Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “casing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Building a Business Case for Compressed Natural Gas in Fleet Applications

VICE 2.0 is the second generation of the VICE financial model developed by the National Renewable Energy Laboratory for fleet managers to assess the financial soundness of converting their fleets to run on CNG. VICE 2.0 uses a number of variables for infrastructure and vehicles to estimate the business case for decision-makers when considering CNG as a vehicle fuel. Enhancements in version 2.0 include the ability to select the project type (vehicles and infrastructure or vehicle acquisitions only), and to decouple vehicle acquisition from the infrastructure investment, so the two investments may be made independently. Outputs now include graphical presentations of investment cash flow, payback period (simple and discounted), petroleum displacement (annual and cumulative), and annual greenhouse gas reductions. Also, the Vehicle Data are now built around several common conventionally fueled (gasoline and diesel) fleet vehicles. Descriptions of the various model sections and available inputs follow. Each description includes default values for the base-case business model, which was created so economic sensitivities can be investigated by altering various project parameters one at a time.

33 ADVANCED PROPULSION SYSTEMS↗

IDC Re-Engineering Phase 2 Iteration E2 Use Case Realizations

This architecturally significant use case describes how the System acquires meteorological data to build atmospheric models used in automatic and interactive processing of infrasound data. The System requests the latest available high-resolution global meteorological data from external data centers and puts it into the correct formats for generation of infrasound propagation models. The system moves the meteorological data from Data Acquisition Partition to the Data Processing Partition and stores the meteorological data. The System builds a new atmospheric model based on the meteorological data. This use case is architecturally significant because it describes acquiring meteorological data from various sources and creating dynamic atmospheric transmission model to support the prediction of infrasonic signal detection

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Drive Electric Vermont Case Study

Currently in the United States, the heavy majority of plug-in electric vehicle (PEV) sales have been in highly conducive, selected, metropolitan areas; opposed to more broad distribution across the country. The U.S. Department of Energy’s EV Everywhere Grand Challenge is looking carefully at the barriers and opportunities that exist to enable small and midsize communities to partake in the PEV market and benefit from the economic and environmental advantages of PEVs. In order to gain insight into these challenges and barriers, DOE selected a success story (i.e., Drive Electric Vermont) as the subject of this case study, as the state of Vermont is tied with Detroit, Michigan in having the highest percentage of 2014 (most recent complete data) PEV registrations for cold weather U.S. cities and has seen more than a sixfold increase in charging stations over the last three years. The overall objective of this case study was to use the lessons learned from Drive Electric Vermont to determine what activities are most effective at encouraging acquisitions of PEVs and deployment of charging infrastructure in small to midsize communities, prioritizing and sequencing their implementation, identifying robust means for extrapolation, and applying this understanding to other small to midsize communities across the nation. The Drive Electric Vermont Program was formed in 2012 with a goal of increasing the use of electrified transportation in Vermont through policy development, education and outreach, and infrastructure development. The Drive Electric Vermont Program can be broadly broken into four components: (1) strategic planning/leadership, (2) stakeholder/partnership development, (3) education and outreach, and (4) incentives. The early phases of the program focused heavily on strategic planning, and stakeholder and partnership development, followed by a transition to education and outreach activities, charging infrastructure development, and grant and incentive programs that support charging infrastructure deployment and PEV purchases. Future plans include an additional round of consumer/dealer PEV incentives, continuation of the marketing campaign, and utilization of consumer surveys to develop new campaign themes and to optimize information distribution channels. In Vermont, the number of PEVs grew from 88 in July 2012 to 1,113 in January 2016, with a high percentage of the PEVs being plug-in hybrids (i.e., 865) versus all electric vehicles (i.e., 248). The most popular PEVs are Toyota’s Prius Plug-in and Ford’s C-Max Energi, which make up a combined 48% of the total PEV ownership in the state. The PEVs are predominantly clustered in four counties: Lamoille, Caledonia, Washington, and Chittenden. There is no evident correlation between community size and PEV penetration; however, over 70% of PEV owners are in communities of 1,000 to 10,000 people. On the other hand, there is a close correlation between where PEVs are registered and where they publically charge. The number of PEV charging stations in Vermont grew from 17 in January 2013 to 111 in January 2016, at a variety of charging venues, including retail, parking (short term and long term), workplace, dealerships, hotels, education, leisure, and hospitals. The vast majority of the charging venues contain Level 2 electric vehicle supply equipment (EVSE) solely or combined with Level 1 EVSE or direct current fast charging. The average power transferred per charging event for communities across Vermont ranged from 4.8 to 13.8 kWh for direct current fast charging and 1.0 to 11.9 kWh for and Level 2 EVSE. Over half the charging locations offer free charging. For those that do require payment, different pricing models are employed, including monthly memberships, hourly payment (where there is often a higher fee for the first hour followed by a lower hourly fee for the remaining hours), and energy use based on kWh drawn from the EVSE. There is no correlation between pricing models and community size and region, the strongest correlation is by network provider. Charging events across Vermont generally correlate with east-west bands of chargers (Figure ES-1) running from Burlington to Montpelier and in the area of Rutland.

33 ADVANCED PROPULSION SYSTEMS↗

Case Study for the ARRA-funded Ground Source Heat Pump Demonstration at Denver Museum of Nature & Science

High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one such GSHP demonstration projects that uses a recycled water heat pump (RWHP) system installed at the Denver Museum of Nature & Science in Denver, Colorado. The RWHP system uses recycled water from the city’s water system as the heat sink and source for a modular water-to-water heat pump (WWHP). This case study was conducted based on the available measured performance data from December 2014 through August 2015, utility bills of the building in 2014 and 2015, construction drawings, maintenance records, personal communications, and construction costs. The annual energy consumption of the RWHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional VAV system using a water-cooled chiller and a natural gas fired boiler, both of which have the minimum energy efficiencies allowed by ASHRAE 90.1-2010. The comparison was made to determine energy savings, operating cost savings, and CO2 emission reductions achieved by the RWHP system. A cost analysis was performed to evaluate the simple payback of the RWHP system. Summarized below are the results of the performance analysis, the learned lessons, and recommended improvement in the operation of the RWHP system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Colorado State University: A Midscale Market Solar Customer Case Study

Despite substantial increases in solar photovoltaic (PV) deployment between 2005 and 2015, a large untapped market for solar PV deployment still exists in midscale market investments by universities. Recent estimates show that if all universities in the United States installed enough solar PV to meet 25% of their annual electricity consumption, this would cumulatively result in just over 16 gigawatts (GW) of additional installed PV capacity. Within this context, midscale market projects - loosely defined as solar PV installations ranging from 100 kilowatts (kW) to 2 megawatts (MW), but more broadly representing installations not captured in the residential or utility-scale sectors - could be an attractive option for universities. This case study focuses on one university solar customer, Colorado State University (CSU), to provide a detailed example of the challenges, solutions, and opportunities associated with university solar power procurement. Between 2009 and 2015, a combined 6,754 kW of both ground-mounted and rooftop solar PV was installed across multiple CSU campuses in Fort Collins, Colorado. This case study highlights CSU's decision-making process, campus engagement strategies, and relationships with state, local, and utility partners, which have culminated in significant on-campus PV deployment.

14 SOLAR ENERGY↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Business Case Calculations for DMS

Distribution Management System (DMS) applications require a substantial commitment of technical and financial resources. In order to proceed beyond limited-scale demonstration projects, utilities must have a clear understanding of the business case for committing these resources that recognizes the total cost of ownership. Many of the benefits provided by investments in DMSs do not translate easily into monetary terms, making cost-benefit calculations difficult. For example, Fault Location Isolation and Service Restoration (FLISR) can significantly reduce customer outage duration and improve reliability. However, there is no well-established and universally-accepted procedure for converting these benefits into monetary terms that can be compared directly to investment costs. This report presents a methodology to analyze the benefits and costs of DMS applications as fundamental to the business case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Establishing a Commercial Buildings Energy Data Framework for India: A Comprehensive Look at Data Collection Approaches, Use Cases and Institutions

Enhancing energy efficiency of the commercial building stock is an important aspect of any national energy policy. Understanding how buildings use energy is critical to formulating any new policy that may impact energy use, underscoring the importance of credible data. Data enables informed decision making and good quality data is essential for policy makers to prioritize energy saving strategies and track implementation. Given the uniqueness of the buildings sector and challenges to collecting relevant energy data, this study characterizes various elements involved in pertinent data collection and management, with the specific focus on well-defined data requirements, appropriate methodologies and processes, feasible data collection mechanisms, and approaches to institutionalizing the collection process. This report starts with a comprehensive review of available examples of energy data collection frameworks for buildings across different countries. The review covers the U.S. experience in the commercial buildings sector, the European experience in the buildings sector and other data collection initiatives in Singapore and China to capture the more systematic efforts in Asia in the commercial sector. To provide context, the review includes a summary and status of disparate efforts in India to collect and use commercial building energy data. Using this review as a key input, the study developed a data collection framework for India with specific consideration to relevant use cases. Continuing with the framework for data collection, this study outlines the key performance indicators applicable to the use cases and their collection feasibility, as well as immediate priorities of the participating stakeholders. It also discusses potential considerations for data collection and the possible approaches for survey design. With the specific purpose of laying out the possible ways to structure and organize data collection institutionally, the study collates existing mechanisms to analyze building energy performance in India and opportunities for standardizing data collection. This report describes the existing capacities and resources for establishing an institutional framework for data collection, the legislation and mandates that support such activity, and identifies roles and responsibilities of the relevant ministries and organizations. Finally, the study presents conclusions and identifies two major data collection strategies within the existing legal framework.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Seamless Digital Environment – Data Analytics Use Case Study

Multiple research efforts in the U.S Department of Energy Light Water Reactor Sustainability (LWRS) Program studies the need and design of an underlying architecture to support the increased amount and use of data in the nuclear power plant. More specifically the three LWRS research efforts; Digital Architecture for an Automated Plant, Automated Work Packages, Computer-Based Procedures for Field Workers, and the Online Monitoring efforts all have identified the need for a digital architecture and more importantly the need for a Seamless Digital Environment (SDE). A SDE provides a mean to access multiple applications, gather the data points needed, conduct the analysis requested, and present the result to the user with minimal or no effort by the user. During the 2016 annual Nuclear Information Technology Strategic Leadership (NITSL) group meeting the nuclear utilities identified the need for research focused on data analytics. The effort was to develop and evaluate use cases for data mining and analytics for employing information from plant sensors and database for use in developing improved business analytics. The goal of the study is to research potential approaches to building an analytics solution for equipment reliability, on a small scale, focusing on either a single piece of equipment or a single system. The analytics solution will likely consist of a data integration layer, predictive and machine learning layer and the user interface layer that will display the output of the analysis in a straight forward, easy to consume manner. This report describes the use case study initiated by NITSL and conducted in a collaboration between Idaho National Laboratory, Arizona Public Service – Palo Verde Nuclear Generating Station, and NextAxiom Inc.

97 MATHEMATICS AND COMPUTING↗

India Commercial Buildings Data Framework: A Summary of Potential Use Cases

This report details a potential set of use cases for India’s Commercial Buildings Data Framework. The use cases are aimed at enabling data-driven, evidence-based policy making and at transforming the market for energy efficiency in the building sector by facilitating the adoption of (1) superior energy-efficient building design and operation and maintenance practices, and (2) better specification and procurement of end-use equipment and systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Well Casing Baseline Analysis for the Big Hill Strategic Petroleum Reserve Site

This report analyzes data from multi-arm caliper (MAC) surveys taken at the Big Hill SPR site to determine the most likely casing weights within each well. Radial arm data from MAC surveys were used to calculate the approximate wall thickness of each well. Results from this study indicate that (1) most wells at the site have thinner wall thicknesses than expected, (2) most wells experienced an acute increase in diameter near the salt/caprock interface, and (3) there were isolated instances of well sections being the wrong casing weight. All three findings could have a negative impact on well integrity.

02 PETROLEUM↗

Case Study Analyses of Radionuclide Transport in Variably Saturated Media at Rainier Mesa

This document presents a series of six case study analyses of groundwater flow and contaminant transport in the subsurface formations underlying the Rainier Mesa (RM) testing area at the NNSS. The analyses are designed to assess the potential over a 1,000-year period for radionuclide contamination derived from underground nuclear tests at RM to enter and migrate in saturated groundwater underlying the testing areas. The radionuclide source zones at RM consist of individual test centers corresponding to 62 unique detonations conducted in 2 shafts and 11 tunnel complexes; the E-, N-, and T-Tunnel pond systems that captured contaminated water discharged from these tunnel complexes (and continue to do so in the case of E-Tunnel); and the contaminated N- and T-Tunnel “reservoirs” that formed behind plugs installed between 1992 and 1994 to block subsequent contaminant losses into the N- and T-Tunnel ponds.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Case for All New City Buses in India to be Electric

Indian cities are struggling to keep the air breathable for inhabitants, due in part to emissions from diesel buses. While the case for electric buses, and more generally, zero emission buses, has always been clear from an urban air pollution perspective, the economic case depended strongly on their environmental benefits. However, the situation seems different today. We illustrate that when the benefits of recent dramatic declines in Lithium battery prices are fully realized, the total cost of ownership of urban (intra-city) electric buses is lower than that for diesel buses in India even without subsidies. Factoring in the air quality benefits, projected reductions in the cost of batteries and solar electricity, it becomes evident that transitioning to an all-electric bus fleet presents an enormous opportunity for India to reduce urban air pollution while improving the finances of urban bus transit agencies. The policy ecosystem that delivered substantial price reductions and large-scale rapid deployment of solar PV and LEDs is a model to achieve similar outcomes for battery electric buses. Well-designed high volume auctions and clear long term ambitious targets for fleet electrification could achieve to rapid electrification with little net public subsidy in the long-run.

33 ADVANCED PROPULSION SYSTEMS↗

The Significance of Strategic Foresight in Verification Technologies: A Case Study of the INF Treaty

Verification technologies can serve as important tools of statecraft in arms control efforts beyond providing monitoring capabilities and deterring noncompliance. The INF Treaty provides an insightful case study of the strategic side of verification technologies, illuminating how these capabilities can be used to shape negotiation positions and treaty content, provide domestic and international assurance, and manage tensions in the treaty implementation process. Operationalizing verification technologies in this way expands the tools available at the diplomatic and policy levels, but it requires foresight and preparedness to identify and develop the relevant technical capabilities. The most important finding of this case study is that technical preparedness had an important impact, but only after a period of latency. The verification approaches used in the INF Treaty were developed before the topic was raised in the negotiations, and thus the capabilities were available when certain political shifts had occurred

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗