Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

MISSE-11 Ground Experiment Control

Back during the Apollo missions, when astronauts were being sent to the moon to explore and further scientific knowledge by conducting experiments and collecting samples for scientists back on Earth, they were faced with a surprising problem. It was discovered that the moon’s surface is covered with dust that has electrostatic properties, which would stick to suit and equipment. This hindered the functionality of the astronauts’ space suits, solar panels, optical instruments, among other exposed surfaces due to the jagged geometry of the dust which would damage said equipment. To resolve this issue, the Electrostatics and Surface Physics Laboratory (ESPL) came up with the solution of using an Electrodynamic Dust Shield (EDS)1 that uses electrostatic forces to move particles across a surface. Varieties of this dust shield have been developed for different applications. The purpose of the Materials International Space Station Experiments 11 (MISSE-11) is to experiment a payload that contains the dust mitigation technology to be flown to space for one year and an identical payload will be on earth, under vacuum, in the Electrostatics and Surface Physics Laboratory. The space payload was prepared prior to our arrival and shipped to fly on the International Space Station (ISS). The payload staying on the ground is going to act as a control for the experiment so that we may compare it to the payload that was flown in space. During our time at Kennedy Space Center, we were tasked with building and start testing the ground control unit of the MISSE-11 payload. To complete our task for the ground control unit, we constructed a new vacuum chamber setup and added automated aspects, procured the necessary flight electronics, designed and communicated for the machining of the payload frame, and performed functional and thermal testing on the electronics to the same original operational standards. Some modifications were made where possible, without affecting the performance of the samples, to be efficient with the production of the control unit while keeping important aspects identical. The experiment is now nearly complete, and testing will be starting within the next few weeks.

MISSE↗

Solar Array (Radiated/Non-Radiated): Materials Characterization and Cryogenic Thermal Cycling Qualification for the Planned Europa Clipper Mission (ECM)

Two special instruments were custom built for our critical study and manufactured and employed to test the SA materials of interest to cryogenic temperature conditions. We have procured custom manufactured two independent systems such as Thermo -Mechanical Analyzer (TMA) with Three Point Bend Probe (TPBP) module and Dilatometer. TMA can be used to measure Young’ s modulus or elastic modulus (e -modulus). Dilatometer can be used to measure Co -efficient of Thermal Expansion (CTE). We have optimized the materials configuration to measure physical properties of radiated and non -radiated materials for CTE and e -modulus, which will be useful to assess materials and processes reliability for cryogenic temperature applications. We have successfully implemented for some materials that are of interest to solar panels for the planned ECM project to measure CTE and Young's modulus. Also a separate study was undertaken to thermal cycle qualify SAs for ECM project. One can do thermal cycling to temperatures of 50 K and 133 K using liquid Helium (Lq He). This is in reality exorbitantly too expensive and is also inefficient. Furthermore, this is not technically controllable test to 133 K and 50 K temperatures. This is also too expensive to accomplish. Therefore, a vacuum set -up was made along with a cryostat successfully. This is a closed loop system where we do not lose the Helium gas. We were able to get to 35 K for a given test coupon size. These temperatures are lower than what we would intend to qualify the solar array technologies. This will allow to have some margin at cold temperatures. We successfully completed the qualification of solar array technologies down to 50 K temperatures. This is the first time we are reporting this accomplishment. In this paper, we will present the solar array materials properties for cryogenic temperatures down to 20 K temperatures and the thermal cycling qualification test results from 133 K to 50 K for three times the mission life of 120 thermal cycles to meet JPL Design.

Ramesham, Rajeshuni↗

Flight Servicing of Robotic Refueling Mission 3

The Robotic Refueling Mission 3 (RRM3) payload launched aboard a SpaceX rocket en route to the International Space Station on December 5th, 2018. The Goddard Space Flight Center designed payload carried approximately 50 liters of liquid methane onboard, with a mission to demonstrate long term storage and transfer of the cryogenic fluid in microgravity. Kennedy Space Center (KSC) was tasked to design, fabricate, test, and operate a system equipped to fill an RRM3 dewar with liquid methane prior to launch. Though KSC has a rich history of fueling rockets and payloads, no such operations had previously been accomplished using liquid methane. As such, all of the hardware and processes had to be developed from scratch. The completed ground system design, along with the verification and validation testing will be outlined in this paper. Several challenges that were met and overcome during procurement of the high purity methane are described. In addition, budget restrictions prohibited fueling operations from occurring in traditional processing facilities. The unique and creative solutions which were required to maintain payload cleanliness during cryogenic servicing are also detailed.

Cryogenics↗

Flight Servicing of Robotic Refueling Mission 3

The Robotic Refueling Mission 3 (RRM3) payload launched aboard a SpaceX rocket en route to the International Space Station on December 5th, 2018. The Goddard Space Flight Center designed payload carried approximately 50 liters of liquid methane onboard, with a mission to demonstrate long term storage and transfer of the cryogenic fluid in microgravity. Kennedy Space Center (KSC) was tasked to design, fabricate, test, and operate a system equipped to fill an RRM3 dewar with liquid methane prior to launch. Though KSC has a rich history of fueling rockets and payloads, no such operations had previously been accomplished using liquid methane. As such, all of the hardware and processes had to be developed from scratch. The completed ground system design, along with the verification and validation testing will be outlined in this paper. Several challenges that were met and overcome during procurement of the high purity methane are described. In addition, budget restrictions prohibited fueling operations from occurring in traditional processing facilities. The unique and creative solutions which were required to maintain payload cleanliness during cryogenic servicing are also detailed.

Thermal Conductivity↗

Flight Servicing of Robotic Refueling Mission 3

The Robotic Refueling Mission 3 (RRM3) payload launched aboard a SpaceX rocket en route to the International Space Station on December 5th, 2018. The Goddard Space Flight Center designed payload carried approximately 50 liters of liquid methane onboard, with a mission to demonstrate long term storage and transfer of the cryogenic fluid in microgravity. Kennedy Space Center (KSC) was tasked to design, fabricate, test, and operate a system equipped to fill an RRM3 dewar with liquid methane prior to launch. Though KSC has a rich history of fueling rockets and payloads, no such operations had previously been accomplished using liquid methane. As such, all of the hardware and processes had to be developed from scratch. The completed ground system design, along with the verification and validation testing will be outlined in this paper. Several challenges that were met and overcome during procurement of the high purity methane are described. In addition, budget restrictions prohibited fueling operations from occurring in traditional processing facilities. The unique and creative solutions which were required to maintain payload cleanliness during cryogenic servicing are also detailed.

Cryogenics↗

Cost Controls in the Cloud

The pay-as-you-go model used by most Cloud Service Providers shifts ownership of resource procurement from finance and management teams to IT, engineering, development and other stakeholders. This requires individual contributors to adopt a more "cost conscious" approach to development, and for projects to invest time into the creation of automated cost controls and cost-focused monitoring. This talk will presents some patterns and examples of cost controls based on our experience managing a multi-tenant cloud environment.

circuit breaker↗

Gateway System Requirements

The Gateway Program (GW) System Requirements Document (SRD) is approved for the public domain to support NASA's Lunar Gateway Program. The main intent of these documents is to define top level functional and performance requirements for the systems that facilitate cooperative deep space exploration endeavors and execute lunar missions. The SRD defines NASA requirements for the procurement and development of the GW mission. The Gateway Program is a collaboration of US government, international partners and commercial providers. The Gateway SRD are expected to be used by all parties in development of the Gateway Program elements. For effective development and integration of the Gateway vehicle, all involved entities must use, and have awareness of, these high level program requirements to flow down to their respective developmental responsibilities so all Gateway elements will be operable as an entity. The Gateway SRD represents the requirements that are necessary for the Gateway mission. NASA has determined there is benefit to U.S. and foreign spacecraft developers to approve this information for the public domain because all the parties/participants need a common understanding of the requirements and the parameters under which they operate (size, shape, form fit and function). This will allow systems built by various nations and commercial entities to attach and function together properly and safely in the hostile environment of space.The Gateway SRD provides information regarding the current requirements for Gateway elements. Specifically, the Gateway SRD provide an overview of expected features and capabilities and requirements for safe integration of elements within the Gateway program. The SRD contains top-level functional and performance descriptions of the Gateway and definition of the interfaces limited to the scope necessary for integration purposes between Gateway elements. The documents do NOT contain detailed design information or any specifics of hardware or software implementation. The data approved for release does not include: manufacturing drawings, detailed interface control and design data, software code, detailed CAD models, structural or thermal models of the system, avionics or avionics box, board, or cable manufacturing information.

Adamek, Christopher↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, numerous small satellites have been launched into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks - or worse, be neglected altogether. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities.

Radiation Hardness Assurance (RHA)↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, government agencies, private companies and academic institutions, have launched hundreds of small satellites into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of components within small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities. In this course we suggest RHA strategies that engineers and scientists can apply to a wide range of aerospace systems, including constellations, with a focus on how to manage aggressive system scaling for smaller platforms.

Radiation Hardness Assurance (RHA)↗

MIL/JEDEC Standards Update

MIL/JEDEC standards play a vital role in electronic parts procurement and usage on all NASA missions. Through the NASA Electronic Parts Assurance Group (NEPAG) Program, NASA is an active participant in work related to the standards as they apply to electronic parts. This paper will provide an update on those activities.

Agarwal, S.↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, numerous small satellites have been launched into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks—or worse, be neglected altogether. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities.

Radiation Hardness Assurance (RHA)↗

Improving Reliability and Maintainability (R&M) in Space Life Support

This paper considers how to improve the reliability and maintainability (R&M) of future NASA space life support systems. If these systems are procured under an industry contract, defining the R&M requirements would take precedence over providing technical guidance on designing the system. Imposing a specific R&M design could be over constraining. However, the mission may define the overall R&M approach, as the International Space Station (ISS) did by requiring Orbital Replacement Units (ORUs). Before defining the R&M requirements for the next mission, the life support research program should understand and plan the R&M approach. The recent NASA technical standard on R&M has moved away from requiring specific R&M activities during each of the traditional project phases to instead developing and planning to implement the R&M requirements to meet the top level project R&M objectives. The emphasis is on providing the evidence to show that the R&M requirements are met, rather than on conducting specific prescribed R&M activities. The technical standard on R&M defines a comprehensive hierarchy of specific R&M objectives and identifies particular strategies to implement them at each level. That is, the top level R&M objective is defined and then one or more design strategies to implement it are developed immediately, before the next lower objectives are defined and the strategies to achieve those are designed. This step-by-step, top-down approach is similar to the axiomatic design method. The objectives are the R&M requirements, and the strategies are the hardware designs or operations plans developed to meet these requirements. The new R&M process is aligned with the systems design process and helps ensure that the methods to meet the R&M requirements are built into the design.

Jones, Harry W.↗

Vision and Objectives

The purpose of Industry Day is to exchange information with industry to increase understanding of the Government's current vision and objectives for the xEVA Production and Services Contract. The presentation provides industry with the opportunity to provide input into the xEVAPS procurement strategy and encourage offerors to submit questions and comments. A technical overview of the xEVA System serves as the foundation for the content related to draft requirements in the SOW.

Hansen, Chris↗

Lunar COTS: Using the Moon's Resources to Enable An Economical and Sustainable Pathway to Mars and Beyond

To support NASAs goal of sending humans to Mars, a new plan was constructed to develop and demonstrate cislunar capabilities and services in partnership with commercial industry using the well-proven Commercial Orbital Transportation Services (COTS) Program acquisition model. The NASA COTS Program was a very successful program that developed and demonstrated cost-effective commercial cargo transportation services to the International Space Station (ISS). As a result of NASAs COTS program, two new launch vehicles and spacecraft were developed and have been successfully performing cargo transportation missions to the ISS since 2012. The COTS acquisition strategy utilized a new model than normally accepted in traditional procurement practices. This new model used Space Act Agreements where NASA entered into partnerships with industry to jointly share cost, development and operational risks to demonstrate new capabilities for mutual benefit. This model proved to be very beneficial to both NASA and its industry partners as NASA saved significantly in development and operational costs, as much as tenfold, while industry partners successfully expanded their market share of the global launch transportation business for significant economic benefit. Using the COTS acquisition model as a basis, a new plan, notionally referred to as Lunar Commercial Orbital Transfer Services (or Lunar COTS), has been developed to determine the potential benefits and challenges of a new Lunar COTS plan[1]. The proposed plan includes low-cost, commercial-enabled missions to prospect for resources, determine the economic viability of extracting those resources and assess the value proposition of using these resources in future exploration architectures such as Mars. These missions would be accomplished in partnership with industry to meet these exploration goals but will also have the capability to carry payloads to meet science goals as well.

Zuniga, Allison↗

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg↗

NASA’s Space Launch System: Launch Capability for Lunar Exploration and Transformative Science

Excitement is building for the first launch of NASA’s Space Launch System (SLS), a unique exploration asset for the agency’s Artemis lunar program as well as for a new generation of science missions. SLS is designed for an array of missions beyond Earth’s orbit. The flexible system, which can be configured for Orion, cargo or Orion with co-manifested payload missions, offers high escape velocities to send more mass to deep space destinations. When configured with an 8.4 m-diameter fairing, SLS offers unmatched payload volume for human exploration and science missions. The initial Block 1 variant will insert at least 26 metric tons (t) to trans-lunar injection (TLI) and the more powerful Block 1B vehicle will launch 34-37 t to TLI using a new-development upper stage. Much of the initial SLS Block 1 vehicle is complete, including the upper stage and payload section, the core stage, engines and the solid rocket boosters. The first mission, Artemis I, launching from modernized and upgraded facilities at Kennedy Space Center (KSC), will be an uncrewed test flight of SLS, Orion and ground processing, with a primary objective of testing Orion’s heat shield at lunar re-entry velocity. Artemis I will have accommodations for 13 6U CubeSat payloads. These CubeSat missions will be deployed along the upper stage disposal trajectory after Orion separates from the vehicle. A rare opportunity for CubeSats to be deployed beyond low Earth orbit (LEO), Artemis I CubeSat missions range from searching for hydrogen and other volatiles on the lunar South Pole to studying the acceleration mechanisms of solar and interplanetary particles from a heliocentric trajectory. With manufacturing of the initial vehicle complete, fabrication and procurement is progressing for the second flight of SLS and Orion, Artemis II. Also an SLS Block 1 and Orion flight launching from KSC, Artemis II will mark the return of American astronauts to deep space with a lunar flyby-free return trajectory mission. With the Artemis III flight, NASA has the goal to land the first woman and the next man on the Moon. Infrastructure beyond SLS will be required for this effort, including elements of the lunar Gateway as well as lunar rovers, landers and additional commercially supplied launch services. SLS, as the only vehicle with the capability to lift 26 t of mass to TLI in its initial Block 1 variant, will remain a key component of this new-era exploration program. Future variants – Block 1B and Block 2 –will lift 34-45 t to TLI. This paper will discuss the status of testing and integration for the Artemis I vehicle, manufacturing progress for the second vehicle and the manifest outlook for primary, co-manifested and secondary payloads in the current deep space exploration environment.

Creech, Stephen D.↗

TPSAS-NF1676L-26669-DND

The NASA Langley Research Center has acquired a state-of-art composites fabrication environment to support the Center's research and technology development mission. This overall system described in this paper is named ISAAC, or Integrated Structural Assembly of Advanced Composites. ISAAC's initial operational capability is a commercial robotic automated fiber placement system from Electroimpact, Inc. that consists of a multi-degree of freedom commercial robot platform, a tool changer mechanism, and a specialized automated fiber placement end effector. Examples are presented of how development of advanced composite materials, structures, fabrication processes and technology are enabled by utilizing the fiber placement end effector directly or with appropriate modifications. Several advanced capability end effectors have been procured, and alternate processes with different capabilities can be developed with NASA's partners in industry and academia.

K C Wu↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗