Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

58 GEOSCIENCES↗

Dynamical systems probabilistic risk assessment

Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Seismic Hazards Update for LLNL

Fugro Consultants, Inc. (FCL) completed the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015b), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015a) were developed in accordance with ANS/ANSI 2.29- 2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC and GMC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015c). The PSHA results are documented in Project Report No. 2259-PR-07 (FCL, 2016c).

58 GEOSCIENCES↗

Probabilistic Seismic Hazard Assessment for Iraq

Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Iraq was published in 1997. An update to this edition is in the process of being released. However, there are no national PSHA studies in Iraq for the new building code to refer to for seismic loading in terms of spectral accelerations. As an interim solution, the new draft building code was considering to refer to PSHA results produced in the late 1990s as part of the Global Seismic Hazard Assessment Program (GSHAP; Giardini et al., 1999). However these results are: a) more than 15 years outdated, b) PGA-based only, necessitating rough conversion factors to calculate spectral accelerations at 0.3s and 1.0s for seismic design, and c) at a probability level of 10% chance of exceedance in 50 years, not the 2% that the building code requires. Hence there is a pressing need for a new, updated PSHA for Iraq.

58 GEOSCIENCES↗

SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory

A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Advanced Test Reactor (ATR), and Naval Reactors Facility (NRF) at the Idaho National Laboratory (INL). The PSHA followed the approaches and procedures for Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 study and included a Participatory Peer Review Panel (PPRP) to provide the confident technical basis and mean-centered estimates of the ground motions. A new risk-informed methodology for evaluating the need for an update of an existing PSHA was developed as part of the Seismic Risk Assessment (SRA) project. To develop and implement the new methodology, the SRA project elected to perform two SSHAC Level 1 PSHAs. The first was for the Fuel Manufacturing Facility (FMF), which is classified as a Seismic Design Category (SDC) 3 nuclear facility. The second was for the ATR Complex, which has facilities classified as SDC-4. The new methodology requires defensible estimates of ground motion levels (mean and full distribution of uncertainty) for its criteria and evaluation process. The INL SSHAC Level 1 PSHA demonstrates the use of the PPRP, evaluation and integration through utilization of a small team with multiple roles and responsibilities (four team members and one specialty contractor), and the feasibility of a short duration schedule (10 months). Additionally, a SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels for the Spent Fuel Handling Recapitalization Project (SFHP) process facility.

58 GEOSCIENCES↗

Probabilistic Seismic Hazards Update for LLNL: PSHA Results Report

This report presents the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA by Fugro Consultants, Inc. (FCL). This report is specific to Building 332 only and not to other portions of the Laboratory. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015a), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015c) were developed in accordance with ANS/ANSI 2.29-2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015b).

42 ENGINEERING↗

Probabilistic Economic Valuation of Safety Margin Management

The goal of this project was to explore a new methodology for evaluation of potential safety margin upgrades to add a new instrument to the Risk Informed Safety Margin Characterization (RISMC) toolkit. To this end, the RAVEN code developed by the Idaho National Laboratory was used to perform a cost-benefit analysis of several potential power plant safety upgrades to compare the material cost of the upgrades with the probabilistic benefit of avoiding accident scenario consequences to find the most cost-effective safety upgrades. By coupling RAVEN to MELCOR to drive Monte-Carlo method stochastic parameter analysis and using data from existing nuclear codes, as well as MELCOR’s radionuclide relocation tracking capabilities, the radionuclide release source term activity in a severe accident scenario can be estimated. Severe Accident Mitigation upgrades were benchmarked against the Hardened Containment Ventilation upgrade mandated by the USNRC for Mk1 BWRs using dollars spent per Curie of release prevented as a metric by which to evaluate the economic efficacy of the upgrades. Additionally, Fault Tree/Event Tree-based analyses were performed to compare older methods of evaluation to the methodology pioneered in this work, and Monthly Operating Report (MORP) outage data was analyzed for insights into power plant outage optimization and reduction.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experimental Breeder Reactor II (EBR-II) Level 1 Probabilistic Risk Assessment

The National Academy of Sciences Study of the USDOE Category A Reactors recommended that a Probabilistic Risk Assessment (PRA) should be performed on the EBR-11 Reactor. In January 1989, a Level 1 PRA was initiated. This report documents work performed in completing the Level 1 PRA except for seismic analysis; it describes the methodology used, assumptions made, the analysis performed, and the final results. The seismic risk assessment is in progress. It will be separately documented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probabilistic Seismic Hazard Assessment for Georgia

Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Georgia (2009) is not fully compatible with seismic hazard and design concepts of modern codes. The Ministry of Economy and Sustainable Development of Georgia is currently undertaking an update to the building code to align it with EuroCode. In conjunction with EuroCode, a National Annex specific to Georgia is needed, including seismic hazard values for the territory of Georgia. A comprehensive earthquake catalogue is fundamental to a robust PSHA in the region. The Caucasus has had an uneven seismic recording and reporting history both temporally and spatially. Therefore, there has been a strong regional effort to bring together data from all the countries in the Caucasus, to digitize and standardize paper-based data from the Soviet era, and to re-examine magnitude and location calculations. The earthquake catalogue resulting from this effort forms the basis for a reliable seismic hazard assessment. Recognizing these needs, the U.S. Department of Energy through Lawrence Livermore National Laboratory (LLNL) initiated a project in 2015 to engage and train local scientists in the Caucasus to install new equipment, to enhance the quality of seismic monitoring and reporting, and to improve and harmonize the regional earthquake catalogue. In 2016, the project scope was expanded to include the modernization of seismic hazard assessments. To this end, a series of workshops were held in Georgia, the first one of which presented an overview of PSHA and its components to various participants from the universities and other research organizations in the region. This kick-off workshop was followed by numerous hands-on training workshops in 2017 and 2018, covering all aspects of PSHA. In addition to their training goals, the workshops brought together existing and new information relevant to PSHA studies in the region, providing a platform for local scientists/engineers and experts from other parts of the world to interact, cooperate and discuss various pieces of the PSHA input. This report outlines the aspects of the earthquake catalogue development and PSHA project that were specifically undertaken to form the basis for the building code update in Georgia. Georgia straddles the Greater Caucasus and Lesser Caucasus Fold and Thrust belts, where the convergent tectonic setting generates significant earthquake activity. To the east of the country, evidence indicates the possibility of a remnant subducting slab that causes earthquakes deeper than 40km. This study systematically compiles and improves all available data on local seismicity, active faults, and ground motion attenuation characteristics of the region; and builds a framework to enable a contemporary PSHA to be carried out with the engagement of local scientists. To this end, six regional workshops were organized in total over a three-year period of time, with participation from the United States, Canada and Hungary as well as countries in the Caucasus: Georgia, Armenia, Azerbaijan and Turkey. The workshops served multiple purposes such as training, data collection, interactions between local earth scientists and engineers, and brainstorming and knowledge exchange among local and international experts.

Geosciences↗

Inventory and Probabilistic Function of Natural Hazards in the United States: July 19, 2018 - September 18, 2018

The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a standardized risk assessment process that considers the location-specific vulnerabilities and threats (climate-related as well as human-caused) at a site to generate a ranked list of organizational risks and associated mitigation options for reducing those risks. To support this effort, the Southern Climate Impacts Planning Program (SCIPP), a National Oceanic and Atmospheric (NOAA) Regional Integrated Sciences and Assessments (RISA) team, was selected to provide climate science expertise to develop a comprehensive inventory and probabilistic function of natural hazards (e.g., hurricanes, tornadoes, flooding, and sea level rise) for the entire United States by region. The inventory of climate-related hazards and the associated likelihood scores are incorporated into a companion risk assessment tool enabling standardized comparisons of risk at sites across the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic modeling approach for tracking each collision and breakup of computational parcels

A modeling approach for binary collision and particle breakup is presented for a stochastic particle model in which a computational parcel represents a number of similar physical particles. Presented in this report includes sampling from a distribution of discrete data, parcel number reduction, probabilistic calculation of collision rates, and various particle-particle interactions. Modeling of elastic scattering, coalescence and agglomeration, and breakup are discussed for solid-solid, solid-liquid, and liquid-liquid particle collisions. Numerical procedures are also summarized.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP has developed detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices, as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Probabilistic Machine Learning and Data Assimilation

This white paper responds to Focal Area 1. The associated portfolio of research activities is well-suited to DOE’s asset mix of HPC platforms, climate expertise, climate simulation codes, and AI expertise, which creates an opportunity to use manifold-finding probabilistic AI methods to create more powerful data assimilation techniques that increase the fidelity and forecasting skill of Earth System Prediction.

54 ENVIRONMENTAL SCIENCES↗

Probabilistic Resource Adequacy Suite (PRAS) v0.6 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system’s risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.6 of the tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for the Enhancement of Security Probabilistic Risk Assessments

The US Department of Energy is exploring the methods associated with probabilistic risk assessment (PRA) and how they could be used to enhance physical security evaluations for nuclear facilities. A brief review of both international and US Nuclear Regulatory Commission physical security assessment methods is presented. From this review, and with an understanding of the technical elements associated with a traditional nuclear safety PRA, several observations are made pertaining to where physical security analysis methods could be enhanced. These observations principally support and enhance the answers within a physical security context to the risk triplet: (1) What can go wrong? (2) What is the likelihood? and (3) What are the consequences? Finally, benefits and technical challenges toward the development of a full security PRA are presented.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

FY21 Status Report: Probabilistic SCC Model for SNF Dry Storage Canisters

Stress corrosion cracking (SCC) is an important failure degradation mechanism for storage of spent nuclear fuel. Since 2014, Sandia National Laboratories has been developing a probabilistic methodology for predicting SCC. The model is intended to provide qualitative assessment of data needs, model sensitivities, and future model development. In fiscal year 2021, improvement of the SCC model focused on the salt deposition, maximum pit size, and crack growth rate models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗