Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars 2020”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Novel Ways to use the International Spacer Station as an Exploration Analog: International Progress in Planning "ISS4Mars"

In October 2020, International Space Station (ISS) Partner Agencies held a set of international workshops to solicit and develop creative and forward-looking ideas for using the ISS as an analog for preparation for Mars missions during its 3rd decade of operations. The workshops brought together participants from nine international space agencies or organizations, with stakeholders consisting of research managers, discipline experts, technology developers, flight physicians, flight operators, and astronauts. Breakout meetings and brainstorming sessions were conducted focusing on the following topics: Critical hazards and countermeasures for the transit to Mars; gravity transitions and early surface operations; environmental control and life support systems; food systems; human microbiome, microbial monitoring, and planetary protection; medical operations for Mars missions; isolation and confinement; autonomous systems and crew-centered autonomy; and communications delay effects on operations. In many cases the scenarios and approaches identified were compelling but challenging to implement under the current utilization structure used to manage the ISS for experiments. Following the series of workshops, a team of utilization leaders across the ISS partnership worked to compile the workshop recommendations and extract a set of use-cases with their prerequisites and constraints. The work considered the following aspects: what can be effectively done on ISS; which new technologies, approaches and scenarios are feasible; what alternatives could be considered; and what steps should be taken to enable integrated testing and future use of ISS as an analog for Mars missions. The final report will be published so that the use cases can be considered in each agency’s strategic planning processes. This paper will cover the process of international assessment in detail and how this process has influenced and broadened the vision of ISS utilization beyond single experiments to integrated studies and testing for future Mars missions. This approach to international collaboration informs both the next decade of international exploration research on the ISS and advancement of its utilization as an analog for deep space missions. For many of the participating partners, it also helps to frame the strategy for human research in Artemis as we begin planning for human missions to the moon. We conclude with a summary of the progress on the actions in the report and the additional implementation discussions that have occurred across the partnership.

Julie A Robinson↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and how key performance parameters (KPPs) are being used to measure the degree of capability gap closure. KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the strategic approach to gap closure and provide references to additional technical details, progress, and KPPs.

Life Support↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.

James Lee Broyan↗

Modeling and Testing of Non-Nuclear, Highpower Simulated Nuclear Thermal Rocket Reactor Elements

When the President offered his new vision for space exploration in January of 2004, he said, "Our third goal is to return to the moon by 2020, as the launching point for missions beyond," and, "With the experience and knowledge gained on the moon, we will then be ready to take the next steps of space exploration: human missions to Mars and to worlds beyond." A human mission to Mars implies the need to move large payloads as rapidly as possible, in an efficient and cost-effective manner. Furthermore, with the scientific advancements possible with Project Prometheus and its Jupiter Icy Moons Orbiter (JIMO), (these use electric propulsion), there is a renewed interest in deep space exploration propulsion systems. According to many mission analyses, nuclear thermal propulsion (NTP), with its relatively high thrust and high specific impulse, is a serious candidate for such missions. Nuclear rockets utilize fission energy to heat a reactor core to very high temperatures. Hydrogen gas flowing through the core then becomes superheated and exits the engine at very high exhaust velocities. The combination of temperature and low molecular weight results in an engine with specific impulses above 900 seconds. This is almost twice the performance of the LOX/LH2 space shuttle engines, and the impact of this performance would be to reduce the trip time of a manned Mars mission from the 2.5 years, possible with chemical engines, to about 12-14 months.

Kirk, Daniel R.↗

Resource Prospector (RP) - Early Prototyping and Development

The Resource Prospector (RP) is an In-Situ Resource Utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorate's (HEOMD) Advanced Exploration Systems (AES) Division. The mission, currently planned to launch in 2020, will demonstrate extraction of oxygen from lunar regolith to validate ISRU capability. The mission will address key Strategic Knowledge Gaps (SKGs) for robotic and human exploration to the Moon, Near Earth Asteroids (NEAs), and ultimately Mars, as well as meet the strategic goals of the Global Exploration Roadmap (GER), offered by the International Space Exploration Coordination Group (ISECG). In this roadmap, the use of local resources is specifically addressed relating to human exploration. RP will provide knowledge to inform the selection of future mission destinations, support the development of exploration systems, and reduce the risk associated with human exploration. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources. The moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. Lunar regolith contains useful resources such as oxygen, water, silicon, and light metals, like aluminum and titanium. Oxygen can be separated from the regolith for life support (breathable air), or used to create rocket propellant (oxidizer). Regolith can be used to protect against radiation exposure, be processed into solar cells, or used to manufacture construction materials such as bricks and glass. RP will characterize the constituents and distribution of water and other volatiles at the poles of the Moon, enabling innovative uses of local resources, in addition to validating ISRU capabilities. This capability, as well as a deeper understanding of regolith, will be valuable in the exploration of near-Earth asteroids (NEAs) and Mars. In order to reduce risk and explore system designs, the RP project is attempting two-fold approaches to development as it looks towards flight. We continue to explore flight planning, requirements, and interfaces definition by using Engineering Test Units (ETUs), looking towards lunar deployment, while also using fiscal year 2015 to develop, build and test an earth-terrestrial prototype rover and payload system. This terrestrial prototype, called "RP15", is built to both inform the system design, and to be a partnership advocacy tool for this unique mission. RP15 must be affordable within the resource and time constraints of fiscal year 2015, while working to the following Needs, Goals, and Objectives provided by HEOMD/AES: 1. Demonstrate rover mobility in a 1g environment 2. The Surface Segment (prototype rover + payload system) shall represent the flight system concept with as much fidelity as affordable (limited by cost and schedule) - Surface Segment shall be the approximate size/dimension/footprint -Surface Segment shall package all the expected devices (instruments, systems, etc.), even if some facets are mocked-up due to time/cost constraints -Overall Surface Segment fidelity negotiable to make achievable 3. Priority should be given to illustrating mission functionality over support functionality, which exists solely to support mission functionality This paper will provide an overview of RP project developments, including the design and build, capturing the development and initial integrated testing of RP15 in relevant environments.

Lunar↗

Sensitivity of the MAR Regional Climate Model Snowpack to the Parameterization of the Assimilation of Satellite-Derived Wet-Snow Masks on the Antarctic Peninsula

Both regional climate models (RCMs) and remote sensing (RS) data are essential tools in understanding the response of polar regions to climate change. RCMs can simulate how certain climate variables, such as surface melt, runoff and snowfall, are likely to change in response to different climate scenarios but are subject to biases and errors. RS data can assist in reducing and quantifying model uncertainties by providing indirect observations of the modeled variables on the present climate. In this work, we improve on an existing scheme to assimilate RS wet snow occurrence data with the “Modèle Atmosphérique Régional” (MAR) RCM and investigate the sensitivity of the RCM to the parameters of the scheme. The assimilation is performed by nudging the MAR snowpack temperature to match the presence of liquid water observed by satellites. The sensitivity of the assimilation method is tested by modifying parameters such as the depth to which the MAR snowpack is warmed or cooled, the quantity of water required to qualify a MAR pixel as “wet” (0.1 % or 0.2 % of the snowpack mass being water), and assimilating different RS datasets. Data assimilation is carried out on the Antarctic Peninsula for the 2019–2021 period. The results show an increase in meltwater production (+66.7 % on average, or +95 Gt), along with a small decrease in surface mass balance (SMB) (−4.5 % on average, or −20 Gt) for the 2019–2020 melt season after assimilation. The model is sensitive to the tested parameters, albeit with varying orders of magnitude. The prescribed warming depth has a larger impact on the resulting surface melt production than the liquid water content (LWC) threshold due to strong refreezing occurring within the top layers of the snowpack. The values tested for the LWC threshold are lower than the LWC for typical melt days (approximately 1.2 %) and impact results mainly at the beginning and end of the melting period. The assimilation method will allow for the estimation of uncertainty in MAR meltwater production and will enable the identification of potential issues in modeling near-surface snowpack processes, paving the way for more accurate simulations of snow processes in model projections.

regional climate models↗

Occultation of a Large Star by the Large Plutino (28978) Ixion on 2020 October 13 UTC

We observed the occultation of the star Gaia DR2 4056440205544338944 by (28978) Ixion. The event was observed from two Lowell Observatory sites, using the 4.3 m Lowell Discovery Telescope (LDT), near Happy Jack, AZ, USA, and a 0.32 m telescope co-mounted with the Titan Monitoring telescope on Lowell’s Mars Hill campus in Flagstaff, AZ. The LDT chord, at 44.86 s, was roughly 30% longer than the longest predicted possible chord. Under the assumption of a spherical body, Ixion’s fitted diameter D = 709.6 ± 0.2 km. The LDT light-curve profile was used to place an upper limit on the surface pressure P < 2 μbar on any possible atmosphere of Ixion. At the distance of Ixion, the occulted star had a fitted projected diameter of 19.25 ± 0.3 km assuming uniform disk illumination, giving a stellar angular diameter of 0.675 ± 0.010 mas. Using the Gaia EDR3 parallax of 0.565 mas, the stellar radius is 130{sub −17}{sup +20} R{sub ⊙}. The measured size is consistent with prior spectral classification of this star as a reddened mid-M giant. This is one of only a modest number of M5 III stars to have a directly measured diameter, and is more distant than most.

79 ASTRONOMY AND ASTROPHYSICS↗

Resource Prospector (RP): A Cost-Effective Lunar Resource Pathfinder

Resource Prospector (RP) is an in-situ resource utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorates (HEOMD). This clever mission is currently planned to launch in 2020 and will demonstrate extraction of oxygen, water and other volatiles, as well measure mineralogical content such as silicon and light metals, like aluminum and titanium, from lunar regolith. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources, and the moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. This mission is equally important; however, for how it executes as a risk-tolerant, cost-effective mission. RP follows on the path-finding approaches of the Lunar Crater Observation and Sensing Satellite (LCROSS) mission. The LCROSS mission confirmed the presence of water-ice on the moon, but also established a new lightweight-approach to project and mission execution which was considerably cheaper and faster than traditional NASA missions. RP has been designated as a Class D mission, just as LCROSS. This mission classification is the most risk-tolerant class of mission within the NASA risk framework and as such, is given more latitude to accept higher-levels of residual risk. The intention is that by saving monies normally spent attempting to assure a single missions success, more missions can be funded. A well-designed portfolio can accept occasional mission failure, as it still gets more done for the same investment of resources. This classification enables tailoring the NASA Policy Requirements (NPRs) to lighter-weight approaches to mission management and execution. RP is also studying both international and commercial partnerships as a means to maximize return on the investment. International partnerships provide both capabilities synergies and cost-sharing opportunities, while the evolving new space commercial options are revealing new approaches to acquiring cost-effective services, including the benefits of bundling services. Even the world of launch vehicles is changing, offering much less expensive access to space, especially if NASA is able to be flexible in how it approaches mission assurance. Finally, leveraging investments being made elsewhere within a program portfolio, can enable cost-savings by enabling two applications with one investment. RP will be the next pathfinder mission to both enable exploration capabilities for future missions, and continue to evolve cost-effective approaches for NASA.

Lunar↗

Observation of the Radiation Environment and Solar Energetic Particle Events in Mars Orbit in May 2018- June 2022

Epithermal Neutron Detector (FREND). Here we present results from measurements of the charged particle fluxes, dose rates and estimation of dose equivalent rates at ExoMars TGO Mars science orbit, provided by Liulin-MO from May 2018 to June 2022. The period of measurements covers the declining and minimum phases of the solar activity in 24th solar cycle and the rising phase of the 25th cycle. Compared are the radiation values of the galactic cosmic rays (GCR) obtained during the different phases of the solar activity. The highest values of the dose rate and flux from GCR are registered from March to August 2020. At the minimum of 24th and transition to 25th solar cycle the dose rate from GCR is 15.9 ± 1.6 µGy h−1, particle flux is 3.3 ± 0.17 cm−2 s−1, dose equivalent rate is 72.3 ± 14.4 µSv h−1. Since September 2020 the dose rate and flux of GCR decrease. Particular attention is drawn to the observation of the solar energetic particle (SEP) events in July, September and October 2021, February and March 2022 as well as their effects on the radiation environment on TGO during the corresponding periods. The SEP event during15–19 February 2022 is the most powerful event observed in our data. The SEP dose during this event is 13.8 ± 1.4 mGy (in Si), the SEP dose equivalent is 21.9 ± 4.4 mSv. SEP events recorded in Mars orbit are related to coronal mass ejections (CME) observed by SOHO and STEREO A coronagraphs. Compared are the time profiles of the count rates measured by Liulin-MO, the neutron detectors of FREND and neutron detectors of the High Energy Neutron Detector (HEND) aboard Mars Odyssey during 15–19 February 2022 event. The data obtained is important for the knowledge of the radiation environment around Mars, regarding future manned and robotic flights to the planet. The data for SEP events in Mars orbit during July 2021-March 2022 contribute to the details on the solar activity at a time when Mars is on the opposite side of the Sun from Earth.

Jordanka Semkova↗

Practical Operational Readiness Gambits: Operations Training Simulations for the Curiosity Rover

The Mars Science Laboratory team had been puttingin effort to make a Training Venue to allow for parallel shadowtactical operations for trainees to actively work alongside theprime tactical operations personnel without affecting operations,since staffing constraints and shortened operations timelineswere straining the tactical process in supporting operationstrainees in the traditional way. The COVID- 19 Pandemic presentedfurther challenges in continuing on-console training forMSL operations trainees. The MSL operations team switched tofully remote operations, thus hampering the direct mentorshipa trainee would normally receive while on site at JPL. TheMars 2020 training team had developed a concept for roveroperations training simulations based on Johnson Space Center’sextensive simulations training program for astronauts andflight controllers. The MSL team borrowed this idea, and implementedthese training simulations which are called PracticalOperational Readiness Gambits (PORGs). The PORGs so farhave focused on the Science Planner and Rover Planner roles,which are two crucial roles in tactical operations that engagein key interactions throughout a shift. PORGs are based onactual sol scenarios that have occurred on Mars and follow thetactical operations process and timeline as closely as possible.However, unlike an operations shift, PORGs can slow down orpause to allow for more mentoring time. PORGs can focus onparticular skills to test the trainees on their understanding ofa concept. PORGs increase in complexity with each scenario toease the trainees into more typical tactical operations workloads.As more trainees join the MSL operations team, more roles arebeing incorporated into PORGs. There are plans to incorporatecertified operations personnel into PORGs to practice anomalyresponse situations. PORGs have become an essential part of theMSL operations training program and will continue even afterthe return to on-site operations at JPL.

Gajeway, Jocelyn↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration directs NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. This decision was reached after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by building on the Apollo Program and other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Snoddy, Jim↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo-era experts to derive other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, William D.↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020 by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage (EDS). This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo era experts to derive other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, WIlliam↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This PowerPoint presentation supports the following paper submission's abstract (STRIVES 20210015025). This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.

Life Support↗

Heliospheric Physics and NASA's Vision for Space Exploration

The Vision for Space Exploration outlines NASA's development of a new generation of human-rated launch vehicles to replace the Space Shuttle and an architecture for exploring the Moon and Mars. The system--developed by the Constellation Program--includes a near term (approx. 2014) capability to provide crew and cargo service to the International Space Station after the Shuttle is retired in 2010 and a human return to the Moon no later than 2020. Constellation vehicles and systems will necessarily be required to operate efficiently, safely, and reliably in the space plasma and radiation environments of low Earth orbit, the Earth's magnetosphere, interplanetary space, and on the lunar surface. This presentation will provide an overview of the characteristics of space radiation and plasma environments relevant to lunar programs including the trans-lunar injection and trans-Earth injection trajectories through the Earth's radiation belts, solar wind surface dose and plasma wake charging environments in near lunar space, energetic solar particle events, and galactic cosmic rays and discusses the design and operational environments being developed for lunar program requirements to assure that systems operate successfully in the space environment.

Minow, Joseph I.↗

Response of Ablative Thermal Protection Materials to Degradation in Low Earth Orbit –Characterization of Specimens from MISSE-13

The environment of low Earth orbit presents unique material interactions due to the presence of atomic oxygen and solar spectrum UV. A variety of degradation mechanisms can occur depending, inlarge part, on the specific material system involved. This talk will review the characterization of two ablative materials, PICA-D and HEEET, as well as relevant adhesive joints and coatings. PICA-D is a variant of the phenolic impregnated carbon ablator (PICA) and is the baseline thermal protection system (TPS) on Dragonfly and the lander for Mars Sample Return (MSR). HEEET is a 3D woven system from which MSR’s Earth entry TPS is derived. The samples for these materials were flown in orbit during the Materials International Space Station Experiment-13 (MISSE-13) which launched on March 6, 2020 and returned to Earth on January 13, 2021. Changes to surface microstructure and reflectivity will be presented along with tomographic analysis. The effect of differential erosion rates on the composites and the impacts of the orbit environment on coating performances will be discussed in the context of TPS performance and mission design aspects.

MISSE↗

Response of Ablative Thermal Protection Materials to Degradation in Low Earth Orbit – Characterization of Specimens from MISSE-13

The environment of low Earth orbit presents unique material interactions due to the presence of atomic oxygen and solar spectrum UV. A variety of degradation mechanisms can occur depending, in large part, on the specific material system involved. This talk will review the characterization of two ablative materials, PICA-D and HEEET, as well as relevant adhesive joints and coatings. PICA-D is a variant of the phenolic impregnated carbon ablator (PICA) and is the baseline thermal protection system (TPS) on Dragonfly and the lander for Mars Sample Return (MSR). HEEET is a 3D woven system from which MSR’s Earth entry TPS is derived. The samples for these materials were flown in orbit during the Materials International Space Station Experiment-13 (MISSE-13) which launched on March 6, 2020 and returned to Earth on January 13, 2021. Changes to surface microstructure and reflectivity will be presented along with tomographic analysis. The effect of differential erosion rates on the composites and the impacts of the orbit environment on coating performances will be discussed in the context of TPS performance and mission design aspects.

MISSE↗

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗