Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management Information Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

SLS-SPEC-159 Cross-Program Design Specification for Natural Environments (DSNE) Revision D

This document is derived from the former National Aeronautics and Space Administration (NASA) Constellation Program (CxP) document CxP 70023, titled "The Design Specification for Natural Environments (DSNE), Revision C." The original document has been modified to represent updated Design Reference Missions (DRMs) for the NASA Exploration Systems Development (ESD) Programs. The DSNE completes environment-related specifications for architecture, system-level, and lower-tier documents by specifying the ranges of environmental conditions that must be accounted for by NASA ESD Programs. To assure clarity and consistency, and to prevent requirements documents from becoming cluttered with extensive amounts of technical material, natural environment specifications have been compiled into this document. The intent is to keep a unified specification for natural environments that each Program calls out for appropriate application. This document defines the natural environments parameter limits (maximum and minimum values, energy spectra, or precise model inputs, assumptions, model options, etc.), for all ESD Programs. These environments are developed by the NASA Marshall Space Flight Center (MSFC) Natural Environments Branch (MSFC organization code: EV44). Many of the parameter limits are based on experience with previous programs, such as the Space Shuttle Program. The parameter limits contain no margin and are meant to be evaluated individually to ensure they are reasonable (i.e., do not apply unrealistic extreme-on-extreme conditions). The natural environments specifications in this document should be accounted for by robust design of the flight vehicle and support systems. However, it is understood that in some cases the Programs will find it more effective to account for portions of the environment ranges by operational mitigation or acceptance of risk in accordance with an appropriate program risk management plan and/or hazard analysis process. The DSNE is not intended as a definition of operational models or operational constraints, nor is it adequate, alone, for ground facilities which may have additional requirements (for example, building codes and local environmental constraints). "Natural environments," as the term is used here, refers to the environments that are not the result of intended human activity or intervention. It consists of a variety of external environmental factors (most of natural origin and a few of human origin) which impose restrictions or otherwise impact the development or operation of flight vehicles and destination surface systems. These natural environments include the following types of environments: Terrestrial environments at launch, abort, and normal landing sites (winds, temperatures, pressures, surface roughness, sea conditions, etc.); Space environments (ionizing radiation, orbital debris, meteoroids, thermosphere density, plasma, solar, Earth, and lunar-emitted thermal radiation, etc.); Destination environments (Lunar surface and orbital, Mars atmosphere and surface, near Earth asteroids, etc.). Many of the environmental specifications in this document are based on models, data, and environment descriptions contained in the CxP 70044, Constellation Program Natural Environment Definition for Design (NEDD). The NEDD provides additional detailed environment data and model descriptions to support analytical studies for ESD Programs. For background information on specific environments and their effects on spacecraft design and operations, the environment models, and the data used to generate the specifications contained in the DSNE, the reader is referred to the NEDD paragraphs listed in each section of the DSNE. Also, most of the environmental specifications in this document are tied specifically to the ESD DRMs in ESD-10012, Revision B, Exploration Systems Development Concept of Operations (ConOps). Coordination between these environment specifications and the DRMs must be maintained. This document should be compatible with the current ESD DRMs, but updates to the mission definitions and variations in interpretation may require adjustments to the environment specifications.

Roberts, Barry C.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASAs RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit 2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Igiugig Site Visit Report

The National Renewable Energy Laboratory (NREL) team conducted a site visit during January 23-25, 2019 with the Igiugig Village Council (IVC) and other stakeholders to assist the community of Igiugig in refining their long-term energy strategy. The agenda included a tour of the village, data collection, presentations, long-term visioning exercises, identification of energy scenarios, and a school presentation. Participants in the site visit activities spanned a range of local, regional, government, and industry participation. There were 24 attendees at the all-day community workshop on Thursday, January 24th, with participants from the IVC, NREL, Bristol Bay Native Association (BBNA), Bristol Bay Native Corporation (BBNC), Lake and Peninsula Borough, Alaska Energy Authority, Intergrid, ORPC, Deer Stone Consulting, the Southwest Alaska Municipal Conference, and University of Alaska Fairbanks - Alaska Center for Energy and Power. Igiugig is a well-organized rural Alaskan community, with a leadership team that appears to have broad community support. The use of consensus-based decision making is one tangible example of how the leadership team actively invokes and promotes community-focused thinking. The NREL team observed anecdotal evidence of how this approach seems to be strengthening the community: active participation in the visioning exercise, a student hosted fund-raiser dinner at the school, a clean and organized landfill, and well-maintained roads and buildings. Igiugig has wind, solar, and river hydrokinetic resources readily available within the community. Wind has shown to be a promising resource in the region, and has been integrated into microgrids around the state, but the community has had mixed success with wind technologies: some devices failed quickly and others continue to operate. The economics of solar energy are improving in Alaska, and economical solar projects are being installed around the state. Considering that economic activity in Igiugig peaks during the summer sport fishing season, solar could prove to be a valuable supplement to the electrical system. Igiugig has been a test site for two different river hydrokinetic devices, and they have began a third project to operate ORPC's RivGen device, which is delivering valuable device performance data, operations and maintenance experience, and design refinement information. Already, this device has made over 7-million revolutions, and delivered over 8 MWh of power to the community. Igiugig's river resource is fairly unique because it is available year-round and has the potential to provide reliable base-load power for months at a time. A preliminary investigation of this diverse resource mix suggests that Igiugig could achieve very high levels (70% or more) of annual renewable generation contributions. A critical step in pursuing this path is identifying the mix of energy assets (generation and storage) that best meets the community's budget, needs, and goals. The assets that a community installs early in their grid-modernization initiative can constrain the options that are economical at later stages, which may lead to sub-optimal solutions. This is where technical and economic analysis of potential scenarios (i.e., distinct mixes of energy assets) can be useful in identifying the most promising pathways so that a community can make informed and strategic decisions about the assets they install. These analyses are most accurate and informative when they are based on actual technology performance and cost data. As the RivGen project continues to operate and generate this data, we will be better prepared to evaluate the technology's long-term viability and to identify research areas that would improve it. Igiugig's energy projects are at the cutting edge of two intersecting technology areas: 1) deploying an operational river hydrokinetic turbine, and 2) integrating renewable energy sources to achieve very high percent renewables. If these projects are successful, the lessons learned and technologies developed could be valuable for other microgrids around the world. Igiugig's unique resource mix make it an ideal location for this work, and the community's organizational strength make it an ideal partner in this ground-breaking work. Ongoing support for technical assistance to manage and address technical challenges along the way will maximize the probability of project success.

13 HYDRO ENERGY↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PR100 One-Year Progress Summary Report: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This report, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The summary report follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish https://www.nrel.gov/docs/fy23osti/85144.pdf.

100%↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geospatial Data Platform for All

Spatiotemporal data has evolved in scale due to augmented use in cross-domain applications. Simultaneously, there is substantial growth in the availability of Geographic Information Systems (GIS) data provided by the United States Geological Survey (USGS) along with other federal, state, county, or local agencies through open-data portals and public access APIs. However, data availability does not equate with accessibility. Large-scale analyses and applications require robust, performant data management with co-location of data storage and computing. The insufficiency of data management infrastructure compels researchers to adopt ad hoc project- specific GIS data storage solutions (e.g., copying data to High-Performance computer file systems). As an ad hoc storage strategy does not scale, it hampers cross-domain analyses causing difficulty in data reuse and utilizing existing code bases. Furthermore, GIS data is complex and requires expertise to analyze and manipulate due to its intricate data structures and data-specific projection transformations. Despite the challenges, we recognize that derived GIS data products, e.g., satellite or LIDAR-based images, can be used in downstream applications such as AI by domain, but non-GIS experts. To address the data needs and overcome the challenges, we are working towards a GIS Data Platform focused on efficient data storage, data discovery and access, and an API to enable common workflows. We propose a knowledge-graph (KG) approach for data discovery, whereby datasets are semantically linked to higher- level constructs such as projects and research areas. The semantic data links enable researchers to explore datasets in a top-down approach by specifying relevant and meaningful terms (assists in finding hidden data). An advantage is that the nodes and edges in a knowledge graph create built-in semantic documentation. Deeper spatiotemporal connections between data sources can be encoded via Graph Neural Networks (GNN) (Zhang et al., 2021). The KG approach can be extended to integrate the data itself in a Virtual KG (VKG). Our work will derive inspiration from large-scale VKG efforts that have been undertaken or are currently underway as part of the OpenStreetMap project (Ding et al., 2021). For DOE Data Days, we share the proposed geospatial data platform hybrid (cloud/on-prem) architecture, our work-to-date on storing, retrieving, and transforming LiDAR and raster data relevant to two important NREL use-cases, including the Renewable Energy Potential (reV) Model, and present our proposal for a KG based data discovery engine.

data platform↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GCAM–GLORY v1.0: representing global reservoir water storage in a multi-sector human–Earth system model

Abstract. Reservoirs play a significant role in modifying the spatiotemporal availability of surface water to meet multi-sector human demands, despite representing a relatively small fraction of the global water budget. Yet the integrated modeling frameworks that explore the interactions among climate, land, energy, water, and socioeconomic systems at a global scale often contain limited representations of water storage dynamics that incorporate feedbacks from other systems. In this study, we implement a representation of water storage in the Global Change Analysis Model (GCAM) to enable the exploration of the future role (e.g., expansion) of reservoir water storage globally in meeting demands for, and evolving in response to interactions with, the climate, land, and energy systems. GCAM represents 235 global water basins, operates at 5-year time steps, and uses supply curves to capture economic competition among renewable water (now including reservoirs), non-renewable groundwater, and desalination. Our approach consists of developing the GLObal Reservoir Yield (GLORY) model, which uses a linear programming (LP)-based optimization algorithm and dynamically linking GLORY with GCAM. The new coupled GCAM–GLORY approach improves the representation of reservoir water storage in GCAM in several ways. First, the GLORY model identifies the cost of supplying increasing levels of water supply from reservoir storage by considering regional physical and economic factors, such as evolving monthly reservoir inflows and demands, and the leveled cost of constructing additional reservoir storage capacity. Second, by passing those costs to GCAM, GLORY enables the exploration of future regional reservoir expansion pathways and their response to climate and socioeconomic drivers. To guide the model toward reasonable reservoir expansion pathways, GLORY applies a diverse array of feasibility constraints related to protected land, population, water sources, and cropland. Finally, the GLORY–GCAM feedback loop allows evolving water demands from GCAM to inform GLORY, resulting in an updated supply curve at each time step, thus enabling GCAM to establish a more meaningful economic value of water. This study improves our understanding of the sensitivity of reservoir water supply to multiple physical and economic dimensions, such as sub-annual variations in climate conditions and human water demands, especially for basins experiencing socioeconomic droughts.

54 ENVIRONMENTAL SCIENCES↗

US Department of Energy, Office of Science High Performance Computing Facility Operational Assessment 2019 Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory's (ORNL's) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable computational ecosystems; creating innovative solutions for high performance computing (HPC) needs; and managing risks, safety, and security associated with operating some of the most powerful computers in the world. The results can be seen in the cutting-edge science conducted by users and the praise from the research community. Calendar year (CY) 2019 was a big year as OLCF staff ran five world-class resources (the leadershipclass computers Titan and Summit, the large analysis cluster called Eos, and the massive parallel filesystems called Atlas and Alpine)) and also began power and cooling upgrades for a 2021 exascale system called Frontier. While continuing exceptional operation of Titan, Eos, and Rhea, the OLCF released the Summit supercomputer for production on January 1, 2019. Summit debuted as the most capable and efficient system in its class and has been recognized as the most powerful system in the world for its performance on both the high performance linpack (HPL) and conjugate gradient (HPCG) benchmark applications since June 2018 according to TOP500. Summit represents the culmination of a multiyear effort between the OLCF, IBM, NVIDIA, and Mellanox to deliver a system that is unmatched for modeling, simulation, data analysis, and learning. To hit the ground running with science-ready applications on day one, application teams worked closely with the OLCF through the Center for Accelerated Application Readiness (CAAR) program for years in advance of the Summit deployment. CY 2019 was filled with outstanding results and accomplishments: a very high rating from users on overall satisfaction for the sixth year in a row; a tremendous amount of core-hours delivered to researchers from two leadership-class systems; and success in delivering on the allocation split of roughly 60%, 30%, and 10% of core-hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director's Discretionary (DD) programs, respectively (see Operational Performance section). These accomplishments, coupled with the high utilization rates (overall and capability usage), represent the fulfillment of the promise of both leadership-class machines: efficient facilitation of leadership-class computational applications. Table ES.1 presents a summary of the 2019 OLCF metric targets and the associated results. More information can be found in the Operational Performance section for each OLCF resource. The scientific accomplishments of OLCF users are a strong indication of long-term operational success, with publications this year in such notable journals and publications as Nature, Nature Physics, Nature Plants, Physical Review X, Journal of the American Physical Society, Cell, Nano Letters, and Trends in Biotechnology. Crucial domain-specific discoveries facilitated by resources at the OLCF are described in the High Performance Computing Facility Operational Assessment 2019 Oak Ridge Leadership Computing Facility (OAR) Strategic Results section. For example, researchers used Summit to pinpoint and understand the production of proteins from genetic information, including mutations and the functional expression of disease (Section 8.2).

97 MATHEMATICS AND COMPUTING↗

Field Test Bed for Vadose-Zone Monitoring Approaches - 20404

In the Central Plateau at the U.S. Department of Energy Hanford Site, a large inventory of contaminants resides in unsaturated sediments within the approximately 100-meter-thick vadose zone, posing a potential continuing risk to groundwater. Vadose zone remedies used to address these contaminants will require performance monitoring to provide feedback during implementation and for long-term verification that remedial action objectives have been met. Passive approaches may also need long-term monitoring to demonstrate that the flux of contaminants from the vadose zone to the groundwater are below thresholds established to meet groundwater protection goals. Collection of physical (e.g., groundwater or sediment) samples is a common method for identifying contaminant concentration distributions, but this approach is limited by the number of locations and the frequency with which data can be collected. In situ vadose zone measurements have evolved over the past few years to include key measurements of water content, soil water pressure, temperature, and chemical concentration. However, the current generation of sensors is designed for relatively short-term use in near-surface soils or sediments. Geophysical methods have been evolving but are also limited in that they have not been designed for the specific long-term vadose zone monitoring needs at the Hanford Site. Overall, monitoring under unsaturated conditions can be difficult due to the need to install and maintain instrumentation over a large area and depth and the need to identify preferential flow pathways due to geologic and chemical heterogeneities over long periods. Thus, a vadose zone monitoring test bed was initiated to address these challenges and identify cost-effective approaches for implementation and postclosure monitoring of the deep vadose zone. The monitoring test bed is expected to provide valuable field-scale information for the design of vadose zone monitoring systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Regulation and Practical Implementation of Analyses of Inadvertent Human Intrusion - 20169

Recommendations from the International Commission for Radiological Protection (ICRP) and the International Atomic Energy Agency (IAEA) identify the need to consider potential inadvertent human intrusion into a near-surface radioactive waste disposal facility when developing limits for radionuclide concentrations that can be disposed. The recommendations also provide perspective on expectations for performance criteria and general assumptions for such analyses. Inadvertent human intrusion analyses are conducted to address the potential failure of institutional controls and loss of memory of a disposal facility. The analyses consider potential consequences of human actions that result in unknowingly bringing waste to the surface. Inadvertent human intrusion scenarios consider potential impacts to someone involved in an activity that actually disturbs the waste (e.g., drilling or excavation of a basement) or that exposes the person to emanations from the waste (e.g., radioactive gases) and also for the case where there may be longer term exposures to waste that has been brought to the surface. In practice, inadvertent human intrusion analyses have proven to be a critical consideration for the development of waste classification systems and for the determination of disposal requirements and limitations on wastes that can be disposed at shallow depths. The IAEA implemented a project on Human Intrusion in the context of Disposal of Radioactive waste (HIDRA) to further explore the regulatory expectations and practical implementation of analyses of potential inadvertent human intrusion. The paper begins with a discussion of international recommendations related to consideration of inadvertent human intrusion and then summarizes examples of some topical considerations related to addressing inadvertent human intrusion that are being discussed as part of the second phase of the HIDRA project. The topical considerations are planned to be addressed in a formal IAEA publication. All information in this paper simply reflects on-going project discussions and no formal recommendations are implied for these topical considerations at this time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Migration and Swelling in Engineered Barrier Materials for Radioactive Waste Disposal

Deep, underground repositories are needed to isolate radioactive waste from the biosphere. Because bentonite is an integral component of many multibarrier repository systems, information on the hydraulic behavior of bentonite is crucial for modeling the long-term viability of such systems. In this paper the hydraulic behavior of bentonite samples was analyzed as a function of aggregate size, and samples were subjected to hydrothermal treatments involving contact with NaCl, KCl, and deionized water. Neutron and X-ray imaging were used to quantify water sorption into packed bentonite samples and bentonite swelling into the water column. The distance between the original clay-water interface and the wetting front was determined as a function of time. Average water uptake exhibited a square-root-of-time dependence in freshly prepared samples, but more variable rates were observed for samples previously in contact with water. The radiography was supported by small-angle neutron scattering analysis and ultra-small-angle neutron scattering analysis of aggregate size distributions and by inelastic neutron scattering to understand the physicochemical environment of the sorbed water. Results showed that hydrothermal treatment with KCl had the greatest effect of increased water transport in the bentonite, possibly as a result of the interaction of K + with smectite layers in the clay.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Safety [Vol. 32, No. 4, October-December 1991]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 477 Report on the International Symposium on the Use of Probabilistic Safety Assessment for Operational Safety—PSA '91, S. Chakraborty and M. Khatib-Rahbar; 488 Good Relationships Are Pivotal in Nuclear Data Bases, A. S. Heger and B. V. Koen; 494 Technical Note: The Interagency Nuclear Safety Review Panel's Evaluation of the Ulysses Space Mission, J. A. Sholtis, Jr., D. A. Huff, L. B. Gray, N. P. Klug, and R. O. Winchester; ACCIDENT ANALYSIS: 502 The Severe Accident Analysis Program for the Savannah River Nuclear Production Reactors, M. L. Hyder; CONTROL AND INSTRUMENTATION: 511 A Framework for Selecting Suitable Control Technologies for Nuclear Power Plant Systems, R. A. Kisner; DESIGN FEATURES: 521 Containments for Gas-Cooled Power Reactors History and Status, P.W. Williams; ENVIRONMENTAL EFFECTS: 537 Indoor Radon: A Natural Risk, N. H. Harley and J.H. Harley; On the Importance of the Atmospheric Parameters in the Fission Products Distribution of a Severe Reactor Accident, M. C. Barla and A. R. Bayulken; Book Review: Health Effects of Exposure to Low Levels of Ionizing Radiation BEIR V, C. R. Richmond; WASTE AND SPENT FUEL MANAGEMENT: 555 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver OPERATING EXPERIENCES: 567 Effects of Component Aging on the Westhinghouse Control Rod Drive System, K. Sullivan and W. Gunther; 577 Reactor Shutdown Experience, Compiled by J. W. Cletcher, 580 Selected Safety-Related Events, Compiled by G. A. Murphy; 582 Operating U 8 Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver, RECENT DEVELOPMENTS: 596 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 610 Reports, Standards, and Safety Guides, D. S. Queener; 614 Proposed Rule Changes as of June 30, 1991; ANNOUNCEMENTS: 520 Workshop on PC PRAISE: A Probabilistic Fracture Mechanics Personal Computer Code for Nuclear Power Plant Piping Reliability Assessment; 536 Fifth Workshop on Nuclear Power Plant Containment Integrity; 624 New OECD "International Information System on Occupational Exposure (ISOE)"; 625 Harvard School of Public Health Announces Short Courses; 625 Eighth Power Plant Dynamics, Control and Testing Symposium; 626 Second Training Course on Off-Site Emergency Planning and Response for Nuclear Accidents; 618 The Authors; 622 Reviewers of Nuclear Safety, Vol 32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗