Commissioning Results of the ESR2 Compressors at JLab
Abstract The future operation of the 4 kW 15 Kelvin MOLLER experiment at Jefferson lab necessitates an increase of cryogenic capacity at the End Station Refrigerator. The current plant is the former 1.5 kW (4.5 K) ESCAR plant that has been operating at Jefferson Lab since 1995. The existing 1.5 kW plant is not able to support the load for MOLLER and will be replaced with a refurbished plant comprised of the cold box and compressors of the 4 kW ASST-A plant from the Superconducting Super Collider in Texas. This paper reports the commissioning results of the warm compressor system. We compare the compressors’ current and past performance, specifically examining their Isothermal and Volumetric efficiency. The results indicate that the refurbished equipment’s efficiency is comparable to its original performance, proving that the reuse and refurbishment of old systems is a worthwhile endeavor.