Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

CROCUS Low Cost All-in-One Weather Station AMB-002 Data Argonne National Laboratory Prairie Site

The Ambient Weather WS-2902D (AMB) is a low cost weather station that has become very useful for filling data gaps in harder to deploy locations. These low cost weather stations collect 13 second data, which is averaged to a five minute data output available to users through an API key. The data files contain measurements for precipitation, temperature, wind chill/heat index, relative humidity, dew point, UV index, solar radiation, wind speed, wind direction, wind gust, and with an external particulate matter 2.5 (PM 2.5) sensor. Having all of these measurements in one condense system allows for fast deploying and dense network capabilities. Three of the AMB weather stations were deployed at the Argonne Testbed for Multiscale Observational Science (ATMOS), a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The instruments are denoted by their three digit identifier (CMS-AMB-xxx) format. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (atmos), instrument name (CMS-AMB-002), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or ACT-DOE.

54 ENVIRONMENTAL SCIENCES↗

CROCUS Low Cost All-in-One Weather Station AMB-001 Data Argonne National Laboratory Prairie Site

The Ambient Weather WS-2902D (AMB) is a low cost weather station that has become very useful for filling data gaps in harder to deploy locations. These low cost weather stations collect 13 second data, which is averaged to a five minute data output available to users through an API key. The data files contain measurements for precipitation, temperature, wind chill/heat index, relative humidity, dew point, UV index, solar radiation, wind speed, wind direction, wind gust, and with an external particulate matter 2.5 (PM 2.5) sensor. Having all of these measurements in one condense system allows for fast deploying and dense network capabilities. Three of the AMB weather stations were deployed at the Argonne Testbed for Multiscale Observational Science (ATMOS), a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The instruments are denoted by their three digit identifier (CMS-AMB-xxx) format. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (atmos), instrument name (CMS-AMB-001), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or ACT-DOE.

54 ENVIRONMENTAL SCIENCES↗

CROCUS Low Cost All-in-One Weather Station AMB-004 Data Argonne National Laboratory Prairie Site

The Ambient Weather WS-2902D (AMB) is a low cost weather station that has become very useful for filling data gaps in harder to deploy locations. These low cost weather stations collect 13 second data, which is averaged to a five minute data output available to users through an Application Programming Interface (API) key. The data files contain measurements for precipitation, temperature, wind chill/heat index, relative humidity, dew point, UV index, solar radiation, wind speed, wind direction, wind gust, and with an external particulate matter 2.5 (PM 2.5) sensor. Having all of these measurements in one condense system allows for fast deploying and dense network capabilities. Three of the AMB weather stations were deployed at the Argonne Testbed for Multiscale Observational Science (ATMOS), a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The instruments are denoted by their three digit identifier (CMS-AMB-xxx) format. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (atmos), instrument name (CMS-AMB-004), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or ACT-DOE.

EARTH SCIENCE > ATMOSPHERE > AEROSOLS > PARTICULAT↗

Systems engineering and integration: Cost estimation and benefits analysis

Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

Dean, ED↗

Value of Landsat in urban water resources planning

The reported investigation had the objective to evaluate the utility of satellite multispectral remote sensing in urban water resources planning. The results are presented of a study which was conducted to determine the economic impact of Landsat data. The use of Landsat data to estimate hydrologic model parameters employed in urban water resources planning is discussed. A decision regarding an employment of the Landsat data has to consider the tradeoff between data accuracy and cost. Bayesian decision theory is used in this connection. It is concluded that computer-aided interpretation of Landsat data is a highly cost-effective method of estimating the percentage of impervious area.

Jackson, T. J.↗

Electrical Infrastructure Cost Model for Marine Energy Systems

The National Renewable Energy Laboratory's Electrical Infrastructure Cost Model is an Excel-based tool designed to estimate the electrical infrastructure costs of marine energy components and subsystems. It incorporates data collected from offshore wind projects, utility projects, and other relevant sources to provide accurate and comprehensive cost projections. With its user-friendly interface, the model allows users to input various parameters related to the system array, electrical cables, and substations. By leveraging industry data, cost trends, and technological advancements, the model generates outputs that include system array sizing, electrical cable specifications and costs, substation specifications and costs, and total electrical infrastructure costs. One of the notable strengths of the model is its flexibility in covering multiple-orders-of-magnitude scaled systems, accommodating projects ranging from proof-of-concept or pilot-scale installations to large-scale offshore systems. By collecting data largely from offshore wind reports and utility projects, the model incorporates real-world conditions and accounts for industry-specific factors. It incorporates cost trends and sizing relationships to deliver cost estimations for electrical infrastructure components, such as electrical cables and substation equipment.

16 TIDAL AND WAVE POWER↗

Space Station Furnace Facility. Volume 3: Program cost estimate

The approach used to estimate costs for the Space Station Furnace Facility (SSFF) is based on a computer program developed internally at Teledyne Brown Engineering (TBE). The program produces time-phased estimates of cost elements for each hardware component, based on experience with similar components. Engineering estimates of the degree of similarity or difference between the current project and the historical data is then used to adjust the computer-produced cost estimate and to fit it to the current project Work Breakdown Structure (WBS). The SSFF Concept as presented at the Requirements Definition Review (RDR) was used as the base configuration for the cost estimate. This program incorporates data on costs of previous projects and the allocation of those costs to the components of one of three, time-phased, generic WBS's. Input consists of a list of similar components for which cost data exist, number of interfaces with their type and complexity, identification of the extent to which previous designs are applicable, and programmatic data concerning schedules and miscellaneous data (travel, off-site assignments). Output is program cost in labor hours and material dollars, for each component, broken down by generic WBS task and program schedule phase.

Source record↗

Managing Model Data Introduced Uncertainties in Simulator Predictions for Generation IV Systems via Optimum Experimental Design

An optimization technique has been developed to select optimized experimental design specifications to produce data specifically designed to be assimilated to optimize a given reactor concept. Data from the optimized experiment is assimilated to generate posteriori uncertainties on the reactor concept’s core attributes from which the design responses are computed. The reactor concept is then optimized with the new data to realize cost savings by reducing margin. The optimization problem iterates until an optimal experiment is found to maximize the savings. A new generation of innovative nuclear reactor designs, in particular fast neutron spectrum recycle reactors, are being considered for the application of closing the nuclear fuel cycle in the future. Safe and economical design of these reactors will require uncertainty reduction in basic nuclear data which are input to the reactor design. These data uncertainty propagate to design responses which in turn require the reactor designer to incorporate additional safety margin into the design, which often increases the cost of the reactor. Therefore basic nuclear data needs to be improved and this is accomplished through experimentation. Considering the high cost of nuclear experiments, it is desired to have an optimized experiment which will provide the data needed for uncertainty reduction such that a reactor design concept can meet its target accuracies or to allow savings to be realized by reducing the margin required due to uncertainty propagated from basic nuclear data. However, this optimization is coupled to the reactor design itself because with improved data the reactor concept can be re-optimized itself. It is thus desired to find the experiment that gives the best optimized reactor design. Methods are first established to model both the reactor concept and the experiment and to efficiently propagate the basic nuclear data uncertainty through these models to outputs. The representativity of the experiment to the design concept is quantitatively determined. A technique is then established to assimilate this data and produce posteriori uncertainties on key attributes and responses of the design concept. Several experiment perturbations based on engineering judgment are used to demonstrate these methods and also serve as an initial generation of the optimization problem. Finally, an optimization technique is developed which will simultaneously arrive at an optimized experiment to produce an optimized reactor design. Solution of this problem is made possible by the use of the simulated annealing algorithm for solution of optimization problems. The optimization examined in this work is based on maximizing the reactor cost savings associated with the modified design made possible by using the design margin gained through reduced basic nuclear data uncertainties. Cost values for experiment design specifications and reactor design specifications are established and used to compute a total savings by comparing the posteriori reactor cost to the a priori cost plus the cost of the experiment. The optimized solution arrives at a maximized cost savings.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tailored Fiber Placement for Complex Preforms

Tailored Fiber Placement (TFP) offers a novel approach to optimize fiber architecture for the fabrication of complex, structural parts not traditionally suitable for advanced composites. This technology not only offers new routes for weight reduction via metal substitution, it also offers cost reduction through minimization of material scrap and reduced labor. This reduction in component weight leads to increased fuel efficiency, and reduced production energy consumption, thereby, helping to achieve the stated IACMI technical goals. This technology leverages centuries of manufacturing development in support of the textile and embroidery industry. One major drawback to this technology is the lack of commercial or non- proprietary structural performance data and robust analytical tools used to optimize fiber architecture and predict performance. This project was structured to utilize common sub-element features to validate analytical performance tools, generate performance data, and gather cost and performance data on components of interest. This project was designed to give industry sponsors the confidence and ability to take full advantage of TFP to fabricate primary, highly loaded structure and integrate features such as metallic fasteners. The project focused principally on the use of high strength carbon fiber, such as T700, and the use of aerospace epoxy resin matrix to primarily support development of new composite applications in vehicle, aerospace, and industrial markets. This project applied previously developed analytical tools to predict the performance of TFP produced parts. This work focused on developing the pipeline to characterize material in order to accurately predict component performance when modifying the TFP print paths and stitch density. This focused on experimental characterization via standardized ASTM testing, alongside experimental testing of more representative service components by testing curved beam strength, beam shear performance, a large scale TFP lug, and ultimately designing a fully TFP clip bracket that reduced weight and cost compared to a traditional metallic component. The new knowledge gained from this program included: 1) development and demonstration of novel analytical tools applied to analysis of TFP preforms; 2) development and demonstration of a building block approach using coupons and sub-elements to optimize the design of a more complex component; 3) demonstration that optimized fiber orientation using TFP can exceed performance of conventional textile composite materials and can open new applications currently limited to metallic components; 4) Demonstration of performance and cost benefits of the TFP process as compared to metallic and conventional textile composites. Recommendations for follow-on work include development of design allowables to assess the impact of high temperature/moisture exposure or saturation during loading, tracking the impact of stitching needle wear on the performance of parts and ability to stitch thicker preforms, using TFP preforms as local reinforcement at areas of bearing or complex loading, and topology optimization of components by tow steering. The expertise developed during the course of this project can be leveraged to provide commercial engineering design and fabrication services using TFP. UDRI is in the process of formalizing their partnership with Spintech, who will serve as the commercialization partner for this technology and provide molding services and deliver finished components to the end user. UDRI will continue to produce the preforms until the economics allow Spintech to procure its own TFP equipment or lease UDRI equipment, at which point UDRI will step away from manufacture and serve as the engineering and design lead on product development.

36 MATERIALS SCIENCE↗

Cambium 2022 Scenario Descriptions and Documentation

The National Renewable Energy Laboratory’s (NREL’s) Cambium data sets are annually released sets of simulated hourly emission, cost, and operational data for a range of modeled futures of the U.S. electric sector with metrics designed to be useful for long-term decision making. The 2022 Cambium data set is the third annual release. The data sets are a companion product to NREL’s Standard Scenarios, which are likewise released annually and are a set of projections of how the U.S. electric sector could evolve across a suite of different potential futures, but covering more scenarios with less temporal granularity. In this documentation, we describe Cambium 2022’s scenarios (Section 3), define the metrics (Section 5), and document the Cambium-specific methods for calculating those metrics (Section 6).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cambium 2023 Scenario Descriptions and Documentation

The National Renewable Energy Laboratory's (NREL's) Cambium data sets are annually released sets of simulated hourly emission, cost, and operational data for a range of modeled futures of the U.S. electric sector with metrics designed to be useful for long-term decision- making. The 2023 Cambium data set is the fourth annual release. The data sets are a companion product to NREL's Standard Scenarios, which are likewise released annually and are a set of projections of how the U.S. electric sector could evolve across a suite of different potential futures, but covering more scenarios with less temporal granularity (Gagnon et al. 2024). Information about Cambium and related publications can be found at https://www.nrel.gov/analysis/cambium.html, and the Cambium data sets can be viewed and downloaded at https://scenarioviewer.nrel.gov/. In this documentation, we describe Cambium 2023's scenarios, define the metrics, and document the Cambium-specific methods for calculating those metrics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Selection of the Ground Segment for the Next Generation Space Telescope (NGST) Flight Demonstrator (Nexus)

Nexus was a technology demonstrator project that was designed to bridge from the Hubble Space Telescope (HST) to its successor, the Next Generation Space Telescope (NGST). This paper focuses on the process used in designing the ground segment for Nexus and the lessons learned in its development. Ground station cost drivers were: (1) Contact time, (2) Cost of transporting data between the ground stations and control center, and (3) Cost savings via ground automation. We found that reducing the communication requirement in just the first 100 days could have reduced the total ground station cost by 40%. Contact time cost dwarfed the cost trade between automation development and off-shift operations personnel. Real-time Telemetry and Control (T&C) system analysis was divided into: (1) Potential reuse of the Nexus real-time (T&C) system for NGST, (2) Feasibility of using a 'Finite State-Based Modeling' product, and (3) Selecting a Commercial Off the Shelf (COTS) versus Government Off The Shelf (GOTS) products. We found that each of the products evaluated in detail (ASIST, EPOCH 2000, and ITOS) could adequately support basic mission requirements. Lessons learned were: (1) Include operations at the beginning of the mission, and (2) Develop an operations concept as soon as possible.

Gal-Edd, Jonathan↗

Use of Schema on Read in Earth Science Data Archives

Traditionally, NASA Earth Science data archives have file-based storage using proprietary data file formats, such as HDF and HDF-EOS, which are optimized to support fast and efficient storage of spaceborne and model data as they are generated. The use of file-based storage essentially imposes an indexing strategy based on data dimensions. In most cases, NASA Earth Science data uses time as the primary index, leading to poor performance in accessing data in spatial dimensions. For example, producing a time series for a single spatial grid cell involves accessing a large number of data files. With exponential growth in data volume due to the ever-increasing spatial and temporal resolution of the data, using file-based archives poses significant performance and cost barriers to data discovery and access. Storing and disseminating data in proprietary data formats imposes an additional access barrier for users outside the mainstream research community. At the NASA Goddard Earth Sciences Data Information Services Center (GES DISC), we have evaluated applying the schema-on-read principle to data access and distribution. We used Apache Parquet to store geospatial data, and have exposed data through Amazon Web Services (AWS) Athena, AWS Simple Storage Service (S3), and Apache Spark. Using the schema-on-read approach allows customization of indexing spatially or temporally to suit the data access pattern. The storage of data in open formats such as Apache Parquet has widespread support in popular programming languages. A wide range of solutions for handling big data lowers the access barrier for all users. This presentation will discuss formats used for data storage, frameworks with This presentation will discuss formats used for data storage, frameworks with support for schema-on-read used for data access, and common use cases covering data usage patterns seen in a geospatial data archive.

cloud applications↗

Protein Data Bank (PDB): Fifty-three years young and having a transformative impact on science and society

This review article describes the co-evolution of structural biology as a discipline and the Protein Data Bank (PDB), established in 1971 as the first open-access data resource in biology by like-minded structural scientists. As the PDB archive grew in size and scope to encompass macromolecular crystallography, NMR spectroscopy, and cryo-electron microscopy, new technologies were developed to ingest, validate, curate, store, and distribute the information. Community engagement ensured that the needs of structural biologists (data depositors) and data consumers were met. Today, the archive houses more than 230,000 experimentally determined structures of proteins, nucleic acids, and macromolecular machines and their complexes with one another and small-molecule ligands. Aggregate costs of PDB data preservation are ~1% of the cost of structure determination. The enormous impact of PDB data on basic and applied research and education across the natural and medical sciences is presented and highlighted with illustrative examples. Enablement of de novo protein structure prediction (AlphaFold2, RoseTTAfold, OpenFold, etc.) is the most widely appreciated benefit of having a corpus of rigorously validated, expertly curated 3D biostructure data.

bioinformatics↗

RED-BL: Evaluating dynamic workload relocation for data center networks

In this study, we present RED-BL (Relocate Energy Demand to Better Locations), a framework to minimize the electricity cost for operating data center networks over consecutive intervals of fixed duration. Within each interval, RED-BL provides a mapping of workload to a set of geographically distributed data centers. To this end, RED-BL uses the geographical and temporal variations in electricity prices as exhibited by electrical energy markets. In addition, we incorporate the transition costs associated with a change in workload mapping from one interval to the next, over a planning window comprising multiple such intervals. This results in a sequence of workload mappings that is optimal over the entire planning window, even though the workload mapping in a given interval may not be locally optimal. Our evaluation of RED-BL uses electricity prices from the US markets and workload traces from live Internet applications with millions of users. We find that RED-BL can reduce the electric bill by as much as 45% compared to the case when the workload is uniformly distributed. When compared to existing workload relocation solutions, for a wide range of data center deployment sizes, RED-BL achieves electricity cost savings that are 8.28% higher, on average. This seemingly modest reduction can save millions of dollars for the operators. The cost of this saving is an inexpensive computation at the start of each planning window.

97 MATHEMATICS AND COMPUTING↗

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

Manned orbital systems concept study. Book 4: Programmatics for extended-duration missions

The cost estimates, schedule data, and funding distributions generated in the Manned Orbital Systems Concepts (MOSC) study are presented. The overall objectives were to examine the requirements for, and to describe, a cost-effective concept for an orbital facility capable of supporting manned operations in earth orbit beyond the 7-to-30-day mission duration provided by the Shuttle/Spacelab system. The cost, schedule, and other programmatic data were developed to provide information useful for their long-range planning activities. The major portion of the data documented and discussed consists of project- and system-level schedule and funding information and also project-, system-, and subsystem-level cost summaries.

Source record↗

Multi-mission ground data systems - breakthroughs and challenges

Given the cost-constrained nature of JPL Flight Projects, especially Discovery Class missions, there is more and more pressure to reduce the costs associated with mission operations, particularly the costs for the Ground Data System. This paper explores the successes (and failures) of using the Mission Management Office (MMO) GDS team to provide a common set of services, tools, procedures, and products to JPL Flight Projects.

GDS↗