Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space launch systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Artemis I: Test Flight Buys Down Risk for Humanity's Return to the Moon

The Artemis program successfully demonstrated its foundational deep space human transportation system during the Artemis I test flight in late 2022. This bold mission put the Artemis program on a course to accomplish increasingly complex missions to return humans to the Moon and to prepare for Mars and other destinations. The Artemis I uncrewed mission tested the Space Launch System (SLS) rocket and the Orion spacecraft using the ground processing, launch and recovery services provided by the Exploration Ground Systems (EGS) program at the Kennedy Space Center (KSC). The Artemis team accomplished key mission priorities that deliberately bought down risk for upcoming crewed missions as part of a build-up flight test strategy. The Artemis I mission priorities were 1) demonstrate Orion heatshield at lunar re-entry conditions; 2) operate systems in flight environment; and 3) retrieve the spacecraft. The successful performance and demonstration of these primary mission objectives from lift-off thru orbital insertion, translunar injection, outbound transit towards the Moon, entry into lunar orbit, coast in the lunar Distant Retrograde Orbit (DRO), exit from lunar orbit, transit back to Earth, atmospheric re-entry, descent, splashdown and recovery successfully showed that NASA has a foundational deep space transportation capability in place for human class missions. In addition to the primary mission objectives, a set of scientific payloads, approved Flight Test Objectives (FTOs) and Development Flight Test Objectives (DFTOs) were incorporated into the nominal mission plan and were designated as secondary, or priority 4, and were considered “bonus objectives” in terms of crewed flight risk buydown. During the mission, the team found itself in a position where it was comfortable achieving even more content than originally planned. As a result, DFTOs were added during the mission to further buy down risk to later crewed test flights. This paper presents an overview of the Artemis I test flight, including mission priorities and key test objectives, the launch campaign and as-flown mission profile, test objectives accomplished over the course of the 25.5- day mission, and implications to the crewed Artemis II and later test flight missions.

Artemis↗

Analyzing the Impacts of Natural Environments on Launch and Landing Availability for NASA's Eploration Systems Development Programs

NASA is developing new capabilities for human and scientific exploration beyond Earth orbit. Natural environments information is an important asset for NASA's development of the next generation space transportation system as part of the Exploration Systems Development Program, which includes the Space Launch System (SLS) and MultiPurpose Crew Vehicle (MPCV) Programs. Natural terrestrial environment conditions - such as wind, lightning and sea states - can affect vehicle safety and performance during multiple mission phases ranging from prelaunch ground processing to landing and recovery operations, including all potential abort scenarios. Space vehicles are particularly sensitive to these environments during the launch/ascent and the entry/landing phases of mission operations. The Marshall Space Flight Center (MSFC) Natural Environments Branch provides engineering design support for NASA space vehicle projects and programs by providing design engineers and mission planners with natural environments definitions as well as performing custom analyses to help characterize the impacts the natural environment may have on vehicle performance. One such analysis involves assessing the impact of natural environments to operational availability. Climatological time series of operational surface weather observations are used to calculate probabilities of meeting or exceeding various sets of hypothetical vehicle-specific parametric constraint thresholds.

Altino, Karen M.↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket and the Orion capsule, designed to take humans back to the moon in 2024, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the launch. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The messaging software of LCS is responsible for handling the various data types that can be sent between the hardware and software components of the LCS. Since this system is interacting with numerous devices, controllers, and viewports in real time, the distribution of data across the system must be fast, but also reliable and accurate. To verify the accuracy and reliability of the system, developers on the project have created a set of tests to be performed that covers all operations allowed by the system. Given the extensive Application Programming Interface(API) provided by the messaging software, these unit tests are rather time-consuming and costly (in terms of man-hours) to perform. Therefore, an automated testing framework is used to perform supplemental tests automatically when updates are made to the code base.

Rebecca McFadden↗

Thermal Development of a Commercial off the Shelf (COTS) Camera for Exploration Upper Stage (EUS)

NASA’s Flight Imagery Launch Monitoring Real-time System (FILMRS) cameras were originally developed for the Space Launch System (SLS) Core Stage. These Commercial Off the Shelf (COTS) cameras have been redesigned and reduced by an order of magnitude in size for the Exploration Upper Stage (EUS). The change in thermal environment has led to the application of various passive thermal control methods and the addition of a heater option. This paper will give a summary of the design and development test effort associated with adapting the COTS camera for the demands of the space environment and associated thermal mitigations applied as the project prepares to complete the design. The application of this camera for other space systems is discussed.

Hernandez, Deborah↗

Launch Vehicle Manual Steering with Adaptive Augmenting Control:In-Flight Evaluations of Adverse Interactions Using a Piloted Aircraft

An Adaptive Augmenting Control (AAC) algorithm for the Space Launch System (SLS) has been developed at the Marshall Space Flight Center (MSFC) as part of the launch vehicle's baseline flight control system. A prototype version of the SLS flight control software was hosted on a piloted aircraft at the Armstrong Flight Research Center to demonstrate the adaptive controller on a full-scale realistic application in a relevant flight environment. Concerns regarding adverse interactions between the adaptive controller and a potential manual steering mode were also investigated by giving the pilot trajectory deviation cues and pitch rate command authority, which is the subject of this paper. Two NASA research pilots flew a total of 25 constant pitch rate trajectories using a prototype manual steering mode with and without adaptive control, evaluating six different nominal and off-nominal test case scenarios. Pilot comments and PIO ratings were given following each trajectory and correlated with aircraft state data and internal controller signals post-flight.

adaptive control↗

Unit Testing and Remote Display Development

The Kennedy Space Center is currently undergoing an extremely interesting transitional phase. The final Space Shuttle mission, STS-135, was completed in July of 2011. NASA is now approaching a new era of space exploration. The development of the Orion Multi- Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) launch vehicle that will launch the Orion are currently in progress. An important part of this transition involves replacing the Launch Processing System (LPS) which was previously used to process and launch Space Shuttles and their associated hardware. NASA is creating the Spaceport Command and Control System (SCCS) to replace the LPS. The SCCS will be much simpler to maintain and improve during the lifetime of the spaceflight program that it will support. The Launch Control System (LCS) is a portion of the SCCS that will be responsible for launching the rockets and spacecraft. The Integrated Launch Operations Applications (ILOA) group of SCCS is responsible for creating displays and scripts, both remote and local, that will be used to monitor and control hardware and systems needed to launch a spacecraft. It is crucial that the software contained within be thoroughly tested to ensure that it functions as intended. Unit tests must be written in Application Control Language (ACL), the scripting language used by LCS. These unit tests must ensure complete code coverage to safely guarantee there are no bugs or any kind of issue with the software.

LCS↗

Predicting SLS Launch Environment using a Novel Multiphase Formulation

Powerful acoustic waves generated during ignition of launch vehicles may be dangerous to the vehicle, its payload, or the surrounding structures. The water-based Ignition Overpressure and Sound Suppression (IOP/SS) system at Kennedy Space Center’s (KSC) Launch Complex 39B (LC-39B) will be used to protect the Space Launch System (SLS) from the acoustic vibrations generated during launch. The IOP/SS system uses enormous amounts of water to dampen and attenuate these sound waves. To better understand the launch environment risks and to study the effectiveness of the IOP/SS system it is desirable to have time-accurate unsteady simulations of the vehicle ignition with water-based sound suppression. This paper presents results obtained with a novel, high-order accurate, and robust numerical method designed for simulating compressible multiphase flows. A positivity-preserving finite difference scheme is utilized which is formally high-order accurate and also provably robust. Robustness is critical due to the extreme nature of the flow which exhibits highly nonlinear shock and rarefaction waves interacting with liquid-gas interfaces with density ratios of the order of 1000:1. Furthermore, the high-order accuracy (and the high resolution property) is desirable for predicting wave phenomena like IOP waves since the signal can be resolved accurately and propagated long distances with fewer grid points. This finite-difference method was developed using NASA’s Launch, Ascent, and Vehicle Aerodynamics (LAVA) Cartesian immersed boundary framework. We present a validation case by applying our solver to the SLS Scale Model Acoustic Test (SMAT). The SLS SMAT is a well-instrumented 5% scale model test meant to represent the SLS at NASA KSC’s LC-39B pad. Scale IOP tests were performed with and without the sound suppression water and included many sensors which recorded the pressure waves produced during ignition. For this validation case we conduct two simulations, likewise with and without sound suppression water, and compare the SLS SMAT pressure sensor signals with our numerical signals at identical locations. Following this validation case we present a study of the SLS launch environment to examine engineering safety concerns about the mobile launch pad. Engineers at KSC redesigned the main flame deflector at LC-39B anticipating the increased loads from the SLS and to repair damage from prior Shuttle missions. This deflector redesign made use of surface pressure and temperature data from LAVA full-scale SLS simulations without the sound suppression system. The engineers were questioning the possibility of increased pressure loads on the underside of the mobile launcher due to the water in the flame trench. Based on the results established in our simulations of the SLS SMAT, we performed updated calculations for SLS at LC-39B with and without water systems active to assess the readiness of the launch pad for Artemis I launch. Our results show that the IOP/SS system is effective at reducing the overpressure signal and overall sound pressure levels felt by the vehicle and additionally that the pressure loads experienced by the mobile launcher (ML) during engine startup is not increased by the presence of water.

EGS↗

Consolidated Development Objectives Document (CDOD) For MB-60

This document defines the objectives related to liquid rocket engine system development to be undertaken by JAXA in support of the Space Launch System (SLS) Program managed out of the NASA Marshall Space Flight Center (MSFC). These objectives include furnishing the necessary management, labor, facilities, tools, equipment, and materials required to execute the specified activities. 1.1 Project Scope: The scope of this effort is to develop a rocket engine and associated products per the objectives and technical requirements established in this document. This engine, minus the engine controller, designated here as MB ]60, is to be developed through to a prequalification point of maturity. It is assumed that should JCNE ]1 development proceed beyond this maturity point towards actual flight qualification, the engine controller will be supplied and integrated by NASA. 1.2 Document Structure: The structure of this Consolidated Development Objectives Document (CDOD) includes a traditional description of objectives in a SOO, plus the associated Data Products Document (DPD) in an attached appendix, and then Engine Requirements Document (ERD) as another attached appendix. It is the intent that this document, in conjunction with the cited applicable documents, should constitute a complete programmatic and technical description of the development effort to be pursued.

Greene, William D.↗

Recent Applications of Space Weather Research to NASA Space Missions

Marshall Space Flight Center s Space Environments Team is committed to applying the latest research in space weather to NASA programs. We analyze data from an extensive set of space weather satellites in order to define the space environments for some of NASA s highest profile programs. Our goal is to ensure that spacecraft are designed to be successful in all environments encountered during their missions. We also collaborate with universities, industry, and other federal agencies to provide analysis of anomalies and operational impacts to current missions. This presentation is a summary of some of our most recent applications of space weather data, including the definition of the space environments for the initial phases of the Space Launch System (SLS), acquisition of International Space Station (ISS) frame potential variations during geomagnetic storms, and Nascap-2K charging analyses.

Willis, Emily M.↗

Recent Applications of Space Weather Research to NASA Space Missions

Marshall Space Flight Center s Space Environments Team is committed to applying the latest research in space weather to NASA programs. We analyze data from an extensive set of space weather satellites in order to define the space environments for some of NASA s highest profile programs. Our goal is to ensure that spacecraft are designed to be successful in all environments encountered during their missions. We also collaborate with universities, industry, and other federal agencies to provide analysis of anomalies and operational impacts to current missions. This presentation is a summary of some of our most recent applications of space weather data, including the definition of the space environments for the initial phases of the Space Launch System (SLS), acquisition of International Space Station (ISS) frame potential variations during geomagnetic storms, and Nascap-2K charging analyses.

Willis, Emily M.↗

Integration and Testing of LCS Software

Kennedy Space Center is in the midst of developing a command and control system for the launch of the next generation manned space vehicle. The Space Launch System (SLS) will launch using the new Spaceport Command and Control System (SCCS). As a member of the Software Integration and Test (SWIT) Team, command scripts, and bash scripts were written to assist in integration and testing of the Launch Control System (LCS), which is a component of SCCS. The short term and midterm tasks are for the most part completed. The long term tasks if time permits will require a presentation and demonstration.

Command Script↗

Firing Room Remote Application Software Development & Swamp Works Laboratory Robot Software Development

The National Aeronautics and Space Administration (NASA) is creating a way to send humans beyond low Earth orbit, and later to Mars. Kennedy Space Center (KSC) is working to make this possible by developing a Spaceport Command and Control System (SCCS) which will allow the launch of Space Launch System (SLS). This paper's focus is on the work performed by the author in her first and second part of the internship as a remote application software developer. During the first part of her internship, the author worked on the SCCS's software application layer by assisting multiple ground subsystems teams including Launch Accessories (LACC) and Environmental Control System (ECS) on the design, development, integration, and testing of remote control software applications. Then, on the second part of the internship, the author worked on the development of robot software at the Swamp Works Laboratory which is a research and technology development group which focuses on inventing new technology to help future In-Situ Resource Utilization (ISRU) missions.

Gazebo (Robot simulator)↗

Next Generation Heavy-Lift Launch Vehicle: Large Diameter, Hydrocarbon-Fueled Concepts

With the passage of the 2010 NASA Authorization Act, NASA was directed to begin the development of the Space Launch System (SLS) as a follow-on to the Space Shuttle Program. The SLS is envisioned as a heavy lift launch vehicle that will provide the foundation for future large-scale, beyond low Earth orbit (LEO) missions. Supporting the Mission Concept Review (MCR) milestone, several teams were formed to conduct an initial Requirements Analysis Cycle (RAC). These teams identified several vehicle concept candidates capable of meeting the preliminary system requirements. One such team, dubbed RAC Team 2, was tasked with identifying launch vehicles that are based on large stage diameters (up to the Saturn V S-IC and S-II stage diameters of 33 ft) and utilize high-thrust liquid oxygen (LOX)/RP engines as a First Stage propulsion system. While the trade space for this class of LOX/RP vehicles is relatively large, recent NASA activities (namely the Heavy Lift Launch Vehicle Study in late 2009 and the Heavy Lift Propulsion Technology Study of 2010) examined specific families within this trade space. Although the findings from these studies were incorporated in the Team 2 activity, additional branches of the trade space were examined and alternative approaches to vehicle development were considered. Furthermore, Team 2 set out to define a highly functional, flexible, and cost-effective launch vehicle concept. Utilizing this approach, a versatile two-stage launch vehicle concept was chosen as a preferred option. The preferred vehicle option has the capability to fly in several different configurations (e.g. engine arrangements) that gives this concept an inherent operational flexibility which allows the vehicle to meet a wide range of performance requirements without the need for costly block upgrades. Even still, this concept preserves the option for evolvability should the need arise in future mission scenarios. The foundation of this conceptual design is a focus on low cost and effectiveness rather than efficiency or cutting-edge technology. This paper details the approach and process, as well as the trade space analysis, leading to the preferred vehicle concept.

Holliday, Jon↗

Overview of the NASA Terrestrial Environments Support Role: Data and Applications

This presentation focuses on the terrestrial environment component of the Natural Environments Branch’s (NEB’s) support role and highlights the instrumentation and data sources used, how the data are quality controlled and archived, and the analyses and use-cases of these datasets. A detailed overview is provided about some individual data sources that are used by the branch, which includes a network of instruments (e.g., wind towers, balloons, and profilers) and models, such as the Earth Global Reference Atmospheric Model (Earth-GRAM). Additionally, the data archival and quality control processes that maintain the high-quality climatological datasets from these sources are discussed, as are the implemented and pending updates to this process. Examples of the different applications for these datasets are presented to showcase the analytical and operational capabilities of the NEB and demonstrate the culmination of the entire process. This includes the Range Reference Atmospheres created and maintained by the NEB, sea-state analyses for crewed return, certification of observation systems for space flight, and the day-of-launch support process. The NEB at NASA Marshall Space Flight Center (MSFC) supports the NASA Engineering Directorate (ED) and Exploration Systems Development Mission Directorate (ESDMD) by providing the necessary environmental constraints to facilitate the safe design and operation of assets required for space travel. This includes, but is not limited to, the environmental considerations for assets residing at the launch sites, temporarily stationed at a launch site, traversing the [extra-]terrestrial atmosphere and open space, and arriving at their destination. As such, the Terrestrial and Planetary Environments Team within the NEB is but a part of the whole, delegated to quantify the environment that assets may encounter whilst on Earth and within its atmosphere. However, nearly all ESDMD assets are subjected to terrestrial conditions, which cover a diverse range of meteorological regimes and extremes. The team also supports day-of-launch operations for the Space Launch System (SLS), providing real-time monitoring of the winds and thermodynamics along the launch path using an amalgamation of observed, remotely sensed, and modeled output.

Systems Engineering↗

Steady Surface Pressure Measurement via the Lifetime Method With High-Speed Cameras in NASA's Unitary Plan Wind Tunnel

High spatial resolution measurement of steady surface pressure via pressure-sensitive paint at NASA Ames has traditionally relied on specialized cameras equipped to accumulate charge over multiple exposures, whereas measurement of the fluctuating component of pressure uses an altogether separate set of high-speed cameras. To reduce complexity of installation, data acquisition, and processing, we have implemented methods to use a single set of commercial off-the-shelf cameras to produce both steady and unsteady pressure measurements. Both imaging systems were installed in the 11-by 11-foot NASA Ames Unitary Plan Wind Tunnel and acquired images of a scaled model of the Space Launch System Block 1B Crew and Cargo configurations over a variety of flow conditions. This work focuses on methods for data acquisition, processing, and calibration to produce steady-state pressure estimates on the surface of the wind tunnel model based on the lifetime method. It will then compare the steady solutions produced by the legacy and high-speed imaging systems.

Pressure Sensitive Paint↗

Command and Control System Software Development

Kennedy Space Center has been the heart of human space flight for decades. From the Apollo Program to the Space Shuttle Program, and now to the coming Space Launch System (SLS) and Orion, NASA will be a leader in deep space exploration for mankind. Before any rockets blast off, there is significant work to be done in preparation for launch. People working on all aspects of spaceflight must contribute by developing new technology that has yet to participate in a successful launch, and which can work with technology already proven in flight. These innovations, whether hardware or software, must be tried and true, and includes the projects to which interns contribute to. For this internship, the objective was to create a data recording system for the developers of a LCS section that records certain messages in the traffic of the system. Developers would then be able to use these recordings for analysis later on, either manually or by an automated test. The tool would be of convenience to a developer as it would be used if the system's main data recorder was not available for tests.

Velasquez, Ricky↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying conceptual architectures for a "Proving Ground" near the Moon or in high lunar orbit to conduct human space exploration missions that bridge the gap between today's operations with the International Space Station (ISS) and future human exploration of Mars beginning in the 2030s. This paper describes the framework of a concept of operations ("Conops") for candidate activities in the Proving Ground. The Conops discusses broad goals that the Proving Ground might address, such as participation from commercial entities, support for human landings on the Moon, use of mature technologies, and growth of capability through a steady cadence of increasingly ambitious piloted missions. Additional Proving Ground objectives are outlined in a companion paper. Key elements in the Conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System (SLS) heavy-lift rocket. Potential additions include a new space suit, commercial launch vehicles and logistics carriers, Solar Electric Propulsion (SEP) stages to move elements between different orbits and eventually take them on excursions to deep space, a core module with multiple docking ports, a habitation block, and robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. A module providing advanced regenerative life support functions could launch to the ISS, and later move to the Proving Ground. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The Conops describes notional missions chosen to guide the design of the architecture and its elements. One such mission might be the delivery of a approximately 10-t Transit Habitat element, comanifested with Orion on a Block 1B SLS launcher, to the Proving Ground. In another mission, the architecture might participate in direct human exploration of an asteroidal boulder brought to high lunar orbit by the Asteroid Redirect Mission. The Proving Ground stack could serve as a staging point and tele-operation center for robotic and piloted Moon landings. With the addition of a SEP stage, the architecture could support months-long excursions within and beyond the Earth's sphere of influence, possibly culminating in a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to quantify the risk of landing deconditioned crews on Mars. In a conceptual mission particularly stressing to system design, Proving Ground elements could transit to Mars orbit. Other possible design-driving operations include relocation of the stack with no crew on board, the unpiloted journey of the advanced life support module from ISS to the lunar vicinity, excursions to other destinations in near-Earth space, and additional support for Mars exploration in conjunction with the Evolvable Mars Campaign. The Proving Ground Conops concludes with a discussion of aborts and contingency operations

Love, Stanley G.↗

Core Stage TVC Systems Engineering Challenges in Reusing Heritage Hardware

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Core Auxiliary Power Unit (CAPU) is derived from the Orbiter Auxiliary Power Unit (APU). The Orbiter and Solid Rocket Booster APU turbines are powered by hot gas produced by catalyzed hydrazine decomposition. On the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. While direct reuse or slight modification of existing hardware may seem to be a triple-win for a program in cost, schedule, and technical risk mitigation, those benefits can only be realized when its degree of application in a new system is carefully and thoughtfully managed. The heritage hardware reuse should be prescribed within the heritage design capability and reuse environments must lie within the envelope of heritage qualification testing. Despite the significant test and flight experience of the Shuttle heritage hardware components, successful integration with the newly designed CS TVC components and incorporation into the stage design proved to be a challenge which required re-qualification of the heritage hardware as well as thorough integrated testing to support flight certification. Examples of the challenges that were overcome include: re-qualifying heritage hardware to survive new shock and vibration environments, certifying performance of extensively modified heritage hardware, regenerating design insight due to lack of available heritage vendor data, showing compliance to modern structural design standards, translation of heritage requirements for analog avionics to modern digital avionics, and interfacing heritage mechanical hardware with newly designed avionics. This paper is the second installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. This paper will discuss several engineering challenges encountered during the development process for SLS CS TVC and how they were successfully overcome to reach flight readiness.

Thrust Vector Control↗