Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “turning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Analysis and Experimental Evaluation of Middle-Point Inductance's Effect on Switching Transients for Multiple-Chip Power Module Package

Middle-point inductance L middle can be introduced in multiple-chip power module package designs. In this paper, the effect of middle-point inductance on switching transients is analyzed first using a frequency-domain analysis. Then a dedicated multiple-chip power module is fabricated with the capability of varying L middle , and extensive switching tests are conducted to evaluate the middle-point inductance's impact. Experiment result shows that the active MOSFET's turn-on loss decreases at higher values of L middle , while its turn-off loss increases. Detailed analysis of this loss variation is presented. In addition to the switching loss variation, it is also observed that different peak voltage stresses are imposed on the active switch and antiparallel diode during the switching transients. Specifically, in the case of lower MOSFET's turn-off, the maximum voltage of the lower MOSFET increases as L middle goes up; however, the peak voltage of the antiparallel diode decreases significantly. Furthermore, the induced voltage spikes during upper MOSFET turn-on process is also evaluated, and an opposite trend is observed experimentally. Analysis of the voltage overshoot variation is discussed. Based on the experimental evaluation and analysis, a multiple-chip power module package design guideline is summarized considering the middle-point inductance's effect.

42 ENGINEERING↗

Dead-time optimization for SiC based voltage source converters using online condition monitoring

This paper introduces a dead-time optimization technique for a 2-level voltage source converter (VSC) using turn-off transition monitoring. Dead-time in a VSC impacts power quality, reliability, and efficiency. Silicon carbide (SiC) based VSCs are more sensitive to dead-time from increased reverse conduction losses and turn-off time variability with operating conditions and load characteristics. An online condition monitoring system for SiC devices has been developed using gate drive assist circuits and a micro-controller. It can be leveraged to monitor turn-off time and indicate the optimal dead-time in each switching cycle of any converter operation. It can also be used to specify load current polarity, which is needed for dead-time optimization in an inverter. This is an important distinction from other inverter dead-time elimination/optimization schemes as current around the zero current crossing is hard to accurately detect. A 1kW half-bridge inverter was assembled to test the turn-off time monitoring and dead-time optimization scheme. Results show 91% reduction in reverse conduction power losses in the SiC devices compared to a set dead-time of 500ns switching at 50 kHz.

Dyer, Jacob↗

Effect of the number of pairs of the layers on the quality of the superlattices of the In{sub x}Ga{sub 1-x}As/GaAs/.../GaAs(001) type grown by molecular beam epitaxy under computer control

By the specified program of computer control over the growth process, superlattices of the In{sub x}Ga{sub 1-x}As/GaAs/.../GaAs(001) type with the number of alternating pairs N{sub 1} = 12, N{sub 2} = 6, and N{sub 3} = 3 were grown. Using the X-ray methods of quantitative analysis, the values of periods T{sub 1} = 22 nm, T{sub 2} = 22.5 nm, and T{sub 3} = 22.3 nm and the In content x{sub 1} = 0.09, x{sub 2} = 0.091, and x{sub 3} = 0.092 in these superlattices are measured. In the superlattice with N{sub 1} = 12, the plastic deformation is detected. In superlattices with N{sub 2} = 6 and N{sub 3} = 3, no plastic deformation during the growth was observed. The obtained magnitudes of the periods turned out smaller by a factor of approximately 2 and the alloy concentration turned out smaller by 1/3 than it was specified by the computer program. The measured and calculated values of elastic stresses turned out equal to {sigma}{sub 2N} = 2.43 x 10{sup 6} Pa and {sigma}{sup 2N-1} = -0.88 x 10{sup 9} Pa, at which the plastic deformation took place in the layers of the superlattice with N{sub 1} = 12. In superlattices with N{sub 2} = 6 and N{sub 3} = 3, the elastic stresses were {sigma}{sub 2N} = 1.96 x 10 6 Pa, {sigma}{sub 2N-1} = -1.45 x 10{sup 9} Pa and {sigma}{sub 2N} = 0.99 x 10{sup 6} Pa, {sigma}{sub 2N-1} = -1.88 x 10{sup 9} Pa, respectively. These stresses turned out insufficient to initiate the process of dislocation generation.

36 MATERIALS SCIENCE↗

Grounding our Understanding of the Impacts of Boreal Forest Expansion on Shallow Cumulus Clouds with a Simple Modeling Framework

Abstract The expansion of the boreal forest poleward is a potentially important driver of feedbacks between the land surface and Arctic climate. A growing body of work has highlighted the importance of differences in evaporative resistance between different possible future Arctic land covers, which in turn alters humidity and cloudiness in the boundary layer, for these feedbacks. While thus far this problem has been studied primarily with complex Earth system models, we turn to a locally focused, idealized model capable of diagnosing and testing the sensitivity of first-order processes connecting vegetation, the atmospheric boundary layer, and low clouds in this critical region. This allows us to benchmark the mechanisms and results at the center of predictions from larger-scale simulations. A surface dominated by broadleaf trees, characterized by higher albedo and lower surface evaporative resistance, drives cooling and moistening of the boundary layer relative to a surface of needleleaf trees, characterized by lower albedo and higher surface evaporative resistance. Differences in evaporative resistance between these hypothetical Arctic vegetation covers are of equal importance to changes in albedo for the initial response of the boundary layer to boreal expansion, even with our idealized approach. However, compensation between the elevation of the lifting condensation level (LCL) and more rapid growth of the mixed layer over higher evaporative resistance surfaces can minimize changes in the favorability of shallow clouds over different land cover types under some conditions. We then perform two tests on the sensitivity of this compensating effect, to changes in water availability, represented first by a reduction in boundary layer humidity and then by both a reduction in humidity and soil moisture available to our vegetation surface. Finally, given the importance of this potential LCL–mixed-layer height compensation in our idealized modeling results, we look to determine its relevance in observational data from a field campaign in boreal Finland. These observations do confirm that such a coupling plays an important role in cumulus-topped boundary layers over a needleleaf forest surface. While our results confirm some underlying mechanisms at the center of prior work with Earth system models, they also provide motivation for future work to constrain the impact of boreal forest expansion. This will include both large eddy simulations to examine the impact of processes and feedbacks not resolved by a mixed-layer model, as well as a more systematic evaluation and comparison of relevant observations at the site in Finland and sites from prior boreal field campaigns. Significance Statement Clouds and vegetation are both important components of the climate system that interact across a range of scales. These interactions are central to understanding how changes at the land surface feedback on climate. For example, if a forest expands or recedes, diagnosing how that will impact clouds will determine whether you predict warming or cooling temperatures from that shift in the forest area. These predictions are often made with complex Earth system models, but we look to a more idealized representation of the land–atmosphere system to diagnose how shallow clouds should respond to changes in surface properties with different scenarios of boreal forest expansion at a more foundational level. This both grounds our understanding of previous analysis and provides helpful direction for future studies of this relevant and impactful land cover change.

Meteorology & Atmospheric Sciences↗

Multiplexer System for the SPEAR3 Booster BPM Upgrade

BPM measurements in booster synchrotrons are often only critical during accelerator commissioning or when a problem occurs. As a result, many facilities do not make large investments in booster BPM signal processors; they either have very few BPMs and/or use older generation processors. The SPEAR3 booster BPM processor system, for instance, has operated since 1990 with commercial multiplexers to switch between BPM button signals into a single dated analog BPM processor that was developed at SLAC*. This system has reached its end-of-life so we are in the process of upgrading to modern multiplexers that feed a pair of turn-by-turn Libera SPARK-ERXR processors. This low-cost solution gives us the ability to arbitrarily multiplex between BPM signals during the energy ramp with modern BPM processors. The system can either measure 2 BPMs turn-by-turn in parallel during the entire energy ramp, or sequentially measure all BPMs (2 at a time) at different time slices within the ramp. Here we show measurements of the MiniCircuits switch we chose as well as our architecture for the upgrade.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modeling of standing wave RF cavities for tracking through multi-pass energy recovery linac

Short bunches, high current and multiple linac pass are all characteristics of Energy Recovery Linacs (ERLs), which may result in collective effects. They in turn, may affect the beam, degrading its quality, or even yield to instabilities causing a beam loss. To study and mitigate these effects one needs a numerical simulation code, that can take into account both the collective effects, as well as, particular ERL features, such as a multi-turn design that does not reach a steady state or the multiple passages of the beam through Radio-Frequency (RF) cavities at different energies. CODAL [1], a code developed by SOLEIL in collaboration with IJCLab, enables such studies. It is a 6 dimensional (6D) tracking code applying 'kicks' based on the integration of the local Hamiltonian for each element of the lattice. It is also capable of simulating space charge, wakefields and coherent synchrotron radiation. However, to correctly take into account the ERL dynamics, an upgrade had to be made to include the effect of a standing wave RF cavity in 6D. In this paper, we will concentrate on the implementation and benchmarking (with DESY’s tracking code ASTRA [2]) of both the longitudinal and the transverse models (by J.B. Rosenzweig and L. Serafini [3]), which we use to carry out tracking of fully analytical 6D RF cavity.

Bogacz, A.↗

An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Accelerator Physics↗

LDRD final report on confinement of cluster fusion plasmas with magnetic fields.

Two versions of a current driver for single-turn, single-use 1-cm diameter magnetic field coils have been built and tested at the Sandia National Laboratories for use with cluster fusion experiments at the University of Texas in Austin. These coils are used to provide axial magnetic fields to slow radial loss of electrons from laser-produced deuterium plasmas. Typical peak field strength achievable for the two-capacitor system is 50 T, and 200 T for the ten-capacitor system. Current rise time for both systems is about 1.7 {mu}s, with peak current of 500 kA and 2 MA, respectively. Because the coil must be brought to the laser, the driver needs to be portable and drive currents in vacuum. The drivers are complete but laser-plasma experiments are still in progress. Therefore, in this report, we focus on system design, initial tests, and performance characteristics of the two-capacitor and ten-capacitors systems. The questions of whether a 200 T magnetic field can retard the breakup of a cluster-fusion plasma, and whether this field can enhance neutron production have not yet been answered. However, tools have been developed that will enable producing the magnetic fields needed to answer these questions. These are a two-capacitor, 400-kA system that was delivered to the University of Texas in 2010, and a 2-MA ten-capacitor system delivered this year. The first system allowed initial testing, and the second system will be able to produce the 200 T magnetic fields needed for cluster fusion experiments with a petawatt laser. The prototype 400-kA magnetic field driver system was designed and built to test the design concept for the system, and to verify that a portable driver system could be built that delivers current to a magnetic field coil in vacuum. This system was built copying a design from a fixed-facility, high-field machine at LANL, but made to be portable and to use a Z-machine-like vacuum insulator and vacuum transmission line. This system was sent to the University of Texas in Austin where magnetic fields up to 50 T have been produced in vacuum. Peak charge voltage and current for this system have been 100 kV and 490 kA. It was used this last year to verify injection of deuterium and surrogate clusters into these small, single-turn coils without shorting the coil. Initial test confirmed the need to insulate the inner surface of the coil, which requires that the clusters must be injected through small holes in an insulator. Tests with a low power laser confirmed that it is possible to inject clusters into the magnetic field coils through these holes without destroying the clusters. The university team also learned the necessity of maintaining good vacuum to avoid insulator, transmission line, and coil shorting. A 200-T, 2 MA system was also constructed using the experience from the first design to make the pulsed-power system more robust. This machine is a copy of the prototype design, but with ten 100-kV capacitors versus the two used in the prototype. It has additional inductance in the switch/capacitor unit to avoid breakdown seen in the prototype design. It also has slightly more inductance at the cable connection to the vacuum chamber. With this design we have been able to demonstrate 1 MA current into a 1 cm diameter coil with the vacuum chamber at air pressure. Circuit code simulations, including the additional inductance with the new design, agree well with the measured current at a charge voltage of 40 kV with a short circuit load, and at 50 kV with a coil. The code also predicts that with a charge voltage of 97 kV we will be able to get 2 MA into a 1 cm diameter coil, which will be sufficient for 200 T fields. Smaller diameter or multiple-turn coils will be able to achieve even higher fields, or be able to achieve 200-T fields with lower charge voltage. Work is now proceeding at the university under separate funding to verify operation at the 2-MA level, and to address issues of debris mitigation, measurement of the magnetic field, and operation in vacuum. We anticipate operation at full current with single-turn, magnetic field coils this fall, with 200 T experiments on the Texas Petawatt laser in the spring of 2012.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ion Emittance Growth Due to Focusing Modulation from Slipping Electron Bunch

Low energy RHIC operation has to be operated at an energy ranging from γ = 4.1 to γ = 10. The energy variation causes the change of revolution frequency. While the rf system for the circulating ion will operate at an exact harmonic of the revolution frequency (h=60 for 4.5 MHz rf and h=360 for 28 MHz rf.), the superconducting rf system for the cooling electron beam does not have a frequency tuning range that is wide enough to cover the required changes of revolution frequency. As a result, electron bunches will sit at different locations along the ion bunch from turn to turn, i.e. the slipping of the electron bunch with respect to the circulating ion bunch. At cooling section, ions see a coherent focusing force due to the electrons’ space charge, which differs from turn to turn due to the slipping. We will try to estimate how this irregular focusing affects the transverse emittance of the ion bunch.

43 PARTICLE ACCELERATORS↗

Emittance growth of accumulating proton beam in Booster due to multiple passes through the H-minus stripping foil

Equations were derived for the transverse emittance growth of a single batch of protons passing turn-by-turn through the H-minus stripping foil in Booster. It was assumed there that all particles in the batch go the same number of turns around the machine and pass through the foil the same number of times. The equations therefore apply to the case in which the duration of the pulse of beam injected into Booster is less than one revolution period. We consider here the case in which the incoming beam consists of a series of batches injected one after another into the machine. Each batch is assumed to contain the same number of particles. The leading edge of an incoming batch is assumed to be exactly one revolution period behind the leading edge of the batch in front of it. The batch length is assumed to be less than one revolution period and is assumed to be the same for all batches. By taking the batch length to be less than but close to one revolution period, we can approximate, as closely as we like, the case of a continuous ribbon of beam injected into the machine over a period of several turns.

43 PARTICLE ACCELERATORS↗

Extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Kazimi, Reza↗

Design and Fabrication of a Thyristor Using Ion Implantation of Anode and Cathode

A thyristor is a solid-state semiconductor switch made up of four alternating p and n type layers. When the switch is turned on by a small pulse, current can flow as long as the device stays on. When the voltage drops below the turn on level or the current reverses, the switch will turn off. Thyristors only allow current to flow in one direction. One of the benefits of a thyristor device is in its capacity to conduct large voltages with a small device and a small turn-on pulse requirement. Another distinguishing feature of thyristors compared to other semiconductor devices is that it can only be in the on or off state, there’s no in-between state for the device to exist within. These properties make thyristors very useful as switch devices, especially in applications where current flow is only needed in one direction and could potentially be damaging in the opposite direction. Currently, thyristors are most commonly used to control very high power loads and they are available commercially in many designs to control different amounts of current.

42 ENGINEERING↗

Evaluating Variable-Impedance Magnetically-Insulated Transmission Lines as a Risk-Mitigation Measure for Next-Generation Pulsed Power

This project has produced the first detailed characterizations of power flow resulting from applying the “variable-impedance MITL” concept to real-life systems in Sandia’s pulsed power program (Z and next-generation pulsed power (NGPP)). We present simulation results and analyses for constant-impedance versions of both Z and NGPP and survey the operational viability of several variable-impedance re-designs in the parameter space of linear tapers. Circuit modeling (SCREAMER/Bertha) was used to pinpoint promising candidate designs, and EM-PIC (Empire) simulations were used to evaluate these candidates more rigorously. This approach was particularly successful in the Z regime which resulted in the identification of several viable variable-impedance MITL designs for each level. The approach was more challenged in the operating space NGPP occupies, producing data points that speak to a more restrictive design space due to anode plasma turn-on. In the end, we were able to converge on one viable variable-impedance design for the highest inductance line (level “F”) and one for the highest current line (level “A”). Altogether, the body of simulation evidence presented in this report suggest there does exist flexibility in operating space for magnetically-insulated transmission lines (MITLs) having variable geometric impedance to be a potential enabling technology for safely increasing current delivery (and potentially lowering stack voltage) in pulsed-power drivers by manipulating electron losses; however, operating points for a particular design must be carefully screened. Circuit and EM-PIC modeling provided consistent verdicts in safe operating regimes for operational viability, but additional physics such as anode plasma turn-on which is included in Empire but not in SCREAMER/Bertha was found to be a critical factor affecting power flow that lead to different assessments between the codes. It is not always the case that the occurrence of anode plasma caused a design to fail (some designs turned on anode plasma yet still delivered load currents meeting design targets); the details matter such as how early in the pulse anode surfaces break down (and how large a region). However, in every case that it did fail it was found that the feedback from anode plasma was the cause (i.e., turning off the anode plasma model in Empire restored agreement with the circuit model prediction). As circuit simulations represent an efficient and practical means of surveying design space compared to more computationally-expensive approaches such as EM-PIC, it could be prudent to invest in the research and development of models to include the effects of anode plasma such as ion emission in circuit codes. The variable-impedance MITL design is a new concept that enables controlled manipulation of the initial electron losses in the outer MITL and can be tested on Z today. We encourage follow-on work to explore further optimization (including alternative variable-impedance profiles, e.g., having constant dZ/dR), and to confirm the major findings presented in this report by fielding test hardware on actual Z shots.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Changing-look Active Galactic Nuclei from the Dark Energy Spectroscopic Instrument. I. Sample from the Early Data

Changing-look active galactic nuclei (CL AGNs) can be generally confirmed by the emergence (turn-on) or disappearance (turn-off) of broad emission lines (BELs), associated with a transient timescale (about 100 ~ 5000 days) that is much shorter than predicted by traditional accretion disk models. We carry out a systematic CL AGN search by crossmatching the spectra coming from the Dark Energy Spectroscopic Instrument and the Sloan Digital Sky Survey. Following previous studies, we identify CL AGNs based on Hα, Hβ, and Mg ii at z ≤ 0.75 and Mg ii, C iii], and C iv at z > 0.75. We present 56 CL AGNs based on visual inspection and three selection criteria, including 2 Hα, 34 Hβ, 9 Mg ii, 18 C iii], and 1 C iv CL AGN. Eight cases show simultaneous appearances/disappearances of two BELs. We also present 44 CL AGN candidates with significant flux variation of BELs, but remaining strong broad components. In the confirmed CL AGNs, 10 cases show additional CL candidate features for different lines. In this paper, we find: (1) a 24:32 ratio of turn-on to turn-off CL AGNs; (2) an upper-limit transition timescale ranging from 330 to 5762 days in the rest frame; and (3) the majority of CL AGNs follow the bluer-when-brighter trend. Our results greatly increase the current CL census (~30%) and would be conducive to exploring the underlying physical mechanism.

79 ASTRONOMY AND ASTROPHYSICS↗

A technique for optimizing the design of power semiconductor devices

A technique is described that provides a basis for predicting whether any device design change will improve or degrade the unavoidable trade-off that must be made between the conduction loss and the turn-off speed of fast-switching high-power thyristors. The technique makes use of a previously reported method by which, for a given design, this trade-off was determined for a wide range of carrier lifetimes. It is shown that by extending this technique, one can predict how other design variables affect this trade-off. The results show that for relatively slow devices the design can be changed to decrease the current gains to improve the turn-off time without significantly degrading the losses. On the other hand, for devices having fast turn-off times design changes can be made to increase the current gain to decrease the losses without a proportionate increase in the turn-off time. Physical explanations for these results are proposed.

Schlegel, E. S.↗

Analysis and compilation of missile aerodynamic data. Volume 2: Performance analysis

A general analysis is given of the flight dynamics of several surface-to-air and two air-to-air missile configurations. The analysis involves three phases: vertical climb, straight and level flight, and constant altitude turn. Wind tunnel aerodynamic data and full scale missile characteristics are used where available; unknown data are estimated. For the constant altitude turn phase, a three degree of freedom flight simulation is used. Important parameters considered in this analysis are the vehicle weight, Mach number, heading angle, thrust level, sideslip angle, g loading, and time to make the turn. The actual flight path during the turn is also determined. Results are presented in graphical form.

Burkhalter, J. E.↗