University of Utah, Energy Commercialization Center

During the Energy Commercialization Center’s (ECC) three years in operation, the only thing constant was change. The world of commercialization and cleantech evolved significantly during the time the ECC was formed and operating, including: the availability of cleantech funding lessoned, the growth of incubators and accelerators skyrocketed, the State of Utah created an office dedicated to energy development, the University of Utah was both praised and criticized for its success in commercialization, and the Federal government temporarily shut down. During the three-year grant there were three principle investigators on the grant, as well as three directors for the University’s Commercialization Office. Change can be hard for an organization,but as we instruct the companies we support, “Fail fast and fail often, because it is the fastest path to success.” Although there were some unanticipated challenges along the way, the local ecosystem is stronger because of the ECC’s efforts. Perhaps the greatest lesson learned was the importance of aligned incentives between key stakeholders in the commercialization process and the need for resources at the company and individual entrepreneur levels. The universities have systems and incentives to commercialize technologies, but creating value and companies generally rest with the individuals and entrepreneurs. Unfortunately the ECC was unable to create a viable mechanism to transfer the commercialization process that successfully aligned incentives and achieve a more effective ecosystem within the Rocky Mountain West. However, the ECC was successful in adding value to the individual ecosystems, and connecting national resources to regional and local needs. Regarding the ECC’s effectiveness in developing a cleantech commercialization ecosystem, initial inroads and relationships were established with key stakeholders. However, incentives, perceived or real competition, differences in commercialization processes, and culture all played a role in inhibiting the development and distribution of a regional ecosystem and commercialization process. Had the University and the ECC been able to develop a software platform, some of these challenges may have been overcome, but without the final development and release of the Western Innovation Network, the ECC realistically could not scale and distribute a commercialization platform. Further, cleantech startups need to engage in a more intensive customer validation process, and establish strong community connections if they are to succeed in commercializing their products. The university system incentivizes research and access to research funding and risk capital is competitive, so by nature collaboration on commercialization was difficult. Each of the local ecosystems within the Rocky Mountain West was unique. Utah did not, and does not, have a system outside of the universities to support entrepreneurs and cleantech commercialization. Through the ECC’s efforts developing a regional ecosystem, it became clear that successful ecosystems had a community and associated mechanisms that supported local entrepreneurs and startups. Most importantly the ECC aided in the creation of Utah’s cleantech ecosystem, one that supports entrepreneurs and startup companies that need help and support in their efforts to commercialize clean technologies. The absence of support for clean tech from state government and local organizations was a significant impediment to cleantech commercialization. To overcome this challenge, the ECC has formed Sustainable Startups. Sustainable Startups is a new non-profit organization designed to build a culture and community in Utah that supports and understands the importance of cleantech and sustainable development. While the ECC generated mixed success in building a regional commercialization ecosystem for cleantech, the organization did provide tremendous benefit to startups and the broader public. Over 60 companies were given direct business development support by the ECC, many of whom then generated direct economic development impacts. In addition, the ECC served an important role as community convener, educator and relationship builder through hosting numerous public and private events including: Energize 2013; Millennial Train whistle stop; business plan competition supporter; Clean Tech Open Accelerator organizer; Sustainable Startups Series developer, and much more. While the ECC did not fully apply, develop, and transmit the University of Utah’s TCO commercialization model to cleantech, it nevertheless assisted numerous inventors, entrepreneurs and institutions in furthering the growth of clean energy and energy efficiency technologies. The TCO’s commercialization model was not applied to regional clean tech initiatives for several main reasons. First, flaws with the commercialization model were realized after the ECC’s formation. Second, leadership changes within the TCO and ECC hampered early organizational development and implementation initiatives. Third, misaligned incentives between the ECC, regional universities, institutions, and the State of Utah resulted in a lack of collaboration and knowledge transfer regarding commercialization. In principle, everyone was aligned and willing to collaborate, but reality was much different and challenging.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Magnetic Fields on the National Ignition Facility (MagNIF)

A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentally relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.

42 ENGINEERING↗

Long-Term Information Management (LTIM) of Safeguards Data at Repositories: Phase II

One of the challenges of implementing safeguards for geological repositories will be the long-term preservation of safeguards-related data for 100 years or more. While most countries considering the construction and operation of such facilities agree that safeguards information should be preserved, there are gaps with respect to standardized requirements, guidelines, timescales, and approaches. This study analyzes those gaps and explores research to clarify stakeholder needs, identify current policies, approaches, best practices and international standards, and explores existing safeguards information management infrastructure. The study also attempts to clarify what a safeguards data classification system might look like, how long data should be retained, and how information should be exchanged between stakeholders at different phases of a repository’s life cycle. The analysis produced a variety of recommendations on what information to preserve, how to preserve it, where to store it, retention options and how to exchange information in the long term. Key findings include the use of the globally recognized international records management standard, ISO15489, for guidance on the development of information management systems, and the development of a Key Information File (KIF). The KIF could be used to identify only the most relevant, high-level safeguards information and the history of decision making about the repository. The study also suggests implementing on-site and off-site records storage in digital and physical form; developing a safeguards data classification system; long-term records retention with periodic reviews every 5 to 10 years during each phase of the repository life cycle; and establishing transition procedures well in advance so that data shepherds and records officers can transfer information with incoming facility managers effectively and efficiently. These and other recommendations are further analyzed in this study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency Collaboratives

Collaboratives for energy efficiency have a long and successful history and are currently used, in some form, in more than half of the states. Historically, many state utility commissions have used some form of collaborative group process to resolve complex issues that emerge during a rate proceeding. Rather than debate the issues through the formality of a commission proceeding, disagreeing parties are sent to discuss issues in a less-formal setting and bring back resolutions to the commission. Energy efficiency collaboratives take this concept and apply it specifically to energy efficiency programs—often in anticipation of future issues as opposed to reacting to a present disagreement. Energy efficiency collaboratives can operate long term and can address the full suite of issues associated with designing, implementing, and improving energy efficiency programs. Collaboratives can be useful to gather stakeholder input on changing program budgets and program changes in response to performance or market shifts, as well as to provide continuity while regulators come and go, identify additional energy efficiency opportunities and innovations, assess the role of energy efficiency in new regulatory contexts, and draw on lessons learned and best practices from a diverse group. Details about specific collaboratives in the United States are in the appendix to this guide. Collectively, they demonstrate the value of collaborative stakeholder processes in producing successful energy efficiency programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

13 HYDRO ENERGY↗

2016 State of Wind Development in the United States by Region

Significant expansion of wind energy development will be required to achieve the scenarios outlined in the U.S. Department of Energy's (DOE)'s Wind Vision: 20% wind energy by 2030 and 35% wind energy by 2050. Wind energy currently provides nearly 5% of the nation's electricity but has the potential to provide much more. The wind industry and the DOE's Wind Energy Technologies Office are addressing technical wind energy challenges, such as reducing turbine costs and increasing energy production and reliability. The Office recognizes that public acceptance of wind energy can be challenging, depending on the proximity of proposed wind farms to local populations. Informed decision makers and communities equipped with unbiased information about the benefits and impacts of wind energy development are better prepared to navigate the sometimes contentious development process. In 2014, DOE established six Regional Resource Centers (RRCs) across the United States to communicate unbiased, credible information about wind energy to stakeholders through regional networks. The RRCs provide ready access to this information to familiarize the public with wind energy; raise awareness about potential benefits and issues; and disseminate data on siting considerations such as turbine sound and wildlife habitat protection. This document summarizes the status and drivers for U.S. wind energy development during 2016. RRC leaders provided a report of wind energy development in their regions, which was combined with findings from National Renewable Energy Laboratory (NREL) researchers to provide an account of the state of the regions, as well as updates on developments in individual states. NREL researchers and state partners added updates for all states that are not directly supported by an RRC. Accounts for each region include updates on renewable portfolio standards, the Clean Power Plan, workforce development, manufacturing and economic development, and individual state updates for installed wind capacity, ongoing policy developments, planned projects and their status, transmission progress reports, etc. This report also highlights the efforts of the RRCs to engage stakeholders in their individual regions.

17 WIND ENERGY↗

Systems Engineering Applied to the Development of a Wave Energy Farm.

A motivation for undertaking this stakeholder requirements analysis and Systems Engineering exercise is to document the requirements for successful wave energy farms to facilitate better design and better design assessments. A difficulty in wave energy technology development is the absence to date of a verifiable minimum viable product against which the merits of new products might be measured. A consequence of this absence is that technology development progress, technology value, and technology funding have largely been measured, associated with, and driven by technology readiness, measured in technology readiness levels (TRLs). Originating primarily from the space and defense industries, TRLs focus on procedural implementation of technology developments of large and complex engineering projects, where cost is neither mission critical nor a key design driver. The key deficiency with the TRL approach in the context of wave energy conversion is that WEC technology development has been too focused on commercial readiness and not enough on the stakeholder requirements and particularly economic viability required for market entry.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Technical Report: "Achieving Regional Energy Efficiency Potential in the Southeast”

The overall objective of this award was to facilitate sharing of DOE resources and best practices as well as provide technical assistance to key stakeholders to support greater compliance with energy efficiency standards and increased energy savings. The outcomes of this award include greater awareness among key stakeholders on energy efficiency topics, increased deployment and utilization of DOE resources, and effective policies and programs to support energy efficiency in the Southeast.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrification Beyond Light Duty: Class 2b-3 Commercial Vehicles

The class 2b-3 truck market covers a wide range of commercial truck applications across a half-million vehicle sales annually. This report collected public information and stakeholder input to assess the opportunity for electrification in this market. Although class 2b-3 pickup truck and van bodies are very similar to personal light vehicles, their functional requirements are quite different due to the demands of the commercial market. These demands vary by application and often vary from day to day for a single application. Fleet customers purchase these vehicles to perform a particular job for their business and are concerned about the overall cost of doing that job. Therefore, the vehicles must meet the job requirements cost effectively. Customers also are sensitive to initial cost. Electrification offers the potential to reduce vehicle operating costs and possibly improve vehicle functionality. However, the current market for class 2b-3 electrified trucks is very small, and the trucks are costly. Increased production volumes are key to cost reductions and may be assisted by sharing components with larger or smaller truck classes. Expanding demand is also crucial and stakeholders identified several niche markets with duty cycles that are likely well-suited to electrified class 2b-3 trucks. To expand beyond these niches, class 2b-3 electric solutions must be robust, flexible, and adaptable in order to cover a wide range of vocations, applications, and duty cycles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Guidance on the Technology Performance Level (TPL) Assessment Methodology

This document presents the revised Technology Performance Level (TPL) assessment methodology. There are three parts to this revised methodology 1) the Stakeholder Needs and Assessment Guidance (this document), 2) the Technical Submission form, 3) the TPL scoring spreadsheet. The TPL assessment is designed to give a technology neutral or agnostic assessment of any wave energy converter technology. The focus of the TPL is on the performance of the technology in meeting the customer’s needs. The original TPL is described in [1, 2] and those references also detail the critical differences in the nature of the TPL when compared to the more widely used technology readiness level (TRL). (Wave energy TRL is described in [3]). The revised TPL is particularly intended to be useful to investors and also to assist technology developers to conduct comprehensive assessments in a way that is meaningful and attractive to investors. The revised TPL assessment methodology has been derived through a structured Systems Engineering approach. This was a formal process which involved analyzing customer and stakeholder needs through the discipline of Systems Engineering. The results of the process confirmed the high level of completeness of the original methodology presented in [1] (as used in the Wave Energy Prize judging) and now add a significantly increased level of detail in the assessment and an improved more investment focused structure. The revised TPL also incorporates the feedback of the Wave Energy Prize judges.

99 GENERAL AND MISCELLANEOUS↗

WEC Farm Functions: Defining the Behaviors of the Farm

Capabilities and functions are hierarchical structures (i.e. taxonomies) that are used in a systems engineering framework to identify complimentary requirements for the system: what the system must do to achieve what it must be. In the case of capabilities, the taxonomy embodies the list of characteristics that are desired, from the perspective of the stakeholders, for the system to be successful. In terms of the functions, the hierarchy represents the solution agnostic (i.e. independent of specific design embodiments) elements that are needed to meet the stakeholder requirements. This paper will focus on the development of the functions. The functions define the fundamental elements of the solution that must be provided in order to achieve the mission and deliver the capabilities. They identify the behaviors the farm must possess, i.e. the farm must be able to generate and deliver electricity from wave power. High-level functions are independent of the technology or design used to implement the function. However, detailed functions may begin to border on specific design choices. Hence a strong effort has been made to maintain functions that are design agnostic.

13 HYDRO ENERGY↗

South Carolina Solar Development - Tracking the Effects of Act 236 (2014-2017)

Since 2014, the installed solar capacity in South Carolina (SC) has mushroomed from 5.5 megawatts to more than 354 megawatts today. Concurrently, the number of customer-sited, load-centered solar generation was expected to grow from less than 600 statewide to as many over 10,000 today. This growth was the direct result of a landmark state policy initiative, Act 236, passed by the SC General Assembly and signed into law by the Governor in June of 2014. Local policy makers in SC were ill-equipped to handle the onslaught of solar permitting and zoning requests expected by 2021. Similarly, the state’s building inspectors, first responders, and tax assessors know little about photovoltaic (PV) technology and best practices. Finally, SC’s workforce and workforce trainers were underprepared to benefit from the tremendous opportunity created by the passage of Act 236. Each of these deficits in knowledge of and preparedness for solar PV translated into higher “soft costs” of installed solar PV in SC. The Savannah River National Laboratory (SRNL), together with almost a dozen electricity stakeholders in the Southeast, has studied the ability of Act 236 to serve as replicable model for solar PV cost reduction. In 2015, this study began with a focus on the effects of Act 236 to offer a unique perspective and understanding of the actual impact of rapidly integrating solar energy into the electric grid. This study would analyze the impact of starting at a solar PV penetration of 0.1% and increasing to over 2%, while expanding access, developing regional specific training and educational materials, and developing datasets to support expanding solar markets. Through targeted tracking and analysis, the team developed a baseline of the current market, identified the major obstacles in soft cost reduction, and cooperatively developed stakeholder-centric strategies. This work has enabled us to directly track and report on the growth and effects of recently enacted solar legislation on the industry. This report marks the final in a series of reports examining the effects of Act 236 on the solar economy in SC since 2014.

14 SOLAR ENERGY↗

Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences, which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Decathlon 2017: Final Report and Lessons Learned

Energetics Incorporated, with its project partners (collectively known as Team Energetics), has prepared the Solar Decathlon 2017 Final Report and Lessons Learned for the U.S. Department of Energy (DOE) to summarize and reflect on the administration of the planning, implementation, and close-out of Solar Decathlon 2017. This final report introduces the Solar Decathlon 2017 Program Administrator, Core Advisory Committee, event sponsors and donors, and regional stakeholders that were integral to the success of Solar Decathlon 2017. The substantial balance of this report presents evaluative metrics and lessons learned about the primary aspects of administering Solar Decathlon 2017, including Project Management, Competition and Site Management, Stakeholder Engagement, Communications, Sponsor Management, Education Programming, and Volunteer Coordination. Several appendices compliment the discussion.

14 SOLAR ENERGY↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

ASCR Report on a Quantum Computing Testbed for Science

This report details the findings of the Quantum Testbed Stakeholder Workshop sponsored by the Department of Energy’s Advanced Scientific Computing Research Program to identify opportunities and challenges in establishing a quantum testbed to advance quantum computing hardware and software systems that will enable science investigations. The workshop was help on February 14 – 16, 2017 in Washington DC and served as a forum for individual stakeholders from academia, industry, national laboratories, and government to provide their perspectives and ideas on the overarching goals and objectives of a quantum testbed, technical considerations, and how a quantum testbed program would be synergistic with other nascent quantum computing efforts in the US and worldwide. This report summarizes discussions on best practices for management of various types of collaborative research activities, including topics such as workforce training and building strong relationships with the research community. It also reviews specific technologies that have been identified by the ASCR Program as being important for the success of a quantum testbed whose overall goal is advancing quantum computing for scientific applications in the next five years.