Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

13 HYDRO ENERGY↗

Nevada National Security Site Waste Acceptance Criteria

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: Soil Study Institutional Review Board #1081 Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) to collect soil quality data at an area located at Lawrence Livermore National Laboratory’s (LLNL’s) Experimental Test Site, Site 300 (Site 300) (project) (Figures 1 and 2). The purpose of the project is to determine the chemical and radiological quality of soil in the project area to support feasibility and design of future improvements. This SAP identifies chemicals of concern and describes the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine the reuse potential of shallow soil at the project area. This SAP follows the criteria established in LLNL’s Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

AmeriFlux FLUXNET-1F CA-ER1 Elora Research Station

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-ER1 Elora Research Station. This is the FLUXNET version of the carbon flux data for the site CA-ER1 Elora Research Station produced by applying the standard ONEFlux (1F) software. Site Description - This is an agricultural site that typically grows corn. It is part of a larger research project on N2O fluxes from different fertilizer treatments. The site is relatively flat and homogenous. The site has been managed as agricultural land since the 1960’s and records exist of the previously-grown crops.

Wagner-Riddle, Claudia↗

Field Demonstration of The Krauklis Seismic Wave In A Novel Mva Method For Geologic CO 2 Storage

The Energy & Environmental Research Center (EERC) conducted a feasibility study of a new, low-impact geophysics monitoring method designed to incrementally track the saturation front of CO 2 injected into a reservoir. The method leverages a new way of transmitting energy from the surface to the reservoir and employs a new subsurface signal called the Krauklis wave (K-wave) and other guided waves for seismic monitoring. The EERC partnered with Seismos, Inc., the company that holds the exclusive technology license for this method, to advance development of K-wave technology, and Denbury Onshore, LLC, to field-test the system. The system was field-tested at Denbury’s Bell Creek oil field, currently undergoing CO 2 -based enhanced oil recovery (EOR) in southeastern Montana. The K-wave system uses a wellhead-mounted source to propagate energy down the wellbore in the form of a tube wave and through the well perforations into the reservoir. Part of the energy transmitted through the perforations into the reservoir converts to slow moving K-waves and/or other guided waves that are expected to propagate through the formation to neighboring wells. The propagated signal would induce tube waves in the neighboring wells that return to the surface to be recorded with a wellhead-mounted receiver. The propagation time of the signal is directly affected by the presence of CO 2 between the wells, so the difference in transit time of the returning signal between pre- and postinjection data sets could be used to help define the lateral extent of a CO 2 saturation front. Objectives of the study were to demonstrate, validate, and evaluate the K-wave method’s ability to monitor the morphology of injected CO 2 and estimate saturation distribution. Results from the demonstration were to be compared to conventional 4-D surface seismic methods, dynamic reservoir simulations, and CO 2 breakthrough data to validate the technology and provide useful information that may result in improvements. Prior to mobilizing for the full-scale K-wave baseline survey, a field test was conducted to better understand wellhead hardware configurations and test the response from the Bell Creek reservoir using three wells. Useful operational information resulted but signal from the first-generation gas release/gas injection source was not recorded in neighboring wells. After the initial field test, numerical modeling of the K-wave method was initiated using parameters specific to the Bell Creek Field. Modeling results indicated that the fundamental concepts behind the K-wave method exhibited problems and revealed a significantly greater attenuation of the signal at the wellbore perforations than expected, totaling on the order of 10-8 from source well to receiver well over a 400-m well spacing. Modeling also showed that greater source frequency bandwidth was needed to produce guided waves within a 30-foot-thick reservoir layer such as that at Bell Creek and that reservoir layer seismic velocity would need to be slower than the velocities of the bounding layers in order to act as a wave guide opposite to what exists at Bell Creek. Modeling results prompted a second field test with a stronger, second-generation displacement source developed in the interim. Concurrent with the second field test, a 3-D seismic survey was acquired to serve as a baseline for project validation and to serve as a monitor data set for the portion of the project area where CO 2 injection had already commenced. The new source was tested using a four-well geometry and failed to produce a detectable signal, which appeared to confirm modeling results and indicated that the Bell Creek Field is not an ideal site for the K-wave test. It was concluded that a source with sufficient strength and bandwidth could not be built to overcome the factors discovered by the modeling within a reasonable amount of time. Several other sites undergoing CO 2 -based EOR were also evaluated; however, none of these sites was amenable because of geology, limitations of source and receiver hardware, or the advanced state of the CO 2 flood. In addition, two other configurations of the source and receiver layout were considered; however, these design modifications either changed the scope of the project or did not meet the goals of the Carbon Storage Program. In consultation with the U.S. Department of Energy (DOE) Project Manager and Technology Manager, a no-go decision was invoked to forego additional expenditures as the technology would not meet current project objectives. Project activities to date have moved the technology forward by developing modeling equations that can be applied elsewhere, advanced the state of wellhead sensors and sources, and spurred improvements to field operations. The 3-D seismic survey in the project area and the dynamic reservoir simulations done as part of this study have provided value for ongoing and future synergistic activities at Bell Creek related to DOE carbon storage goals.

54 ENVIRONMENTAL SCIENCES↗

Observations, Ideas, and Opinions: Systems Engineering and Integration for Return to Flight

This presentation addresses project management and systems engineering and integration challenges for return to flight, focusing on the Thermal Protection System Tile Repair Project (TRP). The program documentation philosophy, communication with program requirements flow and philosophy and planned deliverables and documentation are outlined. The development of TRP 'use-as-is' analytical tools is also highlighted and emphasis is placed on the use flight history to assess pre-flight and real-time risk. Additionally, an overview is provided of the repair procedure, including an outline of the logistics deployment chart.

Gafka, George K.↗

Unveiling NASA’s Agile Projects, Successes, Challenges, and Transformative Insight

The NASA Agile Community of Practice recently hosted the first NASA Agile Technical Interchange Meeting (TIM). The TIM provided an opportunity for Agile practitioners across the Agency to share their successes, challenges, and recommendations from Agile transformations. NASA has increasingly turned to private industry for collaborative efforts in space exploration, satellite deployment, and other missions. Embracing Agile principles, NASA is adapting its project management strategies to foster more flexible, efficient, and collaborative relationships with commercial partners. This paper provides highlights from the projects presented at the Agile TIM on how those teams have been able to iterate rapidly, respond to changing requirements, and deliver value more effectively.

agile↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fast Paced, Low Cost Projects at MSFC

What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in one year. FastSat HSV01 also deployed a Poly Picosatellite Orbital Deployer (PPOD) for a separate nano ]satellite class spacecraft (Cubesat: Nano Sail Demonstration) in partnership with Ames Research Center. The Robotic lunar lander is a MSFC JHU APL partnership that led to the development of a flexible architecture for landers to support robotic missions to a wide range of lunar and asteroid destinations. The team started with the goal of meeting NASA agency directives that led to the creation of a test bed focusing on GN&C and software to demonstrate the descent and landing on any airless body for the final 30 to 60 meters. The team created a complex technology demonstration as well as Guidance Control and Navigation (GN&C) algorithms providing autonomous control of the lander. The team uses a green propellant of 90% hydrogen peroxide and has completed 18 successful test flights. The International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) is a technology demonstration payload to assist the SERVIR project with environmental monitoring for disaster relief and humanitarian efforts. The ISERV project was a partnership with TBE. The ISERV payload consists of a commercial off the shelf camera, telescope, and MSFC developed power distribution box and interfaces on ISS with the Window Observational Research Facility in the US Lab. MSFC has identified three key areas that enabled the low cost mission success to include culture, partnering, and cost/schedule control. This paper will briefly discuss these three Class D efforts, FastSat HSV-01, the Robotic Lunar Lander and the ISERV camera system, the lessons learned, their successes and challenges.

Watson-Morgan, Lisa↗

Requirements for Cataloging Hanford Geophysical Datasets

Environmental management activities at the Hanford Site produce extensive data about site conditions, contaminants, cleanup, and more. Managing and archiving that data requires a high degree of collaboration among site contractors and a high level of awareness by project managers and staff. Part of that effort is developing a Hanford Environmental Information and Data Index (HEIDI) to organize the data and maximize its value by making it findable and available for reuse. The objective is to catalog the disparate data sets collected to address the evolving needs of planning, executing, and documenting cleanup over several decades up to the present day, including links to active data sources when available. A properly implemented data catalog makes finding environmental datasets related to an area or theme a routine, reliable process, without requiring the searcher to have special knowledge that a data set exists and where it may be stored. In this project, a working group, including the U.S. Department of Energy, the Hanford Site contractors, and Pacific Northwest National Laboratory staff, identified needs and requirements for handling complex site data. Geophysical data was chosen as a test case because it can be large and complex and often involves multiple processing steps to extract the information incorporated into deliverables. The ability to document those steps was one of the requirements identified for the catalog. In addition to developing requirements, other activities included selecting a metadata schema and initial testing with the objective of determining whether the workflow and capabilities of selected data catalog software platforms were sufficient to implement and impose the identified requirements. This initial testing involved running the default catalog instance using the software platform of interest and altering the configuration to achieve each requirement, if possible. Where configuration alone was insufficient, the possibility of modifying the software by changing the code was examined, but not implemented. A follow-on task is planned to reprogram the code as necessary to implement requirements in a prototype catalog.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating principles and multidisciplinary projects in design education

The critical need to improve engineering design education in the U.S. is presented and a number of actions to achieve that end are discussed. The importance of teaching undergraduates the latest methods and principles through the means of team design in multidisciplinary projects leading to a testable product is emphasized. Desirable training for design instructors is described and techniques for selecting and managing projects that teach effectively are discussed.

Nevill, Gale E., Jr.↗

Composite Cryotank Technologies and Demonstration

NASA is exploring advanced composite materials and processes to reduce the overall cost and weight of liquid hydrogen (LH2) cryotanks while maintaining the reliability of existing metallic designs. The fundamental goal of the composite cryotank project was to provide new and innovative technologies that enable human space exploration to destinations beyond low-Earth orbit such as the Moon, near-Earth asteroids, and Mars. In September 2011, NASA awarded Boeing the contract to design, manufacture, and test two lightweight composite cryogenic propellant tanks. The all-composite tanks shown iare fabricated with an automated fiber placement machine using a prepreg system of IM7 carbon fiber/CYCOM 5320-1 epoxy resin. This is a resin system developed for out-of-autoclave applications. Switching from metallic to composite construction holds the potential to dramatically increase the performance capabilities of future space systems through a dramatic reduction in weight. Composite Cryotank Technologies and Demonstration testing was an agency-wide effort with NASA Marshall Space Flight Center (MSFC) leading project management, manufacturing, and test; Glenn Research Center leading the materials; and Langley Research Center leading the structures effort for this project. Significant contributions from NASA loads/stress personnel contributed to the understanding of thermal/mechanical strain response while undergoing testing at cryogenic temperatures. The project finalized in September 2014.

Vickers, John↗

Advancing STEM in Bhutan through Increased Earth Observation Capacity: Applying NASA DEVELOP’s Model to Bhutanese Scholars

The NASA DEVELOP Program, a dual capacity building effort within NASA’s Applied Sciences, fosters the development of skills and knowledge to use Earth observations for environmental decision making. The program engages students, recent graduates, early career individuals, and transitioning career professionals through 10-week feasibility studies that assess the potential for integrating NASA Earth observing satellite data into partner organization decision making processes. DEVELOP projects provide an experiential learning opportunity for participants while building the institutional capacity of partner organizations. Since 2020, DEVELOP has worked with the Government of Bhutan to engage 30 Bhutanese scholars on a series of projects focused on environmental issues in Bhutan. These projects have offered an opportunity for Bhutanese scholars studying in the US to gain geospatial knowledge and skills, project management and leadership skills, and science communication experience. This presentation will highlight the DEVELOP model of empowering its participants, collaborative projects, and highlight example outcomes of the Bhutan engagement.

Capacity Building↗

Thinking Tools for Successful Collaborative Initiatives - 13351

Successful collaboration requires effective communication and collective problem solving. Regardless of the subject area --- environmental remediation, waste management, program planning and budgeting --- those involved must focus their efforts in an orderly and cooperative manner. A thinking tool is a technique used to get individuals to focus on specific components of the task at the same time and to eliminate the 'noise' that accompanies communications among individuals with different objectives and different styles of communicating. For example, one of these thinking tools is a technique which enables a working group to delineate its roles, responsibilities and communication protocols so that it can deliver the right information to the right people at the right time. Another enables a group to objectively and collectively evaluate and improve a policy, plan, or program. A third technique enables a group to clarify its purpose and direction while generating interest and buy-in. A fourth technique makes it possible for a group with polarized opinions to acknowledge their differences as well as what they have in common. A fifth technique enables a group to consider a subject of importance from all perspectives so as to produce a more comprehensive and sustainable solution. These thinking tools make effective communication and collective problem solving possible in radioactive waste management and remediation. They can be used by a wide spectrum of professionals including policy specialists, program administrators, program and project managers, and technical specialists. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗