Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Optimal Stop Word Selection for Text Mining in Critical Infrastructure Domain

Eliminating all stop words from the feature space is a standard practice of preprocessing in text mining, regardless of the domain which it is applied to. However, this may result in loss of important information, which adversely affects the accuracy of the text mining algorithm. Therefore, this paper proposes a novel methodology for selecting the optimal set of domain specific stop words for improved text mining accuracy. First, the presented methodology retains all the stop words in the text preprocessing phase. Then, an evolutionary technique is used to extract the optimal set of stop words that result in the best classification accuracy. The presented methodology was implemented on a corpus of open source news articles related to critical infrastructure hazards. The first step of mining geo-dependencies among critical infrastructures from text is text classification. In order to achieve this, article content was classified into two classes: 1) text content with geo-location information, and 2) text content without geo-location information. Classification accuracy presented methodology was compared to accuracies of four other test cases. Experimental results with 10-fold cross validation showed that the presented method yielded an increase of 1.76% or higher in True Positive (TP) rate and a 2.27% or higher increase in the True Negative (TN) rate compared to the other techniques.

97 MATHEMATICS AND COMPUTING↗

Optimization of Clean Room Infrastructure and Procedure During LCLS-II Cryomodule Production at Fermilab

Optimization of Fermilab string assembly procedure and infrastructure has yielded a significant improvement of cryomodule particulate counts. Late production of LCLSII cryomodules were tested at CMTF at Fermilab and showed little to no x-ray up to administrative limit. The paper describes the field emission measurement instrumentation, field emission results of Fermilab’s LCLS-II cryomodules, clean room infrastructure upgrade and procedure optimization.

43 PARTICLE ACCELERATORS↗

Continuous Test and Transition Infrastructure for Quantum Networking for Science Complex

We propose a network architecture with a separate quantum dataplane and a conventional control plane: (a) Quantum Data Plane: The Quantum Data plane consists of links of dark fibers connecting quantum switches and repeaters, which in turn, connect to quantum computers, memory and sensors. Since the current reach is limited to local areas, it will begin as a collection of site networks at laboratories, (b) Conventional Control Plane: The Control plane provides management access to quantum devices for configuration and provisioning via control nodes with firewall and encryption capabilities. Continuous Test and Transition Infrastructure: We propose an infrastructure with a control plane connecting multiple sites via encrypted tunnels over conventional networks consisting of the following: (a) Site Quantum Networks: Individual site networks supported by their fiber plants connect laboratories that house and connect to their quantum devices for testing and interoperability.(b) Site Control Planes: Sites are connected over individual control planes with control hosts with Software Defined Networking capabilities, which can be peered with other networks via ESnet.(c) Progressive Expansion: Initially, sites will develop individual data planes with their specific quantum devices and fiber connections, and mechanisms to interface with conventional networks. They progressively expand and interconnect, under a wide-area ecosystem of peered control planes for device testing, interoperability development and roll off into production environments.

Rao, Nageswara S.↗

Infrastructure and Metocean Technology

<strong>Research Problem: </strong>Changes in the ocean environment (i.e., mudslides or burial from subsea currents, strong weather events or natural fluctuations) have been linked to <strong>billions of dollars of impacts</strong>. These events can have a significant effect on the <strong>success and longevity </strong>of offshore infrastructure, as well as affect <strong>safety and cost </strong>during exploration and production activities.<strong>Research Approach: (1) </strong>Determine current state of knowledge regarding hazardous metocean and bathymetric conditions, and data availability regarding these conditions and historic events. (2) EY19 -Evaluate if Ml/AI model can be developed to better identify current hazardous metocean and bathymetric conditions. (3) EY 20 + -develop, train, and test ML/AI model to identify current conditions and forecast changes and vulnerability that may impact offshore infrastructure and operations. <strong>Benefit: </strong>Improved characterization of seabed related hazards in the offshore environment will help to manage and minimize costs and risks during drilling and production operations, and help prevent catastrophic incidents.

Duran, Rodrigo↗

How the NRC modernized its digital I&C infrastructure and where it goes from here

The NRC first formally developed infrastructure for the review of digital instrumentation and control (I&C) systems in the 1990’s. Although, the current U.S. fleet of nuclear power plants were originally designed and constructed with analog systems, the U.S. nuclear industry has for more that thirty years been working to upgrade these older systems with modern digital systems. Digital systems have many advantages but also pose different engineering challenges and need to be reviewed by the Nuclear Regulatory Commission (NRC) in a different way. Because of this the NRC started looking at its regulatory infrastructure to see if changes needed be made to support the expanded safe use of digital systems in nuclear power plants. Several efforts in the 1990’s included a review by the National Academies’ National Research Council, a review of the impact of potential new digital systems by the NRC staff as a result of advanced reactor designs and the NRC staff’s update to the I&C section of the Standard Review Plan (SRP) (Ref 1).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scalable Approaches to Selecting Key Entities in Large Networked Infrastructure Systems

This work aims at bringing advances in discrete optimization algorithms to solving practical engineering problems at scale. Often times, in many engineering design problems, there is a need to select a small set of influential or representative elements from a large ground set of entities in an optimal fashion. Submodular optimization provides for a formal way to solve such problems. Common examples with infrastructure systems involve sensor placement and identification of key entities with certain objectives. However, scaling these approaches to large infrastructure systems can be challenging because of the high computational complexity of the overall framework that include the optimization algorithms as well as high-complexity compute-oracles that provide the necessary objective function values. In this work, we explore a well-studied and widely-applicable paradigm, namely leader-selection in a multi-agent networked setting in the context of scalable methodologies. We demonstrate novel frameworks that utilize variations of accelerated submodular optimization algorithms along with linear-algebraic methods that can help accelerate the oracle computations. We further explore this combination in conjunction with graph partitioning paradigms to take advantage of the accelerated algorithms in a distributed setting. Finally we demonstrate the key findings on a practical problem in an operational setting. For this, we leverage an example road network with approximately 18k nodes and 27k edges in a traffic control application, where we seek a limited number of k=200 key intersections. This problem can be solved in a serial setting in just under 5 hours providing more than 2 orders of magnitude speed-up over methods that do not consider acceleration techniques.

Visweswara Sathanur, Arun↗

Micromobility Integrated Transit and Infrastructure for Efficiency (MITIE)

Nearly omnipresent in many cities of all sizes across the United States, micromobility vehicles-e-scooters, manual bicycles, e-bicycles, and larger seated electric scooters-are notably missing from SMART Mobility research. This project aims to expand the spectrum of modes currently being researched within SMART Mobility by exploring micromobility as an important tool toward meeting energy-efficient mobility goals. It expands on findings from SMART Mobility 1.0 that revealed preferences to reduce transportation-related expenses through use of a network of mobility-as-a-service (MaaS) and other shared mobility options, and builds on findings from a 2019 Vehicle Technology Analysis Program (VTAP) funded micromobility project conducted by our team. We will explore multiple facets of micromobility, including behavior and decision-making, the integration of micromobility within transportation infrastructure, energy estimates, and operations. Guiding research questions include: (1) What are the potential energy savings from low, medium, and high market penetration of micromobility (in passenger, multimodal, and freight domains)? (2) Which scenarios for micromobility use and related enablement of increased public transit use should be modeled/considered in the SMART 2.0 Workflow? (3) To what degree can micromobility supplement/complement transit system operations? (4) What are people's preferences towards micromobility? How do preferences vary across various sociodemographic segments? How can this knowledge inform operations? (5) What are optimal strategies to attain high user adoption and shift users toward more energy-efficient mode choices in terms of micromobility operation? How do these strategies affect energy savings, person-miles traveled, lifecycle energy use, and adoption rates? These questions will be addressed through applied research in five project emphasis areas: (1) Energy estimates of micromobility for Workflow scenarios: Expand and refine previous micromobility work to augment the Workflow approaches to modeling urban travel. (2) Multimodal connection with transit: Utilizing Mobility-Energy Productivity (MEP) tools to evaluate multimodal travel patterns enabled by micromobility, including assessing how to reduce barriers of inequity of access to mobility options and destinations. (3) Mode choice, induced demand, and infrastructure: Understanding the mode shift induced through micromobility to inform energy impact analysis. (4) Energy optimization of micromobility operations: Identification of micromobility operations parameters and development of operations scenarios to better understand present-day micromobility operations for integration into the Workflow, in partnership with BEAM and POLARIS modeling teams. (5) Micro-freight: Characterize the current state of micro-freight activities, including energy effects and geospatial analyses, to inform Workflow.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Micromobility Integrated Transit and Infrastructure for Efficiency (MITIE)

Nearly omnipresent in many cities of all sizes across the United States, micromobility vehicles-e-scooters, manual bicycles, e-bicycles, and larger seated electric scooters-are notably missing from SMART Mobility research. This project aims to expand the spectrum of modes currently being researched within SMART Mobility by exploring micromobility as an important tool toward meeting energy-efficient mobility goals. It expands on findings from SMART Mobility 1.0 that revealed preferences to reduce transportation-related expenses through use of a network of mobility-as-a-service (MaaS) and other shared mobility options, and builds on findings from a 2019 Vehicle Technology Analysis Program (VTAP) funded micromobility project conducted by our team. We will explore multiple facets of micromobility, including behavior and decision-making, the integration of micromobility within transportation infrastructure, energy estimates, and operations. Guiding research questions include: 1) what are the potential energy savings from low, medium, and high market penetration of micromobility (in passenger, multimodal, and freight domains)? 2) which scenarios for micromobility use and related enablement of increased public transit use should be modeled/considered in the SMART 2.0 Workflow? 3) to what degree can micromobility supplement/complement transit system operations? 4) what are people's preferences towards micromobility? How do preferences vary across various sociodemographic segments? How can this knowledge inform operations? 5) what are optimal strategies to attain high user adoption and shift users toward more energy-efficient mode choices in terms of micromobility operation? How do these strategies affect energy savings, person-miles traveled, lifecycle energy use, and adoption rates? These questions will be addressed through applied research in five project emphasis areas: 1) energy estimates of micromobility for Workflow scenarios: Expand and refine previous micromobility work to augment the Workflow approaches to modeling urban travel; 2) multimodal connection with transit: Utilizing Mobility-Energy Productivity (MEP) tools to evaluate multimodal travel patterns enabled by micromobility, including assessing how to reduce barriers of inequity of access to mobility options and destinations; 3) mode choice, induced demand, and infrastructure: Understanding the mode shift induced through micromobility to inform energy impact analysis; 4) energy optimization of micromobility operations: Identification of micromobility operations parameters and development of operations scenarios to better understand present-day micromobility operations for integration into the Workflow, in partnership with BEAM and POLARIS modeling teams; 5) micro-freight: Characterize the current state of micro-freight activities, including energy effects and geospatial analyses, to inform Workflow.

ADVANCED PROPULSION SYSTEMS↗

Virtual Infrastructure Twins: Software Testing Platforms for Computing-Instrument Ecosystems

Science ecosystems are being built by federating computing systems and instruments located at geographically distributed sites over wide-area networks. These computing-instrument ecosystems are expected to support complex workflows that incorporate remote, automated AI-driven science experiments. Their realization, however, requires various designs to be explored and software components to be developed, in order to support the orchestration of distributed computations and experiments. It is often too expensive, infeasible, or disruptive for the entire ecosystem to be available during the typically long software development and testing periods. We propose a Virtual Infrastructure Twin (VIT) of the ecosystem that emulates its network and computing components, and incorporates its instrument software simulators. It provides a software environment nearly identical to the ecosystem to support early development and testing, and design space exploration. We present a brief overview of previous digital infrastructure twins that culminated in the VIT concept, including (i) the virtual science network environment for developing software-defined networking solutions, and (ii) the virtual federated science instrument environment for testing the federation software stack and remote instrument control software. We briefly describe VITs for Nion microscope steering and access to GPU systems.

Rao, Nageswara↗

The Future U.S. Energy Infrastructure - And Who Will Do the Work?

This paper identifies the current state and future implications of power generating capacity in the U.S. It also discusses workforce planning and hiring options to support the anticipated staffing needs that will be required to construct and eventually operate these new plants. The Energy Information Administration forecasts that electricity consumption will increase approximately 40% by 2030. Therefore, new power plants, equivalent to 730 new base-load 400-megawatt power plants, will be required to ensure adequate electricity supplies for the future. Of the 104 operating nuclear plants in the U.S., a majority of them have already been operating approximately 20 to 30 years, and even longer. Over the next 50 years, many of these plants, both nuclear and non-nuclear, will have reached their maximum design basis operating lifetimes. Relatively young plants achieving 20 years of operation today will be completing a 40-year run by the year 2028 and a 70-year run, if allowed to do so, by the year 2058. Furthermore, as the oldest 'baby-boomers' begin retiring over the next several years, the lack of an experienced workforce may indirectly affect the needed workforce required to support the U.S. energy infrastructure from new construction through the safe operation of existing and next-generation nuclear plants. With the prospects of companies needing to hire 'passive' candidates, (i.e., experienced '40-something' workers who are not necessarily looking for a job, but are willing to discuss a career move if it offers a significant upside opportunity) to fill employment vacancies, there are 10 factors to consider when evaluating potential opportunities: 1) the job fit; 2) the job stretch; 3) opportunity for future learning and growth; 4) the chance to make an impact; 5) the hiring manager as mentor; 6) the quality of the team; 7) the company's prospects and strategy; 8) the company culture; 9) work/life balance; and 10) compensation and benefits. If the company is clearly not superior on the first nine factors, the candidate will likely reject the offer. Furthermore, if history serves as a guide to the future, failing to follow through with a cohesive, well-defined energy strategy offered by new plant construction will likely produce the same results following the indefinite deferral to reprocess commercial spent nuclear fuel. Since the deferral in 1977, billions of dollars have been spent, while producing few, if any, substantial results. The significance of maintaining the U.S. energy infrastructure and hiring a combination of both newly-graduated and experienced employees to perform the work must be recognized and acknowledged today to ensure that we have adequate, affordable, and reliable electricity for the future. If these programs fail, expect these scenarios to be repeated again over the next 30 years, instead of achieving energy independence - a truly substantial result. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ALTRIOS - Advanced Locomotive Technology and Rail Infrastructure Optimization System

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool to evaluate strategies for deploying advanced locomotive technologies and associated infrastructure for cost-effective decarbonization. ALTRIOS simulates energy conversion and storage dynamics, locomotive and train dynamics, meet-pass planning (detailed train timetabling), and freight-demand-driven train scheduling in a Pareto optimization. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward tradeoffs of different technology rollout strategies. An open, integrated simulation tool will be invaluable for identifying future research needs and making decisions on technology development, routes, and train selection. ALTRIOS development is a collaboration between NREL, the University of Illinois Urbana-Champaign (UIUC) RailTEC, Southwest Research Institute (SwRI), and BNSF.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Joint probability safety assessment for NPP defense infrastructure against extreme external natural hazards

With the increasing tendency of natural hazards, the typhoon, hurricane and tropical Cyclone induced surge, wave, precipitation, flood and wind as extreme external loads menacing Nuclear Power Plants (NPP) in coastal and inland provinces of China. For all of planned, designed And constructed NPP the National Nuclear Safety Administration of China and IAEA recommended Probable Maximum Hurricane /Typhoon/(PMH/T), Probable Maximum Storm Surge (PMSS), Probable Maximum Flood (PMF), Design Basis Flood (DBF) as safety regulations for NPP defense infrastructures. This paper discusses the joint probability analysis of simultaneous occurrence typhoon induced extreme external hazards and compare with IAEA 2006-2009 recommended safety regulation design criteria for some NPP defense infrastructures along China coast. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Meeting Hanford's Infrastructure Requirements - 12505

Hanford, by all accounts, is an enormous and complex project, with thousands of disparate, but co-mingled activities in motion on any given day. The primary target of the mission at Hanford is cleanup of the 586 square-mile site, but there is the equally vital mission of site services and infrastructure. Without functions like the well-maintained site roads, electricity, water, and emergency management services, not a single cleanup project could be undertaken. As the cleanup projects evolve - with new work-scope emerging, while existing projects are completed - there becomes a very real need to keep projects integrated and working to the same 'blueprint'. And the Hanford blueprint extends for years and includes myriad variables that come with meeting the challenges and complexities associated with Hanford cleanup. Because of an innovative and unique contracting strategy, the Department of Energy (DOE) found a way to keep the cleanup projects un-encumbered from the side task of having to self-provide their individual essential site services, thus allowing the cleanup contractors to concentrate their efforts on their primary mission of cleaning up the site. These infrastructure and support services also need to be provided efficiently and cost effectively - done primarily through 'right-sizing' efforts. The real innovation came when DOE had the foresight to include a second provision in this contract which specifically asked for a specialized role of site integrator and innovator, with a special emphasis placed on providing substantial cost savings for the government. The need for a true site integrator function was necessitated by the ever-increasing complexity of projects at Hanford and the progression of cleanup at others. At present, there are two main DOE offices overseeing the cleanup work and six primary contractors performing that work. Each of these contractors works to separate schedules and cleanup milestones, and the nature of the cleanup differs, but all are intertwined in their need for essential site services. One of the key tasks spelled out in the Mission Support Contract (MSC) is to take the volumes of cost, schedule and budget forecasting data each contractor is responsible for and consolidate that data into a 'one Hanford' perspective, with a clear and well-defined 'map' of the future, taking into account the many cross-cutting priorities at the site. This function is termed 'portfolio management' in the MSC. In 2009, the DOE awarded the MSC to Mission Support Alliance, LLC. (MSA), a team made up of industry leaders with key government services credentials, Lockheed Martin, Jacobs Engineering and WSI. Now into its third year managing the contract, MSA has continually shown tangible results in its oversight of the MSC. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lidar Mapping and Surveillance of Nuclear Infrastructure

Wear is unavoidable, whether it occurs in a nuclear facility or abridge on the highway its detection is crucial to preventing the failure of a system. While tools capable of detecting localized damage exist, industry lacks methods to evaluate the health of larger infrastructure. Routine inspection of nuclear facilities must be undertaken to ensure the safety of personnel and proper containment of nuclear materials. Most systems in a nuclear facility are designated as radioactive and confined spaces. To constantly monitor such systems in person would be hazardous but with a remote inspection tool it can be done in a safer and easier way. Lidar: Operates by emitting a laser pulse and looking for the reflected light. Allows user to gain 3D information of the environment. Project Objective: To develop an inspection tool for evaluating the health of large scale infrastructure using Lidar and machine learning. Autonomous Platform + Lidar + Data Fusion + Big Data. Use SLAM to build a 2D map of the environment. Point cloud created by transforming the points between reference frames. Point cloud to Surface: Inherent representation of surface geometry; Difficult to process with conventional techniques. Point cloud to Image: Easily processed by conventional machine learning algorithms. The quantity of data generated will necessitate a big data framework to manage the data for processing. Additional Sensors: Detecting the temperature (a) chemical makeup (b) and radiation emission (c) of a surface could assist in detecting problems. Human inspection can detect irregularities in both physical objects and their point-cloud representations. This is a good indication that mapping nuclear sites using Lidar will provide qualitative insight into the health of the facility. If deep learning can be used to automatically identify problem areas then the completed tool could become an invaluable asset.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Learnings From the 2022 NREL Partner Forum: Research Needs for Airport Ground Infrastructure and Operations

During the 2022 Partner Forum at the National Renewable Energy Laboratory (NREL), stakeholders and experts from across aviation came to the whiteboard to outline common goals, align interests, understand technologies, and discuss steps for safely and seamlessly decarbonizing aviation. Attendees identified challenges, strategies, and needed research on aviation fuels, infrastructure, and aircraft. Initial insights, strategies, and high-level suggestions from an airport ground infrastructure and operations workshop are summarized below, including potential barriers and synergies for achieving bold decarbonization goals.

airport↗

Charging location selection of an incoming electric vehicle for large EV depot infrastructure

As the use of renewable energy resources increases within charging infrastructures, the risk that charging an additional load within the charging infrastructure will create a violation of the applicable grid code also increases. In an embodiment, a charging location is selected for an incoming load based on a load flow analysis, to thereby mitigate the risk of a violation. This selection process may also account for the charging schedule of the load and the capacity of available charging stations (e.g., fast charging vs. slow charging).

Hafiz, Faeza↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort on Planning and Funding for Electric Vehicle Charging Infrastructure Deployment

From June to December 2023, the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) partnered with World Resources Institute (WRI) to run a peer-learning cohort for local governments on Planning and Funding for Electric Vehicle Charging Infrastructure Deployment. This cohort effort, funded by DOE's Clean Energy to Communities Program, paired 15 local and regional governments with Clean Cities and Communities coalitions to translate cohort learnings to local context and conduct activities that brought participants closer developing of public electric vehicle charging infrastructure plans. This document shares key takeaways, lessons learned, and resources from the six-month cohort.

ADVANCED PROPULSION SYSTEMS↗