to make use of national neutron scattering facilities but do not have (or do not believe they have) the educational background to do so. Education of other stakeholders, including the public, students in kindergarten through twelfth grade (K-12), and policy makers is also included. The opening sessions of the workshop provided the current status of neutron scattering education in North America, Europe, and Australia. National neutron sources have individually developed outreach and advertising programs aimed at increasing awareness among researchers of the potential applications of neutron scattering. However, because their principal mission is to carry out scientific research, their outreach efforts are necessarily self-limiting. The opening session was designed to build awareness that the individual programs need to be coupled with, and integrated into, a broader education program that addresses the complete range of experience, from the student to the experienced researcher, and the wide range of scientific disciplines covered by neutron scattering. Such a program must also take full advantage of existing educational programs and expertise at universities and expand them using modern distance learning capabilities, recognizing that the landscape of education is changing.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AMES: MS and MENG in Advanced Manufacturing for Energy at the University of Connecticut (Final Technical Report)

The objective of the project is to develop and implement an advanced degree program (MS and MENG in Advanced Manufacturing for Energy Systems, AMES) responding to the long-term workforce and technology requirements of the nation’s advanced energy products manufacturing industry. The program provided an industry relevant research experience by leveraging existing energy (e.g. fuels, power electronics, electrochemical power sources) and advanced manufacturing (e.g. additive manufacturing, composites, sensing) research at UConn funded by federal and state agencies, and industry, as well as through our industry partnerships. The trainees have joined research teams, advised by faculty with relevant research interests and expertise and were co-advised by industrial mentors. The AMES program have developed a truly interdisciplinary curriculum, first graduate degree program at UConn School (now College) of Engineering not housed in an academic department, with concentrations focusing on various challenges in advanced manufacturing for energy systems, e.g. advanced materials and processing. The project also developed new courses focusing on common technical and professional skills, and integrated various components for an industry relevant training. The program has admitted 29 Master of Science (MS) students since inception in January 2019. Twenty six of these students were AMES fellows, who have received partial funding from DoE through this project. The program far exceeded the goal of admitting at least five new MS (with thesis) students. All students were required to complete a thesis (M.S.) or a capstone (M.Eng.) project that are defined in collaboration with industry partners to ensure industrial relevancy, addressing a current industrial challenges. Industrial mentors also participated in advising the students in their research. AMES fellows, in addition were also required to complete an industrial internship for further industrial experience.

36 MATERIALS SCIENCE↗

Predicting and Managing Risk to Bats at Commercial Wind Farms using Acoustics

Bat populations in North America face novel threats from white-nose syndrome and widespread turbine-related mortality related to the rapidly expanding wind power industry in addition to long-standing pressures from habitat loss and degradation. Bats, unlike most small mammals, are long-lived and slow to reproduce, highlighting the importance of understanding and managing anthropogenic sources of mortality. My dissertation research used acoustic bat detectors to measure bat activity at commercial wind projects, predict patterns in risk, and design strategic measures to reduce fatality rates by curtailing turbine operation during periods when bats are most active. Bats collide with wind turbines only when their rotors are spinning, and risk of turbine-related fatality is therefore a dynamic factor that can be manipulated by curtailing turbine operation when bats are active. We first measured inter-detector variation in metrics of acoustic bat activity to understand how the acoustic detection process may affect inferences related to spatial and temporal variation in bat activity. Using acoustic detectors mounted on top of wind turbines at two commercial wind farms in West Virginia, we then demonstrated that the amount of bat activity recorded when turbines were operating aligned closely with bat fatality rates on multiple scales. Accordingly, the metric of bat activity exposed to turbine operation provides a meaningful, quantitative indicator of turbine-related bat fatality risk. Further, bats responded consistently to changing wind speed and temperature at turbines in both wind farms across multiple years, enabling exposed bat activity to be predicted accurately among turbines and years. Building on these results, we simulated exposure of bats to turbine operation and energy loss for curtailment strategies recommended by state and federal agencies in the United States and Canada. By adjusting parameters such as cut-in wind speeds and temperature thresholds, we demonstrated the ability to design strategic curtailment programs that achieve equivalent or greater predicted reductions in bat activity exposure for substantially less energy-production loss. Characterizing fatality risk on a finer scale using acoustics will help regulatory agencies and the wind industry alike reduce risks of population-level impacts to vulnerable bat species while continuing to expand large-scale renewable energy generation.

17 WIND ENERGY↗

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE programs are designed to preserve and present the information that future stewards and stakeholders will need to maintain site remedies and knowledge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Budget Request for the DOE Computational Science Graduate Fellowship (CSGF) Grant

The Department of Energy Computational Science Graduate Fellowship (DOE CSGF) is essential for addressing the increasingly complex national workforce demands stemming from the growth of computational science and engineering challenges. Computational science and engineering (CSE) takes a multidisciplinary approach that utilizes scientific computing to tackle practical problems and provide technical tools across the spectrum of scientific discovery. The DOE CSGF specifically highlights high-performance computing (HPC) as a critical enabling technology in CSE, driving advancements in science and engineering that are vital to both the DOE and the broader economy. Over the past half-century, HPC has been an essential tool for DOE’s success. During this period, important missions, such as nuclear stockpile stewardship, have turned to HPC as an essential technology. Entire science disciplines have been transformed through the augmentation of scientific observation via HPC. At government laboratories, academic institutions, and in industry, DOE CSGF alumni are helping push traditional HPC boundaries while contributing to discoveries in high-energy physics, quantum information systems, fusion-reactor design, machine learning, additive manufacturing, nano materials for next-generation batteries and transistors, and advanced nuclear reactor modeling. In addition, HPC is used to address national health needs that will eventually point to cures both by helping cancer researchers manage and analyze huge troves of data, by simulating biological mechanisms, and by accelerating drug development. A 2023 report from the ASCAC Subcommittee on American Competitiveness and Innovation to the ASCR office, “Can the United States Maintain Its Leadership in High-Performance Computing?” says of the Program, “The CSGF program provides a barometer for disciplines that will be of interest to future DOE computing. Computational biology, machine learning, and quantum computing are among the subjects that began to swell in the ranks of CSGF applicants before the labs were hiring as high a percentage of employees in these categories.” The explosion of scientific and technological data has heightened the demand for advanced high-performance computing (HPC) to transform these data into meaningful scientific insights. As access to vast amounts of data increases, the fields of Machine Learning and Artificial Intelligence are experiencing a resurgence, enhancing the established practices of computational modeling and simulation. In its September 2020 subcommittee report on "AI/ML, Data Intensive Science, and High-Performance Computing," the DOE Advanced Scientific Computing Advisory Committee (ASCAC) specifically called for a fellowship program to train computational and data scientists to address exascale and data-intensive computing challenges. This integration of empirical and theoretical modeling will increasingly guide federal policymakers in making decisions that impact American society and future generations. It demands a workforce of highly skilled and intellectually agile computational scientists capable of navigating the rapid advancements in scientific computing within the DOE National Laboratory research environment. The DOE CSGF program has consistently addressed this critical need.

97 MATHEMATICS AND COMPUTING↗

Repository planning for spent nuclear fuel and high-level radioactive waste: insights from U.S.. and international programs - 15638

For decades, the United States and other nations with nuclear programs have been planning for permanent disposition of spent nuclear fuel and high-level waste, to address the increasingly difficult problem of storing these materials for the long term. These plans are complicated by issues ranging from technological factors to regulatory approaches and public concerns about health and environmental protection. In its 2012 report, the Blue Ribbon Commission (BRC) on America's Nuclear Future identified a number of recommendations for creating a safe, long-term solution to the nation's problem of managing and disposing of its spent fuel and high-level radioactive waste. These include a recommendation that the U.S. Environmental Protection Agency (EPA) revise its standards for a high-level waste repository. The EPA is currently reviewing and synthesizing literature relevant to such standards, including: (1) existing national and international standards and guidelines for repositories; and (2) benefits and barriers to such standards, including limitations related to current technologies, as well as siting, licensing, and construction processes. This paper highlights findings of this literature review and synthesis. More than 90 countries, from Albania to Vietnam and Yemen, were identified as potential sources of relevant information based on existing nuclear programs or consideration of such programs to address future energy needs. Pursuant to the BRC recommendations, the U.S. Department of Energy (DOE) has compiled extensive information resources relevant to spent fuel and radioactive waste repositories in the Centralized Used Fuel Resource and Information Exchange (CURIE) database developed by Oak Ridge National Laboratory. Further valuable sources of information include annual proceedings of recent Waste Management Symposia, which provide insights into recent trends and progress across various national and international programs. Recent literature from a number of countries, including the United States and Canada, and the United Kingdom, Finland, Sweden, France, Germany, and other countries in Western Europe, as well as other regions including Australia, indicates that consent-based siting has emerged as a dominant theme. In addition to effective siting processes, key program needs identified in the literature include regulatory standards and performance context, as well as reliable technologies and engineered systems, such as for deep drilling and assured safe containment of these radioactive materials extending into the very long term. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory Hazardous Waste Facility Permit Community Relations Plan

The requirements of the Hazardous Waste Facility Permit are fulfilled through execution of LANL's fourth strategic goal: “Enabling mission delivery through next-generation facility, infrastructure, and operational excellence.” With input from our stakeholders, we will continue to fulfill those requirements and to improve our waste operations. In 2015, the Laboratory purpose statement focused waste management efforts by directing delivery of mission success through operational effectiveness and scientific excellence. This Plan advances that purpose through community involvement. In the process of achieving our national security mission, Los Alamos National Laboratory generates some hazardous and mixed waste. Hazardous waste is solid waste that is dangerous or potentially harmful to human health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded as commercial products, such as cleaning fluids or pesticides, or as the byproducts of operations. Specific substances are listed in 40 Code of Federal Regulations (CFR), Part 261: 40 CFR Part 261. Hazardous waste management activities are regulated by the U. S. Environmental Protection Agency and the New Mexico Environment Department (NMED) pursuant to New Mexico Hazardous Waste Act (HWA; Chapter 74, Article 4 NMSA 1978) and regulations under the Act. In 1989, NMED issued the Hazardous Waste Facility Permit (EPA ID Number NM0890010515-1) that established standards for the Laboratory to manage, store, and treat hazardous wastes on-site and to undertake the closure, post closure care, and cleanup as necessary, of permitted waste management units. On November 30, 2010, NMED renewed the Hazardous Waste Facility Permit (the Permit). In June 2020 the Permittees submitted a permit renewal application to the NMED for their review and approval. The Hazardous Waste Facility Permit Community Relations Plan (CRP) describes the scope of public involvement in the activities of the Permit. The CRP is specifically designed to facilitate the community outreach, engagement, and relations activities concerning the Laboratory’s Hazardous Waste Facility Permit and coordinates with but does not include public involvement for other Laboratory programs, initiatives, or environmental activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation, 2007-2008 Annual Report.

The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ecologic functions lost due to the operation of federal hydropower facilities. The unique nature of this project (scientific team, newest/best science, adaptive management, assessment of ecological functions, etc.) has been to work in a dynamic RDRT process. In addition to being multidisciplinary, this model KTOI project provides a stark contrast to the sometimes inflexible process (review, re-review, budgets, etc.) of the Columbia River Basin Fish and Wildlife Program. The project RDRT is assembled annually, with subgroups meeting as needed throughout the year to address project issues, analyses, review, and interpretation. Activities of RDRT coordinated and directed the selection of research and assessment methodologies appropriate for the Kootenai River Watershed and potential for regional application in the Columbia River Basin. The entire RDRT continues to meet annually to update and discuss project progress. RDRT Subcontractors work in smaller groups throughout the year to meet project objectives. Determining the extent to which ecological systems are experiencing anthropogenic disturbance and change in structure and function is critical for long term conservation of biotic diversity in the face of changing landscapes and land use. KTOI and the RDRT propose a concept based on incorporating hydrologic, aquatic, and terrestrial components into an operations-based assessment framework to assess ecological losses as shown in Figure E-1.

13 HYDRO ENERGY↗

New initiatives in materials security

NRC Mission: To license and regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. Scope of Responsibility: NRC's regulatory mission covers three main areas: - Reactors: commercial reactors for generating electric power and non-power reactors used for research, testing, and training; - Materials: uses of nuclear materials in medical, industrial, and academic settings and facilities that produce nuclear fuel; - Waste: transportation, storage, and disposal of nuclear materials and waste, and decommissioning of nuclear facilities from service. A Changing Environment: - National security is dominant concern; - Obtain appropriate balance between safety and Security initiatives and Operational activities; - Multiple layers of systems, infrastructures for various licensees. Effective Communication: Not easy; Sound bites galore; Nuclear 'phobia'; Acceptability of risk; Balance of cost and benefits; Responsibility of the regulator, licensees and radiation protection professionals. Prioritized Licensee Groups: - High priority: Panoramic irradiators; manufacturers/distributors; - Medium priority: medical and research facilities, radiography, well-logging, broad-scope licenses, self-shielded irradiators, open-field irradiators, and other licensees; - Low priority: Portable gauges. Increased Security Measures: Security Zone; Control Access; Monitor, Detect, Assess, and Respond; Transportation Security; Additional control to secure portable and mobile devices; Liaison with Local Law Enforcement Agencies; Background Investigations and Fingerprinting; License Verification; Document Retention; Information Protection; Orders/Legally binding requirements to more than 3000 licensees. Orders Issued: Large Panoramic Irradiators Security Measures (60 Orders issued 6/03, Inspections done); Manufacturing and Distribution Licensees Security Measures (61 Orders issued 1/04, Inspections done); Transportation of Radioactive Material Quantities of Concern (167 Orders Issued 07/05, Inspections done); Orders for Increased Control Measures for other types of sources by categories of licenses (1,098 NRC Orders and 1782 binding State requirements issued by 12/05, Implemented 06/06, Inspections done by NRC and States). Security Inspection Results: All first year Increased Control inspections completed; NRC Information Notice (IN) 2007-16 issued May 2007; Since IN 2007-16 was issued, {approx}50% of the NRC inspections performed resulted in violations; Licensees misinterpreted or incompletely implemented requirements; Common theme: failure to properly document actions or programs when implementing the Increased Controls. Energy Policy Act of 2005: Established Radiation Source Protection and Security Task Force: cooperative effort with 14 Federal agencies, 2 State organizations; Comprehensive analysis of the security of radiation sources in the U.S.; Directed NRC to contract with National Academy of Sciences to conduct a study on radiation source use and replacement; Report to the President and Congress issued 8/06 and every 4 years thereafter. Radiation Source Protection and Security Task Force: Need higher priority on international transport security; Evaluate feasibility of using new and existing technologies to detect and discourage theft during transport; Conduct a feasibility study on the possible phase out of CsCl in highly dispersible forms; Further evaluate potential alternative technologies; Expedite completion of fingerprint requirements in Act. National Source Tracking System: Joint NRC/DOE 2003 report on Radiological Dispersal Devices recommended development of a national source tracking system; IAEA Code of Conduct recommended establishment of a national registry; U.S. Energy Policy Act of 2005 placed requirements for NRC to issue regulations establishing a mandatory tracking system. New Fingerprinting Requirements: Orders were issued to NRC Increased Control licensees on Dec 5, 2007; Licensees have 60 days to notify the NRC if they are unable to comply or if compliance is unnecessary; Licensees have 90 days to fingerprint and approve a Trustworthiness and Reliability Official; Licensees will have 180 days to implement program; 34 Agreement Stated Increased Control Licensees will receive similar requirements within 180 days. 2007 GAO Investigation: Formed Bogus Company and Obtained NRC License; Altered NRC License; Two Suppliers Agreed to Sell Material; Parallel Attempt to Obtain Agreement State; License Aborted When Notified of Site Visit. Short-Term Actions Taken: Terminated the NRC License; Stopped issuance of new NRC licenses until Interim Guidance was issued; Mandatory pre-Licensing visits or meetings for new applicants; Performed consequence assessment; Coordinated with Federal and State Partners; Retrospective exam ensure licensees are legitimate. Action Plan: Independent, 120-day external review Issued 2/11/08 for comment; National Source Tracking System - Jan 2009; Web-Based Licensing; General Licenses and Outreach; Pre-Licensing and Materials Working Groups; Agreement State Partnership; Comprehensive Internal Assessment. Regulatory Issue Summary (RIS 2008-02): Issued February 1, 2008; Latest developments in materials security; Highlights Energy Policy Act 2005, GAO report and National Academy pending Feb 2008 report; New efforts with DHS, DOE/NNSA and manufacturers on additional security enhancements for Cs-137 irradiators; Low-cost, easily implemented physical security improvements. Enhanced State, Federal and International Partnerships: Federal, State and local interface; DHS' Domestic Nuclear Detection Office 'Securing the Cities' Initiative; DHS Protective Action Guides for RDDs and INDs; DOE/NNSA's Securing the Sources Initiative; International nuclear security outreach activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of the Brazilian National Repository - RBMN Project - 13008

Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining some requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Department of Energy Office of Legacy Management Progress on Defense-Related Uranium Mines Program - 18119

The Defense-Related Uranium Mines (DRUM) Program provides the structure and basis for the US Department of Energy Office of Legacy Management (LM) to manage the verification and validation (V and V) of defense-related uranium mines (mines) that provided ore to the Atomic Energy Commission from 1947 to 1970. V and V activities are conducted to fully understand the scope of potential problems posed by these mines by determining their location, reclamation or remediation status, and potential impacts to public safety, human health, and the environment. Land management agencies have limited resources and have generally not conducted comprehensive inventories of abandoned uranium mines, thus adding to the need to undertake this program. LM has entered into memoranda of understanding (MOUs) with the US Bureau of Land Management (BLM) and US Forest Service (USFS) to facilitate a better understanding of the scope of the problem posed by these mines. Currently, LM has executed MOUs with the BLM state offices in Colorado, New Mexico, Utah, and Wyoming and the USFS Rocky Mountain Region, which includes the national forests in Colorado, Wyoming, and South Dakota. This collaborative effort with partner agencies has led LM to develop a V and V Work Plan that describes the numerous activities and types of data to be collected at the mines. V and V activities verify actual mine location, collect coordinates of mining-related features, collect radiological data and soil samples, identify potential physical safety hazards, prioritize mines using a risk-based screening approach, and report the information to partner agencies. The partner agencies may use the reports to assess priorities and determine if any further action is warranted. The DRUM Program goals are to: - Improve data quality and content in the LM national inventory of abandoned uranium mines; - Conduct site-specific reconnaissance at mines for data verification and validation; - Exchange mine information with other federal agencies and state governments to help address mines presenting the greatest risks; - Develop reports for each mine that will contain a risk scoring assessment to help each agency develop priorities. The preliminary risk screening methodology was based on a joint effort between LM and BLM to develop factors that would be based on field observations, field data, and laboratory data using a multiple-lines-of-evidence approach. The multiple-lines-of-evidence assessment allows land managers the opportunity and flexibility to query specific criteria and make rankings based on specific priorities. The risk screening for each mine is based on evaluating the primary hazards of physical safety and risks to human health and several modifying factors that include accessibility and ecological/environmental risks. Gamma radiation scans are performed across the disturbed area of the mine, and soil samples are taken from waste rock piles and drainages, when applicable. This paper presents the results of performing inventory, environmental sampling, and risk ranking along with other accomplishments and lessons learned during the initial year of V and V activities and reporting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

54 ENVIRONMENTAL SCIENCES↗

An Analytical Impact Assessment Framework for Wildlife to Inform the Siting and Permitting of Wind Energy Facilities

In the United States overall electrical generation capacity is expected to increase by 10-25 gigawatts (GW) per year to meet increases in demand. Wind energy is a key component of state and federal renewable energy standards, and central to the Department of Energy’s 20% by 2030 wind production goals. Increased wind energy development may present increased resource conflict with avian wildlife, and environmental permitting has been identified as a potential obstacle to expansion in the sector. ICF developed an analytical framework to help applicants and agencies examine potential impacts in support of facility siting and permitting. A key objective of our work was to develop a framework that is scalable from the local to the national level, and one that is generalizable across the different scales at which biological communities operate – from local influences to meta-populations. The intent was to allow natural resource managers to estimate the cumulative impacts of turbine strikes and habitat changes on long-term population performance in the context of a species demography, genetic potential, and life history. We developed three types of models based on our literature review and participation in the scientific review processes. First, the conceptual model was developed as a general description of the analytical framework. Second, we developed the analytical framework based on the relationships between concepts, and the functions presented in the scientific literature. Third, we constructed an application of the model by parameterizing the framework using data from and relevant to the Altamont Pass Wind Resource Area (APWRA), and an existing golden eagle population model. We developed managed source code, database create statements, and written documentation to allow for the reproduction of each phase of the analysis. ICF identified a potential template adaptive management system in the form of the US Fish & Wildlife Service (USFWS) Adaptive Harvest Management (AHM) program, and developed recommendations for the structure and function of a similar wind-facility related program. We provided a straw-man implementation of the analytical framework based on assumptions for APWRA-wide golden eagle fatalities, and presented a statistical examination of the model performance. APWRA-wide fatality rates appear substantial at all scales examined from the local APWRA population to the Bird Conservation Region. Documented fatality rates significantly influenced population performance in terms of non-territorial non-breeding birds. Breeder, Juvenile, Subadult, and Adult abundance were mostly unaffected by Baseline APWRA-wide fatality rates. However, increased variability in fatality rates would likely have impacts on long-term population performance, and would result in a substantially larger loss of resources. We developed four recommendations for future study. First, we recommend establishment of concept experts through the existing system of non-profits, regulatory agencies, academia, and industry in the wind energy sector. Second, we recommend the development of a central or distributed shared data repository, and establish guidelines for data sharing and transparency. Third, we recommend development a forum and process for model selection at the local and national level. Last, we recommend experimental implementation of the prescribed system at broader scales, and refinement the expectations for modeling and adaptive management.

54 ENVIRONMENTAL SCIENCES↗

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

Colonie, New York, FUSRAP Site: Pathway from Remediation to Redevelopment - 19465

The Colonie, New York, Formerly Utilized Sites Remedial Action Program (FUSRAP) Site consists of a 4.5-hectare (11.2-acre) US Department of Energy (DOE)-owned vacant property (Main Site) and 56 commercial and residential vicinity properties (VPs). The site was owned and operated by National Lead Industries (NL) from 1937 to 1984. The Main Site was used for manufacturing fuel and weapons components using uranium and thorium. Depleted uranium dust was emitted from exhaust stacks that contaminated the site and the VPs. NL also filled in portions of the site with industrial waste and released contaminants to groundwater. The state court shut the plant down in 1984. The site was acquired by DOE in 1985, which remediated the VPs and began to remediate the Main Site up to 1997. The US Army Corps of Engineers (USACE) undertook remedial actions beginning in 1997. The site has three Operable Units (Main Site, Groundwater, and VPs). The Main Site soil was remediated to residential standards except for three small easement areas. The soils in the easement areas are safe for exposure to workers. There is a groundwater plume beneath the site that will require the use of monitoring and temporary land use controls until cleanup standards are met. The VPs require no further action. A 2-year transition period from USACE to the DOE Office of Legacy Management (LM) began on June 18, 2018, with the receipt of the Site Closeout Report from USACE. LM has determined that the 4.5-hectare site is excess to its mission needs and intends to pursue sale of the property for redevelopment. There are several processes required before the disposal can occur. Organizations with similar sites that are federally owned and ready for private redevelopment may benefit from reviewing the Colonie site disposition processes. This paper will discuss (1) Determining disposal alternatives for the Colonie, New York, site. (2) Describing the federal requirements for the disposal of excess real property. (3) Communicating to stakeholders that the site is ready for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗