Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed workflows”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

726 records · Page 41

Virtual Design Studio (VDS) - Development of an Integrated Computer Simulation Environment for Performance Based Design of Very-Low Energy and High IEQ Buildings

Executive Summary The objective of this study was to develop a “Virtual Design Studio (VDS)”: a software platform for integrated, coordinated and optimized design of green building systems with low energy consumption, high indoor environmental quality (IEQ), and high level of sustainability. This VDS is intended to assist collaborating architects, engineers and project management team members throughout from the early phases to the detailed building design stages. It can be used to plan design tasks and workflow, and evaluate the potential impacts of various green building strategies on the building performance by using the state of the art simulation tools as well as industrial/professional standards and guidelines for green building system design. Engaged in the development of VDS was a multi-disciplinary research team that included architects, engineers, and software developers. Based on the review and analysis of how existing professional practices in building systems design operate, particularly those used in the U.S., Germany and UK, a generic process for performance-based building design, construction and operation was proposed. It distinguishes the whole process into five distinct stages: Assess, Define, Design, Apply, and Monitoring (ADDAM). The current VDS is focused on the first three stages. The VDS considers building design as a multi-dimensional process, involving multiple design teams, design factors, and design stages. The intersection among these three dimensions defines a specific design task in terms of “who”, “what” and “when”. It also considers building design as a multi-objective process that aims to enhance the five aspects of performance for green building systems: site sustainability, materials and resource efficiency, water utilization efficiency, energy efficiency and impacts to the atmospheric environment, and IEQ. The current VDS development has been limited to energy efficiency and IEQ performance, with particular focus on evaluating thermal performance, air quality and lighting environmental quality because of their strong interaction with the energy performance of buildings. The VDS software framework contains four major functions: 1) Design coordination: It enables users to define tasks using the Input-Process-Output flow approach, which specifies the anticipated activities (i.e., the process), required input and output information, and anticipated interactions with other tasks. It also allows task scheduling to define the work flow, and sharing of the design data and information via the internet. 2) Modeling and simulation: It enables users to perform building simulations to predict the energy consumption and IEQ conditions at any of the design stages by using EnergyPlus and a combined heat, air, moisture and pollutant simulation (CHAMPS) model. A method for co-simulation was developed to allow the use of both models at the same time step for the combined energy and indoor air quality analysis. 3) Results visualization: It enables users to display a 3-D geometric design of the building by reading BIM (building information model) file generated by design software such as SketchUp, and the predicted results of heat, air, moisture, pollutant and light distributions in the building. 4) Performance evaluation: It enables the users to compare the performance of a proposed building design against a reference building that is defined for the same type of buildings under the same climate condition, and predicts the percent of improvements over the minimum requirements specified in ASHRAE Standard 55-2010, 62.1-2010 and 90.1-2010. An approach was developed to estimate the potential impact of a design factor on the whole building performance, and hence can assist the user to identify areas that have most pay back for investment. The VDS software was developed by using C++ with the conventional Model, View and Control (MVC) software architecture. The software has been verified by using a simple 3-zone case building. The application of the VDS concepts and framework for building design and performance analysis has been illustrated by using a medium-sized, five story office building that received LEED Platinum Certification from USGBC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantifying Groundwater Response and Uncertainty in Beaver‐Influenced Mountainous Floodplains Using Machine Learning‐Based Model Calibration

Abstract Beavers ( Castor canadensis ) alter river corridor hydrology by creating ponds and inundating floodplains, and thereby improving surface water storage. However, the impact of inundation on groundwater, particularly in mountainous alluvial floodplains with permeable gravel/cobble layers overlain by a soil layer, remains uncertain. Numerical modeling across various floodplain structures considers topographic and sediment complexity and multidirectional flow, linking inundation to groundwater response. This study develops a model‐data integration workflow to address uncertainty in groundwater response to beaver‐induced inundations in a mountainous alluvial floodplain in the Upper Colorado River Basin. Uncertain factors include seasonal hydrologic dynamics, hydraulic conductivities, floodplain structures, and meteorological forcings. We employed an ensemble of groundwater models, based on geophysical and hydrologic data, with machine learning‐based calibration using a neural density estimator. This allowed us to quantify the vertical flux from the soil layer to the permeable gravel bed, the down‐valley underflow within the gravel bed, and their ratios. Results show a significant increase in the vertical flux relative to down‐valley underflow, from 2 during dry pond periods to 20 during wet periods, serving as an analogy for conditions without and with beaver ponds. The study highlights the influence of floodplain structure on groundwater storage, water balance, and water quality impacted by beaver ponds. A thick gravel bed layer, with a large down‐valley underflow, minimizes the effect of beaver‐induced inundation on water quality. We emphasize the need for field‐scale measurements of floodplain structure and improved characterization of evapotranspiration changes to reduce uncertainty in groundwater response. Plain Language Summary Beavers change the flow of water in river corridors by creating ponds, expanding wetlands, and flooding floodplains. This increases surface water area, promotes plant growth, and enhances biodiversity. However, the impact of this flooding on groundwater flow is not well understood, especially in mountainous areas with gravel layers where water moves easily beneath soil. In this study, we used numerical modeling to investigate how beaver ponds influence groundwater in a mountainous floodplain of the Upper Colorado River Basin. We adapted a machine learning method to validate our numerical models using multiple field data sets. Our findings show that beaver ponds significantly increase vertical water flow from the soil to the gravel during wet periods, compared to when the ponds are fully drained. The study also highlights the importance of floodplain structure in controlling both water flow in gravel layers along the river direction and vertical flow from the soil to the gravel with the presence of beavers. To reduce uncertainty in groundwater response, we emphasize the need for more field‐scale measurements of floodplain structure, hydraulic properties, and evapotranspiration changes. Key Points Floodplain structures and hydraulic conductivities are important for groundwater response with beaver ponds in mountainous floodplains Large down‐valley underflow in permeability‐stratified floodplains reduces beaver‐induced impacts on groundwater storage and water quality Machine learning‐based model calibration methods are effective for estimating posterior distributions of groundwater model parameters

Wang, Lijing↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Potosi Reservoir Model 2013c, Property Modeling Update

As part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well #1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. The intention was for 2.2 million tons per annum (2 million tonnes per annum [MTPA]) of CO2 to be injected for 20 years. In the Task Error! Reference source not found., the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010") was re-run using a new injection scenario of 3.5 million tons per annum (3.2 MTPA) for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. The models size was insufficient to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 by 30 mi (48 by 48 km), while preserving all property modeling workflows and layering. This model was retained as the base case. In the preceding Task [1], the Potosi reservoir model was updated to take into account the new data from the Verification Well #2 (VW2) which was drilled in 2012. The porosity and permeability modeling was revised to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This dynamic model was named Potosi Dynamic Model 2013b. In this Task, a new property modeling workflow was applied, where seismic inversion data guided the porosity mapping and geobody extraction. The static reservoir model was fully guided by PorosityCube interpretations and derivations coupled with petrophysical logs from three wells. The two main assumptions are: porosity features in the PorosityCube that correlate with lost circulation zones represent vugular zones, and that these vugular zones are laterally continuous. Extrapolation was done carefully to populate the vugular facies and their corresponding properties outside the seismic footprint up to the boundary of the 30 by 30 mi (48 by 48 km) model. Dynamic simulations were also run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This new dynamic model was named Potosi Dynamic Model 2013c. Reservoir simulation with the latest model gives a cumulative injection of 43 million tons (39 MT) in 30 years with a single well, which corresponds to 40% of the injection target. The injection rate is approx. 3.2 MTPA in the first six months as the well is injecting into the surrounding vugs, and declines rapidly to 1.8 million tons per annum (1.6 MTPA) in year 3 once the surrounding vugs are full and the CO2 start to reach the matrix. After, the injection rate declines gradually to 1.2 million tons per annum (1.1 MTPA) in year 18 and stays constant. This implies that a minimum of three (3) wells could be required in the Potosi to reach the injection target. The injectivity evaluated in this Task was higher compared to the preceding Task, since the current facies modeling (guided by the porosity map from the seismic inversion) indicated a higher density of vugs within the vugular zones. 5 As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. After 30 years of injection, the plume extends 13.7 mi (22 km) in E-W and 9.7 mi (16 km) in N-S directions. After injection finishes, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 60 years post-injection, the plume extends 14.2 mi (22.8 km) in E-W and 10 mi (16 km) in N-S directions, and remains constant as the remaining pressure gradient has become very low. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger plume extent could be expected. The increase of reservoir pressure at the end of injection is approximately 1,200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 10 psia (69 kPa) beyond 14 mi (23 km) away from injector. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger areal pressure increase could be expected. The reservoir pressure declines rapidly during the first 30 years post injection and the initial reservoir pressure is nearly restored after 100 years post-injection. The present evaluation is mainly associated with uncertainty on the vugs permeability and interconnectivity. The use of porosity mapping from seismic inversion might have reduced the uncertainty on the lateral vugs body distributions. However, major uncertainties on the Potosi vugs permeability remains. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells and appropriate spacing to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

The Potosi Reservoir Model 2013

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the VW1 and the CCS1 wells, structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. Intention was for two million tons per annum (MTPA) of CO2 to be injected for 20 years. In the preceding, the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010" in this topical report) was re-run using a new injection scenario; 3.2 MTPA for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. It was not sufficiently large enough to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 miles x 30 miles (48.3km x48.3km), while preserving all property modeling workflows and layering. This model was retained as the base case of Potosi Dynamic Model 2013a. The Potosi reservoir model was updated to take into account the new data from the verification well VW2 which was drilled in 2012. The new porosity and permeability modeling was performed to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.2 MTPA for 30 years. This new dynamic model was named Potosi Dynamic Model 2013b. Due to the major uncertainties on the vugs permeability, two models were built; the Pessimistic and Optimistic Cases. The Optimistic Case assumes vugs permeability of 9,000 mD, which is analog to the vugs permeability identified in the pressure fall off test of a waste water injector in the Tuscola site, approx. 40 miles (64.4km) away from the IBDP area. The Pessimistic Case assumes that the vugs permeability is equal to the log data, which does not take into account the permeability from secondary porosity. The probability of such case is deemed low and could be treated as the worst case scenario, since the contribution of secondary porosity to the permeability is neglected and the loss circulation events might correspond to a much higher permeability. It is considered important, however, to identify the range of possible reservoir performance since there are no rigorous data available for the vugs permeability. The Optimistic Case gives an average CO2 injection rate of 0.8 MTPA and cumulative injection of 26 MT in 30 years, which corresponds to 27% of the injection target. The injection rate is approx. 3.2 MTPA in the first year as the well is injecting into the surrounding vugs, and declines rapidly to 0.8 MTPA in year 4 once the surrounding vugs are full and the CO2 start to reach the matrix. This implies that according to this preliminary model, a minimum of four (4) wells could be required to achieve the injection target. This result is lower than the injectivity estimated in the Potosi Dynamic Model 2013a (43 MT in 30 years), since the permeability model applied in the Potosi Dynamic Model 2013b is more conservative. This revision was deemed necessary to treat the uncertainty in a more appropriate manner. As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. For the Optimistic Case, the plume extends 17 miles (27.4km) in E-W and 14 miles (22.5km) in N-S directions after 30 years. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post injection, the plume extends 20 miles (32.2km) in E-W and 15.5 miles (24.9km) in N-S directions. Should the targeted cumulative injection of 96 MT be achieved; a much larger plume extent could be expected. For the Optimistic Case, the increase of reservoir pressure at the end of injection is approximately 1200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia (206.8 kPa) beyond 14 miles (22.5km) away from injector. Should the targeted cumulative injection of 96 MT be achieved; a much larger areal pressure increase could be expected. The initial reservoir pressure is nearly restored after approximately 100 years post injection. The presence of matrix slows down the pressure dissipations. The Pessimistic Case gives an average CO2 injection rate of 0.2 MTPA and cumulative injection of 7 MT in 30 years, which corresponds to 7% of the injection target. This implies that in the worst case scenario, a minimum of sixteen (16) wells could be required to achieve the injection target. The present evaluation is mainly associated with uncertainty on the vugs permeability, distribution, and interconnectivity. The different results indicated by the Optimistic and Pessimistic Cases signify the importance of vugs permeability characterization. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗