Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

The Energy and Operational Impacts of Using 0-10V Control for LED Streetlights

Lighting systems have historically utilized either a proprietary control method, or one of a handful of standardized methods (e.g., 0-10V, DALI, DMX512) aimed at facilitating vendor interoperability. The utility and market success of the standardized methods has been limited for a variety of reasons. Although 0-10V is presently the most commonly available control interface for indoor and outdoor products in North America – even after the emergence of LED products and “connected lighting systems” with more modern network interfaces and luminaire-level sensors and intelligence – the use of 0-10V methods has significant tradeoffs. For instance, it is difficult to predict relative luminaire light output and input power at any particular control voltage, and performance across luminaires is inconsistent. This study characterizes 23 LED streetlights that claimed dimmability via a 0-10V interface, quantifies the performance variation found in market-available LED drivers, and explores the potential impact of the most recent 0-10V voluntary standard (ANSI C137.1-2022). Notably, the tested products were all manufactured prior to the release of this standard, and thus do not make compliance claims. Variation in response to 0-10V control voltages was expected to be more significant across different make/model luminaires than different units of the same make/model; the test population was structured based on this expectation. The 23 tested luminaires comprised 21 unique make/model streetlights from 14 different manufacturers. Three samples of one make/model streetlight were included in the test population to facilitate a limited exploration of unit-to-unit variation. The 21 unique make/model luminaires contained 20 unique make/model LED drivers from eight different driver manufacturers. Luminaire input power and current were measured at 11 control voltages (0.5 V and 1–10 V in 1 V increments).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Emissions mitigation technology for advanced water-lean solvent-based CO 2 capture processes

This technical final report submitted to DOE/NETL presents all the research activities performed during the entirety of DE-FE0031660 project-Emissions Mitigation Technology for Advanced Water-Lean Solvent-Based CO 2 Capture Processes which spans from October 2018 through March 2022. RTI International has been conducting studies from fundamental and operational aspects to reduce the overall amine emissions from the advanced Water-Lean Solvent (WLS) systems, specifically RTI’s Non-Aqueous Solvent (NAS). This technical final report will highlight the key findings from project which align closely to the project objectives which are: Identify the contribution of vapor loss, entrainment, and aerosols to the overall emissions of water-lean systems; Determine the significance of CO 2 capture system operating parameters to the amine emissions; Develop an emissions model based on critical operating parameters; Evaluate the effectiveness of emissions mitigation devices to reduce the amine emissions to <1 ppm under flue coal-fired flue gas; and, Determine the contribution of the ECTs to the overall CO 2 capture cost. The following are the key findings based on numerous tests using both lab-scale setups and parametric testing performed at RTI’s Bench-scale Gas Absorption System (BsGAS). During the BP1, the aerosol generation system and monitoring equipment were installed at BsGAS to produce and determine the aerosol characteristics during the NAS CO 2 capture process. The aerosol produced by this setup produced aerosols with the peak diameter and concentration of 50 micron and 1.2E10 7 cm -3 , respectively. These particle sizes and concentrations are matched to those observed in the actual coal-fired power plant flue gases and expected to be found at the absorber inlet of the CO 2 capture system. Over 1,300 hours of parametric testing have been conducted to evaluate the impact of the aerosols and operating conditions during the CO 2 capture with NAS on the overall amine emissions in the treated flue gas. At the worse condition tested, the presence of the aerosols in the flue gas could increase the overall emissions by 10X compared to the baseline emissions from NAS’s vapor pressure. CO 2 capture rate was found to be a main factor impacting the overall emissions as well as aerosol size and concentrations in the absorber off-gas. The higher CO 2 capture rate, the higher amine emissions in the treated gas. The temperature difference between the temperature bulge seen in the absorber and the water wash temperature also impacts the particle growth where the larger the temperature difference, the more amine emissions from aerosols in the treated gas. The majority of the aerosols did not grow substantially in the system, and the particle concentrations remained nearly constant between the absorber inlet and wash outlet. Only a small portion of the particles were found to grow significantly. The high efficiency demister with mesh size of 5-10 micron can be installed to remove a portion of the aerosols from the gas stream leaving the water wash. Overall, these results from parametric testing have established the emission baseline and validate our assumption on the need of emission control technologies (ECT) in order to minimize the emissions from the baseline NAS CO 2 capture process. Over 2,000 of BsGAS operating hours was used to investigate a handful of process improvements which led to a selection of the vital few changes that effectively control the amine emissions. These process improvements are lime-coated-filters for absorber gas inlet, advanced demister at the top of the absorber, a second water wash with amine recovery unit were designed, installed, and tested at BsGAS at the end of BP1. The result showed that the NAS CO 2 capture process with these additional emission control devices could lower the amine emission in the treated gas to about 1 ppm using a simulated coal-fire flue gas stream. The main contributor in lowering the amine emission came from the second water wash with amine recovery unit where the amine concentration in the scrubbing water was kept below 2 wt% through a continuous amine removal via an adsorbent bed, resulting in a low amine vapor pressure. The adsorbent bed was regenerated via a direct steam regeneration and the recover amine was returned to the absorber to minimize wastewater and makeup amine. A flue gas generation system was designed and installed during the first half of BP2 to support the emission testing using a real coal-derived flue gas. The system is capable of generating both coal- and natural gas- derived flue gases with the composition of the gaseous species highly resemble to that of the power plant flue gases. The particulates detected in the coal-derived flue gas showed the mean diameter of 1 micron. The CO 2 capture operating was then proceed using the real coal-derived flue gas where the amine emission was controlled to be about 0-3 ppm for the total run time of about 200 hours. Similar testing was conducted with natural gas-derived flue gas and the result showed a highly amine emission of 30 ppm under the total run time of 200 hours. The Principal Component Analysis (PCA) and the Partial Least Squares Projection to Latent Structures (PLS) techniques were applied to the parametric testing data to derive a multivariate statistical model. The model was validated and trained with half of the data collected, and the predictive ability of the model was evaluated using the remaining half of the data. The resulting empirical model was capable of predicting the overall emissions from the NAS process without the ECTs with ±15% accuracy (average absolute deviation, AAD) in BP1. As more emission data were obtained under the real coal-flue gas in the BP2, the model incorporated these new set of data to reflect the final process configuration, operating parameters, and amine emission. This results in the updated empirical model predicting the amine emission from the NAS CO 2 capture process with 84% goodness-of-fit (R 2 ), 85% predictability (Q 2 ), and 15% AAD. The study evaluates the use of RTI’s Non-Aqueous Solvent technology for 90% CO 2 capture from a net 650 MWe pulverized coal power plant, downstream of the flue-gas desulfurization unit. The captured CO 2 has a purity of > 95% CO 2 , and is dried, compressed to 15.3 MPa (2,215 psia), ready for sequestration. The analysis uses Case B12B from the DOE Baseline study on Bituminous Coal, Revision 4 where the Cansolv CO 2 capture plant is replaced by the RTI CO 2 Capture plant. The CO 2 capture plant has been sized to capture >90% CO 2 from flue gas derived from a net 650 MWe supercritical pulverized coal power plant. The CO 2 capture plant is equipped with emission control technologies that limits the amine emissions to < 1 ppm. Two different cases were evaluated for the technoeconomic study. The key difference between the two cases is the regenerator pressure. In Case 1, the regenerator operates at 0.195 MPa (28.3 psia), whereas in Case 2, the regenerator pressure is 0.44 MPa (64 psia) thus removing the need for the first stage of compression of the eight-stage compression train. Results from the TEA are compared against the DOE reference cases for SCPC plant with and without CO 2 Capture (Case B12A and Case B12B of the DOE Baseline study, respectively). Case 2 with CO 2 regeneration at higher pressure results in the lower cost of CO 2 capture. The total capital cost of the capture process has been estimated using 2018 dollars in Aspen Process Economic Analyzer and was estimated to be $579 MM. The capture plant operation leads to a total parasitic power loss rate of 96 MWe, resulting in a decrease in pulverized coal power plant efficiency of 7.8% points. The resulting cost of electric power increases from 64.4 mills/kWh, for no capture, to 97.5 mills/kWh, with 90% capture, an increase of 51% in the COE. The cost of capturing 90% CO 2 was estimated to be $38.2/tonne-CO 2 , and meets the DOE target of $40/t-CO 2 . Emission control technologies (ECT) investigated in this project includes a second water wash with use of activated carbon beds for removal of amine from the wash water prior to recirculation in the water wash. These ECT allow operation of the CO 2 capture plant with < 1 ppm amine emissions with the treated flue gas and contributes to $2.4/t-CO 2 captured. Amine emissions derived from thermal and oxidative degradations were investigated under this project along with the emissions derived from aerosols for the NAS system. The thermally degraded of the lean NAS showed less than 4% decreased of the original total amine content in the NAS at 150 °C while the result obtained at 120 °C showed no drop in total amine content, suggesting that thermal degradation of the NAS is minimal. These results also suggested that the thermally degraded species are not likely formed and contributed to the emissions due to the low regeneration temperature of the NAS at 90-105 °C. The oxidative degradation, on the other hand, could become problematic as some of these oxidative degraded species were observed during the NAS-5 testing at National Carbon Capture Center (NCCC) and SINTEF in our previous project. The rapid screening of selected inhibitors suggested that oxidative degradation of NAS can be suppressed using thiol containing compounds in amounts of at least 1 mol%. The detailed mechanistic degradation pathway was conceived for a specific amine used in NAS formulation during BP2. he reduction of the nitrosamines caused by the NO x present in the flue gas was also examined. The study suggested that the thermo-chemical treatment of the NAS solvent would be a more effective and economically viable compared to removing NO x at the DCC.

01 COAL, LIGNITE, AND PEAT↗

Selection of Glasses in Support of the Sludge Batch 9 Sulfate Solubility Limit for Coupled Operation with the Salt Waste Processing Facility

For Sludge Batches 3 through 8, the sulfate (SO 4 2- )solubility limit for the Defense Waste Processing Facility (DWPF) has been determined by laboratory-scale crucible testing. In preparation for Sludge Batch 9 (SB9) processing, a comparison demonstrated that minor compositional differences existed between the Sludge Batch 8 (SB8)-Frit 803 and SB9-Frit 803 glass composition regions for sludge-only and coupled operations with the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). Thus, no experimental testing was necessary and the SB8 SO 4 2- limit of 0.65 wt.% was recommended for SB9 processing. This previous SB9 assessment did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF), which is anticipated to start operations in November 2019. These high activity streams will include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank (SSRT) as well as Cs-containing strip effluent (SE). The incorporation of these SWPF streams is expected to reach TiO 2 concentrations in glass greater than 2 wt.% based on single and double MST strike scenarios. In support of coupled operation with SWPF, the DWPF Product Composition Control System was revised and allows a TiO 2 concentration of up to 6 wt.% (minus measurement uncertainty) in glass. For the SB8-Frit 803 SO 4 2- solubility study, the maximum TiO 2 concentration evaluated was 0.94 wt.%. Since the influence of increased TiO 2 on the retention of SO 4 2- in the SB9 glass region is unknown, a test matrix of ten glass compositions has been proposed to determine whether the 0.65 wt.% SO 4 2- limit is still appropriate for SB9 coupled operation with SWPF. This report documents the development of a test matrix that will support this study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Warm Unit Stand Analysis for Proton Improvement Project II

The Proton Improvement Project II, commonly referred to as PIP II, is a linear accelerator overhaul at Fermilab to eventually double the output of its existing proton beam to continue to be the leading force in high energy physics. The proton beam is created through a series of high frequency cryomodules that must be connected utilizing a combination of magnets and vacuum pumps to ensure the beam is properly aligned. A housing mechanism for the magnets and vacuum pumps (Warm Units) will be placed between the cryomodules for realignment and require multiple stages of 6 degree-of-freedom adjustment options, to ensure that the beam alignment can fit all realistic requirements. Extensive testing and design modifications on the Warm Unit stand was completed to confirm not only the strength of the unit in nominal configuration, but also at each possible adjustment orientation for each 6 degree-of-freedom option. Structural analysis was also completed for various unique loading conditions i ncluding transportation loading and confirming the unit satisfies international building code. Simultaneously, testing and design modifications were done to confirm that the frequency modes of the system resided outside of concern ranges, which is determined by Fermilab safety codes and is set to exceed 15 Hz. Design changes that simultaneously stiffen the system to raise the lowest frequency modes while expanding access for technicians and allow for easier fabrication were developed and implemented into the Warm Unit stand. Various relationships between the design changes and the overall vibrational patterns were also developed for future use and study as the rest of PIP II matures.

43 PARTICLE ACCELERATORS↗

Technical Assessment of Proposed LAW Simulant for Cold Commissioning

Prior to radioactive operations, the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will implement a cold-commissioning plan or strategy that will include water runs and other melter feed simulants to not only test the various engineering systems, unit operations, and processing strategies with respect to safety and performance, but to also allow facility operations to gain operational experience before introducing radioactive material into the vitrification facilities. Based on direction from Bechtel National, Inc. to eliminate nitrogen oxide (NOx) generation, EnergySolutions has recommended the use of a simple NaOH solution with glass formers to support this stage of testing during cold commissioning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of stress testing for low-risk patients with chest discomfort in the emergency department

Background: The management of patients presenting to an emergency department with chest discomfort at low-risk for acute coronary syndrome represents a common clinical challenge. Such patients are often triaged to chest pain units for monitoring and cardiac stress testing for further risk stratification. Methods: We conducted a retrospective study of 292 low-risk patients who presented to an emergency department with chest discomfort. We performed physician-adjudicated chart reviews of all patients with positive stress tests to assess downstream testing, subsequent coronary revascularization, and outcomes. Results: Of the 292 patients, 33 (11.3%) had stress tests positive for ischemia, and 12 (4.1%) underwent diagnostic cardiac catheterization. Of the 292 patients, 4 (1.4%) underwent coronary revascularization that may have resulted in a mortality benefit. Conclusion: These data suggest a very low yield of detecting clinically significant coronary disease with stress testing low-risk patients with chest discomfort in emergency department chest pain units.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

WBG-Enabled Current-Source Inverters for Integrated PM Motor Drives

This project takes advantage of the special capabilities of wide-bandgap (WBG) power semiconductor devices to develop innovative power electronics in the form of new current-source inverters (CSIs) that offer promising advantages over the dominant voltage-source inverter (VSI) topology. These CSIs, in turn, are extremely well-suited for integration into the housings of permanent magnet synchronous machines (PMSMs) to form integrated motor drives (IMDs). These new IMDs offer great promise for achieving major energy savings in a wide variety of applications that benefit from adjustable-speed control, including air conditioners, laundry appliances, industrial pumps/compressors, electric vehicles, and aerospace drives. WBG devices play a critical enabling role in these new IMDs because of their transformative features including much higher switching frequencies, lower losses, and compatibility with high operating temperatures. When incorporated into new CSI-based IMDs with PM machines, these WBG switches open the door to achieving major increases in power density, drive system efficiency, and fault tolerance, as well as substantial reductions in electromagnetic interference (EMI), manufacturing cost, and temperature-induced failures. The higher operating temperature capability of WBG devices compared to conventional silicon power devices is very appealing in IMD applications because the power electronics is mounted in close proximity to the motors which typically operate at temperatures well above the maximum limits of today’s silicon-based power electronics. This project has succeeded in designing, building, and testing multiple prototype versions of this CSI-IMD that have overcome many technical challenges in order to demonstrate the impressive performance improvements that can be achieved by the WBG-enabled CSI-IMD. The preliminary demo and bench-top versions of the current-source inverter developed during the first two years of the project were critical to laying the technical foundations for the 3 kW prototype CSI-IMD unit that was successfully built and tested during the third year. This prototype CSI-IMD unit was designed to fit within the housing envelope of the original permanent magnet (PM) synchronous machine in order to meet the demanding power density requirements that were set at the beginning of the project. All of the remaining performance objectives set for the prototype CSI-IMD unit including efficiency and electromagnetic interference (EMI) were also met. The last 18 months of the project were devoted to developing further enhancements of the WBG-enabled CSI-IMD technology that better prepare it for commercial production. More specifically, an upgraded version of the prototype CSI-IMD unit was developed that moved the power electronics into the same machine housing chamber as the motor, substantially raising the thermal demands on the power electronics. Tests with five different combinations of motor enclosure types and air cooling configurations were evaluated. Importantly, this work confirmed that the power electronics can deliver its full rated power and still operate well within its maximum temperature limits even for worst-case conditions when the housing is “totally-enclosed” without any openings for air to enter or exit the enclosure, and no blower/fan is provided to blow air over the outside surface of the enclosure. Reaching the full performance and energy-savings potential of this disruptive CSI-IMD motor drive technology is highly consistent with ARPA-E’s stated mission to “enhance the economic and energy security of the United States” while also supporting its commitment to “ensure that the U.S. maintains a technological lead in developing and deploying advanced energy technologies”. Follow-on projects are under way to explore the scalability of WBG-enabled CSI-IMD technology to 100 kW (peak) electric vehicle traction drives and fault-tolerant modular motor drives for future electrified aircraft propulsion applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Surveillance of PLUS7{sup TM} fuel for PWR nuclear power plant

The surveillance program on the advanced nuclear fuel of PLUS{sup TM} developed for Optimized Power Reactors of 1000 MWe (OPR1000s) and Advanced Power Reactors of 1400 MWe (APR1400s) in Korea was completed in the early of 2011. This fuel had been jointly developed through the extensive out-of-pile tests with Westinghouse for three years since 1999. The irradiation tests for the in-reactor verification using four lead test assemblies (LTAs) had been started in Ulchin unit 3 in 2002. During the overhaul period after each irradiation test, the eight (8) burnup-dependent parameters were measured without disassembling using the precise measurement systems in pool-side. After three cycle irradiations, one test assembly was disassembled and the rod-wise inspection on twenty rods was performed. During this stage, five (5) parameters were measured and evaluated. Among these twenty rods, ten rods including skeleton were sent to hot-cell test facility for further detailed examination and are currently being examined. After in-reactor verifications during two cycles, this fuel was commercially supplied to eight (8) OPR1000s sequentially. Currently all eight (8) OPR1000s were replaced with this fuel. In addition, this fuel is going to be supplied to four (4) APR1400s being constructed in Braka, UAE as well as four(4) OPR1000s and four(4) APR1400s being constructed in Korea. In the meanwhile, the surveillance program for the commercially supplied fuel has been launched to confirm growth, creep, corrosion and deformation, etc. obtained during LTA irradiation. Four (4) limiting fuel assemblies, that is, two (2) assemblies to be discharged after 2 cycle irradiations and the other two (2) after 3 cycle irradiations were selected for this surveillance program. Irradiation data of commercially supplied fuels are compared and confirmed to LTA irradiation performance behaviors on this paper. Among the eight (8) burnup-dependent parameters, the interesting ones were irradiation-induced growths of grid width, rod and assembly lengths while cladding oxide thickness, rod creep and swelling followed the LTA results, and assembly bow/twist and rod bow were well below the design limits. The rod growths were on the lower bound of database and contributed to assembly growth. It was evaluated that these results were attributed to PLUS{sup TM} design characteristics which adopted Inconel top and bottom grids and conformal-shaped mid grid spring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-E-T-400: Evaluation of Shielding and Activation at Two Pencil Beam Scanning Proton Facilities

Purpose: To verify acceptably low dose levels around two newly constructed identical pencil beam scanning proton therapy facilities and to evaluate accuracy of pre-construction shielding calculations. Methods: Dose measurements were taken at select points of interest using a WENDI-2 style wide-energy neutron detector. Measurements were compared to pre-construction shielding calculations. Radiation badges with neutron dose measurement capabilities were worn by personnel and also placed at points throughout the facilities. Seven neutron and gamma detectors were permanently installed throughout the facility, continuously logging data. Potential activation hazards have also been investigated. Dose rates near water tanks immediately after prolonged irradiation have been measured. Equipment inside the treatment room and accelerator vault has been surveyed and/or wipe tested. Air filters from air handling units, sticky mats placed outside of the accelerator vault, and water samples from the magnet cooling water loops have also been tested. Results: All radiation badges have been returned with readings below the reporting minimum. Measurements of mats, air filters, cooling water, wipe tests and surveys of equipment that has not been placed in the beam have all come back at background levels. All survey measurements show the analytical shielding calculations to be conservative by at least a factor of 2. No anomalous events have been identified by the building radiation monitoring system. Measurements of dose rates close to scanning water tanks have shown dose rates of approximately 10 mrem/hr with a half-life less than 5 minutes. Measurements around the accelerator show some areas with dose rates slightly higher than 10 mrem/hr. Conclusion: The shielding design is shown to be adequate. Measured dose rates are below those predicted by shielding calculations. Activation hazards are minimal except in certain very well defined areas within the accelerator vault and for objects placed directly in the path of the beam.

60 APPLIED LIFE SCIENCES↗

Cross Section Generation Capability in Griffin

The Griffin code is a Multiphysics Object-Oriented Simulation Environment (MOOSE) based reactor multiphysics analysis application jointly developed by Idaho National Laboratory and Argonne National Laboratory. The code includes a variety of steady-state solvers for fixed-source, k-eigenvalue, adjoint, and subcritical multiplication, as well as transient solvers for point-kinetics, improved quasi-static, and spatial dynamics. The code reads multigroup cross sections in the ISOXML format generated from external deterministic or Monte Carlo cross section generation codes. The implementation of the cross section generation capability in Griffin was initiated last year by plugging in the cross section application programming interface (CSAPI) and reviewing the methodologies for treating particulate fuels. The focus this year was on improving the CSAPI integration and implementing advanced self-shielding methods for applications to advanced reactor problems with TRISO fuels. First, the process for cross section library generation was updated to accurately and rigorously produce isotopic cross section data. Second, the equivalent Dancoff factor cell method performing slowing down calculations on the fly for the resonance treatment was implemented in CSAPI to improve the accuracy of effective multigroup cross sections in the resonance energy range. Third, the iterative local spatial self-shielding method was implemented under the calculation framework of the equivalent Dancoff factor cell method to accurately deal with the double heterogeneity effect of particulate fuel. The updated CSAPI with the advanced self-shielding methods, together with the cross section libraries generated based on the improved process, were tested for pin-cell, unit-cell, and fuel assembly problems with various resonance self-shielding conditions based on very high temperature reactor, high temperature test reactor, and Empire benchmark cores, indicating that the updated CSAPI in Griffin is able to produce multigroup cross sections accurately and efficiently. We also showed that the methodology worked well for pebble bed fuel from HTR-10, but the capability still needs to be fully integrated into CSAPI. In the future, further benchmark tests will be performed for various thermal reactor core problems, including particulate fuel-based pebble bed reactors.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closer of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closure of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RADBALLTECHNOLOGY TESTING AND MCNP MODELING OF THE TUNGSTEN COLLIMATOR

The United Kingdom's National Nuclear Laboratory (NNL) has developed a remote, non-electrical, radiation-mapping device known as RadBall{trademark}, which can locate and quantify radioactive hazards within contaminated areas of the nuclear industry. RadBall{trademark} consists of a colander-like outer shell that houses a radiation-sensitive polymer sphere. The outer shell works to collimate radiation sources and those areas of the polymer sphere that are exposed react, becoming increasingly more opaque, in proportion to the absorbed dose. The polymer sphere is imaged in an optical-CT scanner, which produces a high resolution 3D map of optical attenuation coefficients. Subsequent analysis of the optical attenuation matrix provides information on the spatial distribution of sources in a given area forming a 3D characterization of the area of interest. RadBall{trademark} has no power requirements and can be positioned in tight or hard-to reach locations. The RadBall{trademark} technology has been deployed in a number of technology trials in nuclear waste reprocessing plants at Sellafield in the United Kingdom and facilities of the Savannah River National Laboratory (SRNL). This study focuses on the RadBall{trademark} testing and modeling accomplished at SRNL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Connected Traffic Signal Coordination Optimization Framework through Network-Wide Adaptive Linear Quadratic Regulator–Based Control Strategy

Traffic congestion in metropolitan areas causes several significant challenges, such as longer travel times, decreased productivity, increased fuel consumption and vehicle emissions, and even severe injuries during crashes. Traffic signal control is a management approach to reduce traffic congestion and allocate the appropriate right of way for safety and mobility efficiency, both in temporal and spatial domains. Here, this study proposes a network-wide adaptive signal control coordination optimization framework based on the linear quadratic regulator algorithm. The traffic flow conditions driven by signal control inputs are formulated based on their network-wide state-space representation. After modeling traffic control regulation constraints, an adaptive linear quadratic regulator algorithm is designed to maximize the network-wide total throughput under the current conditions. Optimal signal control split time durations for multiple intersections in the network are derived by solving the algebraic Riccati equation. Furthermore, the recursive least square parameter estimation method is employed to quantify dynamic traffic condition changes. To verify the effectiveness of this proposed signal control framework, both simulation and real-world experimental tests are conducted for multiple intersections in downtown Chattanooga, Tennessee, United States. In preparation for real-world experimental tests, pipelines for real-time data processing implementation and historical traffic flow data analysis are conducted. The test results demonstrate that the proposed control framework achieves a decrease in travel time by up to 19.4%, total time spent (TTS) by up to 11.9%, and relative queue balance (RQB) by up to 15.6%. The research findings indicate that the proposed signal control framework can be generalized to handle large scale signal control optimization network-wide.

97 MATHEMATICS AND COMPUTING↗

Towards an Era of Low-Temperature Integral Critical Experiments: Surrogate Testing of Low-Temperature TEX Configurations

United States and IAEA regulations for the transportation of radioactive materials require that fissile materials must be subcritical under expected ambient temperatures ranging from -40°C to 38°C. While historical experiments have been conducted at room and elevated temperatures, no criticality integral benchmarks exist for temperatures below room temperature. The Low-Temperature Thermal Epithermal eXperiments (LT-TEX) aim to provide benchmark evaluations down to -40°C. The LT-TEX design incorporates stacked HEU plates interspersed with varying thicknesses of polyethylene disks to provide varying levels of moderation, with five configurations at 20°C having already been benchmarked. A novel vacuum/cryogenic chamber was fabricated to contain the LT-TEX configurations in a thermally isolated environment and cool it to -40°C. Prior to testing with fissile materials, testing with surrogate fuel plates was performed to characterize the thermal properties of the system, ensure no condensation forms on the stack, and to test that the uranium plates would not warp, or fracture during the thermal cycling. Surrogate testing has characterized the cryogenic chamber and verified its viability to perform the benchmark experiments, allowing for the next steps in the LT-TEX experimental campaign. The results of the surrogate testing are discussed and compared to heat transfer calculations performed as part of the experiment design process, to establish confidence in the thermal behavior of the system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Perils of Paul: Near Disasters in Airborne Radiochemical Sampling

Beginning with the Trinity test in July 1945, Laboratory radiochemists have collected debris from nuclear tests by various means. At Trinity, two United States Army Sherman tanks were used. Beginning with Operation Crossroads and continuing throughout atmospheric testing, aircraft were used to fly in and around mushroom clouds to collect debris. Paul Guthals, the LASL project leader for sampling operations, flew on many of the B-57 sampling missions. Two such missions, one flown over the Nevada Test and one in the skies near Johnston Atoll, again proved the dangers involved in collecting airborne test debris. The events of these two missions are briefly recounted.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

AOI2 - Initial Engineering, Testing, and Design of a Commercial-Scale Postcombustion CO 2 Capture System on an Existing Coal-Fired Generating Unit (Project Carbon)

The continued long-term use of North Dakota lignite is likely dependent on creating a business case for carbon capture, utilization, and storage (CCUS) that also addresses society’s desire to reduce carbon emissions. CCUS coupled with enhanced oil recovery appears to be the most feasible option for utilities to sustain and grow the lignite industry. Establishing a market where lignite-powered utilities provide carbon dioxide (CO 2 ) to oil producers depends upon having a cost-effective method to capture CO 2 . The application of CO 2 capture technology to lignite-fired flue gas has challenges in addition to the cost of capture, including the effects of the buildup of heat-stable salts, aerosol formation, degradation of solvents or solid sorbents, or subsequent solvent loss. Lignite, especially North Dakota lignite, presents its own set of challenges that include the combination of high sodium, sulfur, and ash contents; NO x reduction; and footprint limitations. Project Carbon was designed to address these technical barriers and provide pre-FEED (preliminary front-end engineering and design) information necessary for additional commercial demonstrations to move forward. A long-term pilot-scale evaluation of Mitsubishi Heavy Industries’ (MHI’s) KS-1™ solvent at Minnkota Power Cooperative’s lignite-fired Milton R. Young Station Unit 2 (MRY2) was a major objective of the project. The purpose of the test was to demonstrate the technology’s compatibility with MRY2’s flue gas over an extended period of time. During the long-term test, aerosol sampling and measurement were performed, and a pilot-scale baghouse was tested to determine the effect of bag material and operation on aerosol concentrations in the flue gas. Project engineering and design work were performed to support the other major project objective: a pre-FEED study of CO 2 capture at MRY2. Finally, a techno-economic assessment (TEA) of the application of CO 2 capture to MRY2 was performed. This project was performed over a period of 28 months, with a total budget of $12,700,000. The U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory, through the Energy & Environmental Research Center’s (EERC’s) Cooperative Agreement, the North Dakota Industrial Commission, and industry partners ALLETE and Minnkota Power Cooperative, funded the project. The pilot-scale test system at MRY2 performed very well for the continuous test period of 83 days. The CO 2 capture plant achieved stable operation while utilizing MHI’s KS-1™ solvent and the MHI amine emission reduction unit. No major concerns were encountered when capturing CO 2 from lignite-fired flue gas. Challenges were encountered because the cooling water temperature was warmer than needed for the capture system to operate efficiently. This affected the ability of the solvent to capture CO 2 and promoted solvent loss through solvent entrainment caused by high CO 2 gas temperature within a cyclone separator. The KS-1™ solvent and the lignite-derived flue gas were analyzed during the long-term test. Analysis of the solvent indicates that, although some metals and heat-stable salts increased over the course of the long-term test, they were at levels that can be treated with filtration and reclaiming and do not pose a concern for effective solvent operation. Fourier transform infrared (FTIR) spectrometry was successfully used to determine the composition of the lignite-derived flue gas as well as concentrations of select components of the flue gas at various locations within the EERC’s CO 2 capture system. The formation of aerosols during the capture process is of interest, as are approaches for their reduction, especially in a baghouse. Testing of aerosol removal was performed using the EERC’s portable baghouse. It was found that both Ryton and polytetrafluoroethylene (PTFE) membrane bags were effective at reducing the level of aerosols during steady-state operation. During backpulse events, however, the amount of aerosols passing through the bags was an order of magnitude lower for the Ryton bags than the PTFE membrane bags. The testing showed that proper design of the baghouse air-to-cloth ratio as well as minimization of backpulsing can dramatically reduce the amount of aerosols that pass through the bags and remain in the flue gas stream exiting a baghouse system. A technology maturation plan (TMP) was performed to enable successful development of the Kansai Mitsubishi Carbon Dioxide Recovery® (KM CDR®) Process for application to a combustion flue gas for which the process has not yet been demonstrated. In the TMP, new challenges to the MHI CO 2 capture technology during its application to MRY2 were identified. These challenges included capture from lignite-fired (as opposed to subbituminous coal-fired) flue gas, a larger scope than previous applications of the technology, and implementation in a colder climate that could affect process and equipment operability. Because MRY2 is located where stack icing in the winter could be problematic, a rime icing study was performed. Rime icing modeling indicated that, under both 100% and 50% operating loads, there is a potential for many icing events during any given part of the year in which below-freezing weather conditions exist. The models showed that a critical amount of rime ice could be formed at the stack top during two or more events per year. CO 2 capture plant stack height and location will need to be determined in order to minimize the formation of rime ice. It was found that the integration of the MHI CO 2 capture process into the normal operation of the MRY2 steam turbine is a viable alternative to a cogeneration facility to provide steam and power for the carbon capture facility. The research performed under this project showed that CO 2 capture at a lignite-fired power plant can successfully be performed. No known fatal flaws that would prevent the continued development of the MRY2 CO 2 capture facility were identified during the pre-FEED study. A TEA performed following DOE methodology shows that applying capture technology to MRY2 may not only meet but exceed the DOE-recognized state-of-the-art baseline.

20 FOSSIL-FUELED POWER PLANTS↗

Power Take-off System for Marine Renewable Devices

The Power Take-off (PTO) System for Marine Renewable Devices (Project) envisioned the design, manufacture and testing of a generator that would ultimately be suitable for fully flooded seawater operation. This would require a generator design and bearing system capable of operating in the presence of seawater without corrosion. The original generator concept design focused on a switched reluctance electromagnetic design for the generator with the understanding that the switched reluctance design would be more robust and tolerant of a seawater medium. A trade study was conducted to prove that hypothesis, but the results of the study indicated that there was no benefit to adopting a switched reluctance design over a more conventional synchronous permanent magnet design. In addition, the novelty of the switched reluctance design added more technical risk to the Project than was warranted. ORPC’s cost of energy analyses pointed to reliability as being the most critical factor for achieving Project systems performance advancement (SPA) metrics. Consequently, the choice of a permanent magnet (PM) machine design over a potentially less reliable switched reluctance design was necessary to achieve the Project results. As a result, ORPC determined that a PM design was a more appropriate design to achieve the Project goals and ORPC selected a highly qualified PM generator firm for the design, manufacture and factory testing of the generator. The factory acceptance test (FAT) of the generator took place on March 20-22, 2017 and all tests were successfully passed. Developing a design for a driveline as part of the PTO system required a full understanding of the loads and operating conditions expected. Detailed analyses for developing turbine loads and subsequent definition of bearing specifications were performed using various analytical methods. Two candidate bearing designs were proposed as part of the Project. After initial design work had been completed, ORPC designed a representative full-scale driveline to validate the detailed design of the advanced driveline components. Full-scale components were manufactured, instrumented and tested, simulating actual system parameters. This full-scale bearing test was conducted at the University of Maine Advanced Structures and Composites Laboratory. The purpose of this test was to characterize the frictional losses associated with bearings and test the suitability and functionality of some commercially available shaft couplings and expansion bushings in cross-flow turbine drivelines. In parallel with component testing and dynamometer testing of the PTO system, ORPC performed design work to demonstrate how the advanced PTO system will be integrated with all ORPC turbine generator units (TGUs). The work would focus primarily on the TidGen® TGU and assess how the advanced PTO would be integrated into TidGen® 001 or other units, then field-deployed and tested in an open water environment under actual operational conditions. In addition to the benefits provided to the MHK industry in general, and ORPC in particular, the Project provided benefits to the general public, including the following: • Increased general awareness of the potential for generation of electricity from ocean energy resources • Demonstrated continuing advancements in the commercialization of MHK technologies, making them more likely to contribute to the electricity generation supply in America in the coming years • Continued awareness of the local economic benefits from the MHK industry through job creation and local spending • Confirmation of a path to improvements in availability, power-to-weight ratio (PWR) and reduction in levelized cost of energy (LCOE). All Project tasks were completed, and the Project objectives were accomplished. All project milestones and deliverables were met. The designs, methodologies, practices, testing, data, analysis and lessons learned from the Project are a step forward in the development of the U.S. MHK industry and provide a sound basis for ultimate commercialization of ORPC’s power systems. Based on the what was learned and demonstrated during the Project, ORPC has determined that the ORPC power systems have the potential of accelerating the commercialization of tidal and ocean current MHK power systems.

16 TIDAL AND WAVE POWER↗