Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Robotic applications at Kennedy Space Center

McDonnell Douglas performed a study (1987) to find effective application of robots and their associated technology at the Kennedy Space Center (KSC). Specifically, this study was directed toward the newly planned Space Station Processing Facility (SSPF). Because the Operations and Checkout (O and C) building has a similar charter to that of the SSPF, the O and C was carefully checked for potential robotic applications. Eleven applications were discovered and a trade study developed to rate these applications. Twenty more applications external to the SSPF were found during additional studies. These robotic tasks fall into three major categories including: teleoperated robots for hazardous tasks, mobile robots for repetitive tasks and feedback compensated robots for refurbishment and inspection tasks. This paper highlights some of the requirements for these tasks and others external to the SSPF. Additionally, the resources available at KSC are discussed.

Wegerif, Dan↗

Space station Platform Management System (PMS) replanning using resource envelopes

One of the responsibilities of the Space Station Platform Management System (PMS) is to maintain constraint-free, short-term plans for platform and free-flyer activities. Both the replanning function and the associated constraint-checking function are viewed as potentially requiring expert system assistance. The PMS Resource Envelope Scheduling System (PRESS) expert system, which is currently under development, is described. The PRESS capabilities will include the following: plan, replan, and perform constraint checking using resource envelopes resembling those required for telescience; initialize itself using the results fo a previous run; infer the replanning needs associated with a change in resource availability; allow the user to determine the level of interaction (including an advisory capability) with the system during execution; and generate both a graphic timeline and a report as output. The PRESS is being developed on an IBM PC/AT using TeKnowledge, Inc.'s M.1 expert system shell. The PRESS activity definitions and constraints are based on those defined for the Cosmic Background Explorer (COBE) mission scheduled for launch in early 1989.

Bush, Joy Lee↗

Dynamic task allocation for a man-machine symbiotic system

This report presents a methodological approach to the dynamic allocation of tasks in a man-machine symbiotic system in the context of dexterous manipulation and teleoperation. This report addresses a symbiotic system containing two symbiotic partners which work toward controlling a single manipulator arm for the execution of a series of sequential manipulation tasks. It is proposed that an automated task allocator use knowledge about the constraints/criteria of the problem, the available resources, the tasks to be performed, and the environment to dynamically allocate task recommendations for the man and the machine. The presentation of the methodology includes discussions concerning the interaction of the knowledge areas, the flow of control, the necessary communication links, and the replanning of the task allocation. Examples of task allocation are presented to illustrate the results of this methodolgy.

Parker, L. E.↗

History at NASA

The efforts of the National Aeronautics and Space Administration to capture and record the events of the past are described, particularly the research accomplishments of NASA's agency-wide history program. A concise guide to the historical research resources available at NASA Headquarters in Washington, D.C., at NASA facilities around the country, and through the federal records systems is given.

Source record↗

NASA RECON: Course development, administration, and evaluation. A research and development proposal

This proposal addresses the development, administration, and evaluation of a set of transportable, college-level courses to educate science and engineering students in the effective use of automated scientific and technical information storage and retrieval systems, and, in particular, in the use of the NASA RECON system. Chapter 1 presents a brief introduction. Chapter 2 identifies general and specific objectives, i.e., needs analysis, course development, course administration, and course evaluation. Chapter 3 proposes the methodology to be used in successfully accomplishing these objectives. Chapter 4 highlights expected results and product deliverables, and Chapter 5 presents the project evaluation plan to be followed. Chapter 6 is a brief overview of the institutional resources available at the proposing institutions, i.e., at the University of Southwestern Louisiana and at Southern University to support the project. Chapter 7 proposes a budget, time schedule, and management plan. Chapter 8 is a summary of the foregoing.

Dominick, Wayne D.↗

A heuristic approach to incremental and reactive scheduling

An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

Odubiyi, Jide B.↗

Space Station assembly sequence planning - An engineering and operational challenge

This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

Kaidy, James T.↗

Planning for the scientific use of the international Space Station complex

Plans for the development of an international Space Station complex in cooperation with Japan, Canada, and the European Space Agency are reviewed. The discussion covers the planned uses of the Space Station, the principal research facilities, allocation of the resources available to the research facilities, and tactical and strategic planning related to the Space Station project. Particular attention is given to problems related to microgravity sciences and approaches to the solutions of these problems.

Halpern, R. E.↗

Long-lived space observatories for astronomy and astrophysics

NASA's plan to build and launch a fleet of long-lived space observatories that include the Hubble Space Telescope (HST), the Gamma Ray Observatory (GRO), the Advanced X Ray Astrophysics Observatory (AXAF), and the Space Infrared Telescope Facility (SIRTF) are discussed. These facilities are expected to have a profound impact on the sciences of astronomy and astrophysics. The long-lived observatories will provide new insights about astronomical and astrophysical problems that range from the presence of planets orbiting nearby stars to the large-scale distribution and evolution of matter in the universe. An important concern to NASA and the scientific community is the operation and maintenance cost of the four observatories described above. The HST cost about $1.3 billion (1984 dollars) to build and is estimated to require $160 million (1986 dollars) a year to operate and maintain. If HST is operated for 20 years, the accumulated costs will be considerably more than those required for its construction. Therefore, it is essential to plan carefully for observatory operations and maintenance before a long-lived facility is constructed. The primary goal of this report is to help NASA develop guidelines for the operations and management of these future observatories so as to achieve the best possible scientific results for the resources available. Eight recommendations are given.

Savage, Blair D.↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

Report of the NASA lunar energy enterprise case study task force

The Lunar Energy Enterprise Cast Study Task Force was formed to determine the economic viability and commercial business potential of mining and extracting He-3 from the lunar soil for use in earth-based fusion reactors. In addition, the Solar Power Satellite (SPS) and the Lunar Power Station (LPS) were also evaluated because they involve the use of lunar materials and could provide energy for lunar-based activities. The Task Force considered: (1) the legal and liability aspects of the space energy projects; (2) the long-range terrestrial energy needs and options; (3) the technical maturity of the three space energy projects; and (4) their commercial potential. The use of electricity is expected to increase, but emerging environmental concerns and resource availability suggest changes for the national energy policy. All three options have the potential to provide a nearly inexhaustible, clean source of electricity for the U.S. and worldwide, without major adverse impacts on the Earth's environment. Assumption by industry of the total responsibility for these energy projects is not yet possible. Pursuit of these energy concepts requires the combined efforts of government and industry. The report identifies key steps necessary for the development of these concepts and an evolving industrial role.

Source record↗

Human task animation from performance models and natural language input

Graphical manipulation of human figures is essential for certain types of human factors analyses such as reach, clearance, fit, and view. In many situations, however, the animation of simulated people performing various tasks may be based on more complicated functions involving multiple simultaneous reaches, critical timing, resource availability, and human performance capabilities. One rather effective means for creating such a simulation is through a natural language description of the tasks to be carried out. Given an anthropometrically-sized figure and a geometric workplace environment, various simple actions such as reach, turn, and view can be effectively controlled from language commands or standard NASA checklist procedures. The commands may also be generated by external simulation tools. Task timing is determined from actual performance models, if available, such as strength models or Fitts' Law. The resulting action specification are animated on a Silicon Graphics Iris workstation in real-time.

Esakov, Jeffrey↗

Space Station Freedom Pre-Workshop Session

This is a report of a pre-workshop session held before the 1988 Space Station Workshop; it details space station opportunities for commercial users and providers. Aspects covered are: an overview of commercial uses of space; and overview of the Space Station Freedom Program; attributes of space and some practical uses of them; a description of commercial space activities by country, including various statistics; information on each of NASA's Centers for Commercial Development; and monetary and other resources available to help support commercial ventures in space.

Source record↗

Performance-based workload assessment: Allocation strategy and added task sensitivity

The preliminary results of a research program investigating the use of added tasks to evaluate mental workload are reviewed. The focus of the first studies was a reappraisal of the traditional secondary task logic that encouraged the use of low-priority instructions for the added task. It was believed that such low-priority tasks would encourage subjects to split their available resources among the two tasks. The primary task would be assigned all the resources it needed, and any remaining reserve capacity would be assigned to the secondary task. If the model were correct, this approach was expected to combine sensitivity to primary task difficulty with unintrusiveness to primary task performance. The first studies of the current project demonstrated that a high-priority added task, although intrusive, could be more sensitive than the traditional low-priority secondary task. These results suggested that a more appropriate model of the attentional effects associated with added task performance might be based on capacity switching, rather than the traditional optimal allocation model.

Vidulich, Michael A.↗

Background, current status, and prognosis of the ongoing slush hydrogen technology development program for the NASP

Among the Hydrogen Projects at the NASA Lewis Research Center (NASA LeRC), is the task of implementing and managing the Slush Hydrogen (SLH2) Technology Program for the United States' National AeroSpace Plane Joint Program Office (NASP JPO). The objectives of this NASA LeRC program are to provide verified numerical models of fluid production, storage, transfer, and feed systems and to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. The pursuit of these objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. A summary of the NASA LeRC overall SLH2 program plan, is presented along with its implementation, the present level of effort in each of the program areas, some of the results already in hand, and the prognosis for the effort in the immediate future.

Dewitt, R. L.↗

Establishing viable task domains for telerobot demonstrations

A suite of telerobotic tasks has been compiled and assessed for the purpose of selecting viable tasks for near and far term laboratory demonstrations. The primary intent of developing the task is to provide some technical guidelines, with supporting data, for focusing laboratory demonstrations toward application domains that address a wide array of potential telerobot tasks and required technologies. This wide application would then result in a rich technology development environment to meet the broad task requirements of a system such as the Flight Telerobot Servicer. The methodology and results of the telerobot task assessment are described, including a ranking of the final select suite of major tasks. The presented along with guidelines for both interpreting the task ranking results and setting programmatic objectives based on these results. Detailed data about the task candidates and their respective levels of complexity, task primitive actions, and the actual relative measures of task worth as associated with key tradeoff variables such as cost, available research resources, technology availability, and importance to the user community are also presented.

Zimmerman, Wayne↗

A collision avoidance system for a spaceplane manipulator arm

Part of the activity in the area of collision avoidance related to the Hermes spaceplane is reported. A collision avoidance software system which was defined, developed and implemented in this project is presented. It computes the intersection between the solids representing the arm, the payload, and the objects. It is feasible with respect to the resources available on board, considering its performance.

Sciomachen, Anna↗

Selective simulation and selective sensor interpretation in monitoring

An approach to selective processing in monitoring is described. The approach is designed to provide informative feedback on whether a system is performing nominally in the current operating context without exceeding available resources for prediction and interpretation. At the center of the approach to selective sensor interpretation and simulation is a causal model of the system being monitored. The architecture of the monitoring system, called PREMON, is described as well as how causal models of physical systems are represented and simulated.

Doyle, Richard J.↗