Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Finance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Updated Estimates of the Remaining Market Potential of the U.S. ESCO Industry

The energy service company (ESCO) industry has a well-established track record of delivering energy and economic savings in the public and institutional buildings sector, primarily through the use of performance-based contracts. The ESCO industry often provides (or helps arrange) private sector financing to complete public infrastructure projects with little or no up-front cost to taxpayers. In 2014, total U.S. ESCO industry revenue was estimated at $5.3 billion. ESCOs expect total industry revenue to grow to $7.6 billion in 2017—a 13% annual growth rate from 2015-2017. Researchers at Lawrence Berkeley National Laboratory (LBNL) were asked by the U.S. Department of Energy Federal Energy Management Program (FEMP) to update and expand our estimates of the remaining market potential of the U.S. ESCO industry. We define remaining market potential as the aggregate amount of project investment by ESCOs that is technically possible based on the types of projects that ESCOS have historically implemented in the institutional, commercial, and industrial sectors using ESCO estimates of current market penetration in those sectors. In this analysis, we report U.S. ESCO industry remaining market potential under two scenarios: (1) a base case and (2) a case “unfettered” by market, bureaucratic, and regulatory barriers. We find that there is significant remaining market potential for the U.S. ESCO industry under both the base and unfettered cases. For the base case, we estimate a remaining market potential of $92-$201 billion ($2016). We estimate a remaining market potential of $190-$333 billion for the unfettered case. It is important to note, however, that there is considerable uncertainty surrounding the estimates for both the base and unfettered cases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ancillary Service Revenue Potential for Geothermal Generators in California

Achieving California’s 33% renewable generation goal will substantially increase uncertainty and variability in grid operations. Geothermal power plant operators could mitigate this variability and uncertainty by operating plants in a more flexible mode. Plant operators would be compensated for flexibility through payments for ancillary services such as frequency regulation, load following, and spinning reserve. This study explores economic incentives for geothermal plant operators to provide such flexibility. Historical and forecast ancillary service prices are compared to operator compensation for energy under firm contracts at fixed prices, which are higher than current or year 2020 projected market clearing prices for ancillary services in most hours of the year. Power purchase agreements recently executed by geothermal operators typically provide only energy payments at fixed energy prices and escalation rates. We postulate new contract structures that would allow a geothermal plant operator to switch from providing energy to providing ancillary services to the grid operator when it is advantageous to the plant operator to do so. Additional revenues would be earned through ancillary service payments. Estimates of these additional annual revenues a plant operator could realize are developed for a range of contract energy prices. The impacts of flexible operations on reservoir lifetimes and implications for project finance are also discussed.

15 GEOTHERMAL ENERGY↗

Ancillary Service Revenue Potential for Geothermal Generators in California FY15 Final Report

Achieving California’s 33% renewable generation goal will substantially increase uncertainty and variability in grid operations. Geothermal power plant operators could mitigate this variability and uncertainty by operating plants in a more flexible mode. Plant operators would be compensated for flexibility through payments for ancillary services such as frequency regulation, load following, and spinning reserve. This study explores economic incentives for geothermal plant operators to provide such flexibility. Historical and forecast ancillary service prices are compared to operator compensation for energy under firm contracts at fixed prices, which are higher than current or year 2020 projected market clearing prices for ancillary services in most hours of the year. Power purchase agreements recently executed by geothermal operators typically provide only energy payments at fixed energy prices and escalation rates. We postulate new contract structures that would allow a geothermal plant operator to switch from providing energy to providing ancillary services to the grid operator when it is advantageous to the plant operator to do so. Additional revenues would be earned through ancillary service payments. Estimates of these additional annual revenues a plant operator could realize are developed for a range of contract energy prices. The impacts of flexible operations on reservoir lifetimes and implications for project finance are also discussed.

15 GEOTHERMAL ENERGY↗

Chapter 8: Whole-Building Retrofit with Consumption Data Analysis Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Whole-building retrofits involve the installation of multiple measures. Whole-building retrofit programs take many forms. With a focus on overall building performance, these programs usually begin with an energy audit to identify cost-effective energy efficiency measures for the home. Measures are then installed, either at no cost to the homeowner or partially paid for by rebates and/or financing. The methods described here may also be applied to evaluation of single-measure retrofit programs. Related methods exist for replace-on-failure programs and for new construction, but are not the subject of this chapter.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

Identifying Barriers and Pathways to Success for Renewable Energy Development on American Indian Lands

American Indian tribes possess lands rich with renewable energy (RE) resources. Tribes have great potential and need to develop these resources, yet face a host of barriers that continue to impede development. Understanding these challenges as well as the pathways that can be taken to overcome them may facilitate more economic development to meet community needs and better position tribes to play a role in securing a low-carbon energy future for the United States. This paper presents the results of an expert elicitation of 24 tribal energy experts from federal, tribal, academic, and private industry backgrounds to identify barriers and opportunities for federally recognized tribes in the lower 48 states. Experts identified a number of unique challenges facing tribes including financing and funding, infrastructure, tribal leadership and staff, state-level influence, and partnerships. Cultural factors were seen only to be of concern with large-scale development. Tribal sovereignty is a significant motivation for RE development and has yet to be fully realized. Cultural considerations are critical to the success of future projects; smaller residential and community-scale projects may be a better fit. Improving partnerships between tribes and the private sector can increase RE deployment and overcome historical distrust. States can have a double-ended influence on projects within tribal lands through taxation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GeoVision Analysis: Exploration Task Force Report

The GeoVision study effort included ground-breaking, detailed research on current and future market conditions and geothermal technologies in order to forecast and quantify the electric and non-electric deployment potentials under a range of scenarios, in addition to their impacts on the Nation’s jobs, economy and environment. Coordinated by the U.S. Department of Energy’s (DOE’s) Geothermal Technologies Office (GTO), the GeoVision study development relied on the collection, modeling, and analysis of robust datasets through seven national laboratory partners, which were organized into eight technical Task Force groups. The purpose of this report is to provide a central repository for the research conducted by the Exploration Task Force. The Exploration Task Force consists of four individuals representing three national laboratories: Patrick Dobson (task lead) and Christine Doughty of Lawrence Berkeley National Laboratory, Anna Wall of National Renewable Energy Laboratory, Travis McLing of Idaho National Laboratory, and Chester Weiss of Sandia National Laboratories. As part of the GeoVision analysis, our team conducted extensive scientific and financial analyses on a number of topics related to current and future geothermal exploration methods. The GeoVision Exploration Task Force complements the drilling and resource technology investigations conducted as part of the Reservoir Maintenance and Development Task Force. The Exploration Task Force however has focused primarily on early stage R&D technologies in exploration and confirmation drilling, along with an evaluation of geothermal financing challenges and assumptions, and innovative “blue-sky” technologies. This research was used to develop geothermal resource supply curves (through the use of GETEM) for use in the ReEDS capacity expansion modeling that determines geothermal technology deployment potential. It also catalogues and explores the large array of early-stage R&D technologies with the potential to dramatically reduce exploration and geothermal development costs, forming the basis of the GeoVision Technology Improvement (TI) scenario. These modeling topics are covered in detail in Potential to Penetration task force report. Most of the research contained herein has been published in peer-reviewed papers or conference proceedings and are cited and referenced accordingly. The sections that follow provide a central repository for all of the research findings of the Exploration and Confirmation Task Force. In summary, it provides a comprehensive discussion of Engineered Geothermal Systems (EGS) and associated technology challenges, the risks and costs of conducting geothermal exploration, a review of existing government efforts to date in advancing early-stage R&D in both exploration and EGS technologies, as well as a discussion of promising and innovative technologies and implementation of blue-sky concepts that could significantly reduce costs, lower risks, and shorten the time needed to explore and develop geothermal resources of all types.

15 GEOTHERMAL ENERGY↗

Final Technical Report

The goal of this project was to cut the per-wafer equipment cost for PECVD by more than 50% by adopting a Gen 8.5 thin-film manufacturing toolset originally developed for the LCD industry, significantly reducing the total capital-cost, cost-of-capital and wafer-to-cell production cost associated with HVM of Triex cells. Since PECVD is a common process step for many advanced Si PV cells, successful implementation of this device will broad-reaching implications across the domestic PV manufacturing industry. As a domestic PV manufacturing company in a challenging market, Silevo must focus our existing private funding and revenues on developing low-risk, short-term evolutionary improvements to our existing products and manufacturing process for scale-up. As such, without DOE funding, progress toward developing the high-impact manufacturing process described here, will not occur. However, this program leveraged more than $100M in past investment to develop this product and pilot-scale process tool, as well as significant funding that is being deployed to build our 200MW manufacturing plant in NY. With DOE funding, our proposed Gen 8.5 PECVD tool will reduce the CapEx cost associated with this expansion by 29%, allowing us to increase the scale of the Phase 2 facility to 550MW at the same level of investment as our current plan of record. Once this project is complete, all future funding needed to deploy this technology will come from private sources (product revenue and private finance), with no need for future government funding.

14 SOLAR ENERGY↗

The Solar Endowment: A PV Investment Roadmap for Universities and Foundations

The Midwest Renewable Energy Association (MREA) led a diverse group of subject matter experts to define pathways for large-scale PV investments by institutions of higher education and associated endowments and foundations. By leveraging ongoing efforts by Second Nature and the Intentional Endowment Network and applying PV development strategies with four pilot campuses, the MREA defined successful deployment and investment strategies, developed case studies the provide examples of replicable investment models, created a free, online PV financial simulator to compare project finance strategies, and offered an online training to 12 university teams helping them create PV development roadmaps to guide on and off site investments.

14 SOLAR ENERGY↗

The Future of Transportation Electrification: Utility, Industry and Consumer Perspectives

Electric vehicles (EVs) today are a small part of the U.S. transportation fleet. Technological advancements, automotive industry investments and state policies are driving increased transportation electrification. Bloomberg New Energy Finance projects that by 2040, 55 percent of new sales of automobiles worldwide will be EVs. Increased transportation demand for electricity will require additional investments in the distribution system and will impact the bulk power system as load profiles change. At the same time, managed EV charging and discharging can make more efficient use of distribution system assets and increase grid flexibility. EVs also hold promise for lowering transportation costs and reducing air emissions. Infrastructure needs to electrify transportation across the United States far exceed current investment plans by EV charging companies, the public sector and others. Utilities are building “make-ready” infrastructure to ease development of public charging stations and offering rates tailored for EVs, and some utilities are directly investing in charging stations. The growth of EVs raises a number of questions for policymakers and others: How much public charging infrastructure will be needed, where should it be built and when will it be used? What role should utilities play in developing the infrastructure, compared to EV charging companies?How should charging infrastructure costs be allocated among utility customers? How should electricity rates be set to encourage efficient grid use and minimize negative grid impacts? How are states preparing for increasing electrification of the transportation sector? This report in the Future Electric Utility Regulation series from Berkeley Lab, tackles these questions and more. The report approaches the issues from three perspectives: utilities, the EV charging industry and consumers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Productive Use of Energy in African Micro-Grids: Technical and Business Considerations

Demand for electricity from small industry and businesses, which is defined as the productive use of energy (PUE), is a key success factor for micro-grids. Because of the typically low energy usage of residential customers, without linkage to and support for these energy users, micro-grids are likely to struggle to reach the critical revenue needed for financial viability. This report is a resource entrepreneurs and developers can use to understand the technical and business model challenges related to PUE in smaller micro-grids. It focuses on small agricultural processing, and small industrial and commercial loads. This report examines best practices for promoting PUE and the business models used by developers. It starts with background information and a literature review followed by a discussion of key enterprise considerations for productive use (PU) including: value chain and business case analysis, enterprise development and training, appliance financing, and developers running PU businesses. Unlike many other reports on PUE, this report is based on application specific data. The report is also unique in that it provides actual customer demographics and load profiles. This report considers PUE from both business and technical perspectives, and it considers the interests of both the micro-grid operators and the microenterprises and entrepreneurs they serve. It looks at the service levels required by different PUs and the technical characteristics and challenges of different types of PU equipment. The report also includes examples of business cases for some of the most important PU opportunities, including milling, ice making, carpentry, egg incubation, and water treatment. This report is a resource that entrepreneurs, governments, and non-governmental organizations can use to help design programs to meet their individual goals of PUE in micro-grids and economic development in rural Africa. It can also be used by developers, engineers, and other organizations designing micro-grids to inform their technical and business decisions and to improve system design, reduce risk, and increase success with adding PU loads to both new and existing micro-grids.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chefornak Mini-grid Business Case

A business case analysis was performed for the Village of Chefornak. The business case analysis evaluated the optimal case from the technical analysis performed by the National Renewable Energy using HOMER. The optimal case adds an 800 kW wind plant with 650 kW of electric thermal stoves and a 300 kW battery. The project cost 5.8 million. The direct cost of electricity would likely decline from 0.41/kWh to 0.30/kWh. The direct costs don’t include administrative and distribution costs. The addition of the renewable resources and thermal electric stoves reduced total fuel consumption by more almost 80% or approximately 103,000 gallons. The reduction in cost provides an opportunity for Chefornak’s utility, the Naterkaq Light Plant, to obtain financing through grants and loans to install renewable energy and reduce overall fuel consumption to the community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Kokhanok Mini-grid Business Case

A business case analysis was performed for the Village of Kokhanok. The business case analysis evaluated the optimal case from the technical analysis performed by the National Renewable Energy. The optimal case provided for repairing the two Vestas 17 (90 kW) wind turbine controllers and added electric thermal stoves and a battery. The project cost 0.5 million. The direct cost of electricity would likely decline from 0.69/kWh to 0.39/kWh. The direct costs don’t include administrative and distribution costs. The repair of controller and the addition of electric stoves reduced fuel consumption by 63% or approximately 22,000 gallons. The reduction in cost provides an opportunity for the Kokhanok Village Council to obtain financing through grants and loans to install renewable energy and reduce diesel fuel consumption to the cooperative

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Shungnak Mini-grid Business Case

A business case analysis was performed for the Village of Shungnak. The business case analysis evaluated the optimal case from the technical analysis performed by the Sandia National Laboratory using Microgrid Design Toolkit (MDT). The optimal case adds a 500 kW wind plant, 100 kW of solar photovoltaics (PV), 100 kW diesel and 46 kW of electric thermal stoves. The project cost 4.3 million. The direct cost of electricity would likely decline from 0.63/kWh to 0.55/kWh. The direct costs don’t include administrative and distribution costs. The addition of the renewable resources reduced diesel fuel consumption by more than 74% or approximately 96,000 gallons. The reduction in cost provides an opportunity for Alaska Village Electric Cooperative to obtain financing through grants and loans to install renewable energy and reduce diesel fuel consumption to the cooperative.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Visualizing Clustering and Uncertainty Analysis with Multivariate Longitudinal Data

Multivariate time-series datasets are intrinsic to the study of dynamic, naturalistic behavior, such as in the applications of finance and motion video analysis. Statistical models provide the ability to identify event patterns in these data under conditions of uncertainty, but researchers must be able to evaluate how well a model uses available information in a dataset for clustering decisions and for uncertainty information. The Hidden Markov Model (HMM) is an established method for clustering time-series data, where the hidden states of the HMM are the clusters. We develop novel methods for quantifying the uncertainty of the performance of and for visualizing the clustering performance and uncertainty of fitting a HMM to multivariate time-series data. We explain the usefulness of uncertainty quantification and visualization with evaluating the performance of clustering models, as well as how information exploitation of time-series datasets can be enhanced. We implement our methods to cluster patterns of scanpaths from raw eye tracking data.

97 MATHEMATICS AND COMPUTING↗

U.S. DOE Southwest CHP TAP Final Report

The objective of the Department of Energy’s Southwest Combined Heat and Power Technical Assistance Partnership (Southwest CHP TAP) is to provide essential support to continue the market penetration of CHP’s suite of technologies and to substantially contribute to the national goal of 40 GW of new CHP installations by 2020. The CHP TAP work is designed to assist CHP installations by providing technology and fuel-neutral technical assistance to potential end-users, and, to a lesser degree, providing education and engagement to a variety of stakeholders including end-users (commercial, industrial, institutional and more), electric and gas utilities, trade associations, non-profit organizations, and policymakers. This assistance includes evaluating the economic, energy savings, reliability, and environmental value of proposed CHP systems and conveying this value to encourage CHP installations. The CHP TAPs represent multi-state regions and are DOE’s CHP experts providing fact-based, unbiased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related best practice policies. CHP applications (including WHP) can be both stand-alone as well as in District Energy or Microgrid configurations and the CHP TAPs will encourage the installation of CHP in these various configuration types as appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Case for All New City Buses in India to be Electric

Indian cities are struggling to keep the air breathable for inhabitants, due in part to emissions from diesel buses. While the case for electric buses, and more generally, zero emission buses, has always been clear from an urban air pollution perspective, the economic case depended strongly on their environmental benefits. However, the situation seems different today. We illustrate that when the benefits of recent dramatic declines in Lithium battery prices are fully realized, the total cost of ownership of urban (intra-city) electric buses is lower than that for diesel buses in India even without subsidies. Factoring in the air quality benefits, projected reductions in the cost of batteries and solar electricity, it becomes evident that transitioning to an all-electric bus fleet presents an enormous opportunity for India to reduce urban air pollution while improving the finances of urban bus transit agencies. The policy ecosystem that delivered substantial price reductions and large-scale rapid deployment of solar PV and LEDs is a model to achieve similar outcomes for battery electric buses. Well-designed high volume auctions and clear long term ambitious targets for fleet electrification could achieve to rapid electrification with little net public subsidy in the long-run.

33 ADVANCED PROPULSION SYSTEMS↗

Integrated pre-feasibility study for CO 2 geological storage in the Cascadia Basin, offshore Washington State, British Columbia

The Cascadia CarbonSAFE project conducted a pre-feasibility study to evaluate technical and nontechnical aspects of storing 50 million metric tons (MMT) of carbon dioxide in a safe, ocean basalt reservoir offshore Washington State and British Columbia. Sub-seafloor basalts are very common on Earth and enable geological mineralization as a long-term storage mechanism, permanently sequestering the carbon in solid rock form. This project evaluated the offshore storage complex, developed potential industrial source/transport scenarios, built an inventory of existing geophysical/geological data and environmental monitoring capabilities, conducted laboratory studies and reservoir modeling to determine storage capacity, and analyzed economic factors, regulatory requirements, and project management risks. Our team included researchers at Columbia University in New York, Pacific Northwest National Laboratory (PNNL) in Washington, University of Victoria in British Columbia, University of California at Santa Cruz, and GHG Underground in Maine, as well as collaborators at University of Iceland in Reykjavik and University of Washington in Saint Louis. In the study region, large emitters (>100,000 MT/year) generate a total of approximately 40 MMT annually from stationary sources, such as power plants, refineries, ammonia production, and mineral processing plants. Five potential industry source/transport scenarios were identified (three in U.SA S. and two in Canada) to potentially provide 50 MMT of carbon dioxide to the offshore reservoir. One scenario included net carbon-negative sources that would reduce atmospheric levels. The inventory of existing data illustrated that basalt properties in the region are potentially beneficial for long-term storage. Permeability is on the order of 0.1 to 1 Darcies within the uppermost 600 m of ocean crust and density-derived porosity reaches 10–20% in thin layers that provide act as flow channels and provide access to porous and permeable basalt. Fine-grained sediments overlying basalt provide a low-permeability barrier separating the storage reservoir from the overlying ocean. Subsurface monitoring of the storage complex benefits from a unique opportunity close proximity of to the nearby NEPTUNE cabled seafloor observatory, which actively transmits data to shore and could be used to monitor reservoir properties. Injection pressure changes, reservoir chemistry, seismicity, well head corrosion, and potential leakage monitoring would be feasible in real time. Using existing data and published models, the STOMP-CO 2 modeling code developed at PNNL was used to simulate carbon dioxide injection, storage, and mineralization in the reservoir. Preliminary simulations indicate that a 50 MMT carbon dioxide plume injected over a 20-year period remains well within the reservoir area, both laterally and vertically, for at least a 50-year period of post-injection monitoring. Laboratory studies on core samples from Cascadia measured dissolution rates in CO 2 –basalt–seawater mixtures and indicated large variability in rates with the potential for complete mineralization. Compared to published data, the dissolution rate measured in these samples is faster, decreasing the time until full conversion to carbonate minerals would occur. Adding geochemical reactivity in the STOMP-CO 2 model indicates that carbon dioxide would be fully converted to carbonate minerals in 135 years or less after injection ceases. The project assessed the viability and costs for the five scenarios using either dedicated offshore pipelines or shipping vessels. Carbon dioxide capture costs were not considered. Shipping incurred lower upfront CAPEX costs, and because most viable sources were located near the shore and waterways, shipping is preferred; no dedicated carbon dioxide pipelines exist in the region. The project also considered potential risks from mixed-use impacts on surrounding lands and ocean areas, such as active use by commercial and recreational fisherman, and other community considerations in planning for public engagement in the future. Other project risks were identified, including project management, permitting and compliance, and financing, as well as technical issues such as long-term instrumentation, plume migration, and model development. Geological concerns like reservoir permeability, seal, and induced seismicity held relatively low risk. The regulatory framework for offshore storage in the U.S. and Canada may be covered by general legal/regulatory programs, but is not yet fully defined. Existing programs appear to restrict the transportation of carbon dioxide across national boundaries (e.g., Canada to U.S.) and its sub-seabed disposal in some circumstances. Our assessment suggests that developing specific and separate pilot projects will help to advance the technical feasibility and regulatory requirements in each country, and lessons learned from such activities may be transferable elsewhere around the globe.

42 ENGINEERING↗