Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fouling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

725 records · Page 41

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium from Seawater Cost Analysis: Recent Updates

While it is not meant to be a direct competitor with conventionally mined uranium, seawater uranium has significant potential to sway policy makers and the public toward the long term viability of nuclear power. Given the large mass of uranium contained within the ocean and its continual replenishment by freshwater run-off and the ocean floor, seawater uranium can be considered for all practical purposes a renewable resource. In addition to this assurance of supply security placing nuclear power on equal footing with other renewable energy generation technologies, seawater uranium removes a key uncertainty by establishing a cost ceiling on uranium based fuels. Given the evolving nature of this technology, this paper aims to provide an update of the economic model to reflect recent progress. This analysis will reference a passive collection system currently under development by Oak Ridge and Pacific Northwest National Labs. This system consists of a polymer modified to contain amidoxime functional groups, a ligand with high uranium affinity. The adsorbing material is then braided into long segments so it may be moored to the bottom of the ocean where it passively collects uranium for a period on the order of weeks to months. Upon completion of its soaking campaign adsorbent is winched to the surface by work boats so the uranium may be eluted off the braids. After a chemical rinse the braids may then be redeployed for another soaking campaign and uranium elution. The adsorbent can be redeployed as many times as is economically feasible, which is a function of the degradation the material suffers upon each reuse. Noteworthy experimental progress has tightened the gap separating estimates of the optimistic and pessimistic case uranium production cost relative to the most recent analysis. It has been demonstrated before that significant uncertainty in adsorbent performance, and thus recovery cost, arises primarily from variability in adsorbent degradation upon reuse and the effects of marine biofouling on uptake. While the underlying recovery mechanism remains, significant changes have been made regarding the method of adsorbent synthesis, propagating to improvements in adsorbent durability. Additionally, further experimentation regarding the area of marine biofouling has tightened the range of expected adsorbent performance when placed in true marine conditions.

07 ISOTOPE AND RADIATION SOURCES↗