Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Final Report For Project TCF-18-15778

This report documents work performed under the Technology Commercialization Fund (TCF-18-15778, Used (spent) nuclear fuel management and analysis tool) award provided by the US Department of Energy (DOE) Office of Technology Transitions (OTT). This report describes various Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) enhancements to advance the technology readiness level (TRL). The principal work performed under TCF is the integration of the initial dry storage loading optimization algorithm into UNF-ST&DARDS.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Level Gap Analysis for Accident Tolerant and Advanced Fuels for Storage and Transportation

This initial gap analysis considers proposed accident tolerant fuel (ATF) options currently being irradiated in commercial reactors, since these are most likely for future batch implementation. Also, advanced fuel (AF) options that may be likely for use in advanced reactors are considered. The cladding technologies considered were chromium-coated zirconium-based alloys, FeCrAl, and both monolithic and matrix composite Silicide carbide (SiC). The fuel technologies considered were chromium-doped uranium dioxide fuel, uranium alloys, uranium nitride, and uranium silicide. Numerous national labs, industry, and countries are performing significant testing and modeling on these proposed technologies to establish performance, but at this time none of the prototypes being irradiated have achieved end-of-life (EOL) burnup. There are some testing results after one burnup cycle to verify in-reactor performance, but little data beyond that. As the ATF prototypes acquire more burnup, data will be produced that is relevant to storage and transportation. The DOE:NE Spent Fuel and Waste Science and Technology (SWFST) Storage and Transportation (ST) Control Account will evaluate the performance data as it becomes available for application to the identified gaps for ST.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sea ice evolution along the Northern Sea Route and implications for trans-Arctic shipping from 2021 through 2060

Arctic surface temperatures warmed at twice the global average in the second half of the 20 th century due to Arctic amplification (AA), a phenomenon predominantly caused by regional polar changes, like the melting of perennial sea ice and reduced sea ice extent (leading to more solar radiation being absorbed by the ocean surface as opposed to being reflected back to space by the ice surface). AA is projected to reach a factor of three even if the climate is stabilized by the mid 21 st century by reduced greenhouse gas emissions. In all emissions scenarios, AA is projected to lead to temperature changes at least 2.4 times larger than global mean surface temperature changes occurring between 2070 and 2100. The ice-albedo feedback, which occurs when the polar-marine surface absorbs more radiation as highly reflective sea ice melts, is reversible such that the premise of a runaway process is no longer accepted as a realistic possibility. No matter what actions are taken to reduce CO 2 concentrations in the atmosphere from now on, two different methods of predicting an ice-free Arctic suggest that perennial sea ice will mostly disappear in September by the year 2050. If there is no reduction in anthropogenic CO 2 and methane emissions, that scenario could occur sooner than 2030. Defining Arctic navigability as safe and economic passage of Polar Class 7 cargo ships without need of an escorting icebreaker, no single trans Arctic ship route will be navigable year-round in the first half of the 21 st century, including in the strong emission scenarios. However, seasonal trans-Arctic navigability will increase this century. An estimate on the number of days per year that the Northern See Route (NSR) will be navigable in the future is beyond the scope of this report. Along Northern Sea Routes 5 and 6, which run close to the Russian coast and Yamal LNG plant, an ARC 7 ice class LNG tanker, the equivalent of a Polar Class 3 (PC3) vessel, will be at low risk in December through April at some point during the current decade. May will continue to entail some risk (more than April) along relatively short segments of these routes through the end of the next decade (2030-2039). Come June, snow rapidly melts away, and thereafter the underlying sea ice begins becomes thinner and less concentrated, greatly reducing risk. However, neither path is desirable for ARC 7 tankers due to shallow bathymetry in Sannikov Strait, and a more desirable path for these ships passes to the north of the New Siberian Islands (route 20, discussed further below). Conventional LNG tankers (i.e., non-ice-strengthened vessels according to the IMO classification), without icebreaker escorts, will continue to encounter dangerous or impassable conditions along many sections of the NSR through the end of this decade for many months of the year. Through 2039, these conventional tankers will be able to operate safely along NSR 6 from August through October. By 2040-2049, the span of safe operation increases to August through November, and by 2050-2059 it increases to July through November, assuming a northward deviation to avoid the Sannikov Strait.

54 ENVIRONMENTAL SCIENCES↗

ECP Milestone Report: Identify initial kernels, bake-off problems (benchmarks) and miniapps (CEED-MS6)

The CEED co-design center is developing a number of kernels, bake-off / benchmark problems (BPs) and mini-applications (miniapps) that capture the unique requirements of high-order finite element algorithms and use them to influence standards, best practices and vendors to generate more portable, better performing code across diverse hardware designs. This is a main activity in CEED’s Hardware, Applications and Finite Element thrusts. CEED’s miniapps, a.k.a. CEEDlings, are small, standalone applications - surrogates for sub-components of interest from the selected first wave of applications (the MARBL/LLNLApp and ExaSMR projects). The BPs are even smaller standalone programs that solve a simple physical problem, including discretization, linear and/or nonlinear solve, and potentially a relatively small number of time steps. A BP may be a proxy/surrogate for part of a miniapp or another problem of general interest. In CEED, both miniapps and BPs will be used extensively in the project to evaluate and compare the performance of algorithms in specific contexts. The parts of the miniapps and BPs that play an important role in their overall performance will be identified and separated as standalone kernels. These kernels and their interaction inside BPs, miniapps and the actual applications, will be the main focus of our optimization efforts. All three standalone pieces of software (miniapps, BPs, and kernels) will serve as a basis for engaging and collaborating with hardware vendors and software technologies (ST) projects. These partners can start at the bottom of the hierarchy, e.g. with the kernels, and easily transition to BPs and miniapps as all three families will be produced in the same CEED environment. In this milestone we identified the initial kernels, bake-off problems and miniapps and delivered software and documentation for them through the new CEED website, http://ceed.exascaleproject.org. We specifically identified the Nekbone miniapp for the ExaSMR application and developed a new miniapp, Laghos, for the MARBL/LLNLApp application. We also formulated four initial benchmark problems (BP1- BP4) with clearly defined performance metrics and performed an initial bake-off comparison between the Nek5000 (spectral element) and MFEM (high-order finite element) technologies. As part of the milestone, we also engaged vendors (AMD) and ST projects (MPICH, STRUMPACK). In this document we are reporting some details and results from these R&D activities, as well as additional project-wide activities performed in Q3 of FY17, including: making CEED software available on GitHub, developing the project website, and the preparation of CEED’s first annual meeting.

97 MATHEMATICS AND COMPUTING↗

Combined Cycle Integrated Thermal Energy Storage “CiTES” (Final Scientific/Technical Report)

The Phase I of this project confirmed the technical feasibility of a Combined Cycle integrated Thermal Energy Storage “CiTES” system, calculated the key performance parameters like power efficiency and costs, and proved its commercial value with full-year simulations for several US electricity markets with high degree of variable renewable generation and volatile hourly electricity prices. The core element of this project is the Electro Thermal Energy Storage (ETES) technology from Siemens Gamesa Renewable Energy GmbH, using thermally stable and inexpensive volcanic rocks as storage material and air as heat transfer medium. This technology is backed by more than 10 years of experience and a 440MMBTU (130MWh-th) pilot plant in Hamburg, Germany, which is in operation since 2019. The integration of this thermal storage in an existing combined cycle power plant (CCPP) is typical power plant technology without any major technology risks. It allows the storage of inexpensive renewable energy during times of surplus renewable generation and the discharge of this energy in times of high energy demand when the fossil plant is in operation. This supplements the fossil power generation with CO2-emission-free energy. The secondary effect of the CiTES system is that a small part of the stored thermal energy is used to keep the heat recovery steam generator (HRSG) and steam turbine (ST) of the combined cycle power plant in hot and ready-to-start condition. This enables the plant to start rapidly when fossil generation is required to satisfy demand as soon variable generation drops off in the evenings or during cloud cover and calm wind periods. Without pre-warming of the HRSG and ST, the CCPP would need several hours for a cold or warm start, burn a lot of gas and release high NOx emissions during start and wouldn’t be able to use the short times of high energy prices in an efficient or economical manner. The economic parameters of CiTES were determined by a full year “8760” simulation using a data set calculation for each of the hours of the year, and historical electricity and gas prices. For consistency, the simulations were focused on the pre-COVID year 2019. The financially most attractive markets were in the Energy Reliability Council of Texas (ERCOT) region, which allowed substantial value generation with arbitrage (charge with cheap energy during renewable surplus times and discharge when energy is needed and expensive). The improvement of flexibility with the CiTES system by pre-heating and warm-keeping of the CCPP allowed for additional power generation during short time periods when demand is high but renewable generation is down; when the hourly energy prices are highest in these markets. The simulations are based on 2019 data, when ERCOT had 27GW of installed photovoltaic (PV) and wind generation. They showed that the created revenue with the prototypically sized CiTES system of 1,000MMBTU (300MWh-th) falls a little bit short of what is expected from a commercially viable investment. The system has optimization opportunities for cost reduction and increased effectiveness which will be realized during a potential Phase II Pre-FEED study following this project. Furthermore, it is safe to assume that a lot of renewable generation capacity will be added all over the US in the coming years. As an example, ERCOT is predicting to more than double its renewable generation from 27GW in 2019 to a forecasted 63GW in 2023. This will increase the amount of renewable overproduction exponentially. This rapid increase of local overproduction and the need to curtail renewable generation is well documented by the California ISO (www.CAISO.com / managing oversupply). However, the simulations also revealed a weakness in the structure of the electricity markets in the US. More specifically, when electricity prices are very low and approaching negative levels, the owners of Variable Renewable Energy (VRE) will curtail a part of their facility to stabilize the price by reducing supply. This results in a situation in which storage facilities, which are integrated in existing fossil assets and don’t have the behind-the-meter benefit of a VRE, won’t be able to purchase low cost – otherwise curtailed – renewable energy off the grid. A special tariff, which motivates VRE owners to sell otherwise curtailed renewable energy to storage facilities (Hydrogen, thermal, pumped hydro, etc.) can solve this issue. The implementation of such a regulating tariff by Independent System Operators, thus avoiding renewable curtailment, is a pre condition for successful commercialization for renewable energy storage technologies. With this advancement of design and technology and improvements in the market environment, it can be expected that the Combined Cycle integrated Thermal Energy Storage proves itself as an important innovation to keep highly efficient, natural gas-based power generation economically successful and relevant for the power industry in the United States of America.

Wolf, Thorsten↗

FY2021 Improvements to the New CTH Code Verification & Validation Test Suite

Over the past few years, the CTH multiphysics hydrocode has overhauled its software quality and testing processes, implementing current best practices in software quality and building a robust V&V test suite comprised of traditional hydrocode verification problems, including ASC Tri-Lab Test Suite and Enhanced Tri-Lab Test Suite problems, as well as validation problems for some of CTH’s most frequently used equations of state, materials models, and other key capabilities. Substantial progress towards building this new test suite was made in FY19 and FY20. In FY21, the test suite has been expanded to include verification and validation tests of the Steinberg-Guinan-Lund (ST) viscoplastic model and the Johnson Cook (JFRAC) fracture model. Additionally, two new verification tests were added, covering hydrodynamics and high explosive (HE) modeling capabilities: the Kidder Gaussian density problem and the Escape of HE Products (EHEP) problem from the Tri-Lab Test Suite. This report discusses each of these test problems in detail. Verification test results are compared to analytic solutions. Validation test results are compared to experimental data. Wherever possible, convergence or mesh refinement studies are included. Additionally, while implementing the Kidder verification problem, a bug was identified that affects the use of tables to initialize pressure or density in 1D or 2D calculations. A brief discussion of the bug and its fix is included. CTH demonstrates good performance overall on the new test suite problems. Simulation results showed good agreement with analytic solutions for the Kidder problem, with convergence rates ranging between 1.8 and sub-linear, and relatively good agreement for the EHEP problem, though convergence rates for pressure and density were nearly 0. The ST and JFRAC strain rate loading verification tests show good agreement with analytic solutions. Likewise, CTH simulation results show good agreement with experimental validation data, including Taylor rod impact testing, for the materials tested. Future V&V work will focus on adding 2D and 3D versions of existing verification tests as well as adding validation tests of other frequently used capabilities such as other fracture models.

42 ENGINEERING↗

Performance Test Code for Determining and Reporting Annual Heat Rate and CO2 for Coal Fueled EGUs

This material is based upon work supported by the Department of Energy under Award Number DEFE0031933. The US Department of Energy (DOE) has retained the services of ASME Standards Technology LLC (ASME ST-LLC) to develop a standardized test method and calculation protocol for determining and reporting annual/long-term heat rate for coal-fueled plants electricity generating units. ASME ST-LLC has retained the services of McHale & Associates, Inc. and Licata Energy & Environmental Consultants, Inc. to provide the technical input to this study. This code applies to hydrocarbon fueled Rankine cycle power generating facilities of any size. It is intended to be used for the determination of continuous power output and heat rate of a generating facility in its operating load cycle and in its operational lineup during the reporting period.

01 COAL, LIGNITE, AND PEAT↗

Extension of Local Helicity Injection Startup Studies to the Urania Experiment (Final Technical Report)

Initiating high-current plasma in a spherical tokamak (ST) without a central solenoid is a critical issue for the development of the ST configuration. The goal of the research funded through this grant was focused on addressing this challenge by demonstrating scalable startup to high plasma current (I p ), while developing a physical understanding and predictive models for non-solenoidal tokamak plasma startup using Local Helicity Injection (LHI). A major objective of this research and development activity was to use scaling experiments to validate a physics understanding that will support deployment of high-current (~1 MA) startup techniques to fusion-scale facilities such as NSTX-U and beyond.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Carbon Storage Core Characterization Efforts at NETL

The multi-scale Computed Tomography (CT) and core flow facility in the Geocharacterization Laboratory at NETL, Morgantown yields porosity, permeability, and fracture properties of rock core samples obtained from the subsurface while maintaining the integrity of the sample. Additionally, geophysical bulk rock properties are analyzed with the laboratory’s GeoTEK multi-sensor core logger in a comparable fashion to downhole methods. NETL researchers collaborate with stakeholders within the carbon storage, oil and gas, and critical minerals sectors. Since 2017, over 1.88 miles of core have been analyzed within the laboratory and all data is publicly available through the Technical Report Series (TRS) on the Energy Data eXchange (EDX). Additionally, the website, RokBase, was curated to extrapolate and visualize the high-resolution data from field operations. The characterization of the Lively Grove #1 (LG#1) well provides a case study into the full capabilities of the Geocharacterization Laboratory. During the comprehensive study of LG#1 ~1-2 mm in diameter, vertical to bedding, cylindrical structures were identified throughout the St. Peter Formation. These structures are pervasive throughout the St. Peter Formation at depth and are characterized as the trace fossil, Skolithos.

Isom, Shelby L↗

Woody Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for n th -plant and 1 st -plant woody biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for woody biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Conventional feedstock supply systems need to be modified to meet the demands of conversion pathways, specifically to have the ability to adjust the quality of the raw biomass materials. Advanced systems incorporate innovative methods of material handling, preprocessing and supply chain configuration. In advanced designs, variability of the raw biomass can be reduced to produce feedstocks of a uniform format, moving toward biomass commoditization. Against this backdrop, the 2022 Woody SOT for low-ash woody feedstocks utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (wood, bark, needle, and extrinsic ash) to reduce impurities and attempt to maximize the retention of usable fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in forest residues, separate out a majority of the incoming needles (which can be supplied to alternate markets), and maximize the retention of whitewood in the usable fraction. The fractionated forest residues are then mixed with clean-pine chips in a 50-50 blend to prepare the feedstock for the desired conversion pathway. The n th -plant analysis estimated the delivered cost for the feedstock at $\$$69.23/dry ton (2016$\$$) which represents a $\$$6.64/dry ton decrease compared to the cost estimate of the 2021 Woody SOT supply system for low-ash woody feedstocks. The quality requirements in the 2022 Woody SOT were identical to those of the 2021 Woody SOT at = 1.00 wt % ash and = 50.51 wt% carbon. The cost savings derive primarily from reductions in dry matter losses during air classification. The GHG emissions for the n th -plant analysis were estimated at 178.39 kg CO2e/dry ton compared to 178.71 kg CO 2 e/dry ton in the 2021 Woody SOT, a decrease of 0.32 kg CO2e/dry ton. The small change stems from an increase in emissions attributed to preprocessing and slightly larger savings in emissions from transportation. In the 1 st -plant analysis of the 2022 Woody SOT system, the average throughput was estimated to be approximately 2,128 dry tons/day or 96.51% of the name plate capacity. During the simulation the daily throughput ranged from 1,090 dry tons/day to 2,200 dry tons/day, or 49.43% to 99.75% of the daily nameplate capacity. After the year of operation 722,403 tons of processed feedstock were produced in total without regard to quality considerations (99.64% of the annual nameplate capacity). The variability in throughput was primarily caused by equipment failures in the system. Regular failures, downtime caused by routine maintenance per manufacturer guidelines, contributed to a majority 62.50% of failures and 62.60% of downtime. Failures due to wear were the other cause of disruption within the system, impacting the rotary shear and orbital screen and accounting for 37.50% of the failures and 37.40% of the total downtime. Ultimately the system was on stream for 87.84% during the simulation period, which is only 2.16 percentage points below the nth-plant assumption for on-stream time. The production cost of the system averaged $\$$71.66/dry ton. The costs ranged from a minimum of $\$$71.23/dry ton to a maximum of $\$$2,115.30/dry ton. When dry matter losses (disposed low-quality fractions as well as other losses such as in grinders) were considered the costs increased to an average of $\$$75.11/dry ton with a minimum of $\$$74.69/dry ton and a maximum of $\$$2,136.86/dry ton...

09 BIOMASS FUELS↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗

Heat Transfer in Void Generating Foam Decomposition: Further Development

Continued development of the additive conductivity material model, used to simulate changes in heat transfer that occurs in void generating foam decomposition, has resulted in an improved model and new features. The previous version of the model was calibrated against the Aria Bulk Fluid Element (BFE) solution and proposed a third-order polynomial correction term best captured the increased heat transfer due to voids in the foam. An investigation of the Fuego Conjugate Heat Transfer (CHT) and Aria BFE solutions at several geometries revealed the CHT solution and BFE solution had differing behavior across length scales, especially at smaller scales. Five calibration studies, using the Fuego CHT as the calibration data, were carried out with polynomial functions of 4-th, 3-rd, 2-nd, 1-st and 0-th orders to determine the best correction function that generalized well across length scales. Each polynomial function was calibrated/trained on six different sized geometries and then tested on three uniquely sized geometries. This study revealed that the 1-st order additive conductivity model performed the best. A new feature of void formation scaling was implemented to more realistically capture the heat transfer as voids are created. A scaling term was added to the model to activate the conductivity correction as decomposition progresses.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Renewable Energy Integration in Remote Alaska Communities

This guide was developed through the U.S. Department of Energy (DOE) Energy Transitions Initiative Partnership Project (ETIPP) technical assistance (TA) projects for Nikolski and St. George. Both communities had wind turbine projects that failed due to integration and maintenance issues. Due to these failures, Nikolski and St. George sought help to investigate renewable energy alternatives and associated integration strategies, with a focus on technologies that could be easily maintained within the community. The primary objective of this guide was to interview subject matter experts and document lessons learned to address potential renewable energy and storage integration issues in remote Alaskan communities. This guide is intended to provide information to rural Alaskan communities considering renewables with the purpose of sharing best practices and case studies to facilitate the successful implementation of future renewable energy projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

This case study report focuses on the rebuild of a 469 kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix, in the U.S. Virgin Islands. The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. The St. Croix site provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers.

14 SOLAR ENERGY↗

Petrographic and Advanced Geologic Characterization Report on Lively Grove #1 (API# 1218924947)

Lively Grove #1 (LG1 API number 1218924947) well was drilled to a depth of 5,758 feet, from the Glen Dean Limestone to the top of the Precambrian unit. In total, 49 thin sections were taken from Rotary Sidewall Core (RSWC), and one thin section was taken from Whole Core (2,918 feet, New Albany Shale) from 1,700 to 5,872 feet for this report. This report details specifically thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis annotated thin section photomicrographs, scanning electron microscopy (SEM) with Energy Dispersive x-ray Spectroscopy (EDS), X-ray Diffraction (XRD), statistics of grain size analysis on St. Peter Sandstone thin sections, and Argon-Argon (Ar-Ar) dating on Precambrian samples from LG1. Characterized units include the Salem Limestone, New Albany Shale, Trenton Group, Joachim Dolomite, St. Peter Sandstone, Everton Formation, Eminence Formation, Davis Member, Eau Claire Formation, and Precambrian Basement.

01 COAL, LIGNITE, AND PEAT↗

Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT↗

Best Practices for Resilience Hub Development and Management

The Carbon League and its community partners in East St. Louis, Illinois, have identified five facilities to serve as resilience hubs. These hubs are intended to support the local community through a range of services and resources during blue-sky (everyday), gray-sky (pre-event), and black-sky (emergency) conditions. Transforming these facilities into fully functional resilience hubs requires a broad operational improvement and programmatic planning roadmap. This memo outlines best practices to guide the development of these resilience hubs in East St. Louis, including recommendations for infrastructure services; safety and physical protection; community services; operational protocols; and a phased implementation strategy aligned with realistic funding and capacity constraints. Infrastructure recommendations include strengthening electric power, communications, water, sanitation, and transportation/logistics capabilities, all of which are essential for hubs that may serve as cooling and warming centers, distribution points, and information hubs during emergencies. Safety recommendations focus on accessibility, emergency action planning, indoor air quality, and secure storage of critical equipment. A phased roadmap provides guidance from immediate, low-cost readiness actions to long-term optimization and community integration. Performance metrics and maintenance protocols ensure continuous improvement and operational readiness. This guidance draws on best practices that can be used to support the development of resilient, community-centered hubs capable of enhancing public safety, health, and well-being during everyday operations and emergencies alike.

99 GENERAL AND MISCELLANEOUS↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence K - Raw Data

Sequence K: Step AOA, Probes (P) This sequence was designed to quantify the 3-D blade static angle-of-attack response in the presence of rotational influences by varying the blade pitch angle. Sequence K used an upwind, rigid turbine with a 0° cone angle. The wind speeds ranged from 6 m/s to 20 m/s, and data were collected at yaw angles of 0° and 30°. The rotor rotated at 72 RPM. Blade and probe pressure measurements were collected. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. The blade pitch angle ramped continuously at 0.18°/s over a wide range of increasing and decreasing pitch angles. A step sequence was also performed. The blade pitch was stepped 5°, the flow was allowed to stabilize, and the pitch angle was held for 8 seconds. Then the pitch angle step was repeated. Again, a wide range of pitch angles was obtained, both increasing and decreasing. The file lengths for this sequence varied from 96 seconds to 6 minutes, depending on the pitch angle range. Some short points were collected at 0° yaw and 3° pitch to verify the functionality of the instrumentation. The file name convention used the initial letter K, followed by two digits specifying wind speed, followed by two digits for yaw angle, followed by RU, RD, or ST, followed by the repetition digit. The angle-of-attack motion was differentiated by RU (ramp up), RD (ramp down), and ST (step down then step up). This sequence is related to sequences L and R.

17 WIND ENERGY↗