Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users’ Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation SAPHIRE Version 8 Final Report Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the SAPHIRE version 8 software product. SAPHIRE version 8 is being developed with a phased or cyclic iterative rapid application development methodology. Due to this approach, a similar approach has been taken for the IV&V activities on each vital software object. IV&V and Software Quality Assurance (SQA) activities occur throughout the entire development life cycle and therefore, will be required through the full development of SAPHIRE version 8. Later phases of the software life cycle, the operation and maintenance phases, are not applicable in this effort since the IV&V is being done prior to releasing Version 8.

99 GENERAL AND MISCELLANEOUS↗

Commissioning a Vibrating Wire System for Quadrupole Fiducialization

Quadrupoles will be placed between the undulator segments in LCLS to keep the electron beam focused as it passes through. The quadrupoles will be assembled with their respective undulator segments prior to being placed into the tunnel. Beam alignment will be used to center the quadrupoles, along with the corresponding undulators, on the beam. If there is any displacement between the undulator and the quadrupole axes in the assemblies, the beam will deviate from the undulator axis. If it deviates by more than 80{micro}m in vertical or 140{micro}m in horizontal directions, the undulator will not perform as required by LCLS. This error is divided between three sources: undulator axis fiducialization, quadrupole magnetic axis fiducialization, and assembly of the two parts. In particular, it was calculated that the quadrupole needs to be fiducialized to within 25{micro}m in both vertical and horizontal directions. A previous study suggested using a vibrating wire system for finding the magnetic axis of the quadrupoles. The study showed that the method has high sensitivity (up to 1{micro}m) and laid out guidelines for constructing such a system. There are 3 steps in fiducializing the quadrupole with the vibrating wire system. They are positioning the wire at the magnet center (step 1), finding the wire with position detectors (step 2), and finding the quadrupole tooling ball positions relative to the position detector tooling balls (step 3). A previous study investigated the error associated with each step by using a permanent quadrupole magnet on an optical mover system. The study reported an error of 11{micro}m for step 1 and a repeatability of 4{micro}m for step 2. However, the set up used a FARO arm to measure tooling balls and didn't allow to accurately check step 2 for errors; an uncertainty of 100{micro}m was reported. Therefore, even though the repeatability was good, there was no way to check that the error in step 2 was small. Following the recommendations of that study, we used a CMM (Coordinate Measuring Machine) instead of the FARO arm for measuring the tooling balls. In addition, a roller cam positioner system replaced the optical movers for moving the quadrupole. With the exception of the quadrupole itself, the system was identical to what will be used in fiducializing the undulator quadrupoles. In this study, we investigate the new vibrating wire set up, including the error associated with each step of fiducialization. A vibrating wire system was constructed to fiducialize the quadrupoles between undulator segments in the LCLS. This note is a continuation of previous work to study the ability of the system to fulfill the fiducialization requirements.

43 PARTICLE ACCELERATORS↗

The New Muon $g-2$ Experiment at Fermilab: Commissioning and First Physics Data Taking

Extremely precise measurements of the muon magnetic dipole moment two decades ago revealed a tantalizing hint of an anomalous excess at the sub-ppm level over Standard Model predictions. This ~3.5 sigma discrepancy has been widely cited due to the anomaly's potential for constraining many natural extensions to the Standard Model. A new experiment at the Fermi National Accelerator Laboratory will be able to refine this measurement by a factor of four over the next few years by measuring the spin precession of 3.1 GeV muons trapped in a precisely tuned magnetic field. This talk offers an update on the early stages of the experiment and our expectations for accumulating the required statistics.

Stapleton, James↗

Exoplanets in the Antarctic Sky. IV. Dual-band Photometry of Variables Found by the CSTAR-II Commissioning Survey at the North Sky

From the experiences learned in three decades of exoplanet search, wide-field transit surveys have proven to be one of the most effective ways to detect exoplanets. Wide field of view, however, suffers from high false-positive rates caused by blended eclipsing binaries. The chromaticity in eclipse depth is an effective feature to distinguish low-depth eclipsing binaries from transiting exoplanets, making multiple-band photometry follow-up advantageous before a target is passed onto more expensive spectroscopic follow-up. Moreover, a multiple-band photometric survey is itself a powerful method to find and vet planetary candidates and narrow down the candidate list of high-priority targets. In this work, we report the first results of a dual-band (Sloan-g and -i) wide-field photometry survey—the Chinese Small Telescope ARray II (CSTAR-II), an updated version of the original CSTAR. As a key component of the Chinese Exoplanet Searching Program from Antarctica, CSTAR-II has been tested thoroughly at a remote arctic site near Mohe during the winter of 2014. In total, 13,531 light curves with the best overall photometric precision of ∼3 mmag were extracted from 7721 stars in the Sloan-g and -i bands. Using a robust method, we have detected 63 variables, of which 48 are newly discovered. The dual-band photometric results as well as the stellar properties of the detected sources are provided in this work.

79 ASTRONOMY AND ASTROPHYSICS↗

Heavy Duty Natural Gas Single Cylinder Research Engine Installation, Commissioning, and Baseline Testing

Natural Gas (NG) Internal Combustion Engines (ICE) are a promising alternative to diesel engines for on-road heavy-duty applications to reduce greenhouse gas and harmful pollutant emissions. NG engines have not been widely adopted due to the lower thermal efficiency compared with diesel engine counterparts. To develop the base knowledge required to reach the desired efficiency, a Single Cylinder Engine (SCE) is the most effective platform to acquire reliable and repeatable data. A SCE test cell was developed using a Cummins 15-liter six-cylinder heavy-duty engine block modified to fire one cylinder (2.5-liter displacement). A Woodward Large Engine Control Module (LECM) is integrated to permit implementation of real-time advanced combustion control. Intake and exhaust characteristics, fuel composition, and exhaust gas recirculated substitution rate (EGR) are fully adjustable. A high-speed data acquisition system acquires in-cylinder, intake, and exhaust pressure for combustion analysis. The baseline testing shows reliable and consistent results for engine thermal efficiency, indicated mean effective pressure (IMEP), and coefficient of variance of the IMEP over a wide range of operating conditions while achieving effective control of all engine control and operation variables. This test cell will be used to conduct a research program to develop new and innovative control algorithms and CFD optimized combustion chamber designs, allowing ultra-high efficiency and low emissions for NG ICE heavy-duty on-road applications.

03 NATURAL GAS↗