Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Results for the Fourth Quarter Calendar Year 2020 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2020 (CY20) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY20 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples. However, data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals for this current 4QCY20 Tank 50 sample will be obtained and documented per the special analysis associated with the vault classification sample as described in the associated TTQAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 50 Salt Solution Sample (2QCY21)

In this Technical Report, the chemical and radionuclide contaminant results from the Second Quarter Calendar Year 2021 (CY21) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the Second Quarter CY21 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the September Bimonthly Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2021 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2021 September bimonthly sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRR request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Third Quarter Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2021 (CY21) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY21 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Second Quarter Calendar Year 2021 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Second Quarter Calendar Year 2021 (CY21) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the Second Quarter CY21 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the January 2022 Semiannual Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the January 2022 Semiannual sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the January 2022 semiannual sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRMC request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the RMC request, will be obtained semiannually for the January 2022 and July 2022 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the March Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 March bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 March bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the July 2022 Semiannual Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the July 2022 Semiannual sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the July 2022 semiannual sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRMC request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRMC request, will be obtained semiannually for the January 2022 and July 2022 Tank 50 samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the September Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 September bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request. The following facts pertaining to the WAC are drawn from the analytical results, including analytical uncertainty, provided in this report. 1) WAC LIMITS and TARGETS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC LIMITS and TARGETS; 2) Measured average concentrations of nitrate, nitrite and total mercury are approximately 24%, 9% and 12% of the WAC LIMITS, respectively; 3) Measured average concentrations of Tc-99 and I-129 are approximately 19% and 20% of the WAC LIMITS, respectively; 4) All other radionuclide average concentrations are at 4% or less of the WAC LIMITS and TARGETS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2022 Salt Solution Sample for Performance Assessment Analyses

In this Technical Report, the chemical and radionuclide contaminant results from the fourth quarter calendar year 2022 salt solution sample for Performance Assessment (PA) analyses are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste to Tank 50 and the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the salt solution sample was obtained. The chemical and radionuclide contaminant results from the characterization of the fourth quarter calendar year 2022 sampling of salt solution sent to Z area were requested by SRMC personnel via a Technical Task Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2.3.3.404 - National Lab and University Collaboration for MHK Instrumentation and Data Processing Tools

Field and laboratory validation, testing, demonstration, and operation are critical steps for increasing the technology readiness level of marine energy (ME) converters because they provide high-quality testing and performance data that are critical information used to feed all aspects of technology development. This project, in partnership with industry, enables the marine and hydrokinetic energy (MHK) community to reliably and efficiently collect, process, manage, and share quality data by facilitating access to and development of instrumentation, guidelines and data processing/QA tools. Under this project, open-source data processing code (MHKiT) and tools (ME Data Pipeline, MRE Code Hub, PRIMRE Code Catalog), instrumentation (loads measurements), data acquisition systems (miniDAQ), and measurement guidance tools (Telesto, high EMI guidance) were developed to facilitate the collection and processing of quality laboratory and field data. Overall, this project is intended to improve the quality of the data collected during laboratory and field demonstration projects by standardizing the collection and processing techniques, as well as by improving access to instrumentation, code, and measurement guidance. Quality data will, in turn, lead to improved knowledge capture following ME device testing.

data processing↗

Results for the January 2023 Semiannual Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the January 2023 Semiannual sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained.1 The chemical and radionuclide contaminant results from the characterization of the January 2023 semiannual sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR)2 and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP).3 This Technical Report is part of Deliverable 2 relating to Task 1 from the SRMC request.2 Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRMC request will be obtained semiannually for the January 2023 and July 2023 Tank 50 samples.

Crawford, Charles L.↗

Testing of a 15 kA Superconducting Transformer

Here, the manufacturing of superconducting magnets for High Energy Physics (HEP) and Fusion Energy Sciences (FES) applications requires high-current conductors to generate stronger magnetic fields without increasing the inductance of the magnet. Increased inductance is undesirable due to the associated AC losses, which reduce the temperature margin; and the quench protection also becomes complicated. Testing high-current conductors with a direct current (DC) room temperature power supply is unfeasible for two primary reasons: 1) the limited capacity to supply large currents, and 2) the significant heat load losses at the current leads. A superconducting transformer offers a solution to both challenges. A 50-kA superconducting transformer is planned for manufacturing and commissioning at Brookhaven National Laboratory as part of its user facility upgrade. This transformer will facilitate the testing of superconducting cables, conductors, joints, and insert coils under high magnetic field conditions (10 T) and with currents up to 50-kA. To evaluate the manufacturing process and validate the theoretical models, the magnet division has developed and tested a 15-kA prototype transformer. A control loop has been implemented to ensure precise current delivery to the sample. This paper presents the coil design, manufacturing, and experimental results from the cold tests.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Validating deep learning inference during chest X-ray classification for COVID-19 screening

Abstract The new coronavirus unleashed a worldwide pandemic in early 2020, and a fatality rate several times that of the flu. As the number of infections soared, and capabilities for testing lagged behind, chest X-ray (CXR) imaging became more relevant in the early diagnosis and treatment planning for patients with suspected or confirmed COVID-19 infection. In a few weeks, proposed new methods for lung screening using deep learning rapidly appeared, while quality assurance discussions lagged behind. This paper proposes a set of protocols to validate deep learning algorithms, including our ROI Hide-and-Seek protocol, which emphasizes or hides key regions of interest from CXR data. Our protocol allows assessing the classification performance for anomaly detection and its correlation to radiological signatures, an important issue overlooked in several deep learning approaches proposed so far. By running a set of systematic tests over CXR representations using public image datasets, we demonstrate the weaknesses of current techniques and offer perspectives on the advantages and limitations of automated radiography analysis when using heterogeneous data sources.

59 BASIC BIOLOGICAL SCIENCES↗

NRIC DOME Crane Trade Study and Recommendation

The National Reactor Innovation Center (NRIC) is a national program that was established as part of the Nuclear Energy Innovation Capabilities Act (NEICA). NRIC’s mission is to accelerate the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the nation’s most promising advanced nuclear reactors into commercial applications. The NRIC Demonstration of Microreactor Experiments (DOME) facility, formerly known as Experimental Breeder Reactor II (EBR II), located at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL) is intended to allow industrial and other partners the opportunity to test Advanced Microreactors up to 20MW thermal power. The 75-ton capacity polar crane located in the EBR II facility was rendered inoperable to support planned facility demolition in 2015; small holes were flame cut in the girders; hoists and cables were removed; oil was drained from gear boxes; trolley drive, and then filled with absorbent; and the electrical and control umbilical’s were disconnected, removed and disposed. Subsequently, the decision was made to convert the EBR II facility into the DOME test bed.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Cross-Code Verification of Neutronics Analysis Tools at INL Applied for 238 Pu Production in the Advanced Test Reactor

Here, analyses are completed for experiments prior to experiment irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). Various codes are used to qualify all experiments planned for insertion in the reactor, thereby ensuring that all safety and programmatic requirements are satisfied preirradiation. Among the common experiment analysis tools at INL are MCNP5 coupled to ORIGEN2 (MOPY) and MC21. MOPY uses MCNP5 for transport calculations along with calculations for fluxes and select reaction rates, and then ORIGEN2 handles the step-by-step and postirradiation depletion. MC21 handles all in-reactor transport and step-by-step, during-irradiation, depletion calculations, and then ORIGEN (SCALE 6.2.3) is used for decay and dose calculations postirradiation. The MOPY results, along with those obtained via two variations of the MC21 model, were compared in terms of 238 Pu production in the ATR’s H10 position. For the MOPY model, the MC21 model utilizing the HELIOS-based fission product (FP) library, and the MC21 model utilizing the expanded 1300 FP library, the during-cycle irradiation in-core heating results were sufficiently equivalent; however, the MOPY model and the MC21 model with the HELIOS library showed some differences relating to the respective FP libraries. Ultimately, the MC21 model with a 1300 FP library produced the most consistent results throughout the cycle, whereas the MC21 model that utilized the (smaller) HELIOS library was able to handle during-irradiation analysis but lacked certain short-lived FPs that significantly contributed to the total decay heat at shutdown. MOPY, on the other hand, was found to overpredict fission gas production, as a result of limitations in the ORIGEN2 code.

ATR↗

Quality assurance and quality control of the $26~\text {m}^2$ SiPM production for the DarkSide-20k dark matter experiment

DarkSide-20k is a novel liquid argon dark matter detector currently under construction at the Laboratori Nazionali del Gran Sasso (LNGS) of the Istituto Nazionale di Fisica Nucleare (INFN) that will push the sensitivity for Weakly Interacting Massive Particle (WIMP) detection into the neutrino fog. The core of the apparatus is a dual-phase Time Projection Chamber (TPC), filled with 50 tonnes of low radioactivity underground argon (UAr) acting as the WIMP target. NUV-HD-cryo Silicon Photomultipliers (SiPM)s designed by Fondazione Bruno Kessler (FBK) (Trento, Italy) were selected as the photon sensors covering two $10.5~\text {m}^2$ Optical Planes, one at each end of the TPC, and a total of $5~\text {m}^2$ photosensitive surface for the liquid argon veto detectors. This paper describes the Quality Assurance and Quality Control (QA/QC) plan and procedures accompanying the production of FBK NUV-HD-cryo SiPM wafers manufactured by LFoundry s.r.l. (Avezzano, AQ, Italy). SiPM characteristics are measured at 77 K at the wafer level with a custom-designed probe station. As of March 2025, 1314 of the 1400 production wafers (94% of the total) for DarkSide-20k were tested. The wafer yield is $93.2\pm 2.5$%, which exceeds the 80% specification defined in the original DarkSide-20k production plan.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗