Distributed, Active Grid-interrogation and Signal Analysis for Advanced Protective Relaying
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This paper proposes an online data-driven distributed energy resource management system (DERMS) for distribution system optimal DER dispatch as well as voltage regulation. Here, the key innovation is to leverage the Local Sensitivity Factor (LSF) for transforming the DER control into a computationally efficient linear programming (LP) problem. By taking real-time measurements, the estimation of LSF eliminates the need for an accurate distribution system model as well as full nodal load information, which is difficult to achieve in practice. A robust recursive least squares method is also developed to ensure the robust estimation of LSF, which is initialized using reasonable values from model-derived LSFs. This allows the system to adapt to changing operational conditions effectively. A scenario-based, chance-constrained framework is further employed to ensure voltage remains within acceptable limits in the presence of measurement and estimation uncertainties. Test results on a real-world, 759-node distribution network located in western Colorado, U.S., validate the effectiveness and robustness of the proposed control approach and demonstrate its superior performance as compared to alternative methods.
The current electric grid is transitioning through increasing penetration of distributed energy resources (DERs), which include intermittent renewable generation resources on the distribution side. Both the monitoring and control of DERs require extensive data-exchange and communication networks. These networks lead to cyber vulnerabilities and risks of new kinds of cyberattacks that may be extremely destructive for power system operations. Although current standards, such as IEEE Std. 1547-2018, do not discuss cybersecurity measures for DERs, cybersecurity controls should be developed for securing DER systems at the device level, communications level, and applications level. This paper discusses the current industry's best practices related to DER cybersecurity and proposes recommended functionalities for improving the cybersecurity posture of DERs, specifically at the device/distribution level. These practical recommendations have been discussed and verified with the industry through a DER cybersecurity working group.
This paper introduces a novel multirate cosimulation architecture that overcomes previous challenges integrating faster real-time, microseconds-scale, power-hardware-in-the-loop (PHIL) with larger scale but slower, real-time, seconds-scale, quasi-static time-series (QSTS) simulation. Specifically, an intermediate reduced-equivalent electromagnetic transient (EMT) model duplicates the key power system topology to capture high-speed dynamics and converge hardware-power system interactions between QSTS updates. Exchanging multidimensional parameter vectors (loads, control status, etc.) between the QSTS and EMT models enables capturing the interactions of the rich, high-node-count (thousands of electrical nodes) QSTS model with the hardware. This architecture offers full spatial resolution from QSTS, including individual load dynamics, actual distribution management system controls, and nodal voltages. Simultaneously, the intermediate EMT model provides more detailed high-speed transients of key distributed energy resource hardware interactions. In addition, we use careful PHIL interface design and the exchange of complex power data, rather than current, to further improve performance. This cosimulation architecture is demonstrated by testing a simulated distribution system with an interconnected 500-kVA advanced photovoltaic (PV) inverter in PHIL. In conclusion, the architecture successfully captured PV local volt-volt ampere reactive (volt-VAR) control interactions with the larger network under time-varying electrical and weather conditions.
Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.
Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.
In this project, Clarkson University, in collaboration with Southern Methodist University and University of Pittsburgh, conducted the research to model, design, and implement a sophisticated generation and transmission co-optimization planning decision tool, called Multi-stage and Multi-timescale robust Co-Optimization Planning (MMCOP). The MMCOP decision tool intends to facilitate generation and transmission co-optimization planning of emerging power systems, while mitigating risks and uncertainties in both short-term operation dynamics and long-term policy and technology changes. Long-term power system planning aims at optimizing asset utilization by investing in a proper mix of various generation technologies and transmission lines to supply the future load growth. In particular, the Clean Power Plan (CPP), which is designed to combat climate change and reduce carbon emissions by setting a national limit on carbon pollution from power plants, may dramatically change the landscape of the power industry by further promoting clean energy and phasing out emissions-intensive generation technologies. In addition, novel non-wire alternatives (e.g., demand response (DR), distributed generation (DG), energy efficiency (EE), and smart grid technologies) and the computational complexity for large-scale systems significantly complicate the system planning procedure even further. However, existing conventional planning approaches neglect short-term variability and uncertainty of renewable energy, hourly chronological operation details, and physical nonlinear characteristics of the alternating current transmission network. As a result, existing conventional planning approaches may not work properly, and power systems reliability could be in jeopardy. In observing the limitations of existing conventional planning approaches and addressing new challenges of emerging power systems, the main scope of this project to develop co-optimization planning models within a multi-stage and multi-timescale framework. In particular, random contingencies, key uncertainty factors, and AC power flows are included to derive expansion plans while considering both long-term reliability and short-term flexibility.
The “Modular HF Isolated MV String Inverters Enable a New Paradigm for Large PV Farms” project focuses on exploring alternative power converter and system-level plant configurations to achieve the lowest cost and highest energy output for a given solar plus storage (e.g., PV + battery) plant, including the use of medium voltage (MV) collection while taking into account detailed models of all elements. To realize this objective, four approaches were utilized (i) employ a novel Medium Voltage String Inverter (MVSI) topology (soft switching solid state transformer – S4T) to convert 1000 Vdc to 4.16 kVac; (ii) plant collection using standard, low-cost overhead MV distribution network; (iii) enable energy storage integration without additional converter cost to achieve dispatchability of the PV resource; and (iv) provide advanced functionality (autonomous operation, track ISO signals for dynamic balancing and ancillary services, and PV farm operation as a virtual grid resource). Subsequently and in alignment with the previously mentioned approaches, the project was structured in five efforts (i) S4T MVSI simulation and design; (ii) system analysis and storage optimization; (iii) financial analysis; (iv) power converter prototype build and test; and (v) regulatory and commercial impact study. The outcomes provided by each effort can be summarized as follows (i) Project explored the use of MV AC distribution architecture for hybrid PV+storage utility-scale PV farms; (ii) Detailed loss and LCOE analysis for AC and DC side BESS architecture, including multiple converter topologies, as well as for proposed MVSI/MDCT systems; (iii) MVSI was built and holds promise but needs lower-cost high-voltage Si-C devices, which does not seem possible in the near term; (iv) MDCT provides a simpler modular building block – validated through HIL and farm level modeling, simulation and experimental validation; (v) 300 kVA MDCT prototype built and tested, technology is being commercialized; and (vi) Regulatory model of utility building PV plants, where PV panels are treated as DC generation (IPP), seems viable and can allow improved grid integration.
Optimal power management (OPM) is critical for large-scale battery energy storage systems. Today’s methods often require formidable computational effort due to the design based on centralized numerical optimization. Thus, this paper investigates computationally distributed OPM where the agents based on the cells communicate over a network to cooperatively solve the OPM problem. We propose an accelerated tracking alternating direction method of multipliers (ADMM) algorithm to solve the distributed OPM. The proposed algorithm embeds dynamic average consensus and Nesterov’s acceleration technique in the ADMM algorithm. Not only is the proposed algorithm fully distributed without a need for fusion or aggregating nodes, but it also accelerates convergence. The paper formulates the OPM in a model predictive control framework where it seeks to regulate the charging/discharging power of each battery cell to minimize the total power losses and promote balanced use of the constituent cells while complying with the safety constraints. The paper provides ample simulation results to demonstrate the effectiveness and advantages of the proposed distributed OPM in terms of computation and convergence.
The conversion process of a practical large-scale feeder data from a quasi-static time series (OpenDSS) model into a real-time phasor model (ePHASORSIM in Opal-RT) is discussed in the paper. The process is implemented using an open source Python software. Previous reported implementations for the conversion process lead to several errors when applied to a larger-scale system such as the one considered here. Hence in this work, we describe the common issues in this conversion and propose a customized solution to enhance the efficiency of the conversion and reduce the complexity in the process. A quantitative validation of the enhanced conversion process is presented in this work using an actual high PV penetration feeder model that consists of 2230 buses, and using actual load and PV profile data. After a detailed analysis, this customized conversion software will be made available as an open source tool and is expected to be helpful for researchers who want to pursue a similar conversion. Solutions to various observed issues such as identifying the lines due to islanded network, representation of full impedance model of transformer/lines as sequential models, complexity in the representation of single phase buses/lines as three phase buses/lines to make it compatible with the simulator platform are discussed. Comparison of power flow and time series simulation results obtained from both OpenDSS and ePHASORsim models show very low errors, validating the accuracy of the proposed conversion process.
The emerging of microgrids in distribution systems has significantly enhanced the resilience of power grids. However, the operators of a distribution system and microgrids therein can be different and have accessibility to different devices. To model the operation of such a grid, this work proposes a bilevel formulation and probes into the voltage regulation operation, considering the interaction between different systems. The proposed bilevel formulation considers the cooperation of active energy resources (AER), transformer tap-changers, and capacitor banks that are controlled by different operators. To facilitate the solution time of the target bilevel optimization, the lower-level problems with different objectives are modeled using deep neural networks (DNNs) which are then converted into a set of constraints. Hence, the bilevel problem can be reformed to a single-level problem. Lastly, the proposed solution procedures are validated using a customized joint system constructed by the IEEE 123-bus system and a real distribution system in Iowa. According to the numerical validation results, the solution time of the proposed nonlinear activation function based DNN model is 69 times faster than other methods in solving voltage regulation with a bilevel structure.
Power distribution grids are increasingly exposed to High-Impact Low-Probability (HILP) events, which cause widespread disruptions with severe societal and economic impacts. The growing complexity of modern grids, driven by the integration of distributed energy resources and smart grid technologies, has introduced new challenges to effective service restoration. While significant research has explored individual restoration strategies, such as network reconfiguration and microgrid formation, limited attention has been given to methods in which they can be effectively coordinated. Furthermore, the absence of systematic review papers addressing this issue hampers the development of cohesive restoration frameworks capable of addressing the operational complexities of modern grids. This paper presents a systematic review synthesizing existing knowledge on power grid restoration, identifying key limitations, and highlighting opportunities for coordinated strategies. By addressing research gaps and emphasizing the integration of diverse approaches, this study provides critical insights for advancing grid resiliency and recovery, offering a foundation for future research and practical applications in the face of HILP events.
As today's power grid is evolving into a densely interconnected cyber-physical system (CPS), a high fidelity and multifaceted testbed environment is needed to perform cybersecurity experiments in a realistic grid environment. Traditional standalone CPS testbeds lack the ability to emulate complex cyber-physical interdependencies between multiple smart grid domains in a real-time environment. Therefore, there are ongoing research and development (R&D) efforts to develop an interconnected CPS testbed by sharing geographically dispersed testbed resources to perform distributed simulation while analysing simulation fidelity. This paper presents a networked federation testbed for cybersecurity evaluation of today's and emerging smart grid environments. Specifically, it presents two novel testbed architectures, including cyber federation and cyber-physical federation, identifies R&D applications, and also describes testbed building blocks with experimental case studies. It also presents a novel co-simulation interface algorithm to facilitate distributed simulation within cyber-physical federation. The resources available at the PowerCyber CPS security testbed at Iowa State University (ISU) and the US Army Research Laboratory are utilised to develop this platform for performing multiple experimental case studies pertaining to wide-area protection and control applications in power system. Finally, experimental results are presented to analyse the simulation fidelity and real-time performance of the testbed federation.
Power grid inertia plays a vital role in frequency stability following large disturbances, yet its distribution across the U.S. grid is highly uneven. While interconnection-wide inertia benchmarks are useful, they can mask regional variability driven by resource mix, network coupling, and geographic separation. This paper extends event-driven inertia estimation to the regional scale using field measurements from the Frequency Monitoring Network (FNET/GridEye). Starting from balancing authority and independent system operator footprints, candidate regions are refined using a composite coherency score that combines frequency-trajectory shape similarity, timing spread, and lead/lag behavior to ensure dynamic consistency. A filtered sliding difference method (FSDM) is then used to construct regional frequency trajectories, detect disturbance onset, and compute robust regional rate-of-change of frequency (RoCoF). Regional, local, and interconnection inertia are estimated by combining RoCoF with event power imbalance, and additional indicators (regional-to-system inertia ratio and inertial-support arrival time) quantify regional-to-interconnection coupling and relative regional contributions. The method is demonstrated on eleven regions across the Eastern Interconnection (EI) and the Western Electricity Coordinating Council (WECC), with the Electric Reliability Council of Texas (ERCOT) used for validation. In ERCOT, estimates compared against energy management system (EMS) values achieve a mean absolute percentage error of 17.94%. WECC exhibits consistently shorter inertial-support arrival times (0.15–0.3 s) than EI (0.7–1.1 s), highlighting contrasting coupling and disturbance-propagation behavior. Overall, the results reveal pronounced spatial heterogeneity in inertia and coupling, underscoring the value of regional monitoring for both operational decision-making and long-term system planning.
National Laboratory of the Rockies (NLR), in collaboration with the Dubai Electricity and Water Authority (DEWA) and Infra-X, has undertaken the Energy Visualization Analysis Project. The aim of this project is to enhance analytical and 3D visualization capabilities for distribution network planning and renewable energy integration. As modern grid continues to evolve with large-scale solar PV deployment and emerging distributed energy resources (DERs), the ability to effectively analyze, visualize, and communicate complex grid behaviors has become increasingly critical. The project focuses on developing empirical use cases based on real distribution feeder data and engineering workflows, ensuring the outcomes are directly aligned with operational environment. Through time-series power flow simulations and nodal hosting capacity analysis, the study quantifies the impacts of high PV penetration on voltage and thermal limits within representative 11 kV feeders. These analyses identify specific nodes and conditions where DER integration challenges arise. Furthermore, a Battery Energy Storage System (BESS) optimization algorithm was applied to determine the optimal size and placement of storage systems that can mitigate network constraints and enhance hosting capacity. The comparative results between base-case and BESS-augmented scenarios clearly demonstrate improvements in network stability and load management efficiency. In parallel, the NLR team developed an immersive 3D visualization framework, enabling interactive exploration of grid simulations using commodity head-mounted display (HMD) systems. This framework transforms conventional 2D simulation data into spatially intuitive visual environments - allowing engineers to analyze feeder conditions, PV hosting potential, and BESS effects in real time. This report represents the first foundational phase in establishing a visualization-driven analytical ecosystem. It provides a methodological foundation for data integration, visualization architecture, and simulation-based decision support, paving the way for large-scale adoption of immersive visualization across DEWA's Smart Grid Initiative, R&D activities, and future network resilience studies.
We consider the distributed beam scheduling problem in mm-Wave networks where the base stations may belong to different operators and there is no centralized coordination among them. Our goal is to design distributed beam scheduling algorithms such that the network utility, which is defined as a logarithm function of the average throughput of the user equipment, can be maximized. We propose a non-cooperative game-based scheduling approach where the base stations are modeled as players that greedily maximize their own utilities. The Nash Equilibrium (NE) then provides a distributed solution to the network utility maximization problem. By employing the Lyapunov optimization, the asymptotic optimality of the proposed scheduling can be guaranteed. We prove the existence and provide sufficient conditions which guarantee the uniqueness of the NE by establishing an equivalence to the Variational Inequality (VI) problem. We also propose a parallel power adaptation algorithm which is proved to converge to the NE. Numerical results show the superiority of the proposed scheduling over several distributed baseline schemes.
Advanced Metering Infrastructure forms a communication network for the collection of power data from smart meters in Smart Grid. As the communication between smart meters could be secured utilizing public-key cryptography, however, public-key cryptography still has certain challenges in terms of certificate revocation and management particularly related distribution and storage overhead of revoked certificates. To address this challenge, in this work, we propose a novel revocation management approach by utilizing cryptographic accumulators which reduces the space requirements for revocation information significantly and thus enables efficient distribution of such information to all smart meters. We implemented the proposed approach on both ns-3 network simulator and a testbed. We demonstrated its superior performance with respect to traditional methods for revocation management.