On-Site Disposition of Concrete During Decommissioning and Decontamination: A Data Quality Objective-Based Approach

On-site disposition of concrete derived during decommissioning and demolition (D and D) of buildings at industrial sites is a cost-effective, waste minimization alternative to off-site disposal. Because the concrete is to be left on-site it becomes part of the solid matrix of the site and is subject to the compositional constraints governing site soils. In addition, the concrete and its contained-in materials may be subject to physical constraints such as size and shape which do not apply to soils. When considering on-site disposition of concrete, the data quality objective (DQO) process should be used to determine the compositional and physical constraints on the concrete and for developing the characterization approach to determine whether those constraints have been met. The information inputs to the compositional and physical constraints on the concrete constitute the concrete acceptance criteria (CAC) which become the basis for developing decision rules - the yes/no statements that unequivocally state the compositional and physical conditions under which concrete may be left on site. An important DQO boundary concept is concrete classification. The cost of concrete characterization can be minimized with a thorough data gap assessment by focusing resources on the concrete most in need of characterization. Concrete for which a yes/no decision can be made with reasonable certainty based on a comparison of existing data to the CAC receives a lesser amount of characterization scrutiny than does concrete for which existing data is non-existent or ambiguous relative to the CAC. In conclusion: Developing acceptance criteria for the on-site disposition of concrete through the DQO process provides a systematic methodology for determining and documenting what decisions will be made and what information is necessary to support those decisions. At each step in the process, input from all individuals or organizations that have a role in making the ultimate decision must be invited. The primary goal of the DQO process is the development of a clear and defensible set of decision rules that are acceptable, unanimously agreed upon, and approved by all decision makers. By conducting the DQO process in an analytical and systematic manner, unexpected and, perhaps, costly changes to an operational program resulting from last minute second-guessing can be prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of resistance mutations on inhibitor binding to HIV-1 integrase

Here, HIV-1 integrase (IN) is essential for HIV-1 replication, catalyzing two key reaction steps termed 3' processing and strand transfer. Therefore, IN has become an important target for antiviral drug discovery. However, mutants have emerged, such as E92Q/N155H and G140S/Q148H, which confer resistance to raltegravir (RAL), the first IN strand transfer inhibitor (INSTI) approved by the FDA, and to the recently approved elvitegravir (EVG). To gain insights into the molecular mechanisms of ligand binding and drug resistance, we performed molecular dynamics (MD) simulations of homology models of the HIV-1 IN and four relevant mutants complexed with viral DNA and RAL. The results show that the structure and dynamics of the 140s loop, comprising residues 140 to 149, are strongly influenced by the IN mutations. In the simulation of the G140S/Q148H double mutant, we observe spontaneous dissociation of RAL from the active site, followed by an intrahelical swing-back of the 3' -OH group of nucleotide A17, consistent with the experimental observation that the G140S/Q148H mutant exhibits the highest resistance to RAL compared to other IN mutants. An important hydrogen bond between residues 145 and 148 is present in the wild-type IN but not in the G140S/Q148H mutant, accounting for the structural and dynamical differences of the 140s' loop and ultimately impairing RAL binding in the double mutant. End-point free energy calculations that broadly capture the experimentally known RAL binding profiles elucidate the contributions of the 140s' loop to RAL binding free energies and suggest possible approaches to overcoming drug resistance.

60 APPLIED LIFE SCIENCES↗

Process Knowledge Data Gathering and Reporting in Support of Decommissioning [Slides]

Summary of recent ORAU decommissioning activities at the Oak Ridge National Laboratory (ORNL) and the East Tennessee Technology Park (ETTP). Project objective was to generate approved Waste Lot Profiles for legacy facilities scheduled for demolition and shipment to the Environmental Management Waste Management Facility (EMWMF) or appropriate alternate facility. The form and content of process knowledge (PK) reports were developed with input from the EMWMF Waste Acceptance Criteria (WAC) Attainment Team and regulators. PK may be defined as the knowledge of the design and the history of operations that occurs during the life cycle of a facility (paraphrased from SRNL guidance) - similar to the MARSSIM historical site assessment. Some types of PK data used to decommission ORNL and ETTP facilities include: (1) Design drawings; (2) Historical documents [e.g., History of the Oak Ridge National Laboratory by Thomas (1963) and A Brief History of the Chemical Technical Division (ORNL/M-2733)]; (3) Historical photographs; (4) Radiological survey reports; (5) Facility-specific databases - (a) Spill history, (b) Waste Information Tracking System (WITS), and (c) Hazardous Materials Management Information System (HMMIS); (6) Facility walkdown summary reports; and (7) Living memory data. Facility walkdowns are critical for worker safety planning and to assure on-the-ground-conditions match historical descriptions. For Oak Ridge operations, investigators also document the nature and number of items requiring special handling or disposition planning, such as the following: (1) Items containing polychlorinated biphenyls, asbestos, lead, or refrigerants; (2) Items with physical WAC restriction (e.g., large items, pipes, and concrete); and (3) Too 'hot' for EMWMF. Special emphasis was made to interview facility managers, scientists, technicians, or anyone with direct knowledge of process-related activities. Interviews often led to more contact names and reports but also offered anecdotal accounts of releases, process-related operations, maintenance activities, and other relevant information not addressed in the written record. 'Fun' part of PK data gathering. Often got not-so-useful information such as, 'The operations manager was a jerk and we all hated him.' PK data are used to indicate the presence or absence of contaminants. Multiple lines of investigation are necessary for characterization planning and to help determine which disposal facility is best suited for targeted wastes. The model used by ORAU assisted remediation contractors and EMWMF managers by identifying anomalous waste and items requiring special handling.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: 15-19-02, Waste Burial Pit, 15-30-01, Surface Features at Borehole Sites, 15-64-01, Decontamination Area, 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Used fuel extended storage security and safeguards by design roadmap

In the United States, spent nuclear fuel (SNF) is safely and securely stored in spent fuel pools and dry storage casks. The available capacity in spent fuel pools across the nuclear fleet has nearly reached a steady state value. The excess SNF continues to be loaded in dry storage casks. Fuel is expected to remain in dry storage for periods beyond the initial dry cask certification period of 20 years. Recent licensing renewals have approved an additional 40 years. This report identifies the current requirements and evaluation techniques associated with the safeguards and security of SNF dry cask storage. A set of knowledge gaps is identified in the current approaches. Finally, this roadmap identifies known knowledge gaps and provides a research path to deliver the tools and models needed to close the gaps and allow the optimization of the security and safeguards approaches for an interim spent fuel facility over the lifetime of the storage site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamics of human protein kinase Aurora A linked to drug selectivity

Protein kinases are major drug targets, but the development of highly-selective inhibitors has been challenging due to the similarity of their active sites. The observation of distinct structural states of the fully-conserved Asp-Phe-Gly (DFG) loop has put the concept of conformational selection for the DFG-state at the center of kinase drug discovery. Recently, it was shown that Gleevec selectivity for the Tyr-kinase Abl was instead rooted in conformational changes after drug binding. Here, we investigate whether protein dynamics after binding is a more general paradigm for drug selectivity by characterizing the binding of several approved drugs to the Ser/Thr-kinase Aurora A. Using a combination of biophysical techniques, we propose a universal drug-binding mechanism, that rationalizes selectivity, affinity and long on-target residence time for kinase inhibitors. These new concepts, where protein dynamics in the drug-bound state plays the crucial role, can be applied to inhibitor design of targets outside the kinome.

59 BASIC BIOLOGICAL SCIENCES↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Knowledge management information tool Web analytics - 15182

The Knowledge Management Information Tool (KM-IT) is a web-based [01] system developed to maintain and preserve the Department of Energy's (DOE's) D and D knowledge base. The system was developed by Florida International University's Applied Research Center (FIU-ARC) with the support of the D and D community including the DOE Office of Environmental Management, and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. The D and D KM-IT is an interactive web-based system operational and available for free access at www.dndkm.org. [02] The D and D KM-IT is currently composed of the following tailored D and D modules: Web Crawler, Hotline, Technology, Document Library (including Hanford's and Savannah River Sites' ALARA Center Reports), Specialist Directory, Lessons Learned, Best Practices, Video/Picture Library, Vendors, Collaboration Tools, Training, and Mobile Systems. The Web Crawler dynamically searches through the D and D KM-IT repository as well as the web and displays search results based on the search criteria. The Hotline allows registered users to post questions/problems related to D and D and to receive solutions from a subject-matter specialist. The Technology module serves as repository of D and D technologies and contains technology/ demonstration fact sheets and vendor information. D and D community members can add Lessons Learned, Best Practices, Documents, and Pictures/Videos to the D and D KM-IT repository, after a formal approval process. The Vendor module provides a directory of commercial vendors who provide D and D related technologies, supplies, and services. D and D KM-IT makes excellent use of the knowledge that exists within the D and D community by allowing D and D project managers around the DOE complex to collaborate by sharing innovative ideas, past experiences, and practices and by maintaining a directory of subject matter specialists. The mobile version of the KM-IT can be accessed from m.dndkm.org [03] and currently has six active modules: Vendor, Technology, Picture/Video Library, Hotline, Lessons Learned and Specialist Directory. Web analytics is a key tool being implemented by the D and D KM-IT project team in an effort to enhance the system to better meet users' needs. The D and D KM-IT project team incorporates web analytics as part of its operational elements to analyze information and key data points on how the system is being used. Web analytics is the measurement, collection, analysis and reporting of internet data for the purposes of understanding and optimizing web usage. The use of web analytics retains or attracts D and D community members to access and share knowledge through virtual collaboration on the KM-IT platform. D and D KM-IT web analytics measures details on the overall usage of the system without tracking personal information or specific user behavior: how many users visited the application, how many of those users were unique visitors, how visitors come to the system (i.e., by following a link to the system or by using the web site URL via bookmark or directly typing the address), what keywords were used to perform searches with the search engine, how long the average user stayed on a given screen or on the entire system and what links were clicked on. This information is used to identify which areas of the system are more popular than the others and provides information that can be used to streamline the application for a better user experience. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 578: Miscellaneous Inactive Sites Nevada National Security Site, Nevada, (Rev. 0)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 578, Miscellaneous Inactive Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 578 comprises the following 11 corrective action sites (CASs) located in Areas 2, 3, 4, 6, 7, 12, and 23 of the Nevada National Security Site: • 02-26-01, Lead (Concrete Box w/Lining) • 02-26-07, Gun Turret w/Lead in Barrel • 03-16-01, U-3auS Disposal Site • 04-26-02, Lead on Instrument Bunker • 06-99-07, Sump • 07-99-01, Miscellaneous Debris • 12-02-11, UST-P-2 • 12-06-01, Muckpile • 12-06-04, Muckpile • 23-12-01, Boiler (2) • 23-99-04, Salvage Yard This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 578 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

54 ENVIRONMENTAL SCIENCES↗

ConocoPhillips Sweeny IGCC/CCS Project

Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process water needs. The DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

01 COAL, LIGNITE, AND PEAT↗

Annual Site Environmental Report: 2009(ASER)

This report provides information about environmental programs during the calendar year of 2009 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2009/2010 (October 2009 through May 2010), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that Worker safety and health are protected, The environment is protected, and Compliance is ensured. Throughout 2009, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. SLAC's EMS was audited by a review team from the DOE Oak Ridge Office and the DOE SLAC Site Office (SSO) on March 31, 2009. The review team found the EMS to be in substantial conformance with the appropriate EMS requirements. Based on the audit results, SLAC and DOE were able to declare conformance with DOE Order 450.1A ahead of the June 30, 2009 mandated deadline. During 2009, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2009. Hazardous materials field verifications of 36 buildings identified a number of materials that could be removed from inventory due to lack of need or age of the material. In all, 124 chemical containers were removed from inventory. SLAC's chemical purchase approval process was reconfigured to allow for more effective control over purchase of highly toxic materials. One hundred percent of SLAC's purchased desktops, laptops, and monitors were either Silver or Gold level Electronic Product Environmental Assessment Tool (EPEAT) certified in fiscal year (FY) 2009. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in greenhouse gas (GHG) emissions. In 2009, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. During calendar year (CY) 2009, SLAC shipped 1324 cubic feet of low-level radioactive waste, legacy waste accounted for 40 percent of the volume, to appropriate treatment and disposal facilities for low-level radioactive waste. Moreover, SLAC continued its efforts in the inventory reduction of materials no longer needed for its mission: returned 28 sealed sources to the manufacturer, transferred additional 3 sources to Los Alamos National Laboratory, and disposed of 636 kilograms of depleted uranium tiles. In 2009, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region on October 19, 2009, for the investigation and remediation of impacted soil and groundwater at SLAC. Risk-based preliminary cleanup goals for impacted soil and groundwater have been established for SLAC, and the remedial efforts are being designed to meet these established goals.

Source record↗

Streamlining and Transparently Automating Complex Waste Determinations at Los Alamos National Laboratory - 17286

Environmental programs at Los Alamos National Laboratory (LANL) generate a large amount of sampling activities that can result in waste that needs to be characterized and properly disposed. Since 2011, sampling results are managed in the cloud-based Environmental Information Management (EIM) database, which contains over 16 million current and historical data records. In many cases, the database's analytical records are used to characterize and dispose waste from environmental operations. Three factors contribute to streamlining of the waste disposition operations: (1) if possible, use of the existing analytical data for waste characterization to avoid additional laboratory analysis; (2) reduction in time spent on data evaluation for various waste acceptance criteria; and (3) choice of the proper and least expensive disposal alternative. Use of the existing analytical data, when allowed by law, creates some paradoxical problems: when chemical analysis is requested with the purpose of characterizing waste, it creates only 100 to 400 analytical records. However, use of exiting analytical data at LANL may lead to evaluation of tens of thousands of analytical records, with many records for each single analyte. This occurs because data were collected for environmental characterization and not waste characterization. To streamline data analysis for waste disposition using existing data, LANL has created a Waste Data Summary (WDS) module in the site's EIM database. Recognizing that waste determination is performed by groups outside the environmental program at LANL, the WDS allows for logically guided data selection for a specific waste determination (solids, liquids, radiological, etc.) and reduces potentially thousands of rows of data into simple formatted data reports that are easy to comprehend and process. This allows the waste evaluators to review data using multiple approaches to make their own determination on the most appropriate disposal method. There are four basic principles of WDS operation: (1) The highest detected analytical result is evaluated for the selected samples (or the lowest undetected result if there are no detected results); (2) All approved disposal pathways are evaluated; (3) Any failures of the Waste Acceptance Criteria are visibly highlighted to focus the attention of the evaluator; and (4) The decision of the disposal path is left to the trained waste evaluator (WDS does not choose or suggest any disposal paths). The summary results are presented as the set of short data reports. These reports can be divided into two groups: general comparison reports and disposal pathway specific forms. The general comparison forms show all Resource Conservation and Recovery Act (RCRA) analytes with pass/fail evaluation and with preference for toxicity characteristic leaching procedure (TCLP) results (or 20x rule) for solid samples, the potential RCRA hazard codes assignment for detected analytes, and all rad results. The detected chemical and radioactivity results are compared to the background values and to Soil Screening and Soil Action limits (SSL/SAL limits). Disposal pathway specific forms follow Waste Acceptance Criteria requirements for all disposal pathways available at LANL. The programming of the WDS tries to maximize existing data by analyte substitutions (like using gross alpha for necessary alpha emitting isotopes) or by making calculations when analytical results do not agree with legal requirements (like total chlordane in the RCRA regulations, which is most often analyzed and reported as individual isomers). All forms may be annotated by the waste evaluator to provide additional information to support decision making. Upon final decision of a disposal path, the complete dataset used in the evaluation and the WDS forms with annotations is 'frozen' as an un-editable PDF export to document the data used in the waste disposal determination. The streamlined process results in less work for waste evaluators and reduces overall labor and analytical costs. By comparison, a full review of a 10,000 record parent dataset may take a waste evaluator over a week to review, whereas with the WDS module, the task can be accomplished in less than one hour with clear, reproducible results. These results can be reviewed and checked at any time by quality assurance personnel, thus ensuring transparency in the decision making process. LANL believes this approach has broad applicability to other sites where waste determination is based on review of existing data collected for more generalized environmental purposes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ErbB receptors in the biology and pathology of the aerodigestive tract

The most common sites of malignancies in the aerodigestive tract include the lung, head and neck and the esophagus. Esophageal adenocarcinomas (EA), esophageal squamous cell carcinomas (ESCC), and squamous cell carcinomas of the head and neck (SCCHN) are the primary focus of this review. Traditional treatment for aerodigestive tract cancers includes primary chemoradiotherapy (CRT) or surgical resection followed by radiation (or CRT). Recent developments in treatment have focused increasingly on molecular targeting strategies including cetuximab (a monoclonal antibody against epidermal growth factor receptor (EGFR)). Cetuximab was FDA approved in 2006 for treatment of SCCHN, underscoring the importance of understanding the biology of these malignancies. EGFR is a member of the ErbB family of growth factor receptor tyrosine kinases. The major pathways activated by ErbB receptors include Ras/Raf/MAPK; PI3K/AKT; PLC{gamma} and STATs, all of which lead to the transcription of target genes that may contribute to aerodigestive tumor progression. This review explores the expression of ErbB receptors in EA, ESCC and SCCHN and the signaling pathways of EGFR in SCCHN.

60 APPLIED LIFE SCIENCES↗

Structural studies of P-type ATPase–ligand complexes using an X-ray free-electron laser

Membrane proteins are key players in biological systems, mediating signalling events and the specific transport of e.g. ions and metabolites. Consequently, membrane proteins are targeted by a large number of currently approved drugs. Understanding their functions and molecular mechanisms is greatly dependent on structural information, not least on complexes with functionally or medically important ligands. Structure determination, however, is hampered by the difficulty of obtaining well diffracting, macroscopic crystals. Here, the feasibility of X-ray free-electron-laser-based serial femtosecond crystallography (SFX) for the structure determination of membrane protein–ligand complexes using microcrystals of various native-source and recombinant P-type ATPase complexes is demonstrated. The data reveal the binding sites of a variety of ligands, including lipids and inhibitors such as the hallmark P-type ATPase inhibitor orthovanadate. By analyzing the resolution dependence of ligand densities and overall model qualities, SFX data quality metrics as well as suitable refinement procedures are discussed. Even at relatively low resolution and multiplicity, the identification of ligands can be demonstrated. This makes SFX a useful tool for ligand screening and thus for unravelling the molecular mechanisms of biologically active proteins.

59 BASIC BIOLOGICAL SCIENCES↗

SU-F-T-288: Impact of Trajectory Log Files for Clarkson-Based Independent Dose Verification of IMRT and VMAT

Purpose: To investigate the effect of the trajectory files from linear accelerator for Clarkson-based independent dose verification in IMRT and VMAT plans. Methods: A CT-based independent dose verification software (Simple MU Analysis: SMU, Triangle Products, Japan) with a Clarksonbased algorithm was modified to calculate dose using the trajectory log files. Eclipse with the three techniques of step and shoot (SS), sliding window (SW) and Rapid Arc (RA) was used as treatment planning system (TPS). In this study, clinically approved IMRT and VMAT plans for prostate and head and neck (HN) at two institutions were retrospectively analyzed to assess the dose deviation between DICOM-RT plan (PL) and trajectory log file (TJ). An additional analysis was performed to evaluate MLC error detection capability of SMU when the trajectory log files was modified by adding systematic errors (0.2, 0.5, 1.0 mm) and random errors (5, 10, 30 mm) to actual MLC position. Results: The dose deviations for prostate and HN in the two sites were 0.0% and 0.0% in SS, 0.1±0.0%, 0.1±0.1% in SW and 0.6±0.5%, 0.7±0.9% in RA, respectively. The MLC error detection capability shows the plans for HN IMRT were the most sensitive and 0.2 mm of systematic error affected 0.7% dose deviation on average. Effect of the MLC random error did not affect dose error. Conclusion: The use of trajectory log files including actual information of MLC location, gantry angle, etc should be more effective for an independent verification. The tolerance level for the secondary check using the trajectory file may be similar to that of the verification using DICOM-RT plan file. From the view of the resolution of MLC positional error detection, the secondary check could detect the MLC position error corresponding to the treatment sites and techniques. This research is partially supported by Japan Agency for Medical Research and Development (AMED)

60 APPLIED LIFE SCIENCES↗

NEUTRALIZATIONS OF HIGH ALUMINUM LOW URANIUM USED NUCLEAR FUEL SOLUTIONS CONTAINING GADOLINIUM AS A NEUTRON POISON

H-Canyon will begin dissolving High Aluminum - Low Uranium (High Al/Low U) Used Nuclear Fuel (UNF) following approval by DOE which is anticipated in CY2011. High Al/Low U is an aluminum/enriched uranium UNF with small quantities of uranium relative to aluminum. The maximum enrichment level expected is 93% {sup 235}U. The High Al/Low U UNF will be dissolved in H-Canyon in a nitric acid/mercury/gadolinium solution. The resulting solution will be neutralized and transferred to Tank 39H in the Tank Farm. To confirm that the solution generated could be poisoned with Gd, neutralized, and discarded to the Savannah River Site (SRS) high level waste (HLW) system without undue nuclear safety concerns the caustic precipitation of simulant solutions was examined. Experiments were performed with three simulant solutions representative of the H-Canyon estimated concentrations in the final solutions after dissolution. The maximum U, Gd, and Al concentration were selected for testing from the range of solution compositions provided. Simulants were prepared in three different nitric acid concentrations, ranging from 0.5 to 1.5 M. The simulant solutions were neutralized to four different endpoints: (1) just before a solid phase was formed (pH 3.5-4), (2) the point where a solid phase was obtained, (3) 0.8 M free hydroxide, and (4) 1.2 M free hydroxide, using 50 wt % sodium hydroxide (NaOH). The settling behavior of the neutralized solutions was found to be slower compared to previous studies, with settling continuing over a one week period. Due to the high concentration of Al in these solutions, precipitation of solids was observed immediately upon addition of NaOH. Precipitation continued as additional NaOH was added, reaching a point where the mixture becomes almost completely solid due to the large amount of precipitate. As additional NaOH was added, some of the precipitate began to redissolve, and the solutions neutralized to the final two endpoints mixed easily and had expected densities of typical neutralized waste. Based on particle size and scanning electron microscopy analyses, the neutralized solids were found to be homogeneous and less than 20 microns in size. The majority of solids were less than 4 microns in size. Compared to previous studies, a larger percentage of the Gd was found to precipitate in the partially neutralized solutions (at pH 3.5-4). In addition the Gd:U mass ratio was found to be at least 1.0 in all of the solids obtained after partial or full neutralization. The hydrogen to U (H:U) molar ratios for two accident scenarios were also determined. The first was for transient neutralization and agitator failure. Experimentally this scenario was determined by measuring the H:U ratio of the settled solids. The minimum H:U molar ratio for solids from fully neutralized solutions was 388:1. The second accident scenario is for the solids drying out in an unagitiated pump box. Experimentally, this scenario was determined by measuring the H:U molar ratio in centrifuged solids. The minimum H:U atom ratios for centrifuged precipitated solids was 250:1. It was determined previously that a 30:1 H:Pu atom ratio was sufficient for a 1:1 Gd:Pu mass ratio. Assuming a 1:1 equivalence with {sup 239}Pu, the results of these experiments show Gd is a viable poison for neutralizing U/Gd solutions with the tested compositions.

08 HYDROGEN↗

REMOVAL OF LEGACY PLUTONIUM MATERIALS FROM SWEDEN

U.S. Department of Energy’s National Nuclear Security Administration (NNSA) Office of Global Threat Reduction (GTRI) recently removed legacy plutonium materials from Sweden in collaboration with AB SVAFO, Sweden. This paper details the activities undertaken through the U.S. receiving site (Savannah River Site (SRS)) to support the characterization, stabilization, packaging and removal of legacy plutonium materials from Sweden in 2012. This effort was undertaken as part of GTRI’s Gap Materials Program and culminated with the successful removal of plutonium from Sweden as announced at the 2012 Nuclear Security Summit. The removal and shipment of plutonium materials to the United States was the first of its kind under NNSA’s Global Threat Reduction Initiative. The Environmental Assessment for the U.S. receipt of gap plutonium material was approved in May 2010. Since then, the multi-year process yielded many first time accomplishments associated with plutonium packaging and transport activities including the application of the of DOE-STD-3013 stabilization requirements to treat plutonium materials outside the U.S., the development of an acceptance criteria for receipt of plutonium from a foreign country, the development and application of a versatile process flow sheet for the packaging of legacy plutonium materials, the identification of a plutonium container configuration, the first international certificate validation of the 9975 shipping package and the first intercontinental shipment using the 9975 shipping package. This paper will detail the technical considerations in developing the packaging process flow sheet, defining the key elements of the flow sheet and its implementation, determining the criteria used in the selection of the transport package, developing the technical basis for the package certificate amendment and the reviews with multiple licensing authorities and most importantly integrating the technical activities with the Swedish partners.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗