Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Retrofit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Healthy Buildings Initiative: Pacific Northwest National Laboratory Pilot Study

Fact sheet describes Pacific Northwest National Laboratory’s pilot of its framework for evaluating indoor environmental quality metrics and quantifying the potential financial costs and gains related to improving occupant productivity in federal buildings. The framework was piloted at PNNL’s Richland, Washington, campus to investigate how integrated energy and health analysis could benefit building retrofit and operation strategies.

FEMP↗

Establishing Regulatory Jurisdictional Boundaries at Collocated Advanced-Reactor Facilities

This white paper discusses establishing and applying nuclear facility jurisdictional boundaries at advanced-nuclear-reactor facilities. It was written for industry review and evaluation with possible consideration by the U.S. Nuclear Regulatory Commission (NRC) for subsequent regulatory action. The paper proposes a regulatory basis for establishing jurisdictional boundaries at operational advanced (i.e., non-light water) reactor installations at sites proximate to and sharing systems with non-NRC regulated facilities (e.g., users of process heat, fossil-plant retrofits, microgrid electrical power, desalination, etc.). Advanced-reactor technologies can be applied to support many industrial applications to replace the burning of fossil fuels as well as produce steam for electricity. The principal application of the current light-water reactor fleet is electricity generation. These varied industrial applications may involve an advanced-reactor design in combination with different site-specific energy-conversion systems. Some of these process-heat applications will require process-heat delivery systems to lie partially outside the advanced-reactor operator’s facility. Energy conversion systems are conventional, non-nuclear equipment and buildings. Given these varied applications, there should be a clear understanding between the advanced-reactor applicant and the NRC regarding a nominal demarcation between those systems that reside within the nuclear facility under the regulatory jurisdiction of the NRC (i.e., within the scope of a 10 Code of Federal Regulations (CFR) 50 operating license or Part 52 design certification and a combined license) and those that fall outside the scope of the NRC (e.g., an industrial facility). Additionally, it is important to have a clear understanding regarding the plant scope that should be addressed in an advanced-reactor facility Part 52, design certification application and the part of the plant scope that could be addressed as part of a site specific combined license application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Moving Zero Energy Office Buildings to the Mainstream: Establishing Design Guidelines and Energy Targets: Preprint

Office buildings represent a significant portion of the commercial sector and are ideal candidates to lead the market towards achieving zero energy or zero energy ready buildings. The variety of sizes and uses for office buildings make them challenging to determine set design guidance that can be deployed across the market. A project committee for ASHRAE’s Zero Energy - Advanced Energy Design Guide (ZE-AEDG) for small and medium office buildings , comprised of members from five major national associations with market-pull in commercial buildings, created design guidance for achieving zero energy office buildings for new construction and major retrofit. This design guidance focuses on the process, providing a pathway for both office owners and design teams to achieve zero energy status. Energy use intensity targets range from 16 kBtu/ft²·yr to 36 kBtu/ft²·yr for the different climate zones were established such that office buildings can be “zero-ready,” that is, having low energy consumption that can easily be offset with renewables, preferably on-site. The design guidance was rooted in extensive energy modeling, as well as case studies of actual office buildings that have achieved high levels of energy performance and met zero energy or zero energy ready status. A unique aspect of the zero-energy guide is that it is not compared against a baseline but focuses on achieving an absolute target. The paper presents process of creating the targets, the selection of strategies to achieve the targets, and sample case studies that show how the cost-sensitive solutions are achievable for the design community. It also presents outreach strategies to deploy market achievable zero energy measures.

buildings↗

Energy Master Planning for Resilient Public Communities—Best Practices from U.S. Military Installations

Until recently, most planners at military installations addressed energy systems for new facilities on an individual facility basis without consideration of community-wide goals relevant to energy sources, renewables, storage, or future energy generation needs. Building retrofits of public buildings typically do not address energy needs beyond the minimum code requirements making it difficult, if not impossible, to achieve community-level targets on a building-by-building basis. Planning on the basis of cost and general reliability may also fail to deliver community-level resilience. For example, many building code requirements focus on hardening to specific threats, but in a multi-building community, only a few of these buildings may be mission-critical. Over the past two decades, the frequency and duration of regional power outages and water utility disruptions from weather, man-made events, and aging infrastructure have increased. Major disruptions of electric and thermal energy have degraded critical mission capabilities and caused significant economic impacts. In 2016, the U.S. Department of Defense issued guidance that each Service (Army, Navy, Air Force, Marines) complete comprehensive energy plans for the installations that consumed 75% of total building energy. Guidance was updated in 2017 to include metrics for energy resilience, and in some cases, water. This paper describes how community level quantitative and qualitative resilience analysis and metrics have been incorporated into community energy and water planning best practices for military installations in three geographically diverse locations. It is based on research performed under the International Energy Agency’s “Energy in Buildings and Communities Program Annex 73,” focusing on development of guidelines and tools that support the planning of Net Zero Energy Resilient Public Communities as well as research performed under the Department of Defense Environmental Security Technology Certification Program project EW18-D1- 5281, “Technologies Integration to Achieve Resilient, Low- Energy Military Installations.” The first case study reviews progress made on an energy and water planning study conducted at Fort Bliss, Texas. The second and third describes planning conducted at Fort Bragg, North Carolina and the Joint Region Marianas, Guam, respectively, under the updated guidance from 2017 regarding energy and water resilience. Analysis methods, key metrics, and key infrastructure and operational constraints are described, as well as technical, economic and business concepts used during the planning process.

Urban, Angela B.↗

Impact of Tuned Lighting on Skilled Nursing Center Residents' Sleep

The Problem: Sleep disturbance is common among nursing center residents and places them at risk for poor health outcomes. Lighting that changes in color and intensity over the course of the day and night may improve sleep and other outcomes, like dementia behaviors, but has has not been rigorously evaluated under real-world conditions. The Resolution: This single-facility study establishes that facility-level tuned lighting is feasible to implement and evaluate in a nursing center. Researchers randomly-assigned three corridors to one of two lighting conditions, then the other. Residents experienced half as many sleep disturbances while exposed to tuned vs. static lighting. There was no effect on behaviors. Tips for Success: Tuned lighting is a low-risk intervention that could be employed in new construction or when retrofitting fixtures into existing buildings. Key Words: Nursing home, long-term care, lighting, sleep, behaviors

60 APPLIED LIFE SCIENCES↗

Making Data-Driven Policy Decisions for the Nation’s First Building Energy Performance Standards

Nearly every major U.S. city has committed itself to ambitious climate action goals – for Washington, DC this means a 50 percent reduction in greenhouse gases by 2032 and carbon neutrality by 2050. In support of these goals, Washington, DC has passed one of the most aggressive and practical climate action bills in the nation—with the Clean Energy DC Omnibus Act, DC became the first city in the U.S. to adopt energy performance standards for existing buildings. DC’s Building Energy Performance Standards (BEPS) require energy efficiency improvements for all commercial and multifamily buildings that do not meet a sector-specific minimum ENERGY STAR score or equivalent metric, with iterative compliance cycles every five years that will accelerate the pace of whole building retrofits. This paper explores this revolutionary policy framework and uses two data analysis projects that DC conducted to evaluate the potential impact of the BEPS and move towards carbon neutrality. First, we analyze the potential energy savings and greenhouse gas reductions, as well as potential cost impacts, from the implementation of a BEPS policy in DC We then examine the role of BEPS in a carbon neutrality strategy, how BEPS savings iterate over time, and what additional existing building improvements will be driven by the gravitational pull of new building codes on median performance. The paper highlights the benefits and limitations of such data-driven approaches to support policy decisions. Finally, we will review ongoing BEPS implementation, including expected policy directions, critical supportive programs, and lessons learned to date.

Bergfeld, Katie↗

Installer Badges Toolkit

As the focus on home energy efficiency grows, the National Renewable Energy Lab (NREL) and the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private sector workers, and contractors.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Multi-layered Resilient Microgrid Networks

Distribution grid resilience, especially when the grid is under high penetration of Distributed Energy Resources (DER), e.g. PV and energy storage, is essential to ensure the quality of electric power services. The resiliency aspect is particularly important for critical loads that typically include hospitals, police/fire stations, and national security facilities. Networks of multiple interconnected reconfigurable microgrids help to increase renewable energy penetration and may be used as basic building blocks for implementing future resilient power grids. However, this integration requires additional layers of communications, both horizontal and vertical, which may substantially increase the potential cyber attack surfaces as well as escalate risks for wide-spread malfunctions of automation systems. The Mulit-layered Resilient Microgrid Networks project is an industry-academic collaboration between ABB, Duke Energy and the University of Illinois at Urbana-Champaign (UIUC) that has developed and demonstrated a cyber-physical resilient control and communication architecture for deployment of multiple microgrid networks, as well as retrofitting the existing distribution grids by increasing DER penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber-physical Resilient Interoperable Microgrid Networks

The paper presents the results of an industry-academic collaboration between ABB, Duke Energy and the University of Illinois at Urbana-Champaign (UIUC) that has developed and demonstrated a cyberphysical resilient control and communication architecture for deployment of multiple microgrid networks, as well as retrofitting the existing distribution grids by increasing DER penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Air Return Strategies and Airborne SARS-CoV-2

Dedicated ducted air return per zone for heating, ventilating, and air-conditioning (HVAC) systems is sometimes claimed to be a superior technique over plenum return strategy from the viewpoint of exposure reduction to airborne pathogens. While both the return strategies have advantages, there is limited evidence in the literature as to which strategy is superior merely from a standpoint of building vulnerability to airborne contaminants. We performed multizonal airborne contaminant dispersion modelling using CONTAM to simulate the overall building vulnerability to airborne SARS-CoV-2 aerosols when released in an office building and evaluated the two air return strategies. Results showed that for ducted returns, maintaining negative pressure in the release zone coupled with 100% outdoor air supply can greatly reduce overall building vulnerability. However, for a building maintained under a slight positive pressure and a recirculated air percentage as low as 31%, ducted returns do not necessarily outperform plenum returns in terms of overall building vulnerability to airborne pathogens. Building-specific details and factors that are not easily represented with multizone modelling are important, making general preferential statements for either strategy difficult to make. Insights from this study can guide new construction and retrofits of buildings both during and after the COVID-19 pandemic with the aim of safe re-occupancy of buildings while keeping the buildings resilient against potential future epidemics spread by airborne agents.

Shrestha, Prateek↗

Integrated and Advanced Lighting Controls: The Next Frontier in Energy Savings?

Lighting energy use has significantly declined as a portion of overall building energy usage due largely to the uptake of more efficient light-emitting diode technology. Although the per unit cost of lighting controls has declined, the installation and use of lighting controls are low and the installation and use of advanced controls are abysmally low. Increased use of advanced and connected lighting controls, and the ability to integrate lighting with other building systems (e.g., heat and air, plug loads, miscellaneous loads) that make the building “smarter,” offer the potential for additional energy savings. Studies into the performance of new, advanced lighting control technologies in commercial buildings have generated new findings. Although each field evaluation has interesting results individually, an analysis of their collective findings across a spectrum of commercial building types will help establish the current state of the technology and implications related to market readiness. This paper will analyze results from available field evaluation studies (recently completed as well as ongoing) of retrofit sites and share findings and insights including: • The amount of energy savings that may be expected from these systems. • Cost effectiveness, monetization, and cost points of these systems. • Ideal characteristics of these systems the most viable. • Lessons learned from the installation, commissioning, and occupant response of these systems. The results will support Department of Energy research investments and help inform efficiency programs of the potential of these emerging technologies and how they may fit within the clean energy future.

Myer, Michael↗

A Mechanical Test Frame for Property Evaluations at Cryogenic Temperature

On-board storage of hydrogen fuel has been designated as a limiting factor in the advancement of fuel cell technologies in the automotive industry. The use of cryo-compressed Type III pressure vessels presents one option to overcome this barrier. These multi-material vessels will be expected to perform at high pressure and extreme low temperatures, which creates a complex engineering design challenge. Many materials exhibit highly temperature-dependent properties, which must be considered for the efficient design of cryo-compressed pressure vessels. Complicating this issue, mechanical property data at cryogenic temperatures is sparse. This technical paper provides a description of a test apparatus commissioned specifically to help address this shortcoming. A mechanical test frame was retrofitted with a continuous flow cryostat capable to evaluate various mechanical properties throughout a broad temperature range of 25 °C to -269 °C with a load limit of 10 kN. An investigation of the thermomechanical properties of an epoxy resin was carried out as a demonstration.

Mechanical characterization, cryogenic pressure ve↗

Safeguards Modeling for Advanced Nuclear Facility Design.

Future nuclear fuel cycle facilities will see a significant benefit from considering materials accountancy requirements early in the design process. The Material Protection, Accounting, and Control Technologies (MPACT) working group is demonstrating Safeguards and Security by Design (SSBD) for a notional electrochemical reprocessing facility as part of a 2020 Milestone. The idea behind SSBD is to consider regulatory requirements early in the design process to provide more optimized systems and avoid costly retrofits later in the design process. Safeguards modeling, using single analyst tools, allows the designer to efficiently consider materials accountancy approaches that meet regulatory requirements. However, safeguards modeling also allows the facility designer to go beyond current regulations and work toward accountancy designs with rapid response and lower thresholds for detection of anomalies. This type of modeling enables new safeguards approaches and may inform future regulatory changes. The Separation and Safeguards Performance Model (SSPM) has been used for materials accountancy system design and analysis. This paper steps through the process of designing a Material Control and Accountancy (MC&A) system, presents the baseline system design for an electrochemical reprocessing facility, and provides performance metrics from the modeling analysis. The most critical measurements in the electrochemical facility are the spent fuel input, electrorefiner salt, and U/TRU product output measurements. Finally, material loss scenario analysis found that measurement uncertainties (relative standard deviations) for Pu would need to be at 1% (random and systematic error components) or better in order to meet domestic detection goals or as high as 3% in order to meet international detection goals, based on a 100 metric ton per year plant size.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

NRIC Asset Suite Engineering and Operations Data Integration Plan

The National Reactor Innovation Center (NRIC), established by the U.S. Department of Energy (DOE) in August 2019, accelerates the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is a national program led by Idaho National Laboratory (INL), enabling collaborators to harness the world-class capabilities of the U.S. National Laboratory System. Committed to demonstrating advanced reactors by the end of 2025, NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the Nation’s most promising advanced nuclear reactors into commercial applications by 2030. To meet these needs, NRIC is developing two reactor demonstration test beds at Idaho National Laboratory (INL), the Laboratory for Operation and Testing in the United States (LOTUS) and the Demonstration and Operation of Microreactor Experiments (DOME) test bed. Each test bed involves the modification of existing facilities at INL’s Materials and Fuels Complex (MFC). Retrofitting these facilities to accommodate novel reactors, as well as subsequent but similar NRIC projects, is a non-trivial engineering task and is expected to generate a significant amount of new and revised documentation. Leveraging digital engineering practices, this documentation will be managed in a purpose-built data management tool to facilitate origination, review, and approval while coordinating with the design contractor. The subsequent upload and review of documentation to INL’s existing document control system comprises a long and unnecessarily manual task. An opportunity exists to automate this upload process and save job-hours while continuing to adhere to INL/MFC document management procedures.

99 GENERAL AND MISCELLANEOUS↗

Integrated Controls for Plug Loads and Lighting Systems - Case Study: Minnesota DOT Cedar Avenue Truck Station

This case study highlights the strategies the Minnesota Department of Transportation used at Cedar Avenue Truck Station for integrating plug load and lighting systems. An integrated controls pilot project with retrofit installation was conducted from October 2019 to April 2020 and was recognized by DOE's Integrated Lighting Campaign.

integrated lighting, lighting, controls, plug load↗

An Energy Calculator for Simple Commercial Buildings

According to the EIA, simple commercial buildings account for 97% of total commercial building stock. However, most simple commercial buildings for example small- to mid-sized offices, retail, schools and warehouses do not benefit from the data-driven decision-making capabilities of whole-building energy modeling. The high cost of custom modeling limits the use of energy modeling of simple buildings for new construction or retrofit measures. Lack of tools providing helpful information on interactive savings estimates creates difficulties in meeting aggressive decarbonization and energy efficiency goals for simple building designers and utility program managers. This paper reviews a beta phase Simple Building Calculator with the ability to generate relatively accurate and interactive modeling results based on a limited but robust set of inputs. It can evaluate whole-building or single measure savings in new or existing buildings, compare measure package choices, or provide simplified performance modeling for energy codes and utility incentives. The tool combines physical (annual whole building prototype simulation) and statistical modeling techniques to predict annual energy performance. It supports a variety of building characteristics for envelope, HVAC, and lighting with parameters ranging from vintage to max tech configurations, as well as support for single-zone and simple multi-zone HVAC systems. The Simple Building Calculator was designed to provide immediate feedback for otherwise computationally intensive tasks like measure comparison, development of multiple measure package combinations, or verification that measures meet efficiency targets—all with the goal of providing a tool for quick annual energy simulation of simple commercial buildings.

Hart, Reid↗

A New Gold Mine? Achieving HVAC Energy Efficiency Through a System Metric

Washington State's Commercial Energy Code adopted a new energy metric called HVAC Total System Performance Ratio (TSPR) in 2019, a first in the codes world to regulate HVAC system efficiency. TSPR is a ratio of annual heating and cooling loads to the annual carbon emissions associated with the energy consumed by the HVAC system. TSPR provides a performance-based solution to evaluate and improve the overall HVAC design. The TSPR metric and its companion calculation tool were developed by Pacific Northwest National Laboratory (PNNL) with support from U.S. Department of Energy (DOE), Northwest Energy Efficiency Alliance (NEEA) and the City of Seattle. The new metric represents a significant shift in how HVAC design will meet code requirements. Utility programs can also leverage TSPR as a measure to determine energy savings and incentive amounts for HVAC retrofits. This paper describes the efforts by NEEA and its collaborators to prepare the market for TSPR adoption in code. This paper provides the pilot projects led by University of Washington Integrated Design Lab (IDL) to understand potential issues that could be faced by early adopters. This paper also covers how training and outreach provide engagement opportunities that can streamline code compliance, help address issues faced by early adopters and promote participation in utility programs. As Washington State works on the goals of 70% energy reduction and zero fossil-fuel greenhouse gas emission homes and buildings by the year 2031 , system level performance metrics will likely become increasingly more necessary and prevalent. This paper concludes that the HVAC TSPR requirement helps familiarize the HVAC industry with this approach and helps Washington achieve its long-term goals.

Liu, Bing↗