Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

A method for modeling battery-temperature-aware EV power profiles utilizing Next-Gen Profile data

With the expected increase in the number of electric vehicles (EVs) on the road in the coming years, it is important that analysis tools are capable of modeling and predicting the expected load on the power grid due to both individual EV charging sessions as well as large populations of vehicles. To do this accurately, the power profile of an EV charge session must be accurately modeled, including for scenarios where the temperature is above or below the ideal, and also take into account the nuances of manufacturer charging preferences. This paper introduces a method that utilizes the data in the Next-Gen Profile (NGP) data collection project to build a model of EV charging that takes into account the variations in charging power that occur due to off-nominal battery temperature and manufacturer preferences that limit power due to cold temperatures or high battery state-of-charge.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

EVs@Scale High Power Charging Pillar

Slide deck assesses a portfolio of EVs, EVSEs, and Fleets that are expected to utilize High Power Charging (>200kW) to understand charging rates, grid impacts, and asset utilization. Provide DOE, project partners, stakeholders, and the public with analysis on the capability of HPC performance of today's charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Synthetic Atmospheric River Ensembles Generated by Deep-AR

This dataset contains 35,850 synthetic landfalling atmospheric river (AR) realizations generated by the Deep-AR two-stage deep-learning framework over the Northeast Pacific and U.S. West Coast. The archive contains 25 stochastic ensemble members for each of 1,434 held-out observed seed events. Each synthetic realization is initialized from conditions 48 hours before the corresponding observed AR landfall and is generated autoregressively at 6-hour intervals over a 144-hour period. Deep-AR combines a deterministic residual network (ResNet) that advances the large-scale atmospheric state with a Wasserstein generative adversarial network (WGAN) that produces stochastic, high-resolution fields. Each HDF5 file contains 0.25° gridded synthetic integrated vapor transport components (qu, qv), 10 m wind components (u10, v10), and 6-hour accumulated precipitation on a common 200 × 480 grid. The files also include coordinate and datetime arrays. This dataset supports AR hazard analysis, ensemble-based uncertainty characterization, precipitation-extremes research, and regional stress testing. Synthetic files follow the naming convention deepar.model.YYYYMMDD.HHMMSS.vNN.h5. YYYYMMDD.HHMMSS identifies the UTC initial-condition timestamp, which occurs 48 hours before the diagnosed observed landfall, and vNN identifies the zero-padded ensemble member, ranging from v01 through v25. Each synthetic file can be paired with its corresponding observed file by matching the initial-condition timestamp. The paired observed file follows the naming convention deepar.obs.YYYYMMDD.HHMMSS.h5 and is available in the separately registered oracle/deepar.obs dataset at https://wdh.energy.gov/ds/oracle/deepar.obs (DOI: https://doi.org/10.21947/3377671).

17 WIND ENERGY↗

Integrated Energy Systems White Paper

This analysis compares how the existing critical infrastructure continues to be vulnerable and with smart grid technologies being implemented exposes IES, power systems, the grid, and renewable energy in new ways. Continued work in cybersecurity will thwart efforts against adversaries having an opportunity to penetrate these systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Inter Converter Interactions using Harmonic State Space Modeling

Power converters have become a key participant within the modern grid, facilitating the grid's interaction with renewable energy sources and various loads, among others. These converters can also interact with each other, creating harmonics that were previously absent in the grid. While some previous research studies have focused on inter-converter interactions, not much focus has been on the role of pulse width modulators in these inter-converter interactions. This paper focuses on the issue and builds upon harmonic state-space modeling (HSS) to observe inter-converter harmonic interactions. A new modulator model is developed, and its implementation within HSS modeling to observe harmonic coupling between multiple inverters is highlighted. A simulation testbench is developed, and to verify the advantages and limitations of the proposed modeling approach, it is compared with two other traditional modeling methods: namely, average and switching models. The proposed method is shown to be significantly more accurate and informative than conventional average modeling methods and has considerably lower computation costs and simulation time than detailed switching models. The results are verified using extensive simulations on MATLAB.

Xue, Yaosuo↗

Large Scale Pumped Storage to Support Renewable Deployment; PSH Resource Assessment and Complementary Analysis for Alaska

The State of Alaska has a rather unique electric power system, as it has two larger transmission grids (Railbelt and Southeast Alaska) and over 150 islanded stand-alone power systems that are serving remote rural communities. In 2010, the Alaska legislature enacted a non-binding goal for 50% of renewable electricity generation by 2025. With the expected increase in wind and solar generation in the future, the role of energy storage becomes increasingly important. Considering the specific power system characteristics in Alaska, energy storage technologies that can supply electricity over an extended period of time, such as pumped storage hydropower (PSH), may play a key role in enabling the reliability and resiliency of both integrated and rural power systems. The overarching objective of the subject study of this presentation is to investigate the prospects and opportunities for PSH in Alaska.

Alaska↗

RADIANCE Executive Summary

Microgrids are gaining attention from organizations and cities because of their potential reliability and resilience benefits, especially in remote geographic areas: Microgrids can provide local power during emergencies, and they can reduce the costs of imported fuel by reducing overall fuel use. But the complexities and novelties of microgrid technologies are often barriers to deployment that require testing and validation to overcome. This report describes the testing, validation, and deployment of microgrid technologies in Cordova, Alaska, completed through the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) project Resilient Alaskan Distribution system Improvements using Automation, Network analysis, Control, and Energy storage (RADIANCE).

ARIES↗

The National Transmission Planning Study: Chapter 5: Stress Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 4: AC Power Flow Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Quantifying System Strength From Grid-Forming Resources Using Frequency Scan Approach: Preprint

Current industry practices for quantifying the system strength contribution from grid-forming (GFM) resources to ensure stability of power systems dominated by inverter-based resources (IBRs) are primarily based on iterative electromagnetic transient (EMT) time-domain simulation studies. While feasible, these approaches are resource-intensive, lack scalability and intuition, and might not evaluate the system strength contribution over the entire frequency range of interest. This paper introduces a novel, frequency-domain approach to quantify system strength support provided by a GFM resource using frequency scans. The proposed method uses transfer functions from the grid voltage magnitude (V) and phase (?), respectively, to the reactive (Q) and active power (P) output of a GFM resource for quantifying its contribution to system strength. These transfer functions provide a direct measure of the ability of a GFM resource to behave as a stiff voltage source behind a reactance over a specified frequency range, enabling robust quantification of its system strength contribution. The key innovation of this work is the development of a frequency domain system strength metric called the dynamic short-circuit ratio (dSCR) that is suitable for IBR-dominated power systems and is directly related with the familiar short circuit ratio (SCR) metric. The new metric, dSCR, enables the assessment of system strength contributions from both synchronous machines and converter-based GFM resources using a unified benchmark, which is not possible with the traditional SCR metric. The paper also demonstrates how impedance scans could identify if an unstable condition observed during weak grid conditions is a result of the lack active or reactive power support or both. By leveraging the proposed frequency-domain dSCR metric for quantifying system strength contribution from GFM IBRs, the paper demonstrates targeted mitigation strategies for weak grid instabilities without resorting to repeated, time-consuming time-domain simulations. The result is a scalable and efficient approach to remediate stability challenges in power systems with high shares of IBRs and accelerating the integration of GFM technologies for system strength support in power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insights into Methodologies and Stochastic Optimization of Thermal Energy Storage-Coupled Advanced Reactor Systems: A Comparison of Methods for Accessing Long-Term Sub-System Sizing Adequacy

This paper investigates the potential of coupling Thermal Energy Storage (TES) with Advanced Reactors (ARs) to address uncertainties posed by climate change in deep decarbonized power systems. The TES Use-case Team at Idaho National Laboratory (INL) has examined the potential of storing thermal energy from ARs during low demand periods and optimizing discharge during peak-priced hours, in both steady-state and transient conditions. Building on this groundwork, this study bridges the gaps in optimal sizing of the sub-system of TES-coupled AR systems using Risk Analysis Virtual Environment (RAVEN) and Holistic Energy Resource Optimization Network (HERON), INL?s framework for grid optimization. By applying this framework, we present statistically-robust optimal charge, discharge including balance of plant (BOP), and storage sizing for the High-Temperature Gas-Cooled Reactor (HTGR) with 203 MWth output. To this end, we generated synthetic price samples for 30 years using 2018 ? 2021 real-time market data from ERCOT, PJM and MISO. Our results reveals that the TES-coupled HTGR system is highly effective in maximizing revenue from electricity sales. We observed a substantial increase of 40 % in ERCOT and a noteworthy 15 % increase in PJM and MISO when compared to the conventional BOP without TES. This improvement is achieved through regionally-tailored sub-system sizing, which ranges from 398 to 416 MWth for the discharge system and 610 to 1029 MWth for the TES. We find that the average electricity price directly impacts the overall economics, while price volatility influences storage size. Additional sensitivity analyses were performed to access the impact of key assumptions on system economics and sizing, differentiating the optimization window (i.e., 24 ? 219 hours of chronological observations) and by imposing storage continuity condition in tracking TES cycles. We observed that at the 120-hour of the optimization window, a reasonable balance between computation time and accuracy was achieved. Our analysis also highlights the significance of conducting multi-day cycle analysis (> 120-hour) for TES to capture interaction between electricity prices and storage dynamics, providing a comprehensive understanding of TES behavior that AR developers should integrate into their plant designs.

25 ENERGY STORAGE↗

Advanced grid-forming (GFM) inverter controls, modeling and system impact study for inverter dominated grids

Our main goals in this project are to understand: 1) the stability of the power system with very high penetration of PV or other inverter-based resources (IBR), 2) the interactions among IBRs and traditional generators, and 3) the impact of the GFM inverters on bulk power system. To achieve these goals, we took a holistic research and development approach. First, an impedance-based large system modeling and stability analysis tool was developed to aid the large IBR system small-signal stability analysis. Second, consensus-based control and transient overload ride through were developed to control and coordinate multiple GFM inverters in a large system to maintain transient stability during big grid events. Third, high fidelity electromagnetic transient (EMT) IBR models were developed and integrated into a large reduced WECC model to study the system impact from IBRs. Lastly, extensive validation tests of the GFM control which was developed in this project and implemented in two 1MW commercial solar inverters were performed using different validation platforms, e.g., control hardware-in-the-loop (CHIL) platform, power hardware- in-the-loop (PHIL) platform, and a real PV plant.

14 SOLAR ENERGY↗

Data Requirements for Application of Risk-Based Dynamic Contingency Analysis to Evaluate Hurricane Impact to Electrical Infrastructure in Puerto Rico

This paper presents a risk-based dynamic contingency analysis framework that was used to evaluate the hurricane impact to electrical infrastructure in Puerto Rico. PNNL developed a scalable risk-based framework for identifying high-voltage transmission resilience improvements by classifying and prioritizing high-risk power grid contingencies (system failures) under hurricane impact. The risk-based framework is founded on grid outage definitions with their associated probabilities of occurrence from hurricane events, in combination with an impact assessment derived from detailed dynamic cascading failure analysis. This paper focuses on a discussion around data requirements for transmission resilience planning for hurricane events, derived from the development of the risk-based framework and its application to Puerto Rico. This paper launches an important first step in encouraging the engineering community and power system industry to move towards establishing resilience planning as a routine practice. Since actual results for Puerto Rico contain sensitive information, sample simulation results will be used to illustrate the data requirements and risk-based dynamic cascading framework on the Puerto Rico power grid, as well as demonstrate the potential for such a simulation framework. The paper includes a discussion on the lessons learned, importance and need for improved datasets that are not usually considered in traditional power system planning. The paper will also elaborate on how the scalable simulation framework and datasets might be expanded to larger footprints and leveraged for modelling other types of natural disasters.

DCAT, Puerto Rico, hurricane, Power System Stabili↗

A 30-yr high-resolution weather research and forecasting model downscaling data over California and Nevada

This dataset presents a 30-year high resolution meteorological dataset obtained using the WRF model (Advanced version Research WRF version 4.4). We used WRF and European Centre for Medium-Range Weather Forecasts Reanalysis v5 as initial and boundary conditions to generate gridded meteorological variables. A large number of surface weather stations was used for model validation. A multi-physics analysis was first developed to identify a good physics suite extended from 6 November 00 UTC to 10 November 23 UTC, 2018, which included the Camp Fire in northern California. Based on the best physics suite, the downscaling dataset extends from 1 December to 28 February, 1990–2021 and the horizontal domain has 1.5 km grid spacing covering the entire states of California and Nevada in the United States. Comparisons between hourly surface observations and WRF simulations of air temperature, relative humidity and wind speeds show mean absolute errors on the order of (1.6-2.0 C), (10 %) and 1.2–1.5 m s -1 , respectively.

54 ENVIRONMENTAL SCIENCES↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Numerical error analysis of SOLPS-ITER simulations of EAST

Abstract Plasma edge simulations with codes like SOLPS-ITER are widely employed to interpret fusion experiments. However, numerical errors appearing in such simulations are rarely investigated, despite their potential large impact on simulation results. These errors consist of the statistical error and the bias, both resulting from the finite number of employed EIRENE Monte Carlo particles and incomplete convergence, and the discretization error due to the finite resolution of the computational grids. In this contribution, the resulting numerical errors on simulations of pure deuterium and neon seeded H-mode EAST discharges are examined. The statistical error can be kept small compared to other numerical error contributions by averaging the plasma profiles. This allows investigating the bias and discretization errors using Richardson extrapolation. It is shown that grid refinement and the number of employed Monte Carlo particles have the largest influence on the result, in agreement with similar studies of an ITER deuterium case. For the first time, numerical error bars on the entire simulated target profiles are determined showing that the largest numerical error is 17.9%, mainly due to the plasma grid discretization. On top, also numerical errors on simulated neutral pressures are investigated in detail, for which the statistical error is dominant. The analysis demonstrates which setup is needed to keep numerical errors limited: the SOLPS-ITER averaging procedure should be employed including enough EIRENE particles, and the involved grids should be sufficiently refined to reduce discretization errors.

Boeyaert, Dieter (ORCID:0000000309208660)↗

Offering of Variable Resources in Regulation Markets with Performance Targets: An Analysis

To date, wind and solar power plants have mainly provided energy. Going forward, with the application of appropriate controls, they can offer additional grid services, such as regulating reserves. Additional grid services can present an opportunity for additional value streams to wind and solar power plants. However, the additional value might not be realized when operator-determined performance targets and settlement adjustments for the delivery of regulation capacity are disregarded. Additionally, this article studies the participation of variable resources in centralized regulation markets. We derive analytical results for regulation offers in terms of quantity and price considering that a variable resource does not want to risk being disqualified as a regulation provider, incurring losses, or foregoing more profitable opportunities. Our analysis suggests that U.S. operator-determined performance targets impose an upper bound on the quantity of a variable resource’s regulation offer; and settlement adjustments for the delivery of regulation affect the price at which variable resources offer and the calculations of opportunity costs in case of imperfect regulation delivery.

24 POWER TRANSMISSION AND DISTRIBUTION↗