Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Constraint programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Disjunctive linear separation conditions and mixed-integer formulations for aircraft conflict resolution

In this paper, we address the aircraft conflict resolution problem in air traffic control. We introduce new mixed-integer programming formulations for aircraft conflict resolution with speed, heading and altitude control which are based on disjunctive linear separation conditions. We first examine the two-dimensional aircraft conflict resolution problem with speed and heading control represented as continuous decision variables. We show that the proposed disjunctive linear separation conditions are equivalent to the classical nonlinear conditions for aircraft separation. Further, we characterise conflict-free trajectories based on aircraft velocity bounds and propose a simple pre-processing algorithm to identify aircraft pairs which are either always conflict-free, or which cannot be separated using speed and heading control only. We then incorporate altitude control and propose a lexicographic optimisation formulation that aims to minimise the number of flight level changes before resolving outstanding conflicts via two-dimensional velocity control. The proposed mixed-integer programming formulations are nonconvex, and we propose convex relaxations, decomposition methods and constraint generation algorithms to solve the two-dimensional and lexicographic optimisation formulations to guaranteed optimality. Numerical experiments on four types of conflict resolution benchmarking instances are conducted to test the performance of the proposed mixed-integer formulations. Further, the proposed method is compared against two benchmarks based on state-of-the-art approaches for the aircraft conflict resolution problem. Our numerical results show that the proposed method largely outperforms both benchmarks in terms of runtime and is able to solve significantly more instances to global optimality.

97 MATHEMATICS AND COMPUTING↗

Potential of the Julia Programming Language for High Energy Physics Computing

Research in high energy physics (HEP) requires huge amounts of computing and storage, putting strong constraints on the code speed and resource usage. To meet these requirements, a compiled high-performance language is typically used; while for physicists, who focus on the application when developing the code, better research productivity pleads for a high-level programming language. A popular approach consists of combining Python, used for the high-level interface, and C++, used for the computing intensive part of the code. A more convenient and efficient approach would be to use a language that provides both high-level programming and high-performance. The Julia programming language, developed at MIT especially to allow the use of a single language in research activities, has followed this path. In this paper the applicability of using the Julia language for HEP research is explored, covering the different aspects that are important for HEP code development: runtime performance, handling of large projects, interface with legacy code, distributed computing, training, and ease of programming. The study shows that the HEP community would benefit from a large scale adoption of this programming language. The HEP-specific foundation libraries that would need to be consolidated are identified.

97 MATHEMATICS AND COMPUTING↗

Distributed Spatiotemporal Motion Planning for Spacecraft Swarms in Cluttered Environments

This paper focuses on trajectory planning for spacecraft swarms in cluttered environments, like debris fields or the asteroid belt. Our objective is to reconfigure the spacecraft swarm to a desired formation in a distributed manner while minimizing fuel and avoiding collisions among themselves and with obstacles. In our prior work we proposed a novel distributed guidance algorithm for spacecraft swarms in static environments. In this paper, we present the Multi-Agent Moving-Obstacles Spherical Expansion and Sequential Convex Programming (MAMO SE-SCP) algorithm that extends our prior work to include spatiotemporal constraints such as time-varying, moving obstacles and desired time-varying terminal positions. In the MAMO SE-SCP algorithm, each agent uses a spherical-expansion-based sampling algorithm to cooperatively explore the time-varying environment, a distributed assignment algorithm to agree on the terminal position for each agent, and a sequential-convex-programming-based optimization step to compute the locally-optimal trajectories from the current location to the assigned time-varying terminal position while avoiding collision with other agents and moving obstacles. Simulation results demonstrate that the proposed distributed algorithm can be used by a spacecraft swarm to achieve a time-varying, desired formation around an object of interest in a dynamic environment with many moving and tumbling obstacles.

Bandyopadhyay, Saptarshi↗

Strategies for Validation Testing of Ground Systems

In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)

Annis, Tammy↗

Use of optimization to predict the effect of selected parameters on commuter aircraft performance

An optimizing computer program determined the turboprop aircraft with lowest direct operating cost for various sets of cruise speed and field length constraints. External variables included wing area, wing aspect ratio and engine sea level static horsepower; tail sizes, climb speed and cruise altitude were varied within the function evaluation program. Direct operating cost was minimized for a 150 n.mi typical mission. Generally, DOC increased with increasing speed and decreasing field length but not by a large amount. Ride roughness, however, increased considerably as speed became higher and field length became shorter.

Wells, V. L.↗

The usage of substructuring analyses in the Get Away Special (GAS) program

The use of automatic multi-stage substructing analysis is demonstrated for a hypothetical case of a GAS container supported by structural channels with a simulated experimental package inside the container. The GAS program purpose is stated and potential candidate structures to support experimental packages are discussed. The GAS container model and the substructuring analysis capabilities of NASTRAN make it possible to study the experiments inside the container as well as the design constraints resulting from the support structures holding the containers. The use of substructuring in the GAS program could be an important factor in increasing the number of flight opportunities.

Ferragut, N. J.↗

Program Predicts Time Courses of Human/Computer Interactions

CPM X is a computer program that predicts sequences of, and amounts of time taken by, routine actions performed by a skilled person performing a task. Unlike programs that simulate the interaction of the person with the task environment, CPM X predicts the time course of events as consequences of encoded constraints on human behavior. The constraints determine which cognitive and environmental processes can occur simultaneously and which have sequential dependencies. The input to CPM X comprises (1) a description of a task and strategy in a hierarchical description language and (2) a description of architectural constraints in the form of rules governing interactions of fundamental cognitive, perceptual, and motor operations. The output of CPM X is a Program Evaluation Review Technique (PERT) chart that presents a schedule of predicted cognitive, motor, and perceptual operators interacting with a task environment. The CPM X program allows direct, a priori prediction of skilled user performance on complex human-machine systems, providing a way to assess critical interfaces before they are deployed in mission contexts.

Vera, Alonso↗

New evidence favoring multilevel decomposition and optimization

A new multilevel optimization technique based on a global sensitivity matrix which uses behavior variables in addition to design variables and constraints to decompose the problem is proposed. The technique simplifies the decomposition of the design problem and the programming task and improves the convergence speed of multilevel optimization compared to conventional optimization. The technique is particularly well suited to problems with large numbers of design variables and with computationally expensive constraints.

Padula, Sharon L.↗

Chance-constrained Service Restoration for Distribution Networks with Renewables

Power systems operation is facing great challenges from natural disasters and cyber-attacks. It is critical but also difficult to enhance the reliability and resilience against extreme events. To better response to inevitable outages or blackouts, service restoration in distribution networks is important to minimize the disastrous impacts of catastrophic events. The increasing penetration of distributed energy resources (DERs) provides new opportunities to expedite the restoration process. However, the coordination with conventional distribution system control devices and the uncertainty and variability of intermittent renewable energy resources requires new operation and control strategies for distribution service restoration (DSR). This paper develops an optimal bottom-up DSR strategy by coordinating DERs with voltage regulators and capacitor banks. The chance-constrained (CC) programming approach is used to model the probabilistic output limit of solar radiation and PV generation. The Markov's inequality and Latin hypercube sampling techniques are applied to convert and incorporate the chance constraints into the DSR optimization problem. The CC-DSR problem is formulated as a mixed integer convex programming problem, considering various operational cost functions and bidirectional three-phase unbalanced load flow. Simulation results on the modified IEEE 13-node test feeder system demonstrate the effectiveness and flexibility of the bottom-up DSR strategy.

Chance constrained optimization, Distribution serv↗

A Roadmap for using Agile Development in a Traditional System

I. Ensemble Development Group: a) Produces activity planning software for in spacecraft; b) Built on Eclipse Rich Client Platform (open source development and runtime software); c) Funded by multiple sources including the Mars Technology Program; d) Incorporated the use of Agile Development. II. Next Generation Uplink Planning System: a) Researches the Activity Planning and Sequencing Subsystem for Mars Science Laboratory (APSS); b) APSS includes Ensemble, Activity Modeling, Constraint Checking, Command Editing and Sequencing tools plus other uplink generation utilities; c) Funded by the Mars Technology Program; d) Integrates all of the tools for APSS.

uplink planning systems↗

Modeling transmission line constraints in two-stage robust unit commitment problem

Integration of renewable energy sources and demand response poses new challenges to system operators as they increase the uncertainty of the power supply and demand. Recently, robust optimization techniques are applied to the unit commitment problem with uncertainty as an alternative to the stochastic programming approaches. However, it remains challenging to solve the robust unit commitment model with full transmission line constraints. In this paper, we propose novel acceleration techniques for solving two-stage robust unit commitment problem with consideration of full transmission line constraints. We use 1) the cutting-plane algorithm for the master problem, which dynamically includes critical transmission line constraints, and 2) column-generation methods, including the branch-and-price-and-cut algorithm and heuristic approaches, for the subproblems, which add only necessary transmission line dual variables on the fly. Furthermore, computational results for the modified IEEE 118-bus system show that the combination of the cutting-plane algorithm and the heuristic column-generation approach greatly reduces the total solution time of the two-stage robust unit commitment problem.

Heuristic algorithms↗

Structural tailoring of advanced turboprops

A computer program has been developed for the performance of numerical optimizations of highly swept propfan blades by minimizing an objective function that is defined either as direct operating cost or the aeroelastic difference between a blade and its scaled model. Three component analysis categories are employed: an optimization algorithm, approximate analysis procedures for objective function and constraint evaluation, and refined analysis procedures for optimum design validation. The analyses conducted by the program encompass aerodynamic efficiency evaluation, finite element stress and vibration analysis, acoustics, flutter, and forced response life prediction.

Brown, K. W.↗

Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site (Rev.3)

U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, requires that performance assessments (PAs) and composite analyses (CAs) for low-level radioactive waste (LLW) disposal facilities be maintained by the responsible field office. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). The plan is based on DOE Order 435.1 Radioactive Waste Management (DOE 2007), DOE Manual 435.1-1, Radioactive Waste Management Manual (DOE 2011), and DOE Standard DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation (DOE 2017). The facility’s Disposal Authorization Statement (DAS) specifies conditions for the continuing operation of a LLW facility. The DAS is issued based on a review of the facility's PA, CA, the maintenance plan, preliminary closure plan, and preliminary monitoring plan. The DAS specifies the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. The Maintenance Plan uses an Unreviewed Disposal Question (UDQ)/Unreviewed Composite Analysis Question (UCAQ) change control process to identify, evaluate, and control planned or discovered changes affecting the PA, CA, DAS, or other documents composing the Radioactive Waste Management Basis (RWMB). The UDQ/UCAQ process uses the PA and CA GoldSim models to calculate updated results, assess the significance of changes, and to assess the need to revise the PA, CA, or DAS. In addition to the change control process, the Maintenance Plan requires an annual review of all changes and an annual assessment of the need to revise RWMB documents, plans, and programs. The cumulative effect of all changes is assessed annually by preparing a revised PA and CA baseline model that is used to update PA and CA results. The updated results are used to assess compliance with the PA performance objectives and the CA dose constraint, and to assess the need to revise the PAs, CAs, and other documents, plans, and programs supporting the RWMB. An Annual Summary Report documenting the results and conclusions of the annual review is prepared and submitted to DOE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applications of a quadratic extended interior penalty function for structural optimization

A quadratic extended interior penalty function formulation especially well suited for second-order unconstrained optimization procedures is presented. Analytical derivatives of constraints and an approximate analysis technique are used. Minimum-mass design results are presented which indicate that the combination of these procedures can help make mathematical programming a useful optimization tool for large-order structural design problems with a large number of design variables and multiple constraints. Examples include statically loaded high- and low-aspect-ratio wings simultaneously subjected to stress, displacement, minimum gage and, in some cases, maximum strain constraints.

Haftka, R. T.↗

An optimality criterion for sizing members of heated structures with temperature constraints

A thermal optimality criterion is presented for sizing members of heated structures with multiple temperature constraints. The optimality criterion is similar to an existing optimality criterion for design of mechanically loaded structures with displacement constraints. Effectiveness of the thermal optimality criterion is assessed by applying it to one- and two-dimensional thermal problems where temperatures can be controlled by varying the material distribution in the structure. Results obtained from the optimality criterion agree within 2 percent with results from a closed-form solution and with results from a mathematical programming technique. The thermal optimality criterion augments existing optimality criteria for strength and stiffness related constraints and offers the possibility of extension of optimality techniques to sizing structures with combined thermal and mechanical loading.

Rao, G. V.↗

Spike: Artificial intelligence scheduling for Hubble space telescope

Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

Johnston, Mark↗

Mass variance from archival X-ray properties of Dark Energy Survey Year-1 galaxy clusters

ABSTRACT Using archival X-ray observations and a lognormal population model, we estimate constraints on the intrinsic scatter in halo mass at fixed optical richness for a galaxy cluster sample identified in Dark Energy Survey Year-One (DES-Y1) data with the redMaPPer algorithm. We examine the scaling behaviour of X-ray temperatures, TX, with optical richness, λRM, for clusters in the redshift range 0.2 < z < 0.7. X-ray temperatures are obtained from Chandra and XMM observations for 58 and 110 redMaPPer systems, respectively. Despite non-uniform sky coverage, the TX measurements are $\gt 50{{\ \rm per\ cent}}$ complete for clusters with λRM > 130. Regression analysis on the two samples produces consistent posterior scaling parameters, from which we derive a combined constraint on the residual scatter, $\sigma _{\ln T \, |\, \lambda }= 0.275 \pm 0.019$. Joined with constraints for TX scaling with halo mass from the Weighing the Giants program and richness–temperature covariance estimates from the LoCuSS sample, we derive the richness-conditioned scatter in mass, $\sigma _{\ln M \, |\, \lambda }= 0.30 \pm 0.04\, _{({\rm stat})} \pm 0.09\, _{({\rm sys})}$, at an optical richness of approximately 100. Uncertainties in external parameters, particularly the slope and variance of the TX–mass relation and the covariance of TX and λRM at fixed mass, dominate the systematic error. The $95{{\ \rm per\ cent}}$ confidence region from joint sample analysis is relatively broad, $\sigma _{\ln M \, |\, \lambda }\in [0.14, \, 0.55]$, or a factor 10 in variance.

79 ASTRONOMY AND ASTROPHYSICS↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources

Integrating a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problems requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (control-lable DERs), including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperforms other benchmark controllers regarding computation time without compromising operational performance.

DER↗