Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power systems operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Fabrication and Testing of a Thin-Film Heat Flux Sensor for a Stirling Convertor

The NASA Glenn Research Center (GRC) has been testing high efficiency free-piston Stirling convertors for potential use in radioisotope power systems since 1999. Stirling convertors are being operated for many years to demonstrate a radioisotope power system capable of providing reliable power for potential multi-year missions. Techniques used to monitor the convertors for change in performance include measurements of temperature, pressure, energy addition, and energy rejection. Micro-porous bulk insulation is used in the Stirling convertor test set up to minimize the loss of thermal energy from the electric heat source to the environment. The insulation is characterized before extended operation, enabling correlation of the net thermal energy addition to the convertor. Aging microporous bulk insulation changes insulation efficiency, introducing errors in the correlation for net thermal energy addition. A thin-mm heat flux sensor was designed and fabricated to directly measure the net thermal energy addition to the Stirling convertor. The fabrication techniques include slip casting and using Physical Vapor Deposition (PVD). One micron thick noble metal thermocouples measure temperature on the surface of an Alumina ceramic disc and heat flux is calculated. Fabrication, integration, and test results of a thin film heat flux sensor are presented.

Wilson, Scott D.↗

Feasibility of solar power for Mars

NASA, through Project Pathfinder, has put in place an advanced technology program to address future needs of manned space exploration. Included in the missions under study is the establishment of outposts on the surface of Mars. The Surface Power program in Pathfinder is aimed at providing photovoltaic array technology for such an application (as well as for the lunar surface). Another important application is for unmanned precursor missions, such as the photovoltaic-power aircraft, which will scout landing sites and investigate Mars geology for a 1 to 2 year mission without landing on the surface. Effective design and utilization of solar energy depend to a large extent on adequate knowledge of solar radiation characteristics in the region of solar energy system operation. The two major climatic components needed for photovoltaic system designs are the distributions of solar insolation and ambient temperature. These distributions for the Martian climate are given at the two Viking lander locations but can also be used, to the first approximation, for other latitudes. One of the most important results is that there is a large diffuse component of the insolation, even at high optical depth, so that solar energy system operation is still possible. If the power system is to continue to generate power even on high optical opacity days, it is thus important that the photovoltaic system be designed to collect diffuse irradiance as well as direct. In absence of long term insolation and temperature data for Mars, the data presented can be used until updated data are available. The ambient temperature data are given as measured directly by the temperature sensor; the insolation data are calculated from optical depth measurements of the atmosphere.

Appelbaum, Joseph↗

Operational environments for electrical power wiring on NASA space systems

Electrical wiring systems are used extensively on NASA space systems for power management and distribution, control and command, and data transmission. The reliability of these systems when exposed to the harsh environments of space is very critical to mission success and crew safety. Failures have been reported both on the ground and in flight due to arc tracking in the wiring harnesses, made possible by insulation degradation. This report was written as part of a NASA Office of Safety and Mission Assurance (Code Q) program to identify and characterize wiring systems in terms of their potential use in aerospace vehicles. The goal of the program is to provide the information and guidance needed to develop and qualify reliable, safe, lightweight wiring systems, which are resistant to arc tracking and suitable for use in space power applications. This report identifies the environments in which NASA spacecraft will operate, and determines the specific NASA testing requirements. A summary of related test programs is also given in this report. This data will be valuable to spacecraft designers in determining the best wiring constructions for the various NASA applications.

Stavnes, Mark W.↗

ISS and Space Environment Interactions in Event of Plasma Contactor Failure

The International Space Station (ISS), illustrated in Figure 1, will be the largest, highest power spacecraft placed in orbit. Because of this the design of the electrical power system diverged markedly from previous systems. The solar arrays will operate at 160 V and the power distribution voltage will be 120 V. The structure is grounded to the negative side of the solar arrays so under the right circumstances it is possible to drive the ISS potential very negative. A plasma contactor has been added to the ISS to provide control of the ISS structure potential relative to the ambient plasma. The ISS requirement is that the ISS structure not be greater than 40 V positive or negative of local plasma. What are the ramifications of operating large structures with such high voltage power systems? The application of a plasma contactor on ISS controls the potential between the structure and the local plasma, preventing degrading effects. It is conceivable that there can be situations where the plasma contactor might be non-functional. This might be due to lack of power, the need to turn it off during some of the build-up sequences, the loss of functionality for both plasma contactors before a replacement can be installed, and similar circumstances. A study was undertaken to understand how important it is to have the contactor functioning and how long it might be off before unacceptable degradation to ISS could occur.

Carruth, M. R., Jr.↗

Co-Simulation Model for Optimal Wind-Hydro Coordination Using Wind Farm Control Dynamics

The growing share of Variable Renewable Energy sources (VRES) in power systems presents challenges for regula- tors, grid operators and energy producers. The VRES’ operation has limited flexibility in their operations, as they are highly dependent on ambient environments. To address these challenges, decision-makers must consider multiple objectives, among these are revenue, power system services and mechanical load on wind turbines. Coordinated operation of power plants and different wind farm control strategies are examples of measures that can benefit these objectives. This study proposes a Multi-Objective Linear Programming (MOLP) model to simulate the optimum operation of wind and hydropower plants that share limited transmission capacity. Further, wind farm control dynamics are included to obtain realistic output power and accumulated damage. From this, a case study based on a relevant location in Norway is presented to analyze the improved effect of wind- hydro coordination and wind farm control in achieving the objectives of accumulated wind turbine damage and total revenue of the hybrid power system. In addition, the study considers the potential advantages of adding a variable-speed pump to the hydropower plant. The results demonstrate that by considering multiple objectives in the optimization, one may achieve better overall performance of the objectives. By utilizing the flexibility of hydro storage, the decision maker may adjust to obtain the most desired outcome. Moreover, the added flexibility of utilizing a pump for hydro storage shows great improvements for the combined revenue of the power plants and reduced curtailment of the wind farm. However, less impact is observed from using a variable speed pump compared to a fixed speed pump.

13 HYDRO ENERGY↗

CalTestBed - Delphire - Testing and Evaluation of Delphire Sentinel System (CRADA Final Report)

The Delphire Sentinel is a modular fire detection and communications system operating as a mobile field unit, with low voltage DC power supplied by onboard photovoltaics (PV) and batteries. The Sentinel addresses several aspects of fire detection, communications and data analysis. The Sentinel's mobility enables it to be rapidly deployed and operate independently of existing power and communications networks. The duration of independent operation depends critically on the energy consumption of the systems and performance of the onboard PV and battery. The purpose of this testing is to ascertain the power draw and energy consumption of the Delphire Sentinel prototype system under several operational states, including various data transfer packet sizes, transmission time and frequencies, and communication pathways (Wi-Fi, cellular, satellite) expected to be encountered in field deployments. It will also include procedures to test the ability of the Sentinel to operate for extended periods without loss of functionality. Based on results from energy and power measurements, and anticipated duty cycles in field deployments, we will model annual system autonomy (e.g. loss of load probability) for off-grid operation in representative locations.

47 OTHER INSTRUMENTATION↗

An Analysis of the Effects of Renewable Energy Intermittency on the 2030 Korean Electricity Market

Republic of Korea has unique geographical characteristics similar to those of an island, resulting in an isolated power system. For this reason, securing sufficient operating reserves for the system’s stability and reliability in the face of the intermittency of increasing variable renewable energy (VRE) is paramount, and this will pave the way to achieving the nation’s decarbonization target and carbon neutrality. However, the current reserve-operation method in Republic of Korea does not take into account energy-system conditions, such as the intermittency of the VRE. Therefore, this paper presents an analysis of the impact of changes in reserve-operation methods on the electricity market in the future Republic of Korean power system, with the increased levels of VRE that are currently envisioned. Specifically, three reserve-operation methods, including Korea’s current reserve-power-operation standards, were applied to the two power-system plans announced by the Korean government to analyze the annual generator operation and costs. The analysis results show that securing reserves proportional to the VRE would exert negative effects, such as increased power-generation costs and the curtailment of nuclear and VRE generation. These results can contribute to the estimation of operational reserves needed for high levels of VRE and to the design of new the Korean reserve market, to be introduced in 2025.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Megawatt upgrade of NuMI target system

Fermilab operates the world’s highest power neutrino target system, called the Neutrinos at the Main Injector (NuMI) to provide intense neutrino flux to the NuMI Off-axis $\nu_{\mu}$ Appearance (NOvA) near and far neutrino detectors to reveal mysterious property of neutrinos. We report a progress of the NuMI beam power upgrade plan at Fermilab to transport a 1-Mega Watt (MW) proton beam to the high power neutrino target. The latest beam power record is 870 kW in Fall 2021.

Yonehara, Katsuya↗

Adaptive Load Shedding for Grid Emergency Control via Deep Reinforcement Learning

Emergency control, typically such as under-voltage load shedding (UVLS), is broadly used to grapple with low voltage and voltage instability issues in real-world power systems under contingencies. However, existing emergency control schemes are rule-based and cannot be adaptively applied to uncertain and floating operating conditions. Here, we propose an adaptive UVLS algorithm for emergency control via deep reinforcement learning (DRL) and expert systems. We first construct dynamic components for picturing the power system operation as the environment. The transient voltage recovery criteria, which poses time-varying requirements to UVLS, is integrated into the states and reward function to advise the learning of deep neural networks. The proposed method has no tuning issue of coefficients in reward functions, and this issue was regarded as a deficiency in the existing DRL-based algorithms. Case studies illustrate that the proposed method outperforms the traditional UVLS relay in both the timeliness and efficacy for emergency control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Online System ID for Predicting Power Plant Performance Throughout Cycling Operations

This presentation represents a review of the background research conducted by NETL to apply artificial intelligence, i.e. auto-recursive algorithms and data analytics to detect leaks in utility scale boilers and laboratory power systems. The new project being funded by the Advanced Sensors and Controls Program is part of the Field Work Proposal funded in EY21 as Task 53 to demonstrate the application of these techniques on a utility scale power system.

Shadle, Lawrence↗

Summary of Stirling Convertor Testing at GRC

The NASA Glenn Research Center (GRC) has been testing free-piston Stirling convertors for potential use in radioisotope power systems. These convertors tend to be in the 35 to 80 watt electric power output range. Tests at GRC have accumulated over 80,000 hours of operation. Test articles have been received from Infinia Corporation of Kennewick, WA and from Sunpower of Athens, OH. Infinia designed and built the developmental Stirling Technology Demonstration Convertors (TDC) in addition to the more advanced Test Bed and Engineering Unit convertors. GRC has eight of the TDC's under test including two that operate in a thermal vacuum environment. Sunpower designed and developed the EE- 35 and the Advanced Stirling Convertor (ASC). GRC has six of the EE-35's and is preparing for testing multiple ASC's. Free-piston Stirling convertors for radioisotope power systems make use of non-contacting operation that eliminates wear and is suited for longterm operation. Space missions with radioisotope power systems are often considered that extend from three to 14 years. One of the key capabilities of the GRC test facility is the ability to support continuous, unattended operation. Hardware, software, and procedures for preparing the test articles were developed to support these tests. These included the processing of the convertors for minimizing the contaminants in the working fluid, developing a helium charging system for filling and for gas sample analysis, and the development of new control software and a high-speed protection circuit to insure safe, round-the-clock operation. Performance data of Stirling convertors over time is required to demonstrate that a radioisotope power system is capable of providing reliable power for multi-year missions. This paper will discuss the status of Stirling convertor testing at GRC.

Schreiber, Jeffrey G.↗

Application of a Prize Mechanism to Address Data Utilization Challenges at Utilities

The electric industry sector is facing an “explosion” of data from a variety of sources. Electric sector stakeholders need to define how to capitalize on large datasets, both those they create and those from other sources (like data on weather, buildings, electric vehicles, etc.), to improve reliability and resilience and meet the changing system dynamics from renewable integration. For the electricity sector to fully utilize these vast new datasets, it must undergo a transformation in how it manages data quality, storage, and processing. The U.S. Department of Energy (DOE) Office of Electricity (OE) is committed to accelerating research, development, and demonstration of new technologies and tools within the electricity sector to advance reliability, resilience, and affordable operation of the power system. Through the prize mechanism, OE identified two widespread data-related challenges for utilities—load modeling and data analysis automation—and offered an opportunity for utilities and teams of software engineers to identify additional challenges faced by utilities. After completing one round of the American-Made Digitizing Utilities Prize, OE, the National Renewable Energy Laboratory (NREL) as the prize administrator, and Pacific Northwest National Laboratory (PNNL) as the domain experts have compiled the results and lessons learned to feed into the second round of the prize.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Operational performance of the photovoltaic-powered grain mill and water pump at Tangaye, Upper Volta

The first two years of operation of a stand alone photovoltaic (PV) power system for the village of Tangaye, Upper Volta in West Africa are described. The purpose of the experiment was to demonstrate that PV systems could provide reliable electrical power for multiple use applications in remote areas where local technical expertise is limited. The 1.8 kW (peak) power system supplies 120-V (d.c.) electrical power to operate a grain mill, a water pump, and mill building lights for the village. The system was initially sized to pump a part of the village water requirements from an existing improved well, and to meet a portion of the village grain grinding requirements. The data, observations, experiences, and conclusions developed during the first two years of operation are discussed. Reports of tests of the mills used in the project are included.

Martz, J. E.↗

Fission Surface Power Technology Development Update

Power is a critical consideration in planning exploration of the surfaces of the Moon, Mars, and places beyond. Nuclear power is an important option, especially for locations in the solar system where sunlight is limited or environmental conditions are challenging (e.g., extreme cold, dust storms). NASA and the Department of Energy are maintaining the option for fission surface power for the Moon and Mars by developing and demonstrating technology for a fission surface power system. The Fission Surface Power Systems project has focused on subscale component and subsystem demonstrations to address the feasibility of a low-risk, low-cost approach to space nuclear power for surface missions. Laboratory demonstrations of the liquid metal pump, reactor control drum drive, power conversion, heat rejection, and power management and distribution technologies have validated that the fundamental characteristics and performance of these components and subsystems are consistent with a Fission Surface Power preliminary reference concept. In addition, subscale versions of a non-nuclear reactor simulator, using electric resistance heating in place of the reactor fuel, have been built and operated with liquid metal sodium-potassium and helium/xenon gas heat transfer loops, demonstrating the viability of establishing system-level performance and characteristics of fission surface power technologies without requiring a nuclear reactor. While some component and subsystem testing will continue through 2011 and beyond, the results to date provide sufficient confidence to proceed with system level technology readiness demonstration. To demonstrate the system level readiness of fission surface power in an operationally relevant environment (the primary goal of the Fission Surface Power Systems project), a full scale, 1/4 power Technology Demonstration Unit (TDU) is under development. The TDU will consist of a non-nuclear reactor simulator, a sodium-potassium heat transfer loop, a power conversion unit with electrical controls, and a heat rejection system with a multi-panel radiator assembly. Testing is planned at the Glenn Research Center Vacuum Facility 6 starting in 2012, with vacuum and liquid-nitrogen cold walls to provide simulation of operationally relevant environments. A nominal two-year test campaign is planned including a Phase 1 reactor simulator and power conversion test followed by a Phase 2 integrated system test with radiator panel heat rejection. The testing is expected to demonstrate the readiness and availability of fission surface power as a viable power system option for NASA's exploration needs. In addition to surface power, technology development work within this project is also directly applicable to in-space fission power and propulsion systems.

Palac, Donald T.↗

Delivery and application of precise timing for a traveling wave powerline fault locator system

The Bonneville Power Administration (BPA) has successfully operated an in-house developed powerline fault locator system since 1986. The BPA fault locator system consists of remotes installed at cardinal power transmission line system nodes and a central master which polls the remotes for traveling wave time-of-arrival data. A power line fault produces a fast rise-time traveling wave which emanates from the fault point and propagates throughout the power grid. The remotes time-tag the traveling wave leading edge as it passes through the power system cardinal substation nodes. A synchronizing pulse transmitted via the BPA analog microwave system on a wideband channel sychronizes the time-tagging counters in the remote units to a different accuracy of better than one microsecond. The remote units correct the raw time tags for synchronizing pulse propagation delay and return these corrected values to the fault locator master. The master then calculates the power system disturbance source using the collected time tags. The system design objective is a fault location accuracy of 300 meters. BPA's fault locator system operation, error producing phenomena, and method of distributing precise timing are described.

Street, Michael A.↗

Identification of high performance and component technology for space electrical power systems for use beyond the year 2000

Addressed are some of the space electrical power system technologies that should be developed for the U.S. space program to remain competitive in the 21st century. A brief historical overview of some U.S. manned/unmanned spacecraft power systems is discussed to establish the fact that electrical systems are and will continue to become more sophisticated as the power levels appoach those on the ground. Adaptive/Expert power systems that can function in an extraterrestrial environment will be required to take an appropriate action during electrical faults so that the impact is minimal. Manhours can be reduced significantly by relinquishing tedious routine system component maintenance to the adaptive/expert system. By cataloging component signatures over time this system can set a flag for a premature component failure and thus possibly avoid a major fault. High frequency operation is important if the electrical power system mass is to be cut significantly. High power semiconductor or vacuum switching components will be required to meet future power demands. System mass tradeoffs have been investigated in terms of operating at high temperature, efficiency, voltage regulation, and system reliability. High temperature semiconductors will be required. Silicon carbide materials will operate at a temperature around 1000 K and the diamond material up to 1300 K. The driver for elevated temperature operation is that radiator mass is reduced significantly because of inverse temperature to the fourth power.

Maisel, James E.↗

Radiation hardening design of nuclear powered spacecraft

The design and operation of space systems utilizing nuclear fueled power systems must consider the radiation environment from the earliest stages of their design. A range of nuclear systems are being considered for present and future satellite systems capable of supplying tens of kilowatts to multimegawatt and generating a corresponding range of radiation environments. The effects of these radiations on electronics and materials can be minimized by implementing early design considerations which maximize the design efficiency and minimize the impact on system mass. Space systems design considerations for the radiation environment must include all sources in addition to the self induced gamma ray and neutron radiation. These include the orbital dependent environment from the high energy electron and protons encountered in natural space. The system trades which the designer must consider in the development of space platforms which utilize nuclear reactor power supplies are discussed.

Schmidt, R. E.↗

Testing of an Arcjet Thruster with Capability of Direct-Drive Operation

Electric thrusters typically require a power processing unit (PPU) to convert the spacecraft provided power to the voltage-current that a thruster needs for operation. Testing has been initiated to study whether an arcjet thruster can be operated directly with the power produced by solar arrays without any additional conversion. Elimination of the PPU significantly reduces system-level complexity of the propulsion system, and lowers developmental cost and risk. The work aims to identify and address technical questions related to power conditioning and noise suppression in the system and heating of the thruster in long-duration operation. The apparatus under investigation has a target power level from 400-1,000 W. However, the proposed direct-drive arcjet is potentially a highly scalable concept, applicable to solar-electric spacecraft with up to 100's of kW and beyond. A direct-drive electric propulsion system would be comprised of a thruster that operates with the power supplied directly from the power source (typically solar arrays) with no further power conditioning needed between those two components. Arcjet thrusters are electric propulsion devices, with the power supplied as a high current at low voltage; of all the different types of electric thruster, they are best suited for direct drive from solar arrays. One advantage of an arcjet over Hall or gridded ion thrusters is that for comparable power the arcjet is a much smaller device and can provide more thrust and orders of magnitude higher thrust density (approximately 1-10 N/sq m), albeit at lower I(sub sp) (approximately 800-1000 s). In addition, arcjets are capable of operating on a wide range of propellant options, having been demonstrated on H2, ammonia, N2, Ar, Kr, Xe, while present SOA Hall and ion thrusters are primarily limited to Xe propellant. Direct-drive is often discussed in terms of Hall thrusters, but they require 250-300 V for operation, which is difficult even with high-voltage solar arrays. The arcjet requires under 100 V, which is more in-line with what is easily possible with a solar array. Direct-drive of an electric propulsion system confers the advantage of reducing or eliminating the power processing unit (PPU) that is typically needed to convert the spacecraft-provided power to the voltage and current needed for thruster operation. Since the PPU is typically the most expensive piece of an electric thruster system, from both a fabrication and qualification standpoint, its elimination offers the potential for major reductions in system cost and risk. The design of the arcjet built for this effort was based on previous low power (1 kW class) arcjets. It has a precision machined 99.95% pure tungsten anode which also serves as the nozzle. The anode constrictor region is 1 mm (0.040-in) diameter and 1 mm (0.040-in) long. The cathode is a tungsten welding electrode doped with LaO2; its tip was precision ground to a 30◦ angle ending in a blunt end. The two electrodes are separated by a boron-nitride insulator which also serves as the propellant injection manifold; it ends in six small holes which introduce the propellant gas in the diverging section of the nozzle, directly adjacent to the cathode. The electrodes and insulator are housed in a stainless-steel outer-body, with a Macor insulator at the mid-plane to provide thermal isolation between the front and back halves of the device. The gas seals were made using Grafoil gaskets. Figure 1A shows the assembled thruster in the vacuum chamber; figure 1B shows the thruster in operation on argon at a flow rate of 676 sccm (20 mg/s). Initial testing was conducted in a 3.5-ft diameter vacuum chamber; the ultimate pressure reached during quasi-steady operation of the thruster was about 330 millitorr. The thruster was powered with a high-current, 0-100A, 15 kW power supply. The discharge was initiated with a high-voltage (approximately 10 kV) spark initiator that was isolated from the supply by a stack of diodes. The testing indicated that an operating point exists within the I-V characteristics that is compatible with direct-drive solar-electric operation; for a flow rate of 20 mg/s (argon) the arc could be sustained at a voltage of about 20 V and a current of 25 A (500W).

Martin, Adam K.↗