Results for “development design testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

The Use of the STAGS Finite Element Code in Stitched Structures Development

In the last 30 years NASA has worked in collaboration with industry to develop enabling technologies needed to make aircraft more fuel-efficient and more affordable. The focus on the airframe has been to reduce weight, improve damage tolerance and better understand structural behavior under realistic flight and ground loading conditions. Stitched structure is a technology that can address the weight savings, cost reduction, and damage tolerance goals, but only if it is supported by accurate analytical techniques. Development of stitched technology began in the 1990's as a partnership between NASA and Boeing (McDonnell Douglas at the time) under the Advanced Composites Technology Program and has continued under various titles and programs and into the Environmentally Responsible Aviation Project today. These programs contained development efforts involving manufacturing development, design, detailed analysis, and testing. Each phase of development, from coupons to large aircraft components was supported by detailed analysis to prove that the behavior of these structures was well-understood and predictable. The Structural Analysis of General Shells (STAGS) computer code was a critical tool used in the development of many stitched structures. As a key developer of STAGS, Charles Rankin's contribution to the programs was quite significant. Key features of STAGS used in these analyses and discussed in this paper include its accurate nonlinear and post-buckling capabilities, its ability to predict damage growth, and the use of Lagrange constraints and follower forces.

Jegley, Dawn C.↗

A Boresight Adjustment Mechanism for use on Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements, an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (< 1 arcsec over 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition, design, and testing processes of the BAM development effort, how the design was affected by the extremely tight development schedule, and the lessons learned throughout the process.

Hakun, Claef↗

A Boresight Adjusment Mechanism For Use in Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument-boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (less than 2 arcsec over plus or minus 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition design, and testing processes of the BAM development effort how the design was affected by the extremely tight development schedule and the lessons learned throughout the process.

Hakun, Claef↗

Overview and evolution of the LeRC PMAD DC Testbed

Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) has been developed electrical power system test beds to support the overall design effort. Through this time, the SSFP has changed the design baseline numerous times, however, the test bed effort has endeavored to track these changes. Beginning in August 1989 with the baseline and an all DC system, a test bed was developed to support the design baseline. The LeRC power measurement and distribution (PMAD) DC test bed and the changes in the restructure are described. The changes includeed the size reduction of primary power channel and various power processing elements. A substantial reduction was also made in the amount of flight software with the subsequent migration of these functions to ground control centers. The impact of these changes on the design of the power hardware, the controller algorithms, the control software, and a description of their current status is presented. An overview of the testing using the test bed is described, which includes investigation of stability and source impedance, primary and secondary fault protection, and performance of a rotary utility transfer device. Finally, information is presented on the evolution of the test bed to support the verification and operational phases of the SSFP in light of these restructure scrubs.

Soeder, James F.↗

Overview and evolution of the LeRC PMAD DC test bed

Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) has been developed electrical power system test beds to support the overall design effort. Through this time, the SSFP has changed the design baseline numerous times, however, the test bed effort has endeavored to track these changes. Beginning in August 1989 with the baseline and an all DC system, a test bed was developed to support the design baseline. The LeRC power measurement and distribution (PMAD) DC test bed and the changes in the restructure are described. The changes included the size reduction of primary power channel and various power processing elements. A substantial reduction was also made in the amount of flight software with the subsequent migration of these functions to ground control centers. The impact of these changes on the design of the power hardware, the controller algorithms, the control software, and a description of their current status is presented. An overview of the testing using the test bed is described, which includes investigation of stability and source impedance, primary and secondary fault protection, and performance of a rotary utility transfer device. Finally, information is presented on the evolution of the test bed to support the verification and operational phases of the SSFP in light of these restructure scrubs.

Soeder, James F.↗

Heat Exchanger Intensification Through Powder Processing and Enhanced Design (HIPPED)

High intensity, supercritical CO 2 heat exchangers capable of operating at temperatures between 800 and 1100 ˚C and pressures greater than 80 bar are considered a critical component for high efficiency power generation and a range of next-generation industrial processes. A novel heat exchanger concept was proposed in this project. The proposed concept involved a plate-type architecture with three-dimensional fins, called twisted s-shaped fins, that capitalize on additive manufacturing. Four manufacturing processes were studied to realize the complex envisioned design: press and sinter of metallic powders, directed energy deposition, laser powder bed fusion, and a novel powder bed process involving a photoreactive polymer called SEAM (scalable expeditious additive manufacturing), that later was developed at MSU. The team was able to manufacture subscale heat exchangers using laser powder bed fusion (LPBF) and SEAM. The team settled on using SEAM as a final manufacturing approach due to its very low cost. The SEAM-manufactured heat exchanger, however, when tested under pressure, exhibited leaks and the process still requires further development beyond the timeline of the project. To support the heat exchanger design and testing, the team developed a new high temperature flow loop allowing testing under high temperature and pressure. Computational modeling of the heat exchanger was also performed for the twisted s-shaped fins and the computations were validated with experimental data. The new twisted fins resulted in enhanced heat transfer and reduced pressure drop. To further minimize pressure drop in the plate heat exchanger, the team also developed a simplified model for flow maldistribution in the manifolds, providing a new tool for designers that eliminates the need for complex CFD calculations. A technoeconomic analysis was also developed to contrast SEAM with LPBF, this tool indicated that SEAM is several times less costly and offer significant promises as a rapid low cost additive manufacturing process for metallic systems.

30 DIRECT ENERGY CONVERSION↗

The design of an airfoil for a high-altitude, long-endurance remotely piloted vehicle

Airfoil design efforts are studied. The importance of integrating airfoil and aircraft designs was demonstrated. Realistic airfoil data was provided to aid future high altitude, long endurance aircraft preliminary design. Test cases were developed for further validation of the Eppler program. Boundary layer, not pressure distribution or shape, was designed. Substantial improvement was achieved in vehicle performance through mission specific airfoil designed utilizing the multipoint capability of the Eppler program.

Maughmer, Mark D.↗

Report on FY18 Testing Results in Support of Integrated EPP-SMT Design Methods Development

Experiments in support of the development of the integrated Elastic Perfectly-Plastic (EPP) analysis with the Simplified Model Test (SMT) design method continued in FY18. The goal of this integrated design method is to incorporate a SMT data-based approach for creep-fatigue damage evaluation into the EPP methodology to avoid the separate evaluation of creep and fatigue damage and eliminate the requirement for stress classification in current methods; thus, greatly simplifying evaluation of elevated temperature cyclic service.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Path Forward for Groundwater Compliance Strategy at the Tuba City, Arizona, Disposal Site - 19581

The Tuba City, Arizona, Disposal Site is located in the Navajo Nation and near the Hopi Reservation. A uranium mill operated at the site from 1956 to 1966. During the operational period, mill tailings were slurried to an unlined impoundment. Excess slurry water was transferred to unlined evaporation ponds. Groundwater contamination resulting from the infiltration of fluids in the mill tailings impoundment and evaporation ponds was characterized in the 1990's. The site's Groundwater Compliance Action Plan was prepared in 1999, and a groundwater extraction and treatment system was constructed in 2002. Issues with aquifer productivity and treatment plant reliability led to the suspension of operations in 2014. The limitations of the remediation system prompted a realization that the site conceptual model should be reevaluated. An integrated study to better understand the geochemical and hydrologic factors affecting contaminant transport, to support the development of a new groundwater compliance strategy, was initiated in 2017 and is ongoing. In addition to the groundwater science components, the study included the evaluation of enhanced evaporation methods. The integrated evaluation will lead to refinement of the site groundwater flow model and development of a contaminant transport model and subsequent development of remedial alternatives. Remedial alternatives will be evaluated to determine a new groundwater compliance strategy. The objectives of geochemical testing were to confirm and quantify geochemical reactions controlling uranium fate and transport. These reactions are important because they control the distribution of uranium on the solid phase; potential for release from the solid phase; mobility of uranium in the water phase; and potential for uranium redistribution onto the currently uncontaminated solid phase. A key outcome is the change in understanding of the mass of uranium in the subsurface that is potentially soluble. These results contradict the previous basis for remediation: that uranium was almost exclusively present in soluble form, within the boundaries of the contaminant plume. Testing showed that uranium sorption downgradient from the plume was measurable but relatively minimal. The movement of other mill-related constituents (nitrate, sulfate, alkalinity) results in the dissolution of naturally occurring uranium and a higher than background concentration of uranium in groundwater. These constituents are not subject to sorption, and their downgradient concentrations are reduced only by diffusion and dispersion. The geochemical testing provides conceptual and quantitative information on potential plume migration. While the testing revealed the potential availability of uranium contaminant sources, the aquifer buffering capacity, pH, and presence of oxygen in groundwater may, individually or in combination, be controlling factors for plume movement. Evaluation of evaporative treatment alternatives was undertaken to determine one or more sustainable and efficient methods capable of treating 151 liters per minute (L/min) (40 gallons per minute), the annual average flow rate. In addition to establishing the baseline capacity for evaporation using the site's existing pond, prospective methods of enhanced evaporation included preheating water before inflow to the evaporation pond, vertical circulation in the pond, dye addition, and Wind-Aided Intensified Evaporation. Consideration of a 151 L/min evaporative treatment arose from previous analysis of extraction well production rates and contaminant mass removal, which indicated that about 80% contaminant removal, relative to full-scale operation of the site's groundwater treatment plant, could be achieved with a smaller capacity system. The lower-flow evaporative option also represented a potentially more sustainable treatment system in comparison to restarting or reconfiguring the groundwater treatment plant. Aquifer pumping tests were designed to develop or improve estimates of hydraulic properties such as transmissivity, horizontal and vertical hydraulic conductivity, storativity, and storage coefficient. Testing involved pumping from one well at a constant flow rate for up to 5 days while monitoring groundwater drawdown in the pumping well and five surrounding wells and then shutting down the pumping well to observe groundwater recovery. The aquifer pumping test results provide insight regarding the hydraulics of the saturated zone. The saturated zone is in a low-conductivity formation with preferential flow in the horizontal direction. The aquifer exhibits low vertical conductance. The use of AQTESOLV software indicates that the saturated zone is a layered system due to the cross-bedded sand-grain orientation within the Navajo Sandstone. These indicators of limited vertical flow provide a potential justification for the observed depth of the contaminant plume of 15-46 meters (50-150 feet) below ground surface). Given the relatively low vertical conductance, groundwater extraction should be focused on the upper portions of the saturated zone. Aquifer response testing provided an improved understanding of aquifer characteristics. However, the primary objective, to identify optimal groundwater extraction strategies, has not been fully addressed. A list of path forward activities for hydrologic analyses was developed, with an overarching objective of providing input parameters for groundwater flow and contaminant transport modeling. Defensible predictions of contaminant transport, through modeling, are critical to the development of a new site groundwater compliance strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Paper to Production to Test: An Update on NASA's J-2X Engine for Exploration

The NASA/industry team responsible for developing the J-2X upper stage engine for the Space Launch System (SLS) Program has made significant progress toward moving beyond the design phase and into production, assembly, and test of development hardware. The J-2X engine exemplifies the SLS Program goal of using proven technology and experience from more than 50 years of United States spaceflight experience combined with modern manufacturing processes and approaches. It will power the second stage of the fully evolved SLS Program launch vehicle that will enable a return to human exploration of space beyond low earth orbit. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J- 2X employs a gas generator operating cycle designed to produce 294,000 pounds of vacuum thrust in primary operating mode with its full nozzle extension. With a truncated nozzle extension suitable to support engine clustering on the stage, the nominal vacuum thrust level in primary mode is 285,000 pounds. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. Assembly of the first development engine was completed in May 2011 and the first engine test was conducted at the NASA Stennis Space Center (SSC), test stand A2, on 14 July 2011. Testing of the first development engine will continue through the autumn of 2011, be paused for test stand modifications to the passive diffuser, and then restart in the spring of 2012. This testing will be followed by specialized powerpack testing intended to examine the design and operating margins of the engine turbomachinery. The development plan beyond this point leads through more system-level, engine testing of several samples, analytical model validation activities, functional and performance verification, and then ultimate certification to support human spaceflight. This paper will discuss the J-2X development background, provide top-level information on design and development planning, and will explore some of the development challenges and mitigation activities pursued to date.

Kynard, Michael↗

Proposed military handbook for dynamic data acquisition and analysis - An invitation to review

A draft Military Handbook prepared under the sponsorship of the USAF Space Division is presently being distributed throughout the U.S. for review by the aerospace community. This comprehensive document provides recommended guidelines for the acquisition and analysis of structural dynamics and aeroacoustic data, and is intended to reduce the errors and variability commonly found in flight, ground and laboratory dynamic test measurements. In addition to the usual variety of measurement problems encountered in the definition of dynamic loads, the development of design and test criteria, and the analysis of failures, special emphasis is given to certain state-of-the-art topics, such as pyroshock data acquisition and nonstationary random data analysis.

Himelblau, Harry↗

Report on FY17 testing in support of integrated EPP-SMT design methods development

The goal of the proposed integrated Elastic Perfectly-Plastic (EPP) and Simplified Model Test (SMT) methodology is to incorporate a SMT data-based approach for creep-fatigue damage evaluation into the EPP methodology to avoid the separate evaluation of creep and fatigue damage and eliminate the requirement for stress classification in current methods; thus greatly simplifying evaluation of elevated temperature cyclic service. The purpose of this methodology is to minimize over-conservatism while properly accounting for localized defects and stress risers. To support the implementation of the proposed methodology and to verify the applicability of the code rules, thermomechanical tests continued in FY17. This report presents the recent test results for Type 1 SMT specimens on Alloy 617 with long hold times, pressurization SMT on Alloy 617, and two-bar thermal ratcheting test results on SS316H at the temperature range of 405 °C to 705 °C. Preliminary EPP strain range analysis on the two-bar tests are critically evaluated and compared with the experimental results.

97 MATHEMATICS AND COMPUTING↗

Inspection and Verification of Domain Models with PlanWorks and Aver

When developing a domain model, it seems natural to bring the traditional informal tools of inspection and verification, debuggers and automated test suites, to bear upon the problems that will inevitably arise. Debuggers that allow inspection of registers and memory and stepwise execution have been a staple of software development of all sorts from the very beginning. Automated testing has repeatedly proven its considerable worth, to the extent that an entire design philosophy (Test Driven Development) has been developed around the writing of tests. Unfortunately, while not entirely without their uses, the limitations of these tools and the nature of the complexity of models and the underlying planning systems make the diagnosis of certain classes of problems and the verification of their solutions difficult or impossible. Debuggers provide a good local view of executing code, allowing a fine-grained look at algorithms and data. This view is, however, usually only at the level of the current scope in the implementation language, and the data-inspection capabilities of most debuggers usually consist of on-line print statements. More modem graphical debuggers offer a sort of tree view of data structures, but even this is too low-level and is often inappropriate for the kinds of structures created by planning systems. For instance, god or constraint networks are at best awkward when visualized as trees. Any any non-structural link between data structures, as through a lookup table, isn't captured at all. Further, while debuggers have powerful breakpointing facilities that are suitable for finding specific algorithmic errors, they have little use in the diagnosis of modeling errors.

Bedrax-Weiss, Tania↗

Automotive Stirling Engine Development Project

The development and verification of automotive Stirling engine (ASE) component and system technology is described as it evolved through two experimental engine designs: the Mod 1 and the Mod 2. Engine operation and performance and endurance test results for the Mod 1 are summarized. Mod 2 engine and component development progress is traced from the original design through hardware development, laboratory test, and vehicle installation. More than 21,000 hr of testing were accomplished, including 4800 hr with vehicles that were driven more dm 59,000 miles. Mod 2 engine dynamometer tests demonstrated that the engine system configuration had accomplished its performance goals for power (60 kW) and efficiency (38.5%) to within a few percent. Tests with the Mod 2 engine installed in a delivery van demonstrated combined metro-highway fuel economy improvements consistent with engine performance goals and the potential for low emission levels. A modified version of the Mod 2 has been identified as a manufacturable design for an ASE. As part of the ASE project, the Industry Test and Evaluation Program (ITEP), NASA Technology Utilization (TU) project, and the industry-funded Stirling Natural Gas Engine program were undertaken to transfer ASE technology to end users. The results of these technology transfer efforts are also summarized.

Ernst, William D.↗

Aids to School Bus Design

Navistar International Transportation Corporation, Chicago, IL, used three separate NASA-developed technologies in the design and testing of their 3000 Series Bus Chassis which was developed expressly for school bus applications. For structural analysis, they used the MSC/NASTRAN program which mathematically analyzes a design and predicts how it will hold up under stress. They also used the SPATE 9000 system for non-contact measurement of stress, load transfer mechanisms, detection of hidden flaws, and monitoring structural changes during fatigue testing. SPATE 9000 was based on infrared stress measurement technology developed by Langley Research Center. They also employed the Wyle Ride Quality Meter, which was developed by Langley to aid in passenger aircraft design by providing an accurate measurement of ride vibration and sound level. These numbers translate into a subjective discomfort level index. These technologies contribute to the company's 45-48 percent share of the school bus chassis market.

Source record↗

Deep Borehole Field Test Conceptual Design Report

This report documents conceptual design development for the Deep Borehole Field Test (DBFT), including test packages (simulated waste packages, not containing waste) and a system for demonstrating emplacement and retrieval of those packages in the planned Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system. This document therefore identifies key options for a DBD system, describes an updated reference DBD concept, and derives a recommended concept for the DBFT demonstration. The objective of the DBFT is to confirm the safety and feasibility of the DBD concept for long-term isolation of radioactive waste. The conceptual design described in this report will demonstrate equipment and operations for safe waste handling and downhole emplacement of test packages, while contributing to an evaluation of the overall safety and practicality of the DBD concept. The DBFT also includes drilling and downhole characterization investigations that are described elsewhere (see Section 1). Importantly, no radioactive waste will be used in the DBFT, nor will the DBFT site be used for disposal of any type of waste. The foremost performance objective for conduct of the DBFT is to demonstrate safe operations in all aspects of the test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Z Machine Detonator Holder Testing

Current packaging for the detonators used on the Z Machine is dirty, not well suited for reusability, and labor intensive to use. A new packaging design is developed, explosively tested, and approved by the numerous stakeholders resulting in more efficient operations and lowered costs.

42 ENGINEERING↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO 2 from Flue Gas

The objective of this project was to demonstrate an innovative process to mineralize CO 2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO 2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO 2 from the flue gas of a power production facility in Moss Landing, CA as well as flue gas from coal combustion. This final report details all development, analysis, design and testing of the project. Also included in the final report are an updated Techno-Economic Analysis and CO 2 Lifecycle Analysis. The subsystems included in the pilot demonstration plant are the mineralization subsystem, the Alkalinity Based on Low Energy (ABLE) subsystem, the waste calcium oxide processing subsystem, and the fiber cement board production subsystem. The fully integrated plant was proven to be capable of capturing CO 2 from various sources (gas and coal) and mineralizing it into a reactive calcium carbonate binder and subsequently producing commercial size (4ftx8ft) fiber cement boards. The final report provides a description of the “as built” design of these subsystems and the results of the commissioning activities that have taken place to confirm operability. The report also discusses the results of the fully integrated operation of the facility. Fiber cement boards have been produced in this facility exclusively using reactive calcium carbonate from captured CO 2 from flue gas. These boards meet all US and China appropriate acceptance standards. Use demonstrations for these boards are now underway.

20 FOSSIL-FUELED POWER PLANTS↗