Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stability criteria”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

733 records · Page 41

Is There an Exoplanet in the Solar System?

We investigate the prospects for the capture of the proposed Planet 9 from other stars in the Sun’s birth cluster. Any capture scenario must satisfy three conditions: the encounter must be more distant than ∼150 au to avoid perturbing the Kuiper belt; the other star must have a wide-orbit planet (a ≳ 100 au); the planet must be captured on to an appropriate orbit to sculpt the orbital distribution of wide-orbit Solar system bodies. Here we use N-body simulations to show that these criteria may be simultaneously satisfied. In a few per cent of slow close encounters in a cluster, bodies are captured on to heliocentric, Planet 9-like orbits. During the ∼100 Myr cluster phase, many stars are likely to host planets on highly eccentric orbits with apastron distances beyond 100 au if Neptune-sized planets are common and susceptible to planet–planet scattering. While the existence of Planet 9 remains unproven, we consider capture from one of the Sun’s young brethren a plausible route to explain such an object’s orbit. Capture appears to predict a large population of trans-Neptunian objects (TNOs) whose orbits are aligned with the captured planet, and we propose that different formation mechanisms will be distinguishable based on their imprint on the distribution of TNOs.

Kuiper belt↗

LightForce Photon-Pressure Collision Avoidance: Efficiency Assessment on an Entire Catalogue of Space Debris

The potential to perturb debris orbits using photon pressure from ground-based lasers has been confirmed by independent research teams. Two useful applications of this scheme are protecting space assets from impacts with debris and stabilizing the orbital debris environment, both relying on collision avoidance rather than de-orbiting debris. This paper presents the results of a new assessment method to analyze the efficiency of the concept for collision avoidance. Earlier research concluded that one ground based system consisting of a 10 kW class laser, directed by a 1.5 m telescope with adaptive optics, can prevent a significant fraction of debris-debris collisions in low Earth orbit. That research used in-track displacement to measure efficiency and restricted itself to an analysis of a limited number of objects. As orbit prediction error is dependent on debris object properties, a static displacement threshold should be complemented with another measure to assess the efficiency of the scheme. In this paper we present the results of an approach using probability of collision. Using a least-squares fitting method, we improve the quality of the original TLE catalogue in terms of state and co-state accuracy. We then calculate collision probabilities for all the objects in the catalogue. The conjunctions with the highest risk of collision are then engaged by a simulated network of laser ground stations. After those engagements, the perturbed orbits are used to re-assess the collision probability in a 20 minute window around the original conjunction. We then use different criteria to evaluate the utility of the laser-based collision avoidance scheme and assess the number of base-line ground stations needed to mitigate a significant number of high probability conjunctions. Finally, we also give an account how a laser ground station can be used for both orbit deflection and debris tracking.

laser↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strain localization criteria for viscoplastic geomaterials

This report presents a viscoplastic localization criterion to detect quasi-instantaneous (i.e., load-induced) and delayed (creep-induced) strain localization in rate-dependent solids. The study is based on the theory of controllability and a viscoplastic description of the mechanical response. Analytical precursors of unstable states are defined through systems of ordinary differential equations (OEDs). The use of the proposed criteria is illustrated at the material point level through a set of strain localization analyses simulating active strain localization of a porous rock. In addition, full-field finite element simulations of compression tests conducted under various pressures are reported to demonstrate the role of local unstable viscoplasticity in the spontaneous propagation of deformation bands under stationary boundary conditions. The study shows that the viscoplastic localization criterion maintains a negative sign as long as the behavior is unstable, that is, the rate of deformation is accelerating. The sign switch coincides with the transition to decelerating deformation. The analyses revealed that pulses of overstress always emerge in correspondence with the growth of unstable behavior, and the peak matches the transition to stable behavior. The local responses recovered from full-field analyses were consistent with those observed in analyses at material point level and the predictions of the presented theory.

36 MATERIALS SCIENCE↗

Development of High Temperature (>700°C) molten Salt Pump Technology for Gen3 Solar Power Tower Systems

Generation 3 Concentrating Solar Power (CSP) Systems require thermal energy storage that can efficiently receive solar heat and deliver it to a working fluid at temperatures greater than 700°C. For liquid systems, the thermal transfer fluid must be phase stable over large temperature ranges. High temperature molten salts meet this criteria, but are difficult liquids to handle. The high heat and salt content can be very corrosive to several different materials that are wetted by the liquid salt. For power tower collectors, the molten salt must be pumped under high pressure to the top of the collector tower. These pumps have impellers and shafts as part of their rotating elements, and under load, require bearings to control shaft movement while rotating. These high temperature pumps require submerged bearings, and thus bearing materials that can withstand the temperature and molten salt contact over long periods of time. This is essential for keeping pump maintenance costs low, and downtime to a minimum. Long running bearing materials is an enabling technology for integrated liquid systems in Generation 3 CSP Systems. Keeping costs low and systems reliable are critical for the broad adoption of Gen 3 CSP Systems. Hayward Tyler, Inc (HTI) proposed development of journal bearing materials for use in vertical pumps designed for pumping high temperature molten salt on both the hot and cold sides of the solar power tower. To complete this objective, HTI utilized the testing capabilities of Oak Ridge National Laboratory (ORNL) and High Temperature System Design (HTSD). Materials would first be selected for static corrosion testing, then downselected for tribological testing. Successful tribologically tested materials would then be downselected for use in additional test regimes. Ten samples were selected for static corrosion testing. Three passed the static testing regime. Two of these materials were downselected for ball material in tribological testing against three metallic alloys: Sintered Y2O3 Partially Stabilized Zirconia YTZP and Silicon Nitride, Grade 147-31N. HTI also proposed collecting data from a thorough bearing test regime using a test rig designed and built as part of this project, and also a conceptual design for a high temperature molten salt vertical pump. HTI withdrew from the project prior to completion of this work and this report reflects only the work completed prior to withdrawal. The completed work produced two papers, one manuscript submitted for publication, and one paper published in the journal Solar Energy Materials and Solar Cells. The papers are: “Tribological behavior of ceramic-alloy bearing contacts in molten salt lubrication for concentrating solar power” and “Material Selection and Corrosion Studies Of Candidate Bearing Materials For Use In Molten Chloride Salt."

14 SOLAR ENERGY↗

Ni-MH storage test and cycle life test

Gates Aerospace Batteries is conducting two long term test programs to fully characterize the NiMH cell technology for aerospace applications. The first program analyzes the effects of long term storage upon cell performance. The second program analyzes cycle life testing and preliminary production lot testing. This paper summarizes these approaches to testing the NiMH couple and culminates with initial storage and testing recommendations. Long term storage presents challenges to deter the adverse condition of capacity fade in NiMH cells. Elevated but stabilized pressures and elevated but stabilized end-of-charge voltages also appear to be a characteristic phenomenon of long term storage modes. However, the performance degradation is dependent upon specific characteristics of the metal-hydride alloy. To date, there is no objective evidence with which to recommend the proper method for storage and handling of NiMH cells upon shipment. This is particularly critical due to limited data points that indicate open circuit storage at room temperature for 60 to 90 days will result in irrecoverable capacity loss. Accordingly a test plan was developed to determine what method of mid-term to long-term storage will prevent irrecoverable capacity loss. The explicit assumption is that trickle charging at some rate above the self-discharge rate will prevent the irreversible chemical changes to the negative electrode that result in the irrecoverable capacity loss. Another premise is that lower storage temperatures, typically 0 C for aerospace customers, will impede any negative chemical reactions. Three different trickle charge rates are expected to yield a fairly flat response with respect to recoverable capacity versus baseline cells in two different modes of open circuit. Specific attributes monitored include: end-of-charge voltage, end-of-charge pressure, mid-point discharge voltage, capacity, and end-of-discharge pressure. Cycle life testing and preliminary production lot testing continue to dominate the overall technology development effort at GAB. The cell life test program reflects continuing improvements in baseline cell designs. Performance improvements include lower and more stable charge voltages and pressures. The continuing review of production lot testing assures conformance to the design criteria and expectations. This is especially critical during this period of transferring technology from research and development status to production.

Dell, R. Dan↗

Molecular-Resolution Electron Imaging of Defects and Dynamics at the Ice-Water Interface

Water crystallization into hexagonal ice (type I h ) is one of the most critical processes relevant to the Earth’s environment and human activities. However, despite recent breakthroughs in imaging non-equilibrium condensed ice structures, the ice-water interface has never been imaged at a molecular resolution. This is primarily due to the low stability of the hydrogen bonds in ice under high-resolution microscopy conditions and a lack of methods to prepare compatible samples. Here, this presentation describes the first molecular-resolution imaging of ice crystallized from liquid water and the ice-water interface using high-resolution transmission electron microscopy (HRTEM). By encapsulating deionized (DI) water between two amorphous carbon (a-C) TEM grids and subsequently freezing it with liquid N 2 on a cryo sample stage, we generated two types of ice: non-equilibrium, condensed ice from the atmosphere and encapsulated ice from the DI water (Fig. 1A). Condensed ice usually shows irregular, spherulitic shapes (Fig. 1B). Selected area electron diffraction (SAED) shows that they are a mixture of cubic and hexagonal crystals (Fig. 1C). On the contrary, encapsulated ice forms thin films that contain large-area single-crystalline regions of hexagonal ice oriented along the [0001] zone axis (Fig. 1D). Differential electron energy-loss spectroscopy (EELS) confirmed the high purity of the encapsulated ice free from organic contaminations that are common in other encapsulation methods for HRTEM such as graphene liquid cells. These single-crystalline areas are robust under the electron beam up to ~100 e/Å 2 s. Aberration-corrected HRTEM imaging in these areas achieved a line resolution of ~1.3 Å (Fig. 1E and F). This platform allows us to study near-equilibrium ice structures and dynamics at an unprecedented spatial resolution (Fig. 2). For example, we discovered subdomain-rich regions near the defective crystal edges despite the structure appearing single-crystalline according to diffraction criteria. These subdomains connect via low-angle grain boundaries with flat energy landscapes as a function of tilt angles (according to simulations), showing the high tolerance of ice to defect structures. When we tuned the sample temperature and electron flux rate, we observed radiolysis-controlled bubble generation and dissolution in ice single crystals near a steady state of bubble dynamics. Furthermore, rich beam-induced melting and recrystallization dynamics were observed at the ice-water interface with lattice resolution. These data represent the first observation of the ice-water phase transformation at the sub-nanometer level. In summary, the methods developed in this work enabled molecular-resolution observations of ice and the ice-water interface and shed light on the microstructures and phase transformation pathways. Finer control on the temperature, electron irradiation profile, and imaging detector could eventually lead to real-time observation of ice nucleation in water and address long-standing questions in the nucleation pathways.

74 ATOMIC AND MOLECULAR PHYSICS↗

Boosted Dark Matter Search with the ICARUS Detector at the Gran Sasso Underground National Laboratory

The quest to discover dark matter is one of the most pressing topics in modern physics. Evidence of gravitational anomalies is present at different cosmological scales, spanning the stability and rotation of galaxies to the overall density profile of the entire observable Universe. Due to the discrepancy between the mass measured and the gravitational influence on the mass, if General Relativity is to correctly describe gravity at different scales, extra electromagnetically invisible matter termed dark matter must exist. In recent decades, many experiments have been performed to detect dark matter with masses that span many orders of magnitude, from Mass Compact Halo Objects (MACHOs) with masses several orders of magnitude that of our sun to very light particles on the order of $\sim\mu$eV. However, experiments have only been able to constrain the possible parameter space of dark matter models and, in general, probe dark matter models with single constituent dark matter like Weakly Interacting Massive Particles (WIMPs). In the Boosted Dark Matter (BDM) paradigm, there are four particles in the dark sector: $\chi_0$, $\chi_1$, $\chi_2$, and the dark photon $X$. WIMP-like properties are ascribed to $\chi_0$ to describe the physics of the gravitational anomalies, while relativistic components are assigned to $\chi_1$ and $\chi_2$. The inelastic boosted dark matter (iBDM) channel $\chi_1 e^-\rightarrow \chi_2 e^-\rightarrow \chi_1 Xe^-\rightarrow \chi_1 (e^+ e^- ) e^-$, where $\chi_2$ is an excited state of $\chi_1$, has a unique signature that is distinguishable from neutrino interactions, making neutrino experiments a viable search environment for BDM. Using data collected by the ICARUS collaboration with ICARUS T-600 Liquid Argon Time Projection Chamber (LArTPC) during its operation at the Gran Sasso Underground Laboratory (LNGS), the first-ever LArTPC dark matter search using the ICARUS detector is presented. With a total detector exposure of 0.13 kton$\cdot$year, a total of 4 iBDM candidate events were identified by several stages of data scanning. All were rejected due to defined selection criteria and a wire-by-wire $dE/dx$ evaluation, giving a null result. Exclusion plots at 90\%C.L. for the dark photon ($m_X$, $\epsilon$) parameter space for fixed ($m_0,m_1,m_2$) DM mass sets are presented, setting new limits on the dark photon visible decay parameter space.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Update of Erosion Conditions and Assessment of Mitigation Options for the L-Bar Site

The L-Bar former uranium milling site was remediated and closed per regulations and is now under the long-term stewardship of the U.S. Department of Energy, Office of Legacy Management (DOE/LM). Since assuming stewardship in 2004, DOE/LM has observed erosion and sedimentation processes at the L-Bar Site that will challenge meeting the design closure criteria in the long term, and therefore erosion control structures were installed in several areas. Portions of these structures were subsequently damaged by summer convective storm events and they are being redesigned. At the request of DOE/LM, Desert Research Institute (DRI) reviewed the proposed redesign plans of the erosion control structures. The purpose of this review is to support DOE/LM decisions regarding mitigation of ongoing erosion processes, including assessing possible repair of the existing erosion control structures, as well as plan for effective long-term site management. This design review is performed in reference to the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards contained in 40 CFR 192.02 that require containment of residual radioactive material be effective for up to 1,000 years (if achievable, but certainly for 200 years), limit radon release, protect groundwater, and minimize future maintenance. The erosion control structures under review are not subject to the UMTRCA standard directly, but they contribute to the performance of the overall containment system by virtue of their relationship with the large diversion channels bounding the disposal cell. The 11 design drawings included in “Erosion Control Alternatives Analysis, L-Bar, New Mexico, Disposal Site, LTS-111-0043-08-002,” dated January 11, 2019, and listed in Appendix A, and supporting calculations in Weston (2019) are the focus of the review. Additionally, DOE/LM provided supporting data such as a 2018 photogrammetry-based digital elevation model of the site, precipitation records collected from an on-site weather station, and sedimentation records collected at an on-site basin. This assessment includes review of the proposed design to mitigate current site conditions but also addresses site changes between the initial erosion assessment report (Miller et al., 2012) and current conditions. The analysis is at a predesign engineering level and does not include development of hydraulic or sediment transport models. Site precipitation data are included in Miller et al. (2012). The natural conditions of the site, the design of site diversion systems, observed erosion at the site, and predesign engineering analysis are used to develop a holistic view of the challenges to L-Bar Site stability and possible responsive actions.

54 ENVIRONMENTAL SCIENCES↗

The OFP-6M transport jet

This report presents a preliminary design of a commercial jet transport that meets the criteria of the Request For Proposal presented by the American Institute of Aeronautics and Astronauts (AIAA). The proposal requires an innovative design of a low cost domestic commercial transport that will reduce operating costs for airline companies while still meeting present and future requirements of the Federal Aviation Regulations for this type of aircraft. Specifications for the design include a mixed class, 153 passenger aircraft, traveling a range of 3000 nm. The intent of the project is to identify factors that reduce cost and to design within the limits of these constraints. The project includes techniques or options that incorporate new technologies but do not override practicality, alternative design approaches, and a comparison between the new design and current aircraft in its class. The OFP-6M is an alternative design approach to the conventional commercial transport jet and is geared towards customer satisfaction through efficiency and reliability. The goals of the OFP-6M transport design are to provide original, sensible, and practical solutions by combining essential preliminary design factors with growing technology. The design focus of the OFP-6M reduces costs by simplifying systems where significant weight or maintenance savings can be achieved, and by integrating advanced technology for improved performance. Key aspects of the OFP-6M design are efficient use of materials like composites, and efficient advanced ducted high bypass turbofan engines. The high bypass engines lower fuel consumption and aid in reducing costs and meeting future noise emission restrictions. Composites are used for most structural components, including flooring and wing box. Although composites are an emerging technology and presently, a high maintenance material, they can be cost effective and an alternative to aluminum structures when correct manufacturing and design strategies are applied. Since, composites are lighter and require less manufacturing of complex parts, they can significantly reduce structural weight. Because of the large 17 ft. diameter, sophisticated aerodynamic considerations were implemented to significantly lower the drag. Supercritical airfoils were chosen with simple control surface design which allows for less maintenance and manufacturing costs. The interior configuration accommodates either all passenger, dual and single class flights or complete cargo. Also, a relaxed conventional stability is integrated with a stability augmentation system. As a result of these design implementations, the OFP-6M bottom line direct operating costs, compare favorably with the Boeing 737 and 757, at 3.49 cents per available seat mile and costs are expected to reduce when improved manufacturing and maintenance methods are implemented.

Alexander, Kelly↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗